Precise positioning mechanism for embedded foundation bolt in reserved hole of square concrete pile cap

CN224859248UActive Publication Date: 2026-10-16SHANXI ELECTRIC POWER CONSTR CO LTD (CEEC)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522520806.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-27
Publication Date
2026-10-16
Estimated Expiration
2035-11-27

AI Technical Summary

Benefits of technology

[0007] This utility model allows for the adjustment of the positions of the upper and lower steel plate crossarms by moving them forward, backward, left, and right according to the distances and positions specified in the drawings. This ensures that the four anchor bolts are precisely positioned in the pre-embedded space, improving the construction efficiency of electrical installation and the efficiency of secondary grouting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224859248U_ABST
    Figure CN224859248U_ABST
Patent Text Reader

Abstract

The utility model discloses a square concrete bearing platform reserved hole middle embedded anchor bolt's accurate positioning mechanism has realized the accurate positioning of anchor bolt in reserved hole, the top of square foundation bearing platform (1) is sleeved with angle steel square frame (6), is provided with first longitudinal long strip through -hole (7) and second longitudinal long strip through -hole (8) respectively on the left frame of angle steel square frame (6), and the upper first longitudinal long strip through -hole (7) is movably provided with upper steel plate cross arm (11) between the upper third longitudinal long strip through -hole (9), is provided with first anchor bolt (12) and second anchor bolt (13) respectively on the upper steel plate cross arm, and the lower extreme of first anchor bolt is arranged in first reserved hole (2), and the lower extreme of second anchor bolt (13) is arranged in second reserved hole (3), upper left transverse long strip through -hole (14) and first longitudinal long strip through -hole cross -link together, have improved the construction efficiency of electrical installation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the foundation for power equipment installation, and in particular to a positioning mechanism for pre-embedding anchor bolts in reserved holes of a square concrete foundation base for electrical equipment installation. Background Technology

[0002] In the fields of thermal power, wind power, photovoltaic power, and power transmission and distribution, electrical equipment is installed on equipment foundations. These foundations are typically cast-in-place concrete foundations with pre-embedded anchor bolts. The electrical equipment is then installed on these foundations using these anchor bolts. During the pouring of the concrete foundation, holes for installing the anchor bolts (i.e., pre-drilled holes) are pre-drilled, and the cast-in-place concrete foundation cap is completed. When the electrical equipment is installed on the foundation cap, the anchor bolts are positioned in the pre-drilled holes, and then cement mortar is poured into the pre-drilled holes to fix the anchor bolts. This method is called the secondary grouting fixing method for anchor bolts. Many electrical equipment require high precision in terms of the density and level of the contact surface between the foundation cap and the equipment. To meet these requirements, the secondary grouting fixing method is generally used to pre-embed the anchor bolts. However, accurately positioning the anchor bolts in the pre-drilled holes and improving the construction efficiency of the secondary grouting has become a problem that needs to be solved on-site. Summary of the Invention

[0003] This utility model provides a precise positioning mechanism for anchor bolts embedded in pre-drilled holes in square concrete foundations, which realizes the precise positioning of anchor bolts in pre-drilled holes and improves the construction efficiency of secondary grouting.

[0004] This utility model solves the above technical problems through the following technical solution: A precise positioning mechanism for pre-embedded anchor bolts in pre-drilled holes in a square concrete foundation includes a cast-in-place square foundation. A first, second, third, and fourth pre-drilled holes are respectively provided on the top surface of the square foundation. An angle steel square frame is fitted onto the top of the square foundation. A first and second longitudinal elongated through holes are respectively provided on the left side of the angle steel square frame, and a third and fourth longitudinal elongated through hole are respectively provided on the right side of the angle steel square frame. The mechanism is described in the first longitudinal elongated through hole. An upper steel plate crossbeam is movably installed between the square and the third longitudinal elongated through hole. A first anchor bolt and a second anchor bolt are respectively installed on the upper steel plate crossbeam. The lower end of the first anchor bolt is set in the first reserved hole, and the lower end of the second anchor bolt is set in the second reserved hole. An upper left transverse elongated through hole is provided at the left end of the upper steel plate crossbeam, and an upper right transverse elongated through hole is provided at the right end of the upper steel plate crossbeam. The upper left transverse elongated through hole is cross-connected with the first longitudinal elongated through hole, and the upper right transverse elongated through hole is cross-connected with the third longitudinal elongated through hole.

