A mobile slope anchor rod operation platform

CN224870571UActive Publication Date: 2026-10-20CHINA CONSTR EIGHTH BUREAU SOUTH CHINA CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522524533.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-27
Publication Date
2026-10-20
Estimated Expiration
2035-11-27

AI Technical Summary

Benefits of technology

[0011]本实用新型的有益效果是:将卷扬机上的钢丝绳末端固定在边坡顶部的固定物上,启动卷扬机进行收卷使操作平台顺着边坡向上移动或者启动卷扬机进行退卷使操作平台顺着边坡向下移动,从而调整操作架上钻机在边坡上的高度;当操作平台需要在水平方向上移动时,先调整钢丝绳末端固定在边坡顶部的固定物上的位置,然后由工人推动或者抬起操作平台进行水平方向上位置调整;本操作平台省去了传统满边坡搭设脚手架的搭设和拆除工序,节省了脚手架搭设和拆除的人力和脚手架物料。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224870571U_ABST
    Figure CN224870571U_ABST
Patent Text Reader

Abstract

The utility model relates to a mobile side slope anchor rod operation platform, including the chassis, operating frame, support frame, the bottom of operating frame is connected with the front part of chassis with cross buckle, the bottom of support frame is connected with the rear part of chassis with cross buckle, the top of operating frame is connected with support frame with cross buckle, both sides of chassis install two gyro wheels respectively, install two symmetrical arrangement's winches on the chassis. Advantageous effects are: the operation platform has spared the setting and removal procedure of the setting of the conventional full side slope scaffold, and the manpower and scaffold materials of scaffold setting and removal are saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of slope anchor construction technology, and in particular to a mobile slope anchor operation platform. Background Technology

[0002] In slope anchor bolt construction, the stability and efficiency of the working platform directly affect the quality of anchor bolt installation and the overall safety of the project. Currently, slope anchor bolt construction mainly relies on erecting scaffolding along the entire slope to provide a working platform, which is then dismantled after the anchor bolts are installed. The erection and dismantling of scaffolding requires a significant investment of manpower and materials, and accounts for a large proportion of the slope anchor bolt construction cycle. Utility Model Content

[0003] The purpose of this utility model is to overcome the above-mentioned problems in the existing technology and provide a mobile slope anchor bolt operation platform.

[0004] To achieve the above-mentioned technical objectives and effects, this utility model is implemented through the following technical solution:

[0005] A mobile slope anchor bolt operating platform includes a base frame, an operating frame, and a support frame. The bottom of the operating frame is connected to the front of the base frame by a cross-shaped buckle, the bottom of the support frame is connected to the rear of the base frame by a cross-shaped buckle, and the top of the operating frame is connected to the support frame by a cross-shaped buckle. Two rollers are installed on each side of the base frame, and two winches are installed on the base frame in a symmetrical arrangement.

[0006] Preferably, the wire rope of the winch is equipped with a hook at its end.

[0007] The base frame includes two first transverse steel pipes parallel to each other, two second transverse steel pipes parallel to each other, and at least three first longitudinal steel pipes parallel to each other. The first longitudinal steel pipes are connected to the first transverse steel pipes and the second transverse steel pipes by cross-shaped fasteners. The first longitudinal steel pipes are perpendicular to the first transverse steel pipes and the second transverse steel pipes respectively. The two second transverse steel pipes are located between the two first transverse steel pipes.

[0008] The operating frame includes multiple parallel third transverse steel pipes and at least two parallel second longitudinal steel pipes. The second longitudinal steel pipes are connected to the third transverse steel pipes by cross-shaped fasteners and are perpendicular to each other. The second longitudinal steel pipes are connected to the first transverse steel pipes located at the front of the base frame by cross-shaped fasteners and are perpendicular to each other.

[0009] The support frame includes two parallel fourth transverse steel pipes and two parallel third longitudinal steel pipes. The third longitudinal steel pipes are connected to the fourth transverse steel pipes by cross-shaped fasteners and are perpendicular to each other. The bottom of the third longitudinal steel pipe is connected to the first transverse steel pipe located at the rear of the base frame by cross-shaped fasteners and is perpendicular to the first transverse steel pipe located at the rear of the base frame. The middle part of the third longitudinal steel pipe is connected to the third transverse steel pipe located at the top of the operating frame by cross-shaped fasteners and is perpendicular to the third transverse steel pipe located at the top of the operating frame.

[0010] The base frame, operating frame, and support frame form a triangular space, and the winch is located in the triangular space.

