Steel structure floor support plate connecting structure

CN224870793UActive Publication Date: 2026-10-20SHANGHAI WEI LE ARCHITECTURAL DECORATION DESIGN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522513883.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-26
Publication Date
2026-10-20
Estimated Expiration
2035-11-26

AI Technical Summary

Technical Problem

[0004]上述现有技术方案存在以下缺陷:由于制作、安装误差导致相邻楼承板的板端间距超出正常范围时,传统的特定连接件难以灵活适应不同板端的间距

Benefits of technology

1.通过钢梁、可调节式连接组件和垫片的设置,能够根据第一桁架楼承板和第二桁架楼承板之间的距离调节可调节式连接组件的宽度,使得可调节式连接组件能够将第一钢筋桁架楼承板和第二钢筋桁架楼承板相互靠近的一端连接在一起,然后再往可调节式连接组件内注入混凝土,增强第一钢筋桁架楼承板和第二钢筋桁架楼承板之间的连接强度,能够起到灵活适应第一桁架楼承板和第二桁架楼承板之间的不同板端间距,以提升施工效率的目的。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224870793U_ABST
    Figure CN224870793U_ABST
Patent Text Reader

Abstract

The utility model relates to a steel structure floor support plate connecting structure, including first steel bar truss floor support plate, second steel bar truss floor support plate and steel roof beam, first steel bar truss floor support plate and second steel bar truss floor support plate mutual close one end are provided with same adjustable type connecting assembly, through adopting above technical scheme, according to the distance between first truss floor support plate and second truss floor support plate adjustable type connecting assembly's width is adjusted, make adjustable type connecting assembly can with first steel bar truss floor support plate and second steel bar truss floor support plate mutual close one end connect together, then pour concrete into adjustable type connecting assembly again, strengthen the connecting strength between first steel bar truss floor support plate and second steel bar truss floor support plate, thereby can nimblely adapt to the different board end distance between first truss floor support plate and second truss floor support plate, to promote construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of building construction technology, and in particular to a steel structure floor deck connection structure. Background Technology

[0002] In the field of steel structure buildings, steel truss floor decking is widely used due to its advantages such as convenient construction and high comprehensive benefits. In actual construction, multiple floor deckings need to be spliced ​​and installed on top of steel beams.

[0003] Currently, traditional methods typically rely on on-site welding or the use of specific connectors for fixing. On-site welding involves directly welding the end support steel bars or additional connecting steel plates to the lower beams after the adjacent floor slabs are in place. Using specific connectors involves using pre-designed studs, self-locking screws, and special clamps to connect the floor decking to the special clamps.

[0004] The existing technical solutions have the following drawbacks: when the spacing between the ends of adjacent floor deckings exceeds the normal range due to manufacturing and installation errors, traditional specific connectors are difficult to flexibly adapt to the spacing between different decking ends. Utility Model Content

[0005] The purpose of this utility model is to provide a steel structure floor deck connection structure to solve the problems existing in the prior art.

[0006] The above-mentioned technical objective of this utility model is achieved through the following technical solution: A steel structure floor deck connection structure includes a first steel truss floor deck, a second steel truss floor deck, and a steel beam. The first and second steel truss floor decks are symmetrically arranged on the top of the steel beam, and are spaced apart. A common adjustable connection component is provided at one end of each steel truss floor deck that is close to the other. The adjustable connection component is used to connect the first and second steel truss floor decks together.

[0007] By adopting the above technical solution, the width of the adjustable connecting component is adjusted according to the distance between the first truss floor deck and the second truss floor deck, so that the adjustable connecting component can connect the close ends of the first steel truss floor deck and the second steel truss floor deck together. Then, concrete is injected into the adjustable connecting component to enhance the connection strength between the first steel truss floor deck and the second steel truss floor deck, thereby flexibly adapting to different end spacings between the first truss floor deck and the second truss floor deck, and improving construction efficiency.

