Intelligent trolley for tunnel construction
Patent Information
- Application Number
- CN202522285114.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-29
- Publication Date
- 2026-10-20
- Estimated Expiration
- 2035-10-29
AI Technical Summary
[0004]针对现有技术存在的不足,本实用新型的目的在于提供隧道施工智能台车,旨在解决上述台车移动时遇坡易倾覆,影响施工安全的技术问题
通过固定柱、升降机构、电子水平仪和控制器之间的配合,使得台车在隧道中移动时,电子水平仪实时检测支撑板的倾斜角度,当遇到斜坡的情况时,电子水平仪将倾斜角度信息传输给控制器,控制器启动升降机构带动万向轮上下移动,从而调节支撑板的高度并使装置处于水平状态,防止出现滑移或倾覆的风险,从而不影响施工进度,防止对设备和人员造成威胁。
Smart Images

Figure CN224871274U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of tunnel construction equipment technology, and in particular to an intelligent tunnel construction trolley. Background Technology
[0002] Intelligent tunnel construction trolleys, also known as intelligent lining trolleys, are key specialized equipment used for pouring secondary lining concrete in tunnels. They play a central role in tunnel structure forming, dimensional accuracy control, and construction quality assurance. This equipment features automatic walking, hydraulic adjustment, and precise positioning, effectively improving construction efficiency and safety. With technological advancements, intelligent trolleys are developing towards automation and informatization, gradually realizing remote monitoring and intelligent construction, becoming an important piece of equipment in modern tunnel construction.
[0003] However, when the current trolley moves frequently inside the tunnel, it may encounter situations where the ground is sloping, posing a risk of overturning. This not only affects the construction progress but may also threaten the safety of equipment and personnel, so improvements are urgently needed. Utility Model Content
[0004] In view of the shortcomings of the existing technology, the purpose of this utility model is to provide an intelligent trolley for tunnel construction, which aims to solve the technical problem that the trolley is prone to overturning when it encounters a slope, thus affecting construction safety.
[0005] To achieve the above objectives, the present invention adopts the following technical solution: A smart tunnel construction trolley includes a trolley frame, a support plate, and casters. The trolley frame is fixedly connected to the support plate. It also includes: Four fixed columns are provided, and the four fixed columns are fixedly installed on the support plate; The system includes four lifting mechanisms, which are mounted on the fixed column to drive the casters to move up and down. There are eight limiting posts, which are set on the lifting mechanism; The device includes eight locking mechanisms, which are mounted on the limiting post to fix the limiting post in place. The system includes four moving mechanisms, which are mounted on the support plate. Four electronic levels are provided, and the four electronic levels are fixedly installed on the support plate to detect the tilt angle of the support plate. The controller is fixedly mounted on the support plate.
[0006] Preferably, the lifting mechanism includes: The first motor is provided in four parts, and the four first motors are fixedly mounted on the fixed column; There are four screws, which are rotatably mounted on the first motor. One end of each screw is fixedly connected to the output end of the first motor. Four rectangular threaded sleeves are provided, and the four rectangular threaded sleeves are disposed on the screw and threadedly connected to the screw. There are four lifting components, which are mounted on the rectangular threaded sleeve.
[0007] Preferably, the lifting assembly includes: Eight L-shaped fixing plates are provided, and the eight L-shaped fixing plates are fixedly installed on the rectangular threaded sleeve and slidably connected to the fixing column; There are four lifting plates, which are fixedly mounted on the L-shaped fixed plate and rotatably connected to the casters.
[0008] Preferably, the fixed column has eight lifting slots to limit the lifting trajectory of the L-shaped fixed plate.
[0009] Preferably, the locking mechanism includes: Eight springs are provided, and the eight springs are disposed on the limiting post, with one end of each spring fixedly connected to the limiting post; Eight inclined plates are provided, and the eight inclined plates are set on the spring and fixedly connected to the other end of the spring. The support column is fixedly installed on the inclined plate and slidably connected to the limiting column.
[0010] Preferably, the fixing post has multiple inclined slots to limit the position of the inclined plate.
[0011] Preferably, the moving mechanism includes: The second motor is provided in four parts, and the four second motors are fixedly mounted on the support plate. Four bidirectional lead screws are provided, and the four bidirectional lead screws are rotatably mounted on the support plate. One end of each bidirectional lead screw is fixedly connected to the output end of the second motor. Eight nut sleeves are provided, and the eight nut sleeves are set on the bidirectional lead screw and threadedly connected to the bidirectional lead screw. Eight connecting posts are provided, and the eight connecting posts are fixedly mounted on the nut sleeve; There are eight movable columns, which are fixedly installed on the connecting column.