[0005] An upper left fixing bolt is inserted between the upper left transverse elongated through hole and the first longitudinal elongated through hole, and an upper right fixing bolt is inserted between the upper right transverse elongated through hole and the third longitudinal elongated through hole; an upper left through hole is provided on the left side of the upper steel plate crossbeam, and an upper right through hole is provided on the right side of the upper steel plate crossbeam. The first anchor bolt is inserted into the upper left through hole, and the second anchor bolt is inserted into the upper right through hole.

[0006] A first lower fixing nut is provided between the bottom surface of the upper steel plate crossbeam and the first anchor bolt; a second upper fixing nut is provided between the top surface of the upper steel plate crossbeam and the first anchor bolt; a third lower fixing nut is provided between the bottom surface of the upper steel plate crossbeam and the second anchor bolt; and a fourth upper fixing nut is provided between the top surface of the upper steel plate crossbeam and the second anchor bolt.

[0007] This utility model allows for the adjustment of the positions of the upper and lower steel plate crossarms by moving them forward, backward, left, and right according to the distances and positions specified in the drawings. This ensures that the four anchor bolts are precisely positioned in the pre-embedded space, improving the construction efficiency of electrical installation and the efficiency of secondary grouting. Attached Figure Description

[0008] Figure 1 This is a schematic diagram of the structure of this utility model; Figure 2 This is a schematic diagram of the structure of this utility model from a top view. Figure 3 This is a structural schematic diagram of the present invention in the rear view direction. Detailed Implementation

[0009] The present invention will now be described in detail with reference to the accompanying drawings: A precise positioning mechanism for pre-embedded anchor bolts in pre-drilled holes in a square concrete foundation includes a cast-in-place square foundation 1. A first pre-drilled hole 2, a second pre-drilled hole 3, a third pre-drilled hole 4, and a fourth pre-drilled hole 5 are respectively provided on the top surface of the square foundation 1. An angle steel square frame 6 is fitted onto the top of the square foundation 1, with each side of the angle steel square frame 6 engaging with the edge of the top surface of the square foundation 1 to position the angle steel square frame 6. A first longitudinal elongated through hole 7 and a second longitudinal elongated through hole 8 are respectively provided on the left side of the angle steel square frame 6, and a third longitudinal elongated through hole 9 and a fourth longitudinal elongated through hole 10 are respectively provided on the right side of the angle steel square frame 6. An upper steel frame is movably arranged between the first longitudinal elongated through hole 7 and the third longitudinal elongated through hole 9. The upper steel plate crossarm 11 is provided with a first anchor bolt 12 and a second anchor bolt 13. The lower end of the first anchor bolt 12 is set in the first reserved hole 2, and the lower end of the second anchor bolt 13 is set in the second reserved hole 3. An upper left transverse elongated through hole 14 is provided at the left end of the upper steel plate crossarm 11, and an upper right transverse elongated through hole 15 is provided at the right end of the upper steel plate crossarm 11. The upper left transverse elongated through hole 14 is cross-connected with the first longitudinal elongated through hole 7, and the upper right transverse elongated through hole 15 is cross-connected with the third longitudinal elongated through hole 9. The distance between the first anchor bolt 12 and the second anchor bolt 13 can be accurately determined according to the drawings. By moving the upper steel plate crossarm 11 left and right and back and forth, the first anchor bolt 12 and the second anchor bolt 13 are accurately positioned in the reserved holes.

