Reinforced steel plastic geocell
Patent Information
- Application Number
- CN202522512498.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-26
- Publication Date
- 2026-10-16
- Estimated Expiration
- 2035-11-26
AI Technical Summary
[0004]本实用新型的目的在于提供一种增强型钢塑土工格室,以解决上述背景技术提出的现有基带围绕出的土工格室因基带的刚性不足,导致围绕出的土工格室强度不足,容易歪斜,相邻基带之间连接处容易松动,导致围绕出的土工格室断开,进而导致无法有效的固土的问题
本实用新型提供的一种增强型钢塑土工格室,通过在基带内部设置加强筋等部件,能够增加基带的强度,让基带组成的土工格室更为稳固,基带围绕出的固土区用于种植用于固土的植物,这样围绕出的土工格室能够起到固土的效果,避免水土流失,相邻的两个基带之间通过定位机构连接,定位机构可包括第一定位板、第一定位销,相邻两个基带之间通过第一定位板、第一定位销进行组装,连接较为方便且牢固,能够实现土工格室的快速成型,且连接较为紧固,围绕出的土工格室固土能力较强。
Smart Images

Figure CN224858823U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of geocell technology, specifically relating to an enhanced steel-plastic geocell. Background Technology
[0002] Geocells form flexible retaining walls in slope protection, slowing water erosion and restoring vegetation. They are characterized by convenient construction, availability of local materials, and reduced costs, making them suitable for areas with undulating terrain and exhibiting good durability.
[0003] Currently, a common type of geocell on the market consists of multiple interconnected, wavy-patterned geocells that create independent planting areas. However, these geocells with the aforementioned geocell design have the following drawbacks: First, the base strip lacks rigidity, resulting in insufficient strength of the surrounding geocells, making them prone to tilting. Secondly, the connections between adjacent base zones are prone to loosening, causing the surrounding geocells to break, which in turn leads to ineffective soil stabilization. Therefore, this application proposes a reinforced steel-plastic geocell. Utility Model Content
[0004] The purpose of this utility model is to provide an enhanced steel-plastic geocell to solve the problem mentioned in the background art that the existing geocells surrounded by the base strip have insufficient rigidity, resulting in insufficient strength of the surrounding geocells, easy tilting, easy loosening of the connection between adjacent base strips, causing the surrounding geocells to break apart, and thus failing to effectively stabilize the soil.
[0005] To achieve the above objectives, this utility model provides the following technical solution: an enhanced steel-plastic geocell, comprising a base strip, wherein the base strip comprises a plurality of sequentially connected recesses and protrusions, wherein a connecting area is provided at both the recesses and protrusions, and adjacent base strips are symmetrically distributed, and the connecting area is used to connect adjacent base strips; The two adjacent base zones surround the soil stabilization zone; A plurality of reinforcing ribs are inserted into the baseband, and the plurality of reinforcing ribs are inserted into the baseband at equal intervals. The connection area is provided with a positioning mechanism for connecting two adjacent basebands.
[0006] Preferably, the reinforcing rib can be made of steel bars or glass fibers.
[0007] Preferably, the positioning mechanism includes a first positioning plate, two of which are provided and the two first positioning plates press on two connected basebands. The first positioning plate is provided with a plurality of first positioning holes, three of which are vertical and evenly spaced.
[0008] Preferably, the baseband is provided with a first through hole that mates with the first positioning hole, and a first positioning pin is inserted into the first positioning plate. The first positioning pin is inserted into the two first positioning plates and penetrates the first through hole.
[0009] Preferably, the positioning mechanism includes a second positioning plate, two of which are provided and the two second positioning plates press on two connected basebands. The second positioning plate is provided with a plurality of second positioning holes, three of which are vertical and evenly spaced.
[0010] Preferably, the baseband is provided with a second through hole that mates with the second positioning hole, and a second positioning pin is inserted into the second positioning plate. The second positioning pin is inserted into the two second positioning plates and penetrates the second through hole.
[0011] Preferably, the top of the second positioning plate is provided with vertically distributed slots, and a pressure frame is provided at the second positioning plate. The pressure frame is inserted into two slots in the two second positioning plates and presses against the two basebands. The pressure frame is provided with a mounting hole aligned with one of the second through holes.
