A new boiler soot blower

CN224872469UActive Publication Date: 2026-10-20QINGDAO RIO TINTO ELECTRIC POWER TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522519165.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-27
Publication Date
2026-10-20
Estimated Expiration
2035-11-27

AI Technical Summary

Technical Problem

[0003]目前市面上存在一些便携式燃气激波吹灰器,但在携带时缺少对长管状喷嘴进行有效固定和对软导管进行保护,导致在携带过程中长管状喷嘴容易发生晃动掉落,软导管由于具有一定的长度,容易出现散落打结的情况,不便于后续的使用,影响了燃气激波吹灰器的携带和使用,有待改进

Benefits of technology

1.本实用新型通过固定架、固定罩、定位槽、活动罩、定位和定位凸块的设置,可以快速对长管状喷嘴进行限位固定,有效防止其晃动掉落,在使用长管状喷嘴时,只需要打开活动罩,取出长管状喷嘴即可,通过缠绕盘的设置,便于对软导管进行缠绕收纳,防止软导管散落产生打结的情况,从而便于进行携带和后续的使用。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224872469U_ABST
    Figure CN224872469U_ABST
Patent Text Reader

Abstract

The utility model relates to soot blower technical field, and disclose a new type boiler soot blower, including support platform, the right side fixed mounting of support platform top has gas shock wave soot blower, the left side fixed mounting of support platform top has fixed frame, the top fixed mounting of fixed frame front has fixed cover, the front of fixed cover is equipped with movable cover, the left side between fixed cover and movable cover is connected through hinge. The utility model discloses through fixed frame, fixed cover, locating groove, movable cover, the setting of positioning and positioning lug, can be quick to long tubular nozzle and limit fixed, effectively prevent its sway and fall, when using long tubular nozzle, only need to open movable cover, take out long tubular nozzle, through the setting of winding disc, it is convenient to winding storage to soft conduit, prevents the knot situation of soft conduit scattering and producing, thereby it is convenient to carry and subsequent use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the technical field of soot blowing devices, and more specifically to a novel boiler soot blowing device. Background Technology

[0002] A boiler is a device that uses fuel combustion or other energy sources to heat water into hot water or steam, and is widely used in industrial production and daily life. Its core function is to provide heat energy through energy conversion. New-type boilers refer to boiler equipment that uses innovative technologies to improve energy efficiency, environmental friendliness, or fuel adaptability. Currently, ash accumulation is a common problem in boiler operation. Ash accumulation not only reduces the boiler's thermal efficiency and increases energy consumption, but may also threaten the safe operation of the boiler. There are generally three methods for soot blowing in boilers: 1. Acoustic soot blower: uses the vibration of sound waves to loosen and remove ash. 2. Steam soot blower: uses the impact force of high-pressure steam to remove ash. 3. Gas shock wave soot blower: uses the shock wave generated by the combustion of combustible gases such as acetylene or natural gas with air to remove ash from the boiler's heated surfaces.

[0003] Currently, there are some portable gas shockwave soot blowers on the market, but they lack effective fixation for the long tubular nozzle and protection for the flexible conduit when carried. This makes the long tubular nozzle prone to shaking and falling off during transport, and the flexible conduit, due to its length, is prone to scattering and tangling, which is inconvenient for subsequent use. This affects the portability and use of the gas shockwave soot blower and needs to be improved. Utility Model Content

[0004] In order to overcome the above-mentioned defects of the prior art, the present invention provides a novel boiler soot blowing device to solve the problems existing in the background art.

[0005] This utility model provides the following technical solution: A novel boiler soot blowing device includes a support platform. A gas shock wave soot blower is fixedly installed on the right side of the top of the support platform. A fixed frame is fixedly installed on the left side of the top of the support platform. A fixed cover is fixedly installed on the upper front of the fixed frame. A movable cover is provided on the front of the fixed cover. The left side of the fixed cover and the movable cover are connected by a hinge, and the right side of the fixed cover and the movable cover are connected by a snap fastener. A long tubular nozzle is provided on the left side above the support platform. A positioning ring is fixedly sleeved on the lower part of the outer wall of the long tubular nozzle. The outer wall of the positioning ring is movably sleeved inside the space between the fixed cover and the movable cover. A winding disc is provided above the support platform and between the support platform and the fixed frame. A flexible guide tube is wound on the outer wall of the winding disc.