[0012] Preferably, the support column has eight movable slots to limit the movement position of the connecting column.
[0013] In summary, due to the adoption of the above technical solution, the beneficial effects of this utility model are: Through the coordination of the fixed column, lifting mechanism, electronic level and controller, the electronic level can detect the tilt angle of the support plate in real time when the trolley moves in the tunnel. When encountering a slope, the electronic level transmits the tilt angle information to the controller, which then activates the lifting mechanism to move the casters up and down, thereby adjusting the height of the support plate and keeping the device in a horizontal state. This prevents the risk of slippage or overturning, thus not affecting the construction progress and preventing threats to equipment and personnel. Attached Figure Description
[0014] To more clearly illustrate the technical solutions of the embodiments of this utility model, the drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0015] Figure 1 A three-dimensional structural diagram of the intelligent tunnel construction trolley is shown.
[0016] Figure 2 It shows Figure 1 A partial three-dimensional structural diagram.
[0017] Figure 3 It shows Figure 2 A partial three-dimensional structural diagram.
[0018] Figure 4 It shows Figure 3 A frontal sectional view.
[0019] Figure 5 It shows Figure 2 A partial three-dimensional structural diagram.
[0020] Figure 6 It shows Figure 5 A frontal sectional view.
[0021] Legend: 1. Trolley frame; 2. Support plate; 3. Casters; 4. Fixed column; 5. Limiting column; 6. Electronic level; 7. Controller; 8. First motor; 9. Screw; 10. Rectangular threaded sleeve; 11. L-shaped fixed plate; 12. Lifting plate; 13. Lifting groove; 14. Spring; 15. Angled clamping plate; 16. Support column; 17. Angled clamping groove; 18. Second motor; 19. Bidirectional lead screw; 20. Nut sleeve; 21. Connecting column; 22. Moving column; 23. Moving groove. Detailed Implementation
[0022] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of the present utility model.
[0023] In the description of this utility model, it should be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model.
[0024] It should be noted that when a component is described as "fixed to" another component, it can be directly on the other component or may have a component in between. When a component is considered "connected to" another component, it can be directly connected to the other component or may have a component in between. When a component is considered "set on" another component, it can be directly set on the other component or may have a component in between. The terms "vertical," "horizontal," "left," "right," and similar expressions used in this document are for illustrative purposes only.
[0025] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this utility model, "a plurality of" means two or more, unless otherwise explicitly specified.
[0026] Reference Figures 1 to 6 The embodiments of the intelligent tunnel construction trolley of this utility model are further described below.
[0027] The intelligent tunnel construction trolley includes a trolley frame 1, a support plate 2, and casters 3. The trolley frame 1 is fixedly connected to the support plate 2. It also includes: There are four fixed columns 4, which are fixedly installed on the support plate 2; they provide support for the first motor 8 and limit the position of the screw 9. Reference Figure 1 , Figure 2 , Figure 5 and Figure 6In a preferred embodiment, the lifting mechanism comprises four components, each mounted on a fixed column 4, used to drive the casters 3 to move up and down. The lifting mechanism includes: There are four first motors 8, and the four first motors 8 are fixedly mounted on the fixed column 4; There are four screws 9, which are rotatably mounted on the first motor 8. One end of each screw 9 is fixedly connected to the output end of the first motor 8. Four rectangular threaded sleeves 10 are provided, and the four rectangular threaded sleeves 10 are set on the screw 9 and threadedly connected to the screw 9. The lifting assembly comprises four components, each mounted on a rectangular threaded sleeve 10. The lifting assembly includes: Eight L-shaped fixing plates 11 are provided. The eight L-shaped fixing plates 11 are fixedly mounted on the rectangular threaded sleeve 10 and are slidably connected to the fixing column 4. There are four lifting plates 12, which are fixedly mounted on the L-shaped fixed plate 11 and rotatably connected to the casters 3.
[0028] The fixed column 4 has eight lifting slots 13, which are used to limit the lifting trajectory of the L-shaped fixed plate 11.