[0012] Preferably, the positioning mechanism includes a first pressure plate, a second pressure plate, and a pressure head for connecting the first pressure plate and the second pressure plate. The first pressure plate and the second pressure plate respectively abut against two base plates. A third positioning hole is provided in the first pressure plate, and a third through hole that mates with the third positioning hole is provided in the base plate. A positioning rod is provided at the second pressure plate, and the size of the positioning rod is smaller than the size of the second positioning hole.
[0013] Preferably, the positioning mechanism includes an adhesive area disposed between two mating basebands, and the adhesive area is filled with adhesive.
[0014] Preferably, the first positioning pin is replaced by a positioning bolt and a positioning nut, and two adjacent first positioning plates are connected by positioning bolts and positioning nuts.
[0015] Beneficial effects: This utility model provides an enhanced steel-plastic geocell. By setting reinforcing ribs and other components inside the base strip, the strength of the base strip is increased, making the geocell composed of the base strip more stable. The soil-stabilizing area around the base strip is used to plant plants for soil stabilization. In this way, the geocell can achieve the effect of soil stabilization and prevent soil erosion. Adjacent base strips are connected by a positioning mechanism, which may include a first positioning plate and a first positioning pin. The two adjacent base strips are assembled by the first positioning plate and the first positioning pin, which is convenient and firm. It can realize the rapid molding of geocells, and the connection is relatively tight. The geocell has a strong soil stabilization capacity. Attached Figure Description
[0016] Figure 1 This is a schematic diagram of the reinforced steel-plastic geocell structure in this utility model; Figure 2 This utility model Figure 1 Enlarged structural diagram at point A; Figure 3 This is a top view of the reinforced steel-plastic geocell in this utility model; Figure 4 This is a schematic diagram of the reinforced steel-plastic geocell structure in Embodiment 3 of this utility model; Figure 5 This utility model Figure 4 Enlarged structural diagram at point B; Figure 6 This is a schematic diagram of the reinforced steel-plastic geocell structure in Embodiment 4 of this utility model; Figure 7 This utility model Figure 6 A magnified structural diagram at point C.
[0017] Explanation of reference numerals in the attached figures: 1. Base strip; 101. Recessed part; 102. Protruding part; 103. Reinforcing rib; 104. Soil stabilization zone; 2. First positioning plate; 3. First positioning pin; 4. Second positioning plate; 5. Second positioning pin; 6. Pressure frame; 7. First pressure plate; 8. Positioning rod; 9. Pressure head; 10. Second pressure plate. Detailed Implementation
[0018] The specific embodiments of this utility model are described in detail below, but it should be understood that the protection scope of this utility model is not limited to the specific embodiments.
[0019] Example 1
[0020] like Figure 1 As shown, the present invention provides an enhanced steel-plastic geocell, including a base strip 1, which is wavy in shape. Specifically, the base strip 1 includes several recesses 101 and protrusions 102 connected in sequence. A connecting area is provided at both the recesses 101 and the protrusions 102. Two adjacent base strips 1 are symmetrically distributed, and the connecting area is used to connect two adjacent base strips 1.
[0021] Specifically, two adjacent base zones 1 surround the soil stabilization zone 104, which can be referred to as Figure 1 The protrusion 102 and two smoothly connected half-recesses 101 located on both sides of the protrusion 102 together surround half of the soil stabilization zone 104. The recesses 101 and two smoothly connected half-protrusions 102 located on both sides of the recesses 101 can also surround half of the soil stabilization zone 104. The two adjacent base zones 1 are symmetrically distributed, so that a complete soil stabilization zone 104 can be formed.
[0022] The base zone 1 is distributed in the soft soil treatment work during the construction of highways and railways. The soil stabilization zone 104 surrounded by the base zone 1 can be used to plant plants for soil stabilization. In this way, the geocells can play a role in soil stabilization and prevent soil erosion.
[0023] To increase the strength of the baseband 1, several reinforcing ribs 103 are inserted into the baseband 1. In a specific embodiment, the reinforcing ribs 103 can be steel bars, and in another embodiment, the reinforcing ribs 103 can be fibers, specifically glass fibers.