[0006] Furthermore, one end of the flexible conduit is fixedly installed at the output end of the gas shock wave soot blower, and the other end of the flexible conduit is fixedly installed at the input end at the bottom of the long tubular nozzle.

[0007] Furthermore, a support frame is fixedly installed on the back of the winding disc, and the bottom end of the support frame is fixedly installed on the top of the support platform.

[0008] Furthermore, both the fixed cover and the movable cover have positioning grooves on their inner walls, and positioning protrusions are fixedly connected to the front and rear sides of the outer wall of the positioning ring, with the outer walls of the positioning protrusions engaging inside the positioning grooves.

[0009] Furthermore, a rubber anti-slip sleeve is fixedly fitted onto the lower part of the outer wall of the long tubular nozzle, and the rubber anti-slip sleeve is located below the positioning ring.

[0010] Furthermore, casters are installed at the four corners of the bottom of the support platform, and a pusher is fixedly installed on the right side of the top of the support platform.

[0011] The technical effects and advantages of this utility model are as follows: 1. This utility model, through the setting of a fixed frame, a fixed cover, a positioning groove, a movable cover, a positioning element, and a positioning protrusion, can quickly limit and fix the long tubular nozzle, effectively preventing it from shaking and falling. When using the long tubular nozzle, simply open the movable cover and take out the long tubular nozzle. The setting of the winding disc facilitates the winding and storage of the soft tube, preventing the soft tube from scattering and getting tangled, thus making it easy to carry and use.

[0012] 2. This utility model, through the setting of a support platform, push frame and casters, facilitates the movement and handling of the soot blower by the staff. The casters are equipped with a braking component, which can be used to brake the casters when it is necessary to fix the position of the device, thereby maintaining the stability of the device's position. Attached Figure Description

[0013] Figure 1 This is a schematic diagram of the overall structure of this utility model.

[0014] Figure 2 This is a schematic diagram of the overall structure of this utility model from another perspective.

[0015] Figure 3 This is a schematic diagram of the structure of the long tubular nozzle, positioning ring, fixed cover and movable cover of this utility model.

[0016] Figure 4 This is a schematic diagram of the structure of the fixed frame, fixed cover, positioning groove and movable cover of this utility model.

[0017] Figure 5 This is a schematic diagram of the tubular nozzle, positioning ring, positioning protrusion, and rubber anti-slip sleeve of this utility model.

[0018] The attached figures are labeled as follows: 1. Support platform; 2. Gas shock wave soot blower; 3. Flexible conduit; 4. Long tubular nozzle; 41. Positioning ring; 42. Positioning protrusion; 43. Rubber anti-slip sleeve; 5. Support frame; 51. Winding disc; 6. Fixing frame; 7. Fixing cover; 71. Positioning groove; 8. Movable cover; 9. Push frame; 10. Caster. Detailed Implementation

[0019] The technical solution of this utility model will be clearly and completely described below with reference to the accompanying drawings. In addition, the forms of the various structures described in the following embodiments are merely illustrative. The novel boiler soot blowing device involved in this utility model is not limited to the structures described in the following embodiments. All other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this utility model.