[0011] The beneficial effects of this utility model are as follows: By fixing the end of the wire rope on the winch to a fixed object at the top of the slope, the winch is started to wind up, causing the operating platform to move upward along the slope, or the winch is started to unwind, causing the operating platform to move downward along the slope, thereby adjusting the height of the drilling rig on the operating frame on the slope; when the operating platform needs to be moved horizontally, the position of the end of the wire rope fixed to the fixed object at the top of the slope is first adjusted, and then the workers push or lift the operating platform to adjust its horizontal position; this operating platform eliminates the traditional process of erecting and dismantling scaffolding on a full slope, saving manpower and scaffolding materials for scaffolding erection and dismantling. Attached Figure Description

[0012] The accompanying drawings, which are included to provide a further understanding of the present invention and form part of this application, illustrate exemplary embodiments of the present invention and, together with the description thereof, serve to explain the present invention and do not constitute an undue limitation thereof. In the drawings:

[0013] Figure 1 This is a schematic diagram of the slope anchor bolt operating platform of this utility model, viewed from the front side.

[0014] Figure 2 This is a schematic diagram of the slope anchor bolt operating platform of this utility model, viewed from the side and rear.

[0015] Figure 3 This is a schematic diagram of the base frame structure in this utility model;

[0016] Figure 4 This is a schematic diagram of the structure of the operating frame in this utility model;

[0017] Figure 5 This is a schematic diagram of the support frame in this utility model;

[0018] Figure 6 This is a schematic diagram of the structure of the winch in this utility model;

[0019] Figure 7 This is a schematic diagram of the structure of the two rollers in this utility model;

[0020] The following are the labels in the diagram: Base frame 1, First transverse steel pipe 11, Second transverse steel pipe 12, First longitudinal steel pipe 13, Operating frame 2, Third transverse steel pipe 21, Second longitudinal steel pipe 22, Support frame 3, Fourth transverse steel pipe 31, Third longitudinal steel pipe 32, Cross buckle 4, Roller 5, Roller shaft 51, Wheel 52, Winch 6, Wire rope 61, Hook 7, Wire rope buckle 8. Detailed Implementation

[0021] The present invention will now be described in detail with reference to the accompanying drawings and embodiments.

[0022] like Figures 1 to 7 As shown, a mobile slope anchor bolt operating platform includes a base frame 1, an operating frame 2, and a support frame 3.

[0023] The base frame 1 includes two first transverse steel pipes 11 that are parallel front to back, two second transverse steel pipes 12 that are parallel front to back, and at least three first longitudinal steel pipes 13 that are parallel left to right. The first longitudinal steel pipes 13 are connected to the first transverse steel pipes 11 and the second transverse steel pipes 12 respectively by cross buckles 4. The first longitudinal steel pipes 13 are perpendicular to the first transverse steel pipes 11 and the second transverse steel pipes 12 respectively. The two second transverse steel pipes 12 are located between the two first transverse steel pipes 11.

[0024] The operating frame 2 includes multiple parallel third transverse steel pipes 21 and at least two parallel second longitudinal steel pipes 22. The second longitudinal steel pipes 22 and the third transverse steel pipes 21 are connected by cross buckles 4. The second longitudinal steel pipes 22 and the third transverse steel pipes 21 are perpendicular to each other.

[0025] The support frame 3 includes two parallel fourth transverse steel pipes 31 and two parallel third longitudinal steel pipes 32. The third longitudinal steel pipes 32 and the fourth transverse steel pipes 31 are connected by cross buckles 4. The third longitudinal steel pipes 32 and the fourth transverse steel pipes 31 are perpendicular to each other.

[0026] The bottom of the operating frame 2 is connected to the front of the base frame 1 by a cross buckle 4, the bottom of the support frame 3 is connected to the rear of the base frame 1 by a cross buckle 4, and the top of the operating frame 2 is connected to the support frame 3 by a cross buckle 4. The base frame 1, the operating frame 2, and the support frame 3 enclose a triangular space.

[0027] Specifically, the second longitudinal steel pipe 22 is connected to the first transverse steel pipe 11 located at the front of the base frame using a cross-shaped clamp 4, and the second longitudinal steel pipe 22 and the first transverse steel pipe 11 are perpendicular to each other; the bottom of the third longitudinal steel pipe 32 is connected to the first transverse steel pipe 11 located at the rear of the base frame 1 using a cross-shaped clamp 4, and the third longitudinal steel pipe 32 and the first transverse steel pipe 11 located at the rear of the base frame 1 are perpendicular to each other; the middle part of the third longitudinal steel pipe 32 is connected to the third transverse steel pipe 21 located at the top of the operating frame 2 using a cross-shaped clamp 4, and the third longitudinal steel pipe 32 and the third transverse steel pipe 21 located at the top of the operating frame 2 are perpendicular to each other.

[0028] When it is necessary to adjust the tilt angle of the operating frame, simply loosen the cross buckle connecting the operating frame to the base frame and support frame first. After adjusting the tilt angle of the operating frame, tighten the cross buckle connecting the operating frame to the base frame and support frame.

