Railway bridge steel formwork rapid assembly combined structure

CN224870462UActive Publication Date: 2026-10-20WUHAN LIJIE STEEL MOULD CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202521379049.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-07-02
Publication Date
2026-10-20
Estimated Expiration
2035-07-02

AI Technical Summary

Technical Problem

其次,现有的模板系统在拼装和拆卸时操作复杂,耗时较长,增加了人工成本和项目周期

Benefits of technology

本实用新型的连接架包括固定杆和活动杆,使用时固定杆和活动杆之间通过90°的合页活动连接,进而使得该铁路桥梁钢模板快速拼装组合结构中的两块模板可呈90°的直角设置,也可180°平角设置,进而可有效提高该铁路桥梁钢模板快速拼装组合结构的适用范围,增强该铁路桥梁钢模板快速拼装组合结构的实用性。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224870462U_ABST
    Figure CN224870462U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of railway bridge steel formwork quick assembly combination structure, it is related to steel formwork technical field, including railway bridge steel formwork quick assembly combination structure, including first template, second template and the connecting frame for connecting first template and second template, the connecting frame includes fixed rod, the side of the fixed rod is connected with movable movable rod by hinge, the side of the fixed rod is fixedly connected with the first connecting rod connected with first template.The utility model connecting frame includes fixed rod and movable rod, fixed rod and movable rod are connected by 90 ° hinge swing when using, and then make the two templates in the railway bridge steel formwork quick assembly combination structure can be set up 90 ° right angle, also can be 180 ° flat angle setting, and then can effectively improve the application range of the railway bridge steel formwork quick assembly combination structure, enhance the practicality of the railway bridge steel formwork quick assembly combination structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of steel formwork technology, specifically a rapid assembly and combination structure for railway bridge steel formwork. Background Technology

[0002] In modern construction, steel formwork is widely used as an important tool for concrete forming. It is not only reusable but also possesses excellent stability and durability, ensuring the high-quality completion of concrete structures. Compared to traditional materials such as wooden and plywood formwork, steel formwork is more resistant to harsh environments, reducing engineering quality problems caused by material deformation or damage. Furthermore, using steel formwork significantly reduces pore water pressure and air bubble generation during concrete pouring, resulting in a more ideal surface quality, allowing for subsequent construction stages without the need for additional roughing treatment.

[0003] Despite this, traditional steel formwork systems still face several challenges in practical applications. First, the connection methods between formwork panels are relatively fixed, lacking flexibility and making it difficult to adapt to different angle requirements. For example, in railway bridge construction, the angle of the formwork often needs to be adjusted according to specific design requirements to meet the needs of various complex structural shapes. Second, existing formwork systems are complex and time-consuming to assemble and disassemble, increasing labor costs and project timelines. This inefficiency is particularly pronounced in large-scale infrastructure projects. Furthermore, some formwork systems have limited applicability and cannot flexibly respond to changes in the construction site, causing inconvenience to construction.

[0004] To address the aforementioned problems, this utility model proposes a rapid assembly and combination structure for steel formwork of railway bridges. Utility Model Content

[0005] Technical problems to be solved The purpose of this utility model is to overcome the shortcomings of the existing technology and provide a rapid assembly and combination structure for steel formwork of railway bridges.

[0006] Technical solution To achieve the above objectives, this utility model provides the following technical solution: a rapid assembly and combination structure for railway bridge steel formwork, comprising a first formwork, a second formwork, and a connecting frame for connecting the first and second formworks. The connecting frame includes a fixed rod, one side of which is connected to a movable rod via a hinge. A first connecting rod connected to the first formwork is fixedly connected to one side of the fixed rod, and a second connecting rod connected to the second formwork is fixedly connected to one side of the movable rod. The connecting frame includes a fixed rod and a movable rod. In use, the fixed rod and the movable rod are connected by a 90° hinge, allowing the two formworks in the rapid assembly and combination structure for railway bridge steel formwork to be arranged at a 90° right angle or a 180° flat angle. This effectively improves the applicability and practicality of the rapid assembly and combination structure for railway bridge steel formwork. The first template has connection holes on both the top and bottom sides, and connection bolts are inserted into the connection holes.

[0007] Preferably, the first template and the second template have insertion holes inside for connecting with the first connecting rod, and the first connecting rod is movably inserted into the insertion hole.

[0008] Preferably, a first fixing nut is threaded onto the first connecting rod.

[0009] Preferably, the first template and the second template have a second insertion hole inside for connecting with the second connecting rod, and the second connecting rod is movably inserted into the second insertion hole.

[0010] Preferably, a second fixing nut is threaded onto the second connecting rod.

[0011] Preferably, the hinge is a 90° hinge.

[0012] Preferably, the second fixing nut is provided with a spring, which is sleeved on the second connecting rod.

[0013] Preferably, a cushioning pad is fixedly connected to the side of the second template near the connecting frame.

[0014] Beneficial effects: Compared with existing technologies, this rapid assembly and combination structure for railway bridge steel formwork has the following advantages: The connecting frame of this utility model includes a fixed rod and a movable rod. In use, the fixed rod and the movable rod are connected by a 90° hinge, which allows the two templates in the quick assembly structure of railway bridge steel formwork to be set at a 90° right angle or a 180° flat angle. This effectively improves the applicability of the quick assembly structure of railway bridge steel formwork and enhances its practicality. Attached Figure Description

[0015] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0016] Figure 1 This is a schematic diagram of the structure of this utility model; Figure 2 This is a schematic diagram of the structure of the template of this utility model; Figure 3 This is a schematic diagram of the connection structure between the left and right templates of this utility model; Figure 4 This is a schematic diagram of the connection structure between the upper and lower templates of this utility model.

