A kind of air compressor subsequent pipeline dewatering structure for mixing station

CN224865187UActive Publication Date: 2026-10-20WEIHAI GUANHONG COMMERCIAL CONCRETE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522483591.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-24
Publication Date
2026-10-20
Estimated Expiration
2035-11-24

AI Technical Summary

Technical Problem

[0003]随着低温环境下压缩空气中冷凝水量的增加,会引发一系列问题,一方面,液态水在管道内积聚,会导致管道内壁锈蚀,缩短管道的使用寿命,同时锈蚀产生的杂质可能随压缩空气进入气动设备内部,造成设备磨损、卡滞,影响设备的正常运行精度和稳定性,增加设备的维护成本和故障率;另一方面,在环境温度低于冰点时,积聚的液态水会结冰,极易造成管道堵塞,导致压缩空气无法正常输送至气动设备,严重时会使搅拌站的生产中断,影响工程进度;

Benefits of technology

[0016]本实用新型通过在干燥机前增设预先除水结构,可先去除压缩空气中大部分液态水,使其成为水蒸气,再使其进入至干燥机内,显著提升后续干燥机对气体的干燥程度,有效避免冬季低温时管道积水结冰及设备锈蚀、卡滞问题,降低维护成本,保障搅拌站气动设备稳定运行,且适配冬夏工况差异,实用性强。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224865187U_ABST
    Figure CN224865187U_ABST
Patent Text Reader

Abstract

The utility model belongs to air compressor water removal technical field, concretely relates to a kind of air compressor subsequent pipeline water removal structure for mixing station, including air compressor, the port of air compressor is provided with first pipeline, second pipeline and third pipeline are connected on first pipeline, and drying machine is installed between second pipeline and third pipeline, and second pipeline outside is provided with pre-water removal structure, first solenoid valve is installed between second pipeline and third pipeline on first pipeline, second solenoid valve and third solenoid valve are respectively installed on second pipeline and third pipeline, and pre-water removal structure includes inside plate, inside plate is attached and set on the outside of second pipeline, and multiple heating fins are attached and installed on the outside of inside plate.The utility model can significantly improve the drying degree of subsequent drying machine to gas, effectively avoid pipeline water icing and equipment corrosion, stagnation problem when low temperature in winter, reduce maintenance cost, and guarantee the stable operation of mixing station pneumatic equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of air compressor dewatering technology, specifically relating to a dewatering structure for the downstream pipeline of an air compressor used in a mixing plant. Background Technology

[0002] In the construction industry, the normal operation of a batching plant depends on the compressed air provided by an air compressor to drive various pneumatic equipment, such as the pneumatic valves of the concrete mixer and the pneumatic actuators of the batching machine. The compressed air discharged by the air compressor usually contains a certain amount of water vapor. The state of these water vapors is closely related to the ambient temperature. In summer or high-temperature environments, due to the high ambient temperature, the water vapor in the compressed air is not easy to condense into liquid water, and the impact on pneumatic equipment and pipelines is small. Generally, it will not affect the normal operation of the batching plant. However, in winter or low-temperature environments, the situation is significantly different. When the compressed air flows through the subsequent pipelines, it is affected by the low temperature environment, and the water vapor in it will quickly condense into liquid water.

[0003] As the amount of condensed water in compressed air increases in low-temperature environments, a series of problems will arise. On the one hand, the accumulation of liquid water in the pipes will cause corrosion of the pipe walls, shortening the service life of the pipes. At the same time, impurities produced by corrosion may enter the pneumatic equipment with the compressed air, causing wear and jamming, affecting the normal operation accuracy and stability of the equipment, and increasing the maintenance cost and failure rate of the equipment. On the other hand, when the ambient temperature is below the freezing point, the accumulated liquid water will freeze, which can easily cause pipe blockage, preventing the compressed air from being delivered to the pneumatic equipment normally. In severe cases, it can interrupt the production of the mixing plant and affect the progress of the project.

[0004] To address the aforementioned issues, existing technologies typically employ a dryer between the air compressor and the pneumatic equipment to remove moisture from the compressed air. However, when existing dryers directly process the compressed air discharged from the air compressor, the untreated compressed air contains a large amount of water vapor, especially in low-temperature winter conditions. A large amount of condensate directly enters the dryer, significantly reducing its efficiency and drying effect. This results in the dried compressed air still containing a significant amount of moisture, failing to meet the dryness requirements of the pneumatic equipment in the mixing plant and failing to fundamentally solve the problems of pipe icing and equipment damage.

