Concrete pouring form positioning mechanism for high-speed magnetic suspension flywheel device installation well

CN224859249UActive Publication Date: 2026-10-16SHANXI ELECTRIC POWER CONSTR CO LTD (CEEC)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522524961.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-27
Publication Date
2026-10-16
Estimated Expiration
2035-11-27

AI Technical Summary

Technical Problem

[0003]本实用新型提供了一种高速磁悬浮飞轮设备安装井的混凝土浇筑模板定位机构,解决了如何固定飞轮设备的混凝土浇筑模板体系和如何克服井底的钢质真空泵箱在混凝土浇筑中上浮的技术问题

Benefits of technology

[0008] This utility model uses an X-shaped horizontal strut frame to suspend and fix the suspended Ω-shaped irregular steel template, and uses a vertical support rod to overcome the problem of the pre-embedded steel vacuum pump box floating. It realizes the one-time casting of the pre-embedded steel vacuum pump box and the flywheel equipment foundation in the flywheel installation well. The template positioning system is safe and reliable, and easy to install and disassemble.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224859249U_ABST
    Figure CN224859249U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of concrete pouring formwork positioning mechanisms of high-speed magnetic suspension flywheel equipment installation well, solve how to fix the concrete pouring formwork system of flywheel equipment and how to overcome the problem of steel vacuum pump box in well bottom in concrete pouring in floating;Well body side wall concrete pouring outer formwork (3) is provided with outside steel reinforcement framework (4);Bucket-shaped embedded steel vacuum pump box (5) is provided with on the left end of cushion (2) in steel reinforcement framework (4) inside, embedded steel vacuum pump box (5) right side's cushion (2) is tied with the concrete base inner steel reinforcement framework (6) of installation flywheel equipment, the special-shaped steel formwork (7) of omega is provided with on concrete base inner steel reinforcement framework (6) top, X horizontal support frame (8) is connected on the special-shaped steel formwork (7) top of omega, four outside ends of X horizontal support frame, all top and meet on the inside vertical surface of well body side wall concrete pouring outer formwork (3).
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to a cast-in-place high-speed magnetic levitation flywheel equipment installation well, and particularly to a concrete pouring formwork positioning mechanism for a high-speed magnetic levitation flywheel equipment installation well. Background Technology

[0002] The 30MW / 6MWh energy storage project consists of twelve flywheel energy storage frequency regulation units (2.5MW / 0.5MWh). Each flywheel energy storage frequency regulation unit includes ten high-speed magnetic levitation flywheels (250kW / 50kWh), a flywheel auxiliary system, a flywheel drive and control system, and a prefabricated boost converter integrated unit. Every six flywheel energy storage frequency regulation units are connected to the 35kV power distribution device of the energy storage power station via cables, with two aggregation units. After aggregation, the power is supplied through a 40MVA 110kV / 35kV power distribution line. After the transformer steps up the voltage, the signal is sent to the substation, which is equipped with a 110kV step-up substation, an electrical control building, a cooling tower, and other facilities. In this system, the high-speed magnetic levitation flywheel is installed in a flywheel well, which is constructed using cast-in-place concrete. The foundation bottom elevation of the flywheel well is -5.3 meters, the excavation depth of the pit is 4.1 meters, and the bearing layer of the flywheel well foundation is the third layer of silty clay. This layer has a bearing capacity characteristic value of 180 kPa and is not collapsible, making it suitable as a bearing layer. After the flywheel well is excavated, in... First, the reinforcing steel frame of the well wall is tied on the foundation pad, and then the steel formwork on the outside of the well wall is erected. Since the flywheel well contains the vacuum pump box and the high-speed magnetic levitation flywheel equipment installation foundation, a sealed steel vacuum pump box needs to be fixed and installed at the bottom of the well, and a concrete reinforcing steel frame for the high-speed magnetic levitation flywheel equipment base needs to be erected. Then, Ω-shaped special-shaped steel formwork is spliced ​​on the outside of the reinforcing steel frame, and finally, concrete is poured in one go, thus forming the flywheel well wall and the Ω-shaped concrete base of the high-speed levitation flywheel equipment. The vacuum pump box is then embedded in the poured concrete foundation. In the above process, since the formwork of the high-speed magnetic levitation flywheel foundation is suspended in the space above the bottom of the well, how to fix the formwork system becomes a problem in the concrete pouring construction. In addition, the steel vacuum pump box set at the bottom of the well is prone to floating during concrete pouring, which is the second problem that needs to be solved. Furthermore, since the high-speed magnetic levitation flywheel equipment is installed on the base by pre-embedded bolts, how to position and connect the pre-embedded bolts of the high-speed magnetic levitation flywheel equipment is the third problem that needs to be solved. Summary of the Invention

[0003] This utility model provides a concrete pouring template positioning mechanism for the installation well of a high-speed magnetic levitation flywheel device, which solves the technical problems of how to fix the concrete pouring template system of the flywheel device and how to overcome the floating of the steel vacuum pump box at the bottom of the well during concrete pouring.