[0010] An upper left fixing bolt 16 is inserted between the upper left transverse elongated through hole 14 and the first longitudinal elongated through hole 7. An upper right fixing bolt 17 is inserted between the upper right transverse elongated through hole 15 and the third longitudinal elongated through hole 9. An upper left through hole 18 is provided on the left side of the upper steel plate crossbeam 11, and an upper right through hole 19 is provided on the right side of the upper steel plate crossbeam 11. A first anchor bolt 12 is inserted into the upper left through hole 18, and a second anchor bolt 13 is inserted into the upper right through hole 19. After positioning is completed, the position of the upper steel plate crossbeam 11 can be fixed by the above two fixing bolts. A first lower fixing nut 20 is provided between the bottom surface of the upper steel plate crossbeam 11 and the first anchor bolt 12; a second upper fixing nut 21 is provided between the top surface of the upper steel plate crossbeam 11 and the first anchor bolt 12; a third lower fixing nut 22 is provided between the bottom surface of the upper steel plate crossbeam 11 and the second anchor bolt 13; and a fourth upper fixing nut 23 is provided between the top surface of the upper steel plate crossbeam 11 and the second anchor bolt 13. By tightening the upper and lower fixing nuts, the anchor bolt is vertically installed in the reserved hole.

[0011] The method for determining the position of the lower steel plate crossbeam is the same as the method for determining the position of the upper steel plate crossbeam 11. After the four anchor bolts are positioned, cement mortar is poured into the reserved holes. After the poured cement mortar has set, the second upper fixing nut 21 and the fourth upper fixing nut 23 are removed. Then the entire angle steel square frame 6 is moved vertically upward, and the positioning mold is removed from the square foundation 1 for positioning the next foundation.

Claims

1. A precise positioning mechanism for pre-embedded anchor bolts in reserved holes of a square concrete foundation, comprising a cast-in-place square foundation (1), wherein a first reserved hole (2), a second reserved hole (3), a third reserved hole (4), and a fourth reserved hole (5) are respectively provided on the top surface of the square foundation (1), characterized in that, An angle steel square frame (6) is fitted onto the top of the square foundation platform (1). A first longitudinal elongated through hole (7) and a second longitudinal elongated through hole (8) are respectively provided on the left side of the angle steel square frame (6). A third longitudinal elongated through hole (9) and a fourth longitudinal elongated through hole (10) are respectively provided on the right side of the angle steel square frame (6). An upper steel plate crossbeam (11) is movably arranged between the first longitudinal elongated through hole (7) and the third longitudinal elongated through hole (9). A first anchor bolt (12) and a second anchor bolt (10) are respectively provided on the upper steel plate crossbeam (11). Anchor bolt (13), the lower end of the first anchor bolt (12) is set in the first reserved hole (2), and the lower end of the second anchor bolt (13) is set in the second reserved hole (3); an upper left transverse long through hole (14) is provided at the left end of the upper steel plate crossbeam (11), and an upper right transverse long through hole (15) is provided at the right end of the upper steel plate crossbeam (11). The upper left transverse long through hole (14) is cross-connected with the first longitudinal long through hole (7), and the upper right transverse long through hole (15) is cross-connected with the third longitudinal long through hole (9).

2. The precise positioning mechanism for pre-embedded anchor bolts in reserved holes of a square concrete foundation according to claim 1, characterized in that, An upper left fixing bolt (16) is inserted between the upper left transverse long through hole (14) and the first longitudinal long through hole (7), and an upper right fixing bolt (17) is inserted between the upper right transverse long through hole (15) and the third longitudinal long through hole (9); an upper left through hole (18) is provided on the left side of the upper steel plate crossbeam (11), and an upper right through hole (19) is provided on the right side of the upper steel plate crossbeam (11). The first anchor bolt (12) is inserted in the upper left through hole (18), and the second anchor bolt (13) is inserted in the upper right through hole (19).

3. A precise positioning mechanism for pre-embedded anchor bolts in reserved holes of a square concrete foundation according to claim 1 or 2, characterized in that, A first lower fixing nut (20) is provided between the bottom surface of the upper steel plate crossbeam (11) and the first anchor bolt (12); a second upper fixing nut (21) is provided between the top surface of the upper steel plate crossbeam (11) and the first anchor bolt (12); a third lower fixing nut (22) is provided between the bottom surface of the upper steel plate crossbeam (11) and the second anchor bolt (13); and a fourth upper fixing nut (23) is provided between the top surface of the upper steel plate crossbeam (11) and the second anchor bolt (13).