[0005] Therefore, in response to the problem of water accumulation and freezing in the downstream pipelines of the air compressor in the mixing plant under low-temperature conditions in winter, how to improve the dryness of compressed air through structural improvements based on the existing dryer dehydration has become a technical problem that urgently needs to be solved by those skilled in the art. Utility Model Content

[0006] The purpose of this invention is to provide a water removal structure for the downstream pipeline of an air compressor in a mixing plant, which can significantly improve the drying degree of the gas by the downstream dryer, effectively avoid water accumulation and freezing in the pipeline and equipment corrosion and jamming in low winter temperatures, reduce maintenance costs, and ensure the stable operation of pneumatic equipment in the mixing plant.

[0007] The specific technical solution adopted by this utility model is as follows:

[0008] A dewatering structure for the downstream pipeline of an air compressor used in a mixing plant includes an air compressor, a first pipeline at the port of the air compressor, a second pipeline and a third pipeline connected to the first pipeline, a dryer installed between the second pipeline and the third pipeline, and a pre-dewatering structure provided on the outside of the second pipeline.

[0009] A first solenoid valve is installed on the first pipe and located between the second pipe and the third pipe, and a second solenoid valve and a third solenoid valve are respectively installed on the second pipe and the third pipe.

[0010] The pre-dehydration structure includes an inner side plate, which is attached to the outside of the second pipe, and multiple heating elements are attached to the outside of the inner side plate.

[0011] An outer side plate is fixed to the outer side of the inner side plate via a base plate. Multiple mounting shells are fixed to the outer side of the outer side plate, and a fan is installed inside each mounting shell.

[0012] The base plate has through holes evenly distributed inside.

[0013] Both the inner and outer side plates have notches at their bottoms.

[0014] The second pipe is connected to a spiral tube in the middle, and the inner side plate is attached to the outer side of the spiral tube.

[0015] The technical effects achieved by this utility model are as follows:

[0016] This invention adds a pre-drying structure before the dryer, which removes most of the liquid water in the compressed air, turning it into water vapor, before it enters the dryer. This significantly improves the drying effect of the subsequent dryer on the gas, effectively avoids water accumulation and freezing in pipes and equipment corrosion and jamming in low winter temperatures, reduces maintenance costs, ensures stable operation of pneumatic equipment in the mixing plant, and is adaptable to different working conditions in winter and summer, making it highly practical. Attached Figure Description

[0017] Figure 1 This is a schematic diagram of the structure of this utility model;

[0018] Figure 2 This is a schematic diagram of the structure between the spiral tube, the fan, and the outer side plate in this utility model;

[0019] Figure 3 This is a cross-sectional view of the outer side plate and the inner side plate in this utility model;

[0020] Figure 4 This is a schematic diagram of the structure between the heating element, the fan, and the through hole in this utility model.

[0021] The attached diagram lists the components represented by each number as follows:

[0022] 1. Air compressor; 2. First pipe; 3. Second pipe; 4. Dryer; 5. Third pipe; 6. First solenoid valve; 7. Second solenoid valve; 8. Third solenoid valve; 9. Spiral tube; 10. Outer side plate; 11. Inner side plate; 12. Heating element; 13. Notch; 14. Mounting housing; 15. Fan; 16. Base plate; 17. Through hole. Detailed Implementation

[0023] To make the objectives and advantages of this utility model clearer, the following detailed description is provided in conjunction with embodiments. It should be understood that the following text is merely used to describe one or more specific embodiments of this utility model and does not strictly limit the scope of protection specifically claimed by this utility model.

[0024] like Figures 1-4 As shown, a dewatering structure for the downstream pipeline of an air compressor in a mixing plant includes an air compressor 1. A first pipeline 2 is installed at the port of the air compressor 1. A second pipeline 3 and a third pipeline 5 are connected to the first pipeline 2. A dryer 4 is installed between the second pipeline 3 and the third pipeline 5. A pre-dewatering structure is installed on the outside of the second pipeline 3. (Refer to the attached diagram.) Figure 1 A first solenoid valve 6 is installed on the first pipe 2 and between the second pipe 3 and the third pipe 5. A second solenoid valve 7 and a third solenoid valve 8 are installed on the second pipe 3 and the third pipe 5, respectively.