[0024] It should be noted that multiple reinforcing ribs 103 are inserted into the baseband 1 at equal intervals to improve the overall strength of the baseband 1.
[0025] Specifically, a positioning mechanism for connecting two adjacent basebands 1 is provided in the connection area.
[0026] Example 2
[0027] like Figure 1-3 As shown, based on Embodiment 1, the positioning mechanism includes a first positioning plate 2. There are two first positioning plates 2, and the two first positioning plates 2 press on two connected base bands 1. The first positioning plate 2 is provided with a plurality of first positioning holes, and there are three first positioning holes. The three first positioning holes are vertical and evenly spaced. The base band 1 is provided with a first through hole that cooperates with the first positioning hole. A first positioning pin 3 is inserted into the first positioning plate 2. The first positioning pin 3 is inserted into the two first positioning plates 2 and penetrates the first through hole.
[0028] Example 3
[0029] like Figure 4-5 As shown, based on Embodiment 1, the positioning mechanism includes a second positioning plate 4. There are two second positioning plates 4, and the two second positioning plates 4 press on the two connected base bands 1. The second positioning plate 4 is provided with a plurality of second positioning holes, and there are three second positioning holes. The three second positioning holes are vertical and evenly spaced. The base band 1 is provided with a second through hole that cooperates with the second positioning hole. A second positioning pin 5 is inserted into the second positioning plate 4. The second positioning pin 5 is inserted into the two second positioning plates 4 and penetrates the second through hole.
[0030] It should be added that the top of the second positioning plate 4 is provided with vertically distributed slots, and the second positioning plate 4 is provided with a pressure frame 6. The pressure frame 6 is inserted into two slots in the two second positioning plates 4, and the pressure frame 6 presses on the two basebands 1 that are abutting. The pressure frame 6 is provided with a mounting hole that is aligned with one of the second through holes.
[0031] Example 4
[0032] like Figure 6-7As shown, the positioning mechanism includes a first pressure plate 7, a second pressure plate 10, and a pressure head 9 for connecting the first pressure plate 7 and the second pressure plate 10. The first pressure plate 7 and the second pressure plate 10 respectively abut against two base belts 1. A third positioning hole is provided in the first pressure plate 7, and a third through hole that mates with the third positioning hole is provided in the base belt 1. A positioning rod 8 is provided at the second pressure plate 10, and the size of the positioning rod 8 is smaller than the size of the second positioning hole.
[0033] The pressure head 9 is integrated with the first pressure plate 7 and the second pressure plate 10, forming an elastic structure. The first pressure plate 7 is located on one side of one of the base bands 1, and the second pressure plate 10 is located on the other side of the base band 1. Under normal circumstances, the second pressure plate 10 presses on the first pressure plate 7, and the base band 1 fills the space between the first pressure plate 7 and the second pressure plate 10. The second pressure plate 10 exhibits a recoverable elastic deformation. Under the action of the elastic force, the second pressure plate 10 will compress the first pressure plate 7, thereby pressing down on the base band 1 and completing the fixing work between the two base bands 1. The size of the positioning rod 8 is smaller than the size of the second positioning hole because the second pressure plate 10 is tilted when inserted. If the second positioning hole is too small, the positioning rod 8 cannot enter.
[0034] Example 5
[0035] Based on Embodiment 2, the positioning mechanism includes an adhesive area, which is disposed between two bonded basebands 1. The adhesive area is filled with glue, and adjacent basebands 1 are connected by glue.
[0036] To prevent two adjacent basebands 1 from loosening during the bonding process, the first positioning plate 2 and the first positioning pin 3 in Embodiment 2 can be used together. It should be added that the first positioning pin 3 is replaced by a positioning bolt and a positioning nut, and the two adjacent first positioning plates 2 are connected by the positioning bolt and the positioning nut.