[0020] Example 1: like Figure 1-5 As shown, a novel boiler soot blowing device includes a support platform 1. A gas shock wave soot blower 2 is fixedly installed on the right side of the top of the support platform 1. A fixed frame 6 is fixedly installed on the left side of the top of the support platform 1. A fixed cover 7 is fixedly installed on the upper front of the fixed frame 6. A movable cover 8 is provided on the front of the fixed cover 7. The left side between the fixed cover 7 and the movable cover 8 is connected by a hinge, and the right side between the fixed cover 7 and the movable cover 8 is connected by a snap fastener. A long tubular nozzle 4 is provided on the left side above the support platform 1. A positioning ring 41 is fixedly sleeved on the lower part of the outer wall of the long tubular nozzle 4. The outer wall of the positioning ring 41 is movably sleeved inside the space between the fixed cover 7 and the movable cover 8. Positioning grooves 71 are provided on the inner walls of both the fixed cover 7 and the movable cover 8. Positioning protrusions 42 are fixedly connected to the front and rear sides of the outer wall of the positioning ring 41. The outer walls of the positioning protrusions 42 are snapped into the space inside the positioning grooves 71.

[0021] In this embodiment, the long tubular nozzle 4 can be securely installed between the fixed cover 7 and the movable cover 8 through the cooperation of the positioning ring 41 and the positioning protrusion 42, which facilitates subsequent movement. When the long tubular nozzle 4 needs to be used, first open the buckle between the movable cover 8 and the fixed cover 7, and move the movable cover 8. The left side of the movable cover 8 rotates around the hinge, thereby opening the space between the movable cover 8 and the fixed cover 7. Then, remove the positioning ring 41 below the outer wall of the long tubular nozzle 4 from the inside of the fixed cover 7, and the long tubular nozzle 4 can be used.

[0022] Example 2: like Figure 1-5As shown, a winding disc 51 is provided above the support platform 1 and between the support platform 1 and the fixed frame 6. A flexible conduit 3 is wound around the outer wall of the winding disc 51. One end of the flexible conduit 3 is fixedly installed at the output end of the gas shock wave soot blower 2, and the other end of the flexible conduit 3 is fixedly installed at the input end of the bottom of the long tubular nozzle 4. A support frame 5 is fixedly installed on the back of the winding disc 51. The bottom end of the support frame 5 is fixedly installed on the top of the support platform 1. A rubber anti-slip sleeve 43 is fixedly fitted on the lower part of the outer wall of the long tubular nozzle 4. The rubber anti-slip sleeve 43 is located below the positioning ring 41. Casters 10 are installed at the four corners of the bottom of the support platform 1. A pusher 9 is fixedly installed on the right side of the top of the support platform 1.

[0023] In this embodiment, the support frame 5 facilitates the support and fixation of the winding disc 51, and the winding disc 51 facilitates the winding and storage of the flexible conduit 3, preventing the flexible conduit 3 from being scattered. The casters 10 and the push frame 9 facilitate the movement of the entire device. The casters 10 are equipped with a braking assembly. When it is necessary to fix the position of the device, the braking assembly is used to brake the casters 10, thereby maintaining the stability of the device's position.

[0024] In summary, as Figure 1-5 As shown, in use, the operator first moves the support platform 1 and casters 10 by pushing the pusher 9 to move the entire device to the vicinity of the boiler combustion port. After reaching the designated position, the operator uses the brake assembly on the casters 10 to brake the casters 10 and fix the device in position. Then, the operator opens the latch between the movable cover 8 and the fixed cover 7 and moves the movable cover 8. The left side of the movable cover 8 rotates around the hinge, thereby opening the space between the movable cover 8 and the fixed cover 7. Then, the positioning ring 41 below the outer wall of the long tubular nozzle 4 is removed from inside the fixed cover 7. Then, the flexible guide tube 3 is removed from the winding disc 51. The operator can hold the long tubular nozzle 4 through the rubber anti-slip sleeve 43 and place the output end of the long tubular nozzle 4 inside the boiler through the boiler combustion port. Then, the gas shock wave is activated. The shock wave generated by the gas shock wave soot blower 2 is transmitted through the output end to the long tubular nozzle 4 via the flexible conduit 3. The long tubular nozzle 4 then blows soot into the boiler. After blowing soot, the flexible conduit 3 is rewound around the outer wall of the winding disc 51, and the positioning ring 41 on the outer wall of the long tubular nozzle 4 is placed inside the fixed cover 7. At the same time, the positioning protrusion 42 on one side of the positioning ring 41 is inserted into the positioning groove 71 inside the fixed cover 7. The movable cover 8 is then rotated around the hinge to close it with the fixed cover 7, and the buckle between the two is fastened to ensure a tight connection between the movable cover 8 and the fixed cover 7. This fixes the long tubular nozzle 4 between the movable cover 8 and the fixed cover 7. After that, the brake assembly on the caster 10 is released, and the operator can move the device by pushing the support platform 1 and the caster 10 through the pusher 9.

