A scaffolding erection wall connecting adjusting device for nuclear power plant

CN224859185UActive Publication Date: 2026-10-16JIANGSU NUCLEAR POWER CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522327513.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-03
Publication Date
2026-10-16
Estimated Expiration
2035-11-03

AI Technical Summary

Technical Problem

[0004]本实用新型目的在于提供一种核电站用脚手架搭建连墙调节装置,解决现有核电站鼓网维护及维护过程中外墙存在的连墙件安装及墙面强度损伤等问题

Benefits of technology

[0012] Compared with existing technologies, the beneficial effects of this utility model are as follows: The wall tie adjustment device for nuclear power plant scaffolding provided by this utility model, through its structural design, eliminates the need for traditional wall ties to wait for concrete to dry before use, significantly shortening the maintenance cycle. Furthermore, the device features flexible adjustment components, making scaffolding erection more convenient and reducing the manpower and material resources required for wall tie installation, dismantling, and wall repair, thus significantly improving work efficiency. Finally, the adjustment device avoids multiple drilling and repairs to the wall, maintaining its integrity and strength and extending its service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224859185U_ABST
    Figure CN224859185U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of scaffold erecting wall connecting adjustment devices for nuclear power plant, it is related to mechanical adjusting device design technical field, for solving the problems such as wall connecting member installation and wall surface strength damage existing in outer wall in the maintenance of existing nuclear power plant drum net and maintenance process.The device includes: sliding adjustment part and connecting support part;Sliding adjustment part includes: longitudinal sliding groove and fixedly connected with its upper portion transverse sliding groove, the upper portion of transverse sliding groove is equipped with thickness adjustment arm, the inside of longitudinal sliding groove is equipped with length adjustment arm;The node connecting rod of connecting support part and the one end of transverse connecting rod are fixedly connected with length adjustment arm, and the other end is fixedly connected with longitudinal connecting rod;Inclined connecting rod both ends are fixedly connected with length adjustment arm and node connecting rod respectively.The device is adjusted by structure design, can realize transverse, longitudinal, can greatly shorten the maintenance cycle, improve work efficiency and prolong the service life of erecting wall.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of mechanical adjustment device design technology, specifically relating to a wall-connected adjustment device for scaffolding construction in nuclear power plants. Background Technology

[0002] The primary purpose of the seawater filtration system in a nuclear power plant is to filter seawater and prevent marine organisms and other impurities from entering the cooling system. During each major overhaul of the nuclear power unit, the filtration mesh requires cleaning, polishing, and other inspections and maintenance. Initially, to facilitate filtration maintenance, cantilevered scaffolding was erected above the filtration mesh, allowing for inspection and maintenance of each mesh section by rotating the mesh. Therefore, during periods when the filtration mesh is not in operation, holes need to be drilled in the concrete wall above the mesh to install wall ties to support the scaffolding. Due to the highly corrosive nature of seawater, these wall ties will weaken due to corrosion during the next overhaul cycle, failing to meet safety requirements and posing a safety hazard of breakage and foreign object leakage. Therefore, after the filtration mesh inspection and maintenance are completed, the civil engineering team must remove the wall ties. With each overhaul, the wall requires repeated drilling and repairs, significantly damaging the overall strength of the wall and affecting the safe operation of the nuclear power plant. Furthermore, each installation of wall ties requires a 48-hour drying period for the concrete before use, significantly extending the maintenance time for the marine engineering system.

[0003] Similar issues arise during the maintenance of external walls in the production phase of nuclear power plants. The erection of scaffolding at heights requires the installation of wall ties according to regulations. However, since the building is already in use, it's impossible to drill holes in the walls again to install these ties, and suitable installation locations are lacking. Forcing the installation of wall ties could damage the structural walls and potentially lead to safety risks during scaffolding erection. The installation and removal of wall ties, as well as the difficulties in scaffolding erection, during the maintenance of the existing nuclear power plant's ventilation system and external walls present multiple challenges, including extended construction periods, increased maintenance costs, and potential safety hazards. These problems not only affect the maintenance efficiency of nuclear power plants but may also threaten the safe operation of equipment. Utility Model Content

[0004] The purpose of this utility model is to provide a wall-connecting adjustment device for scaffolding in nuclear power plants, which solves the problems of wall-connecting component installation and wall strength damage during the maintenance of the existing nuclear power plant grid.

