A basement crack concrete pouring device

CN224870977UActive Publication Date: 2026-10-20SICHUAN COMM CONSTR MEIZHOU CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522433989.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-17
Publication Date
2026-10-20
Estimated Expiration
2035-11-17

AI Technical Summary

Technical Problem

但是,目前的浇筑机构的施工作业方向单一,对于地下室地面的裂缝和地下室墙体的裂缝,需要使用不同的混凝土浇筑装置

Benefits of technology

1、本实用新型通过在施工梁设置铰接杆,将铰接杆转动连接在横向梁上,通过蜗轮蜗杆机构驱使铰接杆转动至竖直状态即能够使浇筑机构和抹平机构均朝向地面,以便于对地面上的裂缝进行修补;通过蜗轮蜗杆机构驱使铰接杆转动至水平状态即能够使浇筑机构和抹平机构均朝向墙体,以便于对墙体的裂缝进行修补。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224870977U_ABST
    Figure CN224870977U_ABST
Patent Text Reader

Abstract

The utility model provides a basement crack concrete pouring device relates to building construction equipment technical field, including base, store material box, support frame, construction frame, pouring mechanism and trowelling mechanism, the bottom of base is equipped with gyro wheel, the bottom of store material box is equipped with delivery pump, and the delivery pump is provided with the delivery pipe at the discharge end, support frame includes vertical beam and horizontal beam, and construction frame includes construction beam and sets up the hinged link on both sides of construction beam, and the hinged link is hinged and is arranged on horizontal beam, and construction beam sets up one end away from horizontal beam of hinged link, and pouring mechanism sets up one side of construction beam and links with the export end of delivery pipe, and pouring mechanism includes main pipe and multiple branch pipes, and multiple branch pipes are distributed on the main pipe, and trowelling mechanism includes trowelling plate and is used for urging the sliding component of trowelling plate and moves along the length direction of construction beam. The utility model discloses can conveniently adjust the operation direction of pouring mechanism and trowelling mechanism, can repair the crack of ground and wall.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of building construction equipment technology, and more specifically, to a device for pouring concrete for cracked basements. Background Technology

[0002] A basement is a space below ground level in a building, and its construction can improve the utilization rate of space. In the concrete structure of a basement, cracks can appear on the surface due to the concrete's own temperature shrinkage and stress changes, as well as inadequate construction technology and management, requiring timely repair. A common repair method for basement cracks is grouting, which involves applying concrete to the cracks for repair.

[0003] In the past, repairing basement cracks was mostly done manually by pouring concrete and smoothing it out. However, with the widespread use of mechanized operations, there are now specialized pouring devices for basements. These devices inject concrete into the cracks and then smooth it out. However, current pouring devices have a limited range of applications, and different concrete pouring devices are needed for cracks in the basement floor and cracks in the basement walls. Utility Model Content

[0004] The purpose of this utility model is to provide a concrete pouring device for basement cracks, which can easily adjust the working direction of the pouring mechanism and the smoothing mechanism, and can repair cracks in both the ground and the walls.

[0005] This utility model is achieved through the following technical solution: a basement crack concrete pouring device, comprising: a base, the bottom of which is equipped with rollers; a storage bin, the bottom of which is equipped with a conveying pump, the discharge end of which is equipped with a conveying pipe; a support frame, which includes a vertical beam and a horizontal beam disposed on the top of the vertical beam; a construction frame, which includes a construction beam and hinged rods disposed on both sides of the construction beam, the hinged rods being hinged to the horizontal beam, the construction beam being disposed at the end of the hinged rods away from the horizontal beam; a pouring mechanism, which is disposed on one side of the construction beam and connected to the outlet end of the conveying pipe, the pouring mechanism including a main pipe and multiple branch pipes, the multiple branch pipes being spaced apart on the main pipe; and a smoothing mechanism, which includes a smoothing plate and a sliding component for driving the smoothing plate to move along the length direction of the construction beam.

[0006] Furthermore, a rotating rod is connected between the two hinged rods, and a worm gear mechanism for driving the rotating rod to rotate is provided on the transverse beam.

[0007] Furthermore, the conveying pipe is a flexible corrugated pipe, a fixing plate for fixing the end position of the conveying pipe is provided on the construction beam, and a through hole for the conveying pipe to pass through is provided on the vertical beam.