[0004] This utility model solves the above technical problems through the following technical solution: A concrete pouring template positioning mechanism for a high-speed magnetic levitation flywheel equipment installation well includes a foundation pit, a cushion layer at the bottom of the pit, a steel reinforcement skeleton tied to the cushion layer inside the well body sidewall, and an outer formwork for the concrete pouring of the well body sidewall outside the steel reinforcement skeleton. A barrel-shaped embedded steel vacuum pump box is installed at the left end of the cushion layer inside the steel reinforcement skeleton. A steel reinforcement skeleton inside the concrete base for installing the flywheel equipment is tied to the cushion layer to the right of the embedded steel vacuum pump box. An Ω-shaped irregular steel template is installed at the top of the steel reinforcement skeleton inside the concrete base. An X-shaped horizontal support frame is connected to the top of the Ω-shaped irregular steel template. The four outer ends of the X-shaped horizontal support frame are all abutted against the inner vertical surface of the outer formwork for the concrete pouring of the well body sidewall. A top H-shaped steel beam is installed at the top of the outer formwork for the concrete pouring of the well body sidewall, and a vertical top rod is installed between the top H-shaped steel beam and the bottom plate inside the embedded steel vacuum pump box.

[0005] A positioning arc plate with pre-embedded bolts is set at the top of the Ω-shaped irregular steel template. The positioning arc plate with pre-embedded bolts is fixedly connected to the X-shaped horizontal support frame.

[0006] An arc-shaped block is installed at the outer end of the X-shaped horizontal support frame. The X-shaped horizontal support frame is supported on the inner side of the concrete pouring formwork of the well body sidewall through the arc-shaped block. An upper support block is installed at the top of the vertical support rod, and a lower support block is installed at the bottom of the vertical support rod. The vertical support rod is supported on the top H-shaped steel beam through the upper support block, and the vertical support rod is supported on the bottom plate of the pre-embedded steel vacuum pump box through the lower support block.

[0007] Inside the Ω-shaped special-shaped steel template, below the Ω-shaped special-shaped steel template, and outside the pre-embedded steel vacuum pump box, the lower part of the flywheel installation well concrete is poured in one go, pre-embedded the pre-embedded steel vacuum pump box, and form a concrete base with an Ω-shaped concrete step for installing the flywheel equipment.

[0008] This utility model uses an X-shaped horizontal strut frame to suspend and fix the suspended Ω-shaped irregular steel template, and uses a vertical support rod to overcome the problem of the pre-embedded steel vacuum pump box floating. It realizes the one-time casting of the pre-embedded steel vacuum pump box and the flywheel equipment foundation in the flywheel installation well. The template positioning system is safe and reliable, and easy to install and disassemble. Attached Figure Description

[0009] Figure 1 This is a three-dimensional structural schematic diagram of the present invention; Figure 2 yes Figure 1 BB-direction sectional view. Detailed Implementation

[0010] The present invention will now be described in detail with reference to the accompanying drawings: A concrete pouring formwork positioning mechanism for a high-speed magnetic levitation flywheel equipment installation well includes a foundation pit 1. A cushion layer 2 is provided at the bottom of the foundation pit 1. A steel reinforcement skeleton 4, arranged in a ring column shape, is tied to the cushion layer 2. An outer formwork 3 for concrete pouring of the well sidewall is provided outside the steel reinforcement skeleton 4. A barrel-shaped pre-embedded steel vacuum pump box 5 is provided at the left end of the cushion layer 2 inside the steel reinforcement skeleton 4. A steel reinforcement skeleton 6, inside the concrete base for installing the flywheel equipment, is tied to the cushion layer 2 on the right side of the pre-embedded steel vacuum pump box 5. An Ω-shaped special-shaped steel formwork 7 is provided at the top of the steel reinforcement skeleton 6 inside the concrete base. A steel reinforcement skeleton 7 is provided inside the Ω-shaped concrete step within the Ω-shaped special-shaped steel formwork 7. The framework consists of an Ω-shaped steel formwork 7 topped with an X-shaped horizontal support frame 8. The X-shaped horizontal support frame 8 is positioned above the opening of the pre-embedded steel vacuum pump box 5. The four outer ends of the X-shaped horizontal support frame 8 are all abutted against the inner vertical surface of the concrete pouring outer formwork 3 of the well body sidewall. A top H-shaped steel beam 15 is installed at the top of the concrete pouring outer formwork 3 of the well body sidewall. The top H-shaped steel beam 15 is fixedly connected to the concrete pouring outer formwork 3 of the well body sidewall by connecting bolts. A vertical top rod 12 is installed between the top H-shaped steel beam 15 and the bottom plate inside the pre-embedded steel vacuum pump box 5. Two vertical top rods 12 can be installed to prevent the pre-embedded steel vacuum pump box 5 from floating during concrete pouring.