[0008] In a further embodiment, the adjustable connecting assembly includes a fixed plate, a movable plate, a first screw, a second screw, and a welding plate. The fixed plate includes a vertical plate, a horizontal plate, and a mounting plate. The vertical plate is sleeved on the right end of the first steel truss floor slab. The horizontal plate is fixedly installed at the bottom of the vertical plate. The mounting plate is fixedly installed at the front of the vertical plate and the horizontal plate. The first screw passes through the top rear end of the vertical plate, and the second screw passes through the bottom front end of the vertical plate. Both the first screw and the second screw are rotatably connected to the vertical plate. The first screw and the second screw are arranged in parallel. The movable plate is movably installed on the first screw and the second screw. The welding plate is located on the side of the vertical plate and the movable plate away from the mounting plate.

[0009] By adopting the above technical solution, the first screw and the second screw are rotated simultaneously to make the moving plate move left and right along the axis of the first screw and the second screw, thereby moving the moving plate closer to or away from the vertical plate. When the moving plate is engaged with the second truss floor deck, the first screw and the second screw are stopped from rotating. Then, a welding plate of suitable width is selected and welded to the back of the mounting plate, so that the vertical plate, the moving plate, the horizontal plate, the mounting plate and the welding plate can form a rectangular cavity. Finally, concrete is injected into the rectangular cavity.

[0010] In a further embodiment, the first steel truss floor slab includes a base plate and a steel truss. The steel truss is fixedly installed on the top of the base plate. The steel truss includes an upper chord steel bar, a lower chord steel bar, and web steel bars. There are two lower chord steel bars, which are spaced apart at the bottom of the web steel bars. The upper chord steel bars are located at the top of the web steel bars. Both the vertical plate and the movable plate are provided with a first through hole, a second through hole, a third through hole, and a clearance opening that are through the left and right sides.

[0011] By adopting the above technical solution, the first through hole is used to avoid the upper chord reinforcement, the second through hole and the third through hole are both used to avoid the lower chord reinforcement, and the avoidance opening is used to avoid the bottom plate, so that the vertical plate and the movable plate can pass through the first truss floor deck and the second truss floor deck respectively.

[0012] In a further embodiment, the top of the horizontal plate is lower than the bottom of the first steel truss floor, the bottom of the first screw is higher than the top of the first steel truss floor slab, the bottom of the second screw is higher than the top of the horizontal plate, and the top of the second screw is lower than the bottom of the first steel truss floor slab.

[0013] By adopting the above technical solution, it is easy to place the adjustable connection component between the first truss floor deck and the second truss floor deck.

[0014] In a further embodiment, a handle is fixedly installed at the left end of both the first screw and the second screw.

[0015] By adopting the above technical solution, it is convenient for operators to rotate the first screw and the second screw.

[0016] In a further embodiment, shims are provided at both the left and right ends of the top of the steel beam.

[0017] By adopting the above technical solution, the shims create gaps between the steel beams and the first truss floor deck and the second truss floor deck, respectively, providing the necessary space for the horizontal plate to enter between the first truss floor deck and the second truss floor deck.

[0018] In summary, this utility model has the following beneficial effects: 1. By using steel beams, adjustable connecting components, and shims, the width of the adjustable connecting components can be adjusted according to the distance between the first and second truss floor decks. This allows the adjustable connecting components to connect the ends of the first and second steel truss floor decks that are close to each other. Concrete is then injected into the adjustable connecting components to enhance the connection strength between the first and second steel truss floor decks. This allows for flexible adaptation to different end spacings between the first and second truss floor decks, thereby improving construction efficiency. Attached Figure Description

[0019] Figure 1 This is an overall schematic diagram of the present invention, used to illustrate the structural diagram of the steel structure floor deck connection structure; Figure 2 This is a structural schematic diagram illustrating the adjustable connection component of this utility model; Figure 3 This is a structural schematic diagram of the fixing plate used to illustrate this utility model.