[0029] There are eight limit posts 5, which are installed on the lifting mechanism. During operation, the first motor 8 is started, which drives the screw 9, which is fixedly connected to its output end, to rotate. The screw 9 drives the rectangular threaded sleeve 10 to move up and down. The rectangular threaded sleeve 10 drives the L-shaped fixing plate 11 to move up and down along the lifting groove 13. The L-shaped fixing plate 11 drives the lifting plate 12 to move up and down. The lifting plate 12 is used to drive the caster 3 to move up and down, thereby adjusting the height of the support plate 2 so that the device is in a horizontal state and prevents overturning caused by the center of gravity shift. The rectangular threaded sleeve 10 is also used to drive the limiting post 5 to move up and down, thereby driving the locking mechanism to move up and down. Reference Figure 6 In a preferred embodiment, the locking mechanism comprises eight locking mechanisms, which are disposed on the limiting post 5 to fix the limiting post 5; the locking mechanism includes: Eight springs 14 are provided, and the eight springs 14 are set on the limiting post 5, with one end of the spring 14 fixedly connected to the limiting post 5; Eight inclined plates 15 are provided, and the eight inclined plates 15 are set on the spring 14 and fixedly connected to the other end of the spring 14. The support column 16 is fixedly mounted on the inclined plate 15 and is slidably connected to the limiting column 5.
[0030] Multiple inclined slots 17 are provided on the fixed column 4 to limit the position of the inclined plate 15.
[0031] During operation, the rectangular threaded sleeve 10 drives the limiting post 5 to move up and down. The limiting post 5 drives the spring 14 and the support post 16 to move up and down. The support post 16 and the spring 14 drive the inclined plate 15 to move up and down. When the inclined plate 15 moves to the inclined slot 17, the spring 14 releases its elastic potential energy to drive the inclined plate 15 to move, so that the inclined plate 15 is inserted into the inclined slot 17, thereby fixing the fixing post 4 and playing an auxiliary fixing role for the rectangular threaded sleeve 10, reducing the burden on the screw 9.
[0032] Reference Figures 1 to 4 In a preferred embodiment, four moving mechanisms are provided, and the four moving mechanisms are disposed on the support plate 2; the moving mechanisms include: There are four second motors 18, and the four second motors 18 are fixedly mounted on the support plate 2; There are four bidirectional lead screws 19, which are rotatably mounted on the support plate 2. One end of the bidirectional lead screw 19 is fixedly connected to the output end of the second motor 18. Eight nut sleeves 20 are provided, and the eight nut sleeves 20 are set on the bidirectional lead screw 19 and threadedly connected to the bidirectional lead screw 19. There are eight connecting posts 21, which are fixedly mounted on the nut sleeve 20. There are eight movable columns 22, which are fixedly mounted on the connecting column 21.
[0033] The support column 16 has eight movable slots 23, which are used to limit the movement position of the connecting column 21.
[0034] During operation, the second motor 18 is started, which drives the bidirectional screw 9, which is fixedly connected to its output end, to rotate. The bidirectional screw 9 drives the two nut sleeves 20 to move towards each other. The nut sleeves 20 drive the two connecting columns 21 to move towards each other. The connecting columns 21 drive the two moving columns 22 to move. The moving columns 22 move into the inclined slot 17, push the inclined plate 15 out of the inclined slot 17, and compress the spring 14, so that the lifting mechanism can operate normally to adjust the height of the universal wheel 3. There are four electronic levels 6, which are fixedly installed on the support plate 2 to detect the tilt angle of the support plate 2. The controller 7 is fixedly mounted on the support plate 2.
[0035] During operation, the electronic level 6 detects the tilt angle of the support plate 2 in real time and transmits the information to the controller 7. The controller 7 starts the second motor 18 to insert the moving column 22 into the inclined slot 17. Then, the first motor 8 is started to adjust the height of the caster wheel 3. When the appropriate height is reached, the second motor 18 is started to move the moving column 22 out of the inclined slot 17. The spring 14 releases its elasticity and drives the inclined plate 15 to be inserted into the inclined slot 17, thereby further fixing the rectangular threaded sleeve 10.