[0005] The technical solution adopted by this utility model to solve its technical problem is: a wall-connecting adjustment device for scaffolding in nuclear power plants, wherein the device includes: a sliding adjustment part and a connecting support part; the sliding adjustment part includes: a longitudinal sliding groove and a transverse sliding groove fixedly connected to its upper part, a thickness adjustment arm is installed above the transverse sliding groove, and a length adjustment arm is installed inside the longitudinal sliding groove; one end of the node connecting rod and the transverse connecting rod of the connecting support part are fixedly connected to the length adjustment arm, and the other end is fixedly connected to the longitudinal connecting rod; both ends of the oblique connecting rod are fixedly connected to the length adjustment arm and the node connecting rod, respectively.

[0006] The aforementioned scaffolding wall-connecting adjustment device for nuclear power plants includes a number of bolt holes at equal intervals on the thickness adjustment arm and the transverse sliding groove, which are connected by bolts.

[0007] In the aforementioned scaffolding-based wall-connecting adjustment device for nuclear power plants, the end of the transverse sliding groove is welded to the longitudinal sliding groove to form a whole.

[0008] The aforementioned scaffolding-based wall-connecting adjustment device for nuclear power plants includes a longitudinal sliding groove and a length adjustment arm with several bolt holes spaced at equal intervals, which are connected by bolts.

[0009] In the aforementioned scaffolding-based wall-connecting adjustment device for nuclear power plants, one end of the inclined connecting rod is connected to the upper part of the length adjusting arm, and the other end is connected to the end of the node connecting rod away from the length adjusting arm, both of which are fixedly connected by welding.

[0010] In the aforementioned scaffolding-based wall-connecting adjustment device for nuclear power plants, the node connecting rod and the transverse connecting rod are parallel to each other and are respectively welded to the middle and lower parts of the length adjustment arm.

[0011] The aforementioned scaffolding wall-connecting adjustment device for nuclear power plants has the following adjustment range: longitudinal adjustment range 2000mm-5000mm, and lateral adjustment range 300mm-800mm.

[0012] Compared with existing technologies, the beneficial effects of this utility model are as follows: The wall tie adjustment device for nuclear power plant scaffolding provided by this utility model, through its structural design, eliminates the need for traditional wall ties to wait for concrete to dry before use, significantly shortening the maintenance cycle. Furthermore, the device features flexible adjustment components, making scaffolding erection more convenient and reducing the manpower and material resources required for wall tie installation, dismantling, and wall repair, thus significantly improving work efficiency. Finally, the adjustment device avoids multiple drilling and repairs to the wall, maintaining its integrity and strength and extending its service life. Attached Figure Description

[0013] Figure 1 The diagram shown is a schematic representation of the overall structure of a scaffolding-based wall-connecting adjustment device for nuclear power plants according to this invention.

[0014] The following are the reference numerals: 1. Thickness adjustment arm; 2. Transverse sliding groove; 3. Longitudinal sliding groove; 4. Length adjustment arm; 5. Angled connecting rod; 6. Longitudinal connecting rod; 7. Node connecting rod; 8. Transverse connecting rod. Detailed Implementation

[0015] To address the problems of wall tie installation and wall strength damage during the maintenance of existing nuclear power plant grids, this utility model provides a wall tie adjustment device for use in nuclear power plants, constructed using scaffolding. Figure 1 As shown, the device includes a sliding adjustment part and a connecting support part; the sliding adjustment part includes a longitudinal sliding groove 3 and a transverse sliding groove 2 fixedly connected to its upper part by welding, and a thickness adjustment arm 1 is installed above the transverse sliding groove 2. The thickness adjustment arm 1 and the transverse sliding groove 2 are provided with a number of bolt holes at equal intervals, and the two are connected by bolts to realize the length adjustment in the transverse direction to adapt to walls of different thicknesses.

[0016] The longitudinal sliding groove 3 is equipped with a length adjustment arm 4. The longitudinal sliding groove 3 and the length adjustment arm 4 are provided with several bolt holes at equal intervals. The two are connected by bolts to realize the adjustment in the longitudinal height direction, so as to meet the construction needs of walls of different heights.