[0025] All standard parts used in this application can be purchased from the market, and can be customized according to the description and drawings. The specific connection methods of each part adopt conventional methods such as bolts, rivets, and welding that are mature in the prior art. The machinery, parts and equipment adopt conventional models in the prior art. The installation methods between equipment are also the same as conventional installation methods in the prior art. The equipment can be driven by either built-in battery or external power supply. The control method is automatic control by a controller. The control circuit of the controller can be implemented by simple programming by those skilled in the art and is common knowledge in the field. Since this utility model is mainly used to protect mechanical devices, this utility model will not explain the control method and circuit connection in detail. The controller can be an external controller or installed in a position that does not affect the use of this device. The controller can play a control role for the electrical components mentioned in this document, and the controller is a conventional known device.

[0026] Finally, the following points should be noted: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installation", "connection", and "linkage" should be interpreted broadly, and can be mechanical or electrical connections, or internal connections between two components, or direct connections. "Up", "down", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may change. Secondly: The accompanying drawings of the embodiments disclosed in this utility model only involve the structures involved in the embodiments disclosed in this utility model. Other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of this utility model can be combined with each other. Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.

Claims

1. A novel boiler soot blowing device, comprising a support platform (1), characterized in that, A gas shock wave soot blower (2) is fixedly installed on the right side of the top of the support platform (1). A fixed frame (6) is fixedly installed on the left side of the top of the support platform (1). A fixed cover (7) is fixedly installed on the upper front of the fixed frame (6). A movable cover (8) is provided on the front of the fixed cover (7). The left side between the fixed cover (7) and the movable cover (8) is connected by a hinge. The right side between the fixed cover (7) and the movable cover (8) is connected by a buckle. A long tubular nozzle (4) is provided on the left side above the support platform (1). A positioning ring (41) is fixedly sleeved on the lower part of the outer wall of the long tubular nozzle (4). The outer wall of the positioning ring (41) is movably sleeved inside between the fixed cover (7) and the movable cover (8). A winding disc (51) is provided above the support platform (1) and between the support platform (1) and the fixed frame (6). A soft conduit (3) is wound on the outer wall of the winding disc (51).

2. The novel boiler soot blowing device according to claim 1, characterized in that: One end of the flexible conduit (3) is fixedly installed at the output end of the gas shock wave soot blower (2), and the other end of the flexible conduit (3) is fixedly installed at the input end of the bottom of the long tubular nozzle (4).

3. The novel boiler soot blowing device according to claim 1, characterized in that: A support frame (5) is fixedly installed on the back of the winding disc (51), and the bottom end of the support frame (5) is fixedly installed on the top of the support platform (1).

4. A novel boiler soot blowing device according to claim 1, characterized in that: The inner walls of the fixed cover (7) and the movable cover (8) are provided with positioning grooves (71), and the front and rear sides of the outer wall of the positioning ring (41) are fixedly connected with positioning protrusions (42), and the outer walls of the positioning protrusions (42) are engaged in the interior of the positioning grooves (71).

5. A novel boiler soot blowing device according to claim 1, characterized in that: A rubber anti-slip sleeve (43) is fixedly fitted on the lower part of the outer wall of the long tubular nozzle (4), and the rubber anti-slip sleeve (43) is located below the positioning ring (41).

6. A novel boiler soot blowing device according to claim 1, characterized in that: Casters (10) are installed at the four corners of the bottom of the support platform (1), and a pusher (9) is fixedly installed on the right side of the top of the support platform (1).