[0020] In the figure, 1. First steel truss floor deck; 2. Second steel truss floor deck; 3. Steel beam; 4. Adjustable connection assembly; 41. Fixed plate; 411. Vertical plate; 412. Horizontal plate; 413. Mounting plate; 42. Moving plate; 43. First screw; 44. Second screw; 45. Welding plate; 5. Gasket. Detailed Implementation

[0021] The present invention will be further described in detail below with reference to the accompanying drawings.

[0022] Identical parts are indicated by the same reference numerals. It should be noted that the terms "front," "rear," "left," "right," "upper," and "lower" used in the following description refer to the attached figures. Figure 1In this specification, the terms "bottom surface" and "top surface," "inner" and "outer" refer to the direction toward or away from the geometry of a specific component. Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this specification, "a plurality of" means two or more, unless otherwise explicitly and specifically defined by the direction of the center.

[0023] Example 1: like Figures 1-3 As shown, a steel structure floor deck connection structure includes a first steel truss floor deck 1, a second steel truss floor deck 2, and a steel beam 3. The first steel truss floor deck 1 and the second steel truss floor deck 2 are symmetrically arranged on the top of the steel beam 3, and the first steel truss floor deck 1 and the second steel truss floor deck 2 are spaced apart. The same adjustable connection component 4 is provided at the ends of the first steel truss floor deck 1 and the second steel truss floor deck 2 that are close to each other. The adjustable connection component 4 is used to connect the first steel truss floor deck 1 and the second steel truss floor deck 2 together. The adjustable connection assembly 4 includes a fixed plate 41, a movable plate 42, a first screw 43, a second screw 44, and a welding plate 45. The fixed plate 41 includes a vertical plate 411, a horizontal plate 412, and a mounting plate 413. The vertical plate 411 is sleeved on the right end of the first steel truss floor deck 1. The horizontal plate 412 is fixedly installed at the bottom of the vertical plate 411. The mounting plate 413 is fixedly installed at the front of the vertical plate 411 and the horizontal plate 412. The first screw 43 passes through the top rear end of the vertical plate 411, and the second screw 44 passes through the bottom front end of the vertical plate 411. The first screw 43 and the second screw 44 are rotatably connected to the vertical plate 411. The first screw 43 and the second screw 44 are arranged in parallel. The movable plate 42 is movably installed on the first screw 43 and the second screw 44. The welding plate 45 is arranged on the side of the vertical plate 411 and the movable plate 42 away from the mounting plate 413. The first steel truss floor slab 1 includes a base plate and a steel truss. The steel truss is fixedly installed on the top of the base plate. The steel truss includes top chord steel bars, bottom chord steel bars, and web steel bars. There are two bottom chord steel bars, which are spaced apart at the bottom of the web steel bars. The top chord steel bars are located at the top of the web steel bars. The vertical plate 411 and the movable plate 42 are both provided with a first through hole, a second through hole, a third through hole, and a clearance hole that are through the left and right sides. The top of the horizontal plate 412 is lower than the bottom of the first steel truss floor slab 1. The bottom of the first screw rod 43 is higher than the top of the first steel truss floor slab 1. The bottom of the second screw rod 44 is higher than the top of the horizontal plate 412. The top of the second screw rod 44 is lower than the bottom of the first steel truss floor slab 1. Handles are fixedly installed on the left ends of the first screw rod 43 and the second screw rod 44. Shims 5 are provided on both the left and right ends of the top of the steel beam 3.

[0024] Specific implementation process: First, place the first and second steel truss floor decks symmetrically on top of the steel beam, left and right respectively. Use the shims at both ends of the steel beam top to create a gap between the steel beam and the floor decks. Next, install the adjustable connection assembly. Place the vertical plate of the fixed plate onto the right end of the first steel truss floor deck. At this time, the horizontal plate is located below the first steel truss floor deck, and the moving plate also moves between the first and second steel truss floor decks along with the fixed plate. Then, rotate the handles on the left ends of the first and second screws simultaneously. Since the first and second screws are rotatably connected to the vertical plate, the moving plate will move along the axis of the first and second screws. The moving plate moves to the right, gradually approaching the second steel truss floor deck until it is engaged with the second steel truss floor deck, at which point the rotation stops. Then, based on the distance between the vertical plate and the moving plate, a welding plate of appropriate width is selected and welded to the back of the mounting plate, forming a rectangular cavity with the vertical plate, moving plate, horizontal plate, mounting plate, and welding plate. Finally, concrete is poured into the rectangular cavity. After the concrete solidifies, the connection strength between the first and second steel truss floor decks is enhanced, completing the entire connection process. This allows for flexible adaptation to different end distances between the first and second steel truss floor decks, thereby improving construction efficiency.