[0017] The connecting support includes: a synergistic diagonal connecting rod 5, a longitudinal connecting rod 6, a node connecting rod 7, and a transverse connecting rod 8. One end of the node connecting rod 7 and the transverse connecting rod 8 is fixedly connected to the length adjusting arm 4, and the other end is fixedly connected to the longitudinal connecting rod 6. The node connecting rod 7 and the transverse connecting rod 8 are parallel to each other and are respectively welded to the middle and lower parts of the length adjusting arm 4. The node connecting rod 7 and the transverse connecting rod 8 can be used as scaffold wall ties. Both ends of the diagonal connecting rod 5 are fixedly connected to the length adjusting arm 4 and the node connecting rod 7, respectively. One end of the diagonal connecting rod 5 is connected to the upper part of the length adjusting arm 4, and the other end is connected to the end of the node connecting rod 7 away from the length adjusting arm 4; the connection is fixedly made by welding.

[0018] All components of the device are made of metal, preferably carbon steel. The spacing of the bolt holes on the thickness adjusting arm 1, the transverse sliding groove 2, the longitudinal sliding groove 3, and the length adjusting arm 4 is preferably 50mm, and can be adjusted according to different usage scenarios. Furthermore, no bolt holes are provided on the upper part of the longitudinal sliding groove 3. The device is attached to the wall where scaffolding needs to be erected by combining the thickness adjusting arm 1 and the transverse sliding groove 2. The longitudinal adjustment range of the device is 2000mm-5000mm, and the transverse adjustment range is 300mm-800mm. The length of the device components can be increased or decreased according to actual needs.

[0019] It should be noted that the combination of the technical features in the embodiments of this utility model is not limited to the combination methods recorded in the embodiments of this utility model or the combination methods recorded in specific embodiments. All technical features recorded in this utility model can be freely combined or combined in any way, unless there is a contradiction between them.

[0020] The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications or equivalent substitutions made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.

Claims

1. A scaffolding-based wall-connecting adjustment device for nuclear power plants, characterized in that, The device includes a sliding adjustment part and a connecting support part; the sliding adjustment part includes a longitudinal sliding groove (3) and a transverse sliding groove (2) fixedly connected to its upper part, a thickness adjustment arm (1) is installed above the transverse sliding groove (2), and a length adjustment arm (4) is installed inside the longitudinal sliding groove (3); one end of the node connecting rod (7) and the transverse connecting rod (8) of the connecting support part are fixedly connected to the length adjustment arm (4), and the other end is fixedly connected to the longitudinal connecting rod (6); the two ends of the oblique connecting rod (5) are fixedly connected to the length adjustment arm (4) and the node connecting rod (7) respectively.

2. The wall-connecting adjustment device for scaffolding construction in a nuclear power plant according to claim 1, characterized in that, The thickness adjustment arm (1) and the transverse sliding groove (2) are provided with several bolt holes at equal intervals, and the two are connected by bolts.

3. A wall-connecting adjustment device for scaffolding construction in a nuclear power plant according to claim 1, characterized in that, The end of the transverse sliding groove (2) is welded to the longitudinal sliding groove (3) to form a whole.

4. A wall-connecting adjustment device for scaffolding construction in a nuclear power plant according to claim 1, characterized in that, The longitudinal sliding groove (3) and the length adjusting arm (4) are provided with several bolt holes at equal intervals, and the two are connected by bolts.

5. A wall-connecting adjustment device for scaffolding construction in a nuclear power plant according to claim 1, characterized in that, One end of the inclined connecting rod (5) is connected to the upper part of the length adjusting arm (4), and the other end is connected to the end of the node connecting rod (7) away from the length adjusting arm (4), both of which are fixedly connected by welding.

6. A wall-connecting adjustment device for scaffolding construction in a nuclear power plant according to claim 1, characterized in that, The node connecting rod (7) and the transverse connecting rod (8) are parallel to each other and are fixed to the middle and lower parts of the length adjusting arm (4) by welding, respectively.

7. A wall-connecting adjustment device for scaffolding construction in a nuclear power plant according to claim 1, characterized in that, The adjustment range of the sliding adjustment part is: longitudinal adjustment range 2000mm-5000mm, and lateral adjustment range 300mm-800mm.