[0029] Two rollers 5 are installed on both sides of the base frame 1. Each roller 5 includes a roller shaft 51 and a wheel 52. The tail of the roller shaft 51 is inserted into the first transverse steel pipe 11. The roller shaft 41 is connected to the first transverse steel pipe 11 with screws. The wheel 52 is rotatably installed on the head of the roller shaft 51.

[0030] Two winches 6 are symmetrically arranged on the base frame 1, and the winches 6 are located in a triangular space. During installation, the base of the winch 6 is connected to the second transverse steel pipe 12 with matching bolts and nuts.

[0031] The wire rope 61 of the winch 6 is equipped with a hook 7 at its end. When installing the hook, the end of the wire rope 61 is passed through the lifting ring of the hook 7 and then bent 180°. Multiple sets of wire rope clips 8 are used to lock and fix the bent and overlapping wire ropes.

[0032] The installation of hooks facilitates the securing of the wire rope to a fixed object at the top of the slope. After the wire rope is wrapped around the fixed object, the hook is used to secure it.

[0033] The first transverse steel pipe 11, the second transverse steel pipe 12, the first longitudinal steel pipe 13, the third transverse steel pipe 21, the second longitudinal steel pipe 22, the fourth transverse steel pipe 31, and the third longitudinal steel pipe 32 are all made of special steel pipes used for scaffolding. The cross buckle 4 is a fixed cross buckle used for scaffolding.

[0034] Instructions for use: The drilling rig used for slope anchor bolt construction is fixed to the operating frame with fasteners. The end of the wire rope on the winch is fixed to the fixed object at the top of the slope. Start the winch to wind up and move the operating platform up the slope, or start the winch to unwind and move the operating platform down the slope, thereby adjusting the height of the drilling rig on the operating frame on the slope. When the operating platform needs to be moved horizontally, first adjust the position of the end of the wire rope fixed to the fixed object at the top of the slope, and then the worker pushes or lifts the operating platform to adjust its horizontal position.

[0035] In this utility model, unless otherwise explicitly specified and limited, the terms "installation," "connection," "joining," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection, an electrical connection, or a connection that allows communication between them; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components, unless otherwise explicitly limited. Those skilled in the art can understand the specific meaning of the above terms in this utility model according to the specific circumstances.

[0036] The foregoing has shown and described the basic principles, main features, and advantages of this utility model. Those skilled in the art should understand that this utility model is not limited to the above embodiments. The embodiments and descriptions in the specification are merely illustrative of the principles of this utility model. Various changes and modifications can be made to this utility model without departing from its spirit and scope, and all such changes and modifications fall within the scope of the claimed utility model.

Claims

1. A mobile slope anchor bolt operating platform, characterized in that: It includes a base frame, an operating frame, and a support frame. The bottom of the operating frame is connected to the front of the base frame with a cross-shaped buckle. The bottom of the support frame is connected to the rear of the base frame with a cross-shaped buckle. The top of the operating frame is connected to the support frame with a cross-shaped buckle. Two rollers are installed on each side of the base frame. Two winches are installed on the base frame in a symmetrical arrangement.

2. The operating platform according to claim 1, characterized in that: The winch has a hook installed at the end of its wire rope.

3. The operating platform according to claim 1, characterized in that: The base frame includes two first transverse steel pipes parallel to each other front and back, two second transverse steel pipes parallel to each other front and back, and at least three first longitudinal steel pipes parallel to each other left and right. The first longitudinal steel pipes are connected to the first transverse steel pipes and the second transverse steel pipes respectively by cross buckles. The first longitudinal steel pipes are perpendicular to the first transverse steel pipes and the second transverse steel pipes respectively. The two second transverse steel pipes are located between the two first transverse steel pipes.

4. The operating platform according to claim 3, characterized in that: The operating frame includes multiple parallel third transverse steel pipes and at least two parallel second longitudinal steel pipes. The second longitudinal steel pipes are connected to the third transverse steel pipes by cross-shaped fasteners and are perpendicular to each other. The second longitudinal steel pipes are connected to the first transverse steel pipe located at the front of the base frame by cross-shaped fasteners and are perpendicular to each other.

5. The operating platform according to claim 4, characterized in that: The support frame includes two parallel fourth transverse steel pipes and two parallel third longitudinal steel pipes. The third longitudinal steel pipes are connected to the fourth transverse steel pipes by cross-shaped fasteners and are perpendicular to each other. The bottom of the third longitudinal steel pipe is connected to the first transverse steel pipe located at the rear of the base frame by cross-shaped fasteners and is perpendicular to the first transverse steel pipe located at the rear of the base frame. The middle part of the third longitudinal steel pipe is connected to the third transverse steel pipe located at the top of the operating frame by cross-shaped fasteners and is perpendicular to the third transverse steel pipe located at the top of the operating frame.

6. The operating platform according to claim 1, characterized in that: The base frame, operating frame, and support frame enclose a triangular space, and the winch is located in the triangular space.