[0008] Furthermore, connecting blocks are provided at both ends of the main pipe, the connecting blocks are fixedly connected to the construction beam, and the conveying pipe is connected to the middle of the main pipe.

[0009] Furthermore, the branch pipe is a flexible pipe, and a flat section is provided at the end of the branch pipe away from the main pipe.

[0010] Furthermore, the sliding assembly includes a sliding motor, a lead screw, and a drive block. A sliding groove is formed on the construction beam along its own length direction. The lead screw is rotatably connected in the sliding groove. The sliding motor is fixedly installed at one end of the construction beam, and the output shaft of the sliding motor is fixedly connected to the lead screw. The drive block is slidably connected in the sliding groove. A threaded hole is formed on the drive block and it is fixedly connected to the lead screw. The trowel plate is fixedly connected to the end of the drive block located outside the sliding groove.

[0011] Furthermore, the squeegee includes a rigid part and a flexible bending part. The rigid part is fixedly connected to the drive block, and the flexible bending part is located at the end of the rigid part away from the drive block.

[0012] Furthermore, the vertical beam includes a bottom beam and a top beam, the top beam being slidably disposed at the top of the bottom beam, and the bottom beam being provided with a lifting electric cylinder for driving the top beam to rise and fall.

[0013] The technical solution of this utility model has at least the following advantages and beneficial effects: 1. This utility model involves installing a hinged rod on the construction beam and rotatably connecting the hinged rod to the transverse beam. By driving the hinged rod to a vertical position through a worm gear mechanism, both the pouring mechanism and the smoothing mechanism can face the ground, facilitating the repair of cracks on the ground. Similarly, by driving the hinged rod to a horizontal position through the worm gear mechanism, both the pouring mechanism and the smoothing mechanism can face the wall, facilitating the repair of cracks in the wall.

[0014] 2. This utility model uses a bottom beam and a top beam to form a telescopic vertical beam. The overall length of the vertical beam can be changed by raising and lowering the top beam through a lifting electric cylinder, which facilitates the pouring and repair of cracks at different heights on the wall. By using a flexible corrugated pipe as the conveying pipe, it can adapt to changes in the height of the vertical beam and changes in the state of the construction frame. Attached Figure Description

[0015] Figure 1 This is a schematic diagram of the overall structure of this utility model; Figure 2This is a schematic diagram of the structure of the construction frame of this utility model when rotated to a horizontal state; Figure 3 This is a schematic diagram of the structure of the construction frame of this utility model when it is rotated to a vertical position; Figure 4 This is a schematic diagram of the pouring mechanism and smoothing mechanism of this utility model on the construction beam; Reference numerals: 1-base, 11-roller, 2-storage bin, 21-conveying pump, 22-conveying pipe, 3-support frame, 31-vertical beam, 311-bottom beam, 312-top beam, 313-lifting cylinder, 32-horizontal beam, 4-construction frame, 41-construction beam, 42-hinged rod, 43-rotating rod, 44-worm gear mechanism, 45-fixed plate, 5-pouring mechanism, 51-main pipe, 511-connecting block, 52-branch pipe, 521-flat section, 6-smoothing mechanism, 61-smoothing plate, 611-rigid section, 612-flexible bending section, 62-sliding assembly, 621-sliding motor, 622-lead screw, 623-drive block. Detailed Implementation

[0016] To make the objectives, technical solutions, and advantages of the embodiments of this utility model clearer, the technical solutions of the embodiments of this utility model will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this utility model, and not all embodiments. The components of the embodiments of this utility model described and shown in the accompanying drawings can generally be arranged and designed in various different configurations.

[0017] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely to illustrate selected embodiments of the invention. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without inventive effort are within the scope of protection of the present invention.