[0037] In summary, this utility model embodiment provides an enhanced steel-plastic geocell. The base strip 1 is distributed in the soft soil treatment work during the construction of highways and railways. The soil stabilization zone 104 surrounded by the base strip 1 can be used to plant plants for soil stabilization. The geocell thus surrounds the soil and can achieve the effect of soil stabilization, preventing soil erosion. Two adjacent base strips 1 are connected by a positioning mechanism, which may include a first positioning plate 2 and a first positioning pin 3. The two adjacent base strips 1 are assembled by the first positioning plate 2 and the first positioning pin 3, which is convenient and firm, and can realize the rapid molding of the geocell.
[0038] The above-disclosed embodiments are only a few specific examples of the present utility model. However, the embodiments of the present utility model are not limited thereto. Any changes that can be conceived by those skilled in the art should fall within the protection scope of the present utility model.
Claims
1. A reinforced steel-plastic geocell, comprising a base strip (1), characterized in that, The baseband (1) includes several recesses (101) and protrusions (102) connected in sequence. A connection area is provided at both the recesses (101) and the protrusions (102). Two adjacent basebands (1) are symmetrically distributed, and the connection area is used to connect two adjacent basebands (1). The two adjacent base zones (1) surround the soil consolidation zone (104); A plurality of reinforcing ribs (103) are inserted into the baseband (1), and the plurality of reinforcing ribs (103) are inserted into the baseband (1) at equal intervals; The connection area is provided with a positioning mechanism for connecting two adjacent basebands (1).
2. The reinforced steel-plastic geocell as described in claim 1, characterized in that, The reinforcing rib (103) can be made of steel bars or glass fibers.
3. The reinforced steel-plastic geocell as described in claim 1, characterized in that, The positioning mechanism includes a first positioning plate (2), there are two first positioning plates (2), and the two first positioning plates (2) press on the two connected basebands (1). The first positioning plate (2) is provided with a plurality of first positioning holes, and there are three first positioning holes, which are vertical and evenly spaced.
4. The reinforced steel-plastic geocell as described in claim 3, characterized in that, The baseband (1) is provided with a first through hole that mates with the first positioning hole. The first positioning pin (3) is inserted into the first positioning plate (2). The first positioning pin (3) is inserted into the two first positioning plates (2) and penetrates the first through hole.
5. The reinforced steel-plastic geocell as described in claim 1, characterized in that, The positioning mechanism includes a second positioning plate (4), two second positioning plates (4) are provided, and the two second positioning plates (4) press on the two connected basebands (1). The second positioning plate (4) is provided with a plurality of second positioning holes, and three second positioning holes are provided, which are vertical and evenly spaced.
6. The reinforced steel-plastic geocell as described in claim 5, characterized in that, The baseband (1) is provided with a second through hole that mates with the second positioning hole. A second positioning pin (5) is inserted into the second positioning plate (4). The second positioning pin (5) is inserted into the two second positioning plates (4) and penetrates the second through hole.
7. The reinforced steel-plastic geocell as described in claim 6, characterized in that, The second positioning plate (4) has vertically distributed slots on its top and a pressure frame (6) is provided at the second positioning plate (4). The pressure frame (6) is inserted into two slots in the two second positioning plates (4) and presses against the two basebands (1) that are abutting. The pressure frame (6) has a mounting hole that is aligned with one of the second through holes.
8. The reinforced steel-plastic geocell as described in claim 1, characterized in that, The positioning mechanism includes a first pressure plate (7), a second pressure plate (10), and a pressure head (9) for connecting the first pressure plate (7) and the second pressure plate (10). The first pressure plate (7) and the second pressure plate (10) respectively abut against two base strips (1). A third positioning hole is provided in the first pressure plate (7), and a third through hole that cooperates with the third positioning hole is provided in the base strip (1). A positioning rod (8) is provided at the second pressure plate (10), and the size of the positioning rod (8) is smaller than the size of the second positioning hole.
9. The reinforced steel-plastic geocell as described in claim 4, characterized in that, The positioning mechanism includes an adhesive area, which is disposed between two mating base strips (1) and is filled with adhesive.
10. The reinforced steel-plastic geocell as described in claim 9, characterized in that, The first positioning pin (3) is replaced by a positioning bolt and a positioning nut, and two adjacent first positioning plates (2) are connected by the positioning bolt and the positioning nut.