[0017] In the picture: 1. First template; 2. Second template; 4. First fixing nut; 5. Second fixing nut; 6. Spring; 7. Connecting hole; 8. Connecting bolt; 9. Buffer pad; 301. Fixing rod; 302. Hinge; 303. Moving rod; 304. First connecting rod; 305. Second connecting rod; 101. Insertion hole. Detailed Implementation

[0018] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0019] Please see Figures 1-4As shown, this utility model provides a technical solution: a rapid assembly structure for railway bridge steel formwork, including a first formwork 1, a second formwork 2, and a connecting frame for connecting the first formwork 1 and the second formwork 2. The connecting frame includes a fixed rod 301, one side of which is connected to a movable rod 303 via a hinge 302. The hinge 302 is a 90° hinge. One side of the fixed rod 301 is fixedly connected to a first connecting rod 304 connected to the first formwork 1, and one side of the movable rod 303 is fixedly connected to a second connecting rod 305 connected to the second formwork 2. The connecting frame 3 includes a fixed rod 301 and a movable rod 303. In use, the fixed rod 301 and the movable rod 303 are movably connected by the 90° hinge 302, thereby allowing the two formworks in the rapid assembly structure for railway bridge steel formwork to be set at a 90° right angle or a 180° flat angle, thus effectively improving the applicability of the rapid assembly structure for railway bridge steel formwork and enhancing its practicality.

[0020] The first template 1 of this utility model is provided with connecting holes 7 on both the upper and lower sides, and connecting bolts 8 are inserted inside the connecting holes 7. A buffer pad 9 is fixedly connected to the side of the second template 2 near the connecting frame.

[0021] Please refer to the following carefully. Figure 1 , Figure 2 and Figure 3 The first template 1 and the second template 2 have an insertion hole 101 for connecting with the first connecting rod 304. The first connecting rod 304 is movably inserted into the insertion hole 101, and a first fixing nut 4 is threaded onto the first connecting rod 304.

[0022] Please refer to the following carefully. Figure 1 and Figure 3 The first template 1 and the second template 2 have a second insertion hole 201 for connecting to the second connecting rod 305. The second connecting rod 305 is movably inserted into the second insertion hole 201. A second fixing nut 5 is threaded onto the second connecting rod 305. A spring 6 is provided on the second fixing nut 5 and is sleeved on the second connecting rod.

[0023] Working Principle: The fixed rod 301 and the movable rod 303 are movably connected by a 90° hinge 302, allowing the two templates in this railway bridge steel formwork quick assembly structure to be set at a 90° right angle or a 180° flat angle. This effectively improves the applicability of the railway bridge steel formwork quick assembly structure. This utility model provides an innovative solution—a railway bridge steel formwork quick assembly structure. The structure includes a first template, a second template, and a connecting frame for connecting the two. The connecting frame consists of a fixed rod and a movable rod, and the two are flexibly connected by a 90° hinge. This design allows the templates to be set at a 90° right angle or laid flat in a 180° straight line, greatly improving the flexibility and practicality of the template system. In addition, the first template and the second template are respectively provided with insertion holes, through which the first connecting rod and the second connecting rod are inserted and fixed with nuts, ensuring a stable connection between the templates. To enhance the stability of the system, a spring is also provided on the second connecting rod, further optimizing the connection effect.

[0024] In summary, this utility model simplifies the assembly process of the formwork, improves work efficiency, reduces labor intensity, and enhances the applicability and stability of the formwork system. This not only addresses the shortcomings of existing technologies but also provides a more efficient and flexible formwork solution for railway bridges and other construction projects. It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.

[0025] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A rapid assembly structure for railway bridge steel formwork, comprising a first formwork (1), a second formwork (2), and a connecting frame for connecting the first formwork (1) and the second formwork (2), characterized in that: The connecting frame includes a fixed rod (301), one side of the fixed rod (301) is connected to a movable rod (303) via a hinge (302), one side of the fixed rod (301) is fixedly connected to a first connecting rod (304) connected to the first template (1), and one side of the movable rod (303) is fixedly connected to a second connecting rod (305) connected to the second template (2). The first template (1) has connecting holes (7) on both the upper and lower sides, and connecting bolts (8) are inserted inside the connecting holes (7).

2. The rapid assembly and combination structure of railway bridge steel formwork according to claim 1, characterized in that: The first template (1) and the second template (2) have an insertion hole (101) for connecting with the first connecting rod (304), and the first connecting rod (304) is movably inserted into the insertion hole (101).

3. The rapid assembly and combination structure of railway bridge steel formwork according to claim 1, characterized in that: The first connecting rod (304) is threaded with a first fixing nut (4).

4. The rapid assembly and combination structure of railway bridge steel formwork according to claim 1, characterized in that: The first template (1) and the second template (2) have a second insertion hole (201) for connecting with the second connecting rod (305), and the second connecting rod (305) can be movably inserted into the second insertion hole (201).

5. The rapid assembly and combination structure of railway bridge steel formwork according to claim 1, characterized in that: The second connecting rod (305) is threaded with a second fixing nut (5).

6. The rapid assembly and combination structure of railway bridge steel formwork according to claim 1, characterized in that: The hinge (302) is a 90° hinge.

7. The rapid assembly and combination structure of railway bridge steel formwork according to claim 5, characterized in that: The second fixing nut (5) is provided with a spring (6), which is sleeved on the second connecting rod.

8. The rapid assembly and combination structure of railway bridge steel formwork according to claim 1, characterized in that: A cushioning pad (9) is fixedly connected to the side of the second template (2) near the connecting frame.