[0025] In the embodiments disclosed in this utility model, the terms "installation," "connection," "linking," and "fixing" should be interpreted broadly. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; "linking" can be a direct connection or an indirect connection through an intermediate medium. Those skilled in the art can understand the specific meaning of the above terms in the embodiments disclosed in this utility model according to the specific circumstances.

[0026] This specific embodiment is merely an explanation of the present utility model and is not intended to limit the present utility model. After reading this specification, those skilled in the art can make modifications to this embodiment without contributing any inventive step, but as long as they are within the scope of the claims of the present utility model, they are protected by patent law.

Claims

1. A steel structure floor decking connection structure, comprising a first steel truss floor decking (1), a second steel truss floor decking (2), and a steel beam (3), characterized in that: The first steel truss floor deck (1) and the second steel truss floor deck (2) are respectively symmetrically arranged on the top of the steel beam (3). The first steel truss floor deck (1) and the second steel truss floor deck (2) are spaced apart. The first steel truss floor deck (1) and the second steel truss floor deck (2) are provided with the same adjustable connecting component (4) at their respective ends that are close to each other. The adjustable connecting component (4) is used to connect the first steel truss floor deck (1) and the second steel truss floor deck (2) together. The adjustable connection assembly (4) includes a fixed plate (41), a movable plate (42), a first screw (43), a second screw (44), and a welding plate (45). The fixed plate (41) includes a vertical plate (411), a horizontal plate (412), and a mounting plate (413). The vertical plate (411) is sleeved on the right end of the first steel truss floor deck (1). The horizontal plate (412) is fixedly installed at the bottom of the vertical plate (411). The mounting plate (413) is fixedly installed at the front of the vertical plate (411) and the horizontal plate (412). The first screw (43) passes through the top rear end of the vertical plate (411), and the second screw (44) passes through the bottom front end of the vertical plate (411). The first screw (43) and the second screw (44) are rotatably connected to the vertical plate (411). The first screw (43) and the second screw (44) are arranged in parallel. The movable plate (42) is movably installed on the first screw (43) and the second screw (44). The welding plate (45) is arranged on the side of the vertical plate (411) and the movable plate (42) away from the mounting plate (413).

2. The steel structure floor decking connection structure according to claim 1, characterized in that: The first steel truss floor deck (1) includes a base plate and a steel truss. The steel truss is fixedly installed on the top of the base plate. The steel truss includes an upper chord steel bar, a lower chord steel bar and a web steel bar. There are two lower chord steel bars. The two lower chord steel bars are arranged at the bottom of the web steel bars with a front-to-back interval. The upper chord steel bar is arranged at the top of the web steel bar. The vertical plate (411) and the movable plate (42) are both provided with a first through hole, a second through hole, a third through hole and a clearance hole that are connected from left to right.

3. The steel structure floor decking connection structure according to claim 1, characterized in that: The top of the horizontal plate (412) is lower than the bottom of the first steel truss floor, the bottom of the first screw (43) is higher than the top of the first steel truss floor slab (1), the bottom of the second screw (44) is higher than the top of the horizontal plate (412), and the top of the second screw (44) is lower than the bottom of the first steel truss floor slab (1).

4. The steel structure floor decking connection structure according to claim 1, characterized in that: Handles are fixedly installed on the left ends of both the first screw (43) and the second screw (44).

5. A steel structure floor decking connection structure according to claim 1, characterized in that: The top left and right ends of the steel beam (3) are provided with pads (5).