[0018] The following is for reference Figures 1-4As shown in the illustration, and further explained with reference to a specific embodiment, this embodiment provides a basement crack concrete pouring device, including a base 1, a storage bin 2, a support frame 3, a construction frame 4, a pouring mechanism 5, and a smoothing mechanism 6. The base 1 is equipped with rollers 11 at its bottom and a push handle on one side to facilitate pushing the base 1 to the repair location for construction. The storage bin 2 is mounted on the base 1, and a conveying pump 21 is located at its bottom. A conveying pipe 22 is located at the discharge end of the conveying pump 21. The support frame 3 includes a vertical beam 31 and a [missing information - likely a component or structure] welded to the top of the vertical beam 31. The transverse beam 32; the construction frame 4 includes a construction beam 41 and hinged rods 42 arranged on both sides of the construction beam 41. The hinged rods 42 are hinged on the transverse beam 32, and the construction beam 41 is located at the end of the hinged rods 42 away from the transverse beam 32; the pouring mechanism 5 is arranged on one side of the construction beam 41 and connected to the outlet end of the conveying pipe 22. The pouring mechanism 5 includes a main pipe 51 and multiple branch pipes 52, which are spaced apart on the main pipe 51; the smoothing mechanism 6 includes a smoothing plate 61 and a sliding component 62 for driving the smoothing plate 61 to move along the length direction of the construction beam 41.

[0019] Concrete is added to the storage bin 2 and pumped by the delivery pump 21 to the main pipe 51 of the pouring mechanism 5. Multiple branch pipes 52 are inserted into the cracks, allowing concrete to flow out simultaneously from the branch pipes 52 to pour the concrete into the cracks. After pouring, the sliding component 62 drives the squeegee 61 to slide along the length of the construction beam 41, smoothing out any excess concrete on the surface of the poured area. Once the concrete has solidified, the crack repair is complete. By rotating the hinge rod 42 to the transverse beam 32, rotating the hinge rod 42 to a vertical position allows both the pouring mechanism 5 and the squeegee 6 to face the ground, facilitating the repair of cracks on the ground. Rotating the hinge rod 42 to a horizontal position allows both the pouring mechanism 5 and the squeegee 6 to face the wall, facilitating the repair of cracks in the wall.

[0020] Reference Figure 2 , Figure 3 As shown, a rotating rod 43 is fixedly connected between two hinged rods 42. The rotating rod 43 is rotatably connected within a transverse beam 32. A worm gear mechanism 44 is provided on the transverse beam 32 to drive the rotating rod 43 to rotate. The worm gear mechanism 44 can drive the rotating rod 43 to rotate, thereby causing the hinged rods 42 to rotate synchronously, which in turn moves the construction beam 41 to a designated position to facilitate construction.

[0021] Reference Figure 2As shown, the vertical beam 31 is a telescopic beam composed of a bottom beam 311 and a top beam 312. The bottom beam 311 is fixedly connected to the base 1, and the top beam 312 is slidably mounted on the top of the bottom beam 311. The bottom beam 311 is equipped with a lifting cylinder 313 for driving the top beam 312 to rise and fall. The lifting cylinder 313 can drive the top beam 312 to rise and fall, thereby changing the overall length of the vertical beam 31, which facilitates the pouring and repair of cracks at different heights on the wall.

[0022] Reference Figure 1 , Figure 2 As shown, the conveying pipe 22 is a flexible corrugated pipe, which can adapt to the height changes of the vertical beam 31 and the angle changes of the construction frame 4. The construction beam 41 is provided with a fixing plate 45 for fixing the end position of the conveying pipe 22, and the vertical beam 31 is provided with a through hole for the conveying pipe 22 to pass through, so as to provide support for the conveying pipe 22.

[0023] Reference Figure 4 As shown, connecting blocks 511 are provided at both ends of the main pipe 51. The connecting blocks 511 are welded to the construction beam 41. The conveying pipe 22 is connected to the middle of the main pipe 51, allowing concrete to enter the main pipe 51 and be distributed to multiple branch pipes 52. The branch pipes 52 are flexible pipes, and a flattened portion 521 is provided at the end of the branch pipe 52 away from the main pipe 51. Since cracks are usually irregularly shaped curves, making the branch pipe 52 a flexible pipe makes it easy to bend to adapt to the shape of the crack. By providing the flattened portion 521 to the branch pipe 52, it is easy to wedge the end of the branch pipe 52 into the crack, thus eliminating the need for workers to manually support the branch pipe 52 during the pouring process.

[0024] The sliding assembly 62 includes a sliding motor 621, a lead screw 622, and a drive block 623. A groove is formed along the length of the construction beam 41. The lead screw 622 is rotatably connected within the groove. The sliding motor 621 is fixedly mounted at one end of the construction beam 41, and its output shaft is fixedly connected to the lead screw 622. The drive block 623 is slidably connected within the groove, and has a threaded hole that is fixedly connected to the lead screw 622. A trowel plate 61 is fixedly connected to the end of the drive block 623 located outside the groove. By rotating the lead screw 622 driven by the sliding motor 621, the drive block 623 can be driven to slide along the length of the groove, thereby moving the trowel plate 61 to smooth out any concrete overflowing into the cracks.