[0025] In summer, when the air compressor 1 is working, the second solenoid valve 7 and the third solenoid valve 8 are closed to prevent gas from moving towards the second pipe 3 and the third pipe 5, while the first solenoid valve 6 is opened, so that the gas only flows in the first pipe 2. This allows the gas produced by the air compressor 1 to be guided through the first pipe 2. In winter, when the air compressor 1 is working, the second solenoid valve 7 and the third solenoid valve 8 are opened, and the first solenoid valve 6 is closed, thus closing the first pipe 2 while allowing the second pipe 3 and the third pipe 5 to be open. This allows the gas in the air compressor 1 to be transferred from the second pipe 3 to the dryer 4, where the dryer 4 dries the moisture in the air. The gas is then transferred to the first pipe 2 through the third pipe 5, thus removing the moisture from the gas and preventing moisture from causing corrosion or freezing of subsequent pipes.

[0026] See attached document Figure 3 and attached Figure 4 The pre-dehydration structure includes an inner side plate 11, which is attached to the outside of the second pipe 3. Multiple heating elements 12 are attached to the outside of the inner side plate 11, heating the inner side plate 11 and transferring the temperature to the second pipe 3. This allows the second pipe 3 to evaporate as much moisture as possible into gas, facilitating the gas's movement into the dryer 4 and increasing the dryness of the gas. The inner side plate 11 is made of a heat-conducting material, such as metal like iron or copper. A spiral tube 9 is connected to the middle of the second pipe 3. This spiral tube 9 is detachably mounted on the second pipe 3 and can be fixed by insertion, snap-fit, or threaded connection. The inner side plate 11 is attached to the outside of the spiral tube 9, extending the gas's travel length within the second pipe 3 and improving the heating effect of the heating elements 12.

[0027] To prevent the heating element 12 from being damaged by rain or other impacts, please refer to the attached document. Figure 3 and attached Figure 4 An outer side plate 10 is fixed to the outer side of the inner side plate 11 via a base plate 16. The outer side plate 10 protects the heating element 12. Multiple mounting shells 14 are fixed to the outer side of the outer side plate 10, and a fan 15 is installed in each mounting shell 14. The fan 15 can remove heat between the outer side plate 10 and the inner side plate 11, preventing the heating element 12 from being damaged due to overheating. Furthermore, through holes 17 are evenly arranged inside the base plate 16, which connect the space inside the outer side plate 10 with the outside, preventing negative pressure from the space between the outer side plate 10 and the inner side plate 11 when the fan 15 is drawing heat. Furthermore, notches 13 are provided at the bottom of both the inner side plate 11 and the outer side plate 10, allowing the second pipe 3 to be installed inside the inner side plate 11.

[0028] The above description is merely a preferred embodiment of this utility model. It should be noted that those skilled in the art can make various improvements and modifications without departing from the principle of this utility model, and these improvements and modifications should also be considered within the scope of protection of this utility model. Structures, devices, and operating methods not specifically described or explained in this utility model, unless otherwise specified or limited, shall be implemented using conventional methods in the field.

Claims

1. A dewatering structure for the downstream pipeline of an air compressor in a mixing plant, comprising an air compressor (1), characterized in that: The air compressor (1) has a first pipe (2) at its port, a second pipe (3) and a third pipe (5) connected to the first pipe (2), and a dryer (4) is installed between the second pipe (3) and the third pipe (5). A pre-drying structure is provided on the outside of the second pipe (3).

2. The dewatering structure for the downstream pipeline of an air compressor in a mixing plant according to claim 1, characterized in that: A first solenoid valve (6) is installed on the first pipe (2) and between the second pipe (3) and the third pipe (5). A second solenoid valve (7) and a third solenoid valve (8) are installed on the second pipe (3) and the third pipe (5), respectively.

3. The dewatering structure for the downstream pipeline of an air compressor in a mixing plant according to claim 1, characterized in that: The pre-dehydration structure includes an inner side plate (11), which is attached to the outside of the second pipe (3), and a plurality of heating elements (12) are attached to the outside of the inner side plate (11).

4. The dewatering structure for the downstream pipeline of an air compressor in a mixing plant according to claim 3, characterized in that: The outer side of the inner side plate (11) is fixed with an outer side plate (10) via a base plate (16). Multiple mounting shells (14) are fixed to the outer side of the outer side plate (10), and a fan (15) is installed in each mounting shell (14).

5. The dewatering structure for the downstream pipeline of an air compressor in a mixing plant according to claim 4, characterized in that: The base plate (16) has through holes (17) evenly arranged inside.

6. The dewatering structure for the downstream pipeline of an air compressor in a mixing plant according to claim 5, characterized in that: Both the inner side plate (11) and the outer side plate (10) have notches (13) at their bottoms.