[0036] Working principle: When driving on a sloped surface, the electronic level 6 detects the tilt angle of the support plate 2 in real time and transmits the information to the controller 7. The controller 7 starts the second motor 18, which drives the bidirectional screw 9 to rotate. The bidirectional screw 9 drives the two nut sleeves 20 to move towards each other. The nut sleeves 20 drive the two connecting columns 21 to move towards each other. The connecting columns 21 drive the two moving columns 22 to move. The moving columns 22 move into the inclined slot 17, pushing the inclined plate 15 out of the inclined slot 17 and compressing the spring 14. At this time, the controller 7 starts the first motor 8, which drives the screw 9 to rotate. The screw 9 drives the rectangular threaded sleeve 10 to move up and down. The rectangular threaded sleeve 10 drives the L-shaped fixing plate 11 to move up and down along the lifting groove 13. The L-shaped fixing plate 11 drives the lifting plate... The lifting plate 12 moves up and down, driving the caster wheel 3 to move up and down, thereby adjusting the height of the support plate 2 and keeping the device in a horizontal position to prevent overturning caused by the shift of the center of gravity. The rectangular threaded sleeve 10 drives the L-shaped fixing plate 11 to move while also driving the limiting post 5 to move up and down. The limiting post 5 drives the spring 14 and the support post 16 to move up and down. The support post 16 and the spring 14 drive the inclined plate 15 to move up and down. When the inclined plate 15 moves to the inclined slot 17, the second motor 18 is started to drive the moving post 22 to move out of the inclined slot 17. At this time, the spring 14 releases its elastic potential energy to drive the inclined plate 15 to move, so that the inclined plate 15 is inserted into the inclined slot 17, thereby fixing the fixing post 4 and playing an auxiliary fixing role for the rectangular threaded sleeve 10, reducing the burden on the screw 9.
[0037] The above description of the embodiments enables those skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A tunnel construction intelligent trolley, comprising a trolley frame (1), a support plate (2), and casters (3), wherein the trolley frame (1) is fixedly connected to the support plate (2), characterized in that, Also includes: There are four fixed columns (4), which are fixedly installed on the support plate (2); The lifting mechanism is provided in four parts, which are mounted on the fixed column (4) to drive the casters (3) to move up and down. There are eight limit posts (5), and the eight limit posts (5) are set on the lifting mechanism; The locking mechanism is provided in eight parts. The eight locking mechanisms are set on the limiting post (5) to fix the limiting post (5). The moving mechanism is provided in four parts, which are mounted on the support plate (2); Electronic level (6), four of them are fixedly installed on the support plate (2) to detect the tilt angle of the support plate (2); The controller (7) is fixedly mounted on the support plate (2).
2. The intelligent tunnel construction trolley according to claim 1, characterized in that, The lifting mechanism includes: There are four first motors (8), and the four first motors (8) are fixedly installed on the fixed column (4); There are four screws (9), which are rotatably mounted on the first motor (8). One end of each screw (9) is fixedly connected to the output end of the first motor (8). Four rectangular threaded sleeves (10) are provided, and the four rectangular threaded sleeves (10) are provided on the screw (9) and are threadedly connected to the screw (9); There are four lifting components, which are mounted on the rectangular threaded sleeve (10).
3. The intelligent tunnel construction trolley according to claim 2, characterized in that, The lifting assembly includes: There are eight L-shaped fixing plates (11), which are fixedly mounted on the rectangular threaded sleeve (10) and slidably connected to the fixing column (4); There are four lifting plates (12), which are fixedly mounted on the L-shaped fixed plate (11) and rotatably connected to the universal wheel (3).
4. The intelligent tunnel construction trolley according to claim 3, characterized in that, The fixed column (4) has eight lifting slots (13) for limiting the lifting trajectory of the L-shaped fixed plate (11).
5. The intelligent tunnel construction trolley according to claim 4, characterized in that, The positioning mechanism includes: Eight springs (14) are provided, and the eight springs (14) are set on the limiting post (5). One end of the spring (14) is fixedly connected to the limiting post (5). Eight inclined plates (15) are provided, and the eight inclined plates (15) are set on the spring (14) and fixedly connected to the other end of the spring (14); The support column (16) is fixedly installed on the inclined plate (15) and is slidably connected to the limiting column (5).
6. The intelligent tunnel construction trolley according to claim 5, characterized in that, The fixed column (4) has multiple inclined slots (17) for limiting the position of the inclined plate (15).
7. The intelligent tunnel construction trolley according to claim 6, characterized in that, The mobile mechanism includes: There are four second motors (18), and the four second motors (18) are fixedly installed on the support plate (2); There are four bidirectional lead screws (19), which are rotatably mounted on the support plate (2). One end of each bidirectional lead screw (19) is fixedly connected to the output end of the second motor (18). There are eight nut sleeves (20), which are set on the bidirectional lead screw (19) and threadedly connected to the bidirectional lead screw (19); There are eight connecting posts (21), and the eight connecting posts (21) are fixedly installed on the nut sleeve (20); There are eight movable columns (22), which are fixedly installed on the connecting column (21).
8. The intelligent tunnel construction trolley according to claim 7, characterized in that, The support column (16) has eight movable slots (23) for limiting the movement position of the connecting column (21).