[0025] Furthermore, the trowel plate 61 includes a rigid portion 611 and a flexible bending portion 612. The rigid portion 611 is fixedly connected to the drive block 623, and the flexible bending portion 612 is disposed at the end of the rigid portion 611 away from the drive block 623. When the drive block 623 drives the rigid portion 611 to move, the flexible bending portion 612 can bend and press against the wall or floor, while avoiding scratches to the wall or floor.

[0026] The above are merely preferred embodiments of this utility model and are not intended to limit the scope of this utility model. Various modifications and variations can be made to this utility model by those skilled in the art. Any modifications, equivalent substitutions, or improvements made within the spirit and principles of this utility model should be included within the protection scope of this utility model.

Claims

1. A device for pouring concrete into cracked basements, characterized in that, include: A base (1), the bottom of which is provided with casters (11); Storage bin (2), the bottom of the storage bin (2) is provided with a conveying pump (21), and the discharge end of the conveying pump (21) is provided with a conveying pipe (22); The support frame (3) includes a vertical beam (31) and a horizontal beam (32) disposed on the top of the vertical beam (31); Construction frame (4), the construction frame (4) includes a construction beam (41) and hinge rods (42) arranged on both sides of the construction beam (41). The hinge rods (42) are hinged on the transverse beam (32). The construction beam (41) is arranged at the end of the hinge rods (42) away from the transverse beam (32). The pouring mechanism (5) is set on one side of the construction beam (41) and connected to the outlet end of the conveying pipe (22). The pouring mechanism (5) includes a main pipe (51) and multiple branch pipes (52), which are spaced apart on the main pipe (51). And a smoothing mechanism (6), which includes a smoothing plate (61) and a sliding assembly (62) for driving the smoothing plate (61) to move along the length of the construction beam (41).

2. The basement crack concrete pouring device according to claim 1, characterized in that, A rotating rod (43) is connected between the two hinged rods (42), and a worm gear mechanism (44) for driving the rotating rod (43) to rotate is provided on the transverse beam (32).

3. The basement crack concrete pouring device according to claim 1, characterized in that, The conveying pipe (22) is a flexible corrugated pipe. The construction beam (41) is provided with a fixing plate (45) for fixing the end position of the conveying pipe (22). The vertical beam (31) is provided with a through hole for the conveying pipe (22) to pass through.

4. The basement crack concrete pouring device according to claim 3, characterized in that, Both ends of the main pipe (51) are provided with connecting blocks (511), which are fixedly connected to the construction beam (41). The conveying pipe (22) is connected to the middle of the main pipe (51).

5. The basement crack concrete pouring device according to claim 1, characterized in that, The branch pipe (52) is a flexible pipe, and a flat section (521) is provided at the end of the branch pipe (52) away from the main pipe (51).

6. The basement crack concrete pouring device according to claim 1, characterized in that, The sliding assembly (62) includes a sliding motor (621), a lead screw (622), and a drive block (623). The construction beam (41) has a sliding groove along its length. The lead screw (622) is rotatably connected in the sliding groove. The sliding motor (621) is fixedly installed at one end of the construction beam (41), and the output shaft of the sliding motor (621) is fixedly connected to the lead screw (622). The drive block (623) is slidably connected in the sliding groove. The drive block (623) has a threaded hole and is fixedly connected to the lead screw (622). The trowel plate (61) is fixedly connected to the end of the drive block (623) located outside the sliding groove.

7. The basement crack concrete pouring device according to claim 6, characterized in that, The squeegee (61) includes a rigid part (611) and a flexible bending part (612). The rigid part (611) is fixedly connected to the drive block (623), and the flexible bending part (612) is disposed at one end of the rigid part (611) away from the drive block (623).

8. The basement crack concrete pouring device according to claim 1, characterized in that, The vertical beam (31) includes a bottom beam (311) and a top beam (312). The top beam (312) is slidably disposed at the top of the bottom beam (311). The bottom beam (311) is provided with a lifting electric cylinder (313) for driving the top beam (312) to rise and fall.