[0011] A positioning arc plate 10 with pre-embedded bolts is set at the top of the Ω-shaped special steel template 7. Pre-embedded bolts 11 are arranged on the positioning arc plate 10. The positioning arc plate 10 with pre-embedded bolts is fixedly connected to the X horizontal support frame 8. The positioning arc plate 10 with pre-embedded bolts can be positioned and fixed by the X horizontal support frame 8, so that after the subsequent concrete pouring, when the flywheel equipment is installed, the flange on the flywheel equipment is accurately positioned and connected to the pre-embedded bolts 11 on the positioning arc plate 10.

[0012] An arc-shaped block 9 is provided at the outer end of the X-horizontal support frame 8. The X-horizontal support frame 8 is supported by the arc-shaped block 9 on the inner side of the concrete pouring outer formwork 3 of the well body sidewall. An upper top block 14 is provided at the top of the vertical top rod 12, and a lower top block 13 is provided at the bottom of the vertical top rod 12. The vertical top rod 12 is supported by the upper top block 14 on the top H-shaped steel beam 15, and the vertical top rod 12 is supported by the lower top block 13 on the bottom plate inside the pre-embedded steel vacuum pump box 5. The top block setting further ensures the strength of the top connection force.

[0013] Inside the Ω-shaped special-shaped steel template 7, below the Ω-shaped special-shaped steel template 7, and outside the pre-embedded steel vacuum pump box 5, the lower part of the flywheel installation well concrete is poured in one go, pre-embedding the pre-embedded steel vacuum pump box 5, and forming a concrete base for the flywheel equipment with an Ω-shaped concrete step; the concrete pouring of the well wall of the flywheel equipment installation well above the concrete base of the flywheel equipment with an Ω-shaped concrete step is completed by secondary pouring. After the concrete of the concrete base of the flywheel equipment with an Ω-shaped concrete step has initially set, the vertical top rod 12, the X horizontal support frame 8 and the Ω-shaped special-shaped steel template 7 are removed first, and then the secondary pouring concrete is poured.

Claims

1. A concrete pouring formwork positioning mechanism for a high-speed magnetic levitation flywheel equipment installation well, comprising a foundation pit (1), wherein a cushion layer (2) is provided at the bottom of the foundation pit (1), characterized in that, A steel reinforcement cage (4) is tied to the inner wall of the well body on the foundation layer (2), and an outer formwork (3) for concrete pouring of the well body sidewall is set on the outside of the steel reinforcement cage (4); a barrel-shaped pre-embedded steel vacuum pump box (5) is set on the left end of the foundation layer (2) inside the steel reinforcement cage (4), and a steel reinforcement cage (6) is tied to the inner wall of the concrete base for installing the flywheel equipment on the foundation layer (2) to the right of the pre-embedded steel vacuum pump box (5). A steel reinforcement cage (6) is set at the top of the steel reinforcement cage (6) in the concrete base. The Ω-shaped special-shaped steel formwork (7) is connected to the top of the Ω-shaped special-shaped steel formwork (7) with an X horizontal support frame (8). The four outer ends of the X horizontal support frame (8) are all attached to the inner vertical surface of the concrete pouring outer formwork (3) of the well body side wall. A top H-shaped steel beam (15) is set at the top of the concrete pouring outer formwork (3) of the well body side wall. A vertical top rod (12) is set between the top H-shaped steel beam (15) and the bottom plate of the pre-embedded steel vacuum pump box (5).

2. The concrete pouring formwork positioning mechanism for a high-speed magnetic levitation flywheel equipment installation well according to claim 1, characterized in that, An Ω-shaped irregular steel template (7) is provided with a positioning arc plate (10) with pre-embedded bolts at the top. Pre-embedded bolts (11) are arranged on the positioning arc plate (10). The positioning arc plate (10) with pre-embedded bolts is fixedly connected to the X horizontal support frame (8).

3. The concrete pouring formwork positioning mechanism for a high-speed magnetic levitation flywheel equipment installation well according to claim 1 or 2, characterized in that, An arc-shaped block (9) is provided at the outer end of the X horizontal support frame (8). The X horizontal support frame (8) is abutted on the inner side of the concrete pouring formwork (3) of the well body sidewall through the arc-shaped block (9). An upper top block (14) is provided at the top of the vertical top rod (12), and a lower top block (13) is provided at the bottom of the vertical top rod (12). The vertical top rod (12) is abutted on the top H-shaped steel beam (15) through the upper top block (14), and the vertical top rod (12) is abutted on the bottom plate of the pre-embedded steel vacuum pump box (5) through the lower top block (13).

4. The concrete pouring formwork positioning mechanism for a high-speed magnetic levitation flywheel equipment installation well according to claim 3, characterized in that, Inside the Ω-shaped special-shaped steel template (7), below the Ω-shaped special-shaped steel template (7) and outside the pre-embedded steel vacuum pump box (5), the lower part of the flywheel installation well concrete is poured in one go, the pre-embedded steel vacuum pump box (5) is pre-embedded, and a concrete base with an Ω-shaped concrete step is formed for the installation of the flywheel equipment.