Quick-change ceramic glue removing and sintering integrated machine

CN224872861UActive Publication Date: 2026-10-20TIANJIN ZHONGHUAN ELECTRIC FURNACE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522540419.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-29
Publication Date
2026-10-20
Estimated Expiration
2035-11-29

AI Technical Summary

Technical Problem

[0003]现有的陶瓷排胶烧结一体机在使用时,一般是通过小车将陶瓷移动到炉腔内进行排胶烧结加工,但是,在使用过程中,由于必须等到上一组陶瓷排胶烧结完成后,从炉腔内移出并从小车上取下,才能将后一组的陶瓷放在小车上,移入到炉腔内进行加工,换料麻烦,并且在排胶烧结时,一般需要向炉腔内提供气体,气体一般是通过设置在炉腔某个部位的管道进行输送,这样在输送气体时,气体会首先聚集在炉腔内靠近管道的位置,气体分布不均,并低温空气输送到炉腔内会对炉腔内的温度造成影响,使用效果差

Benefits of technology

[0022]1、通过在炉体下方设置环形轨道,并在环形轨道上设置多个移动座,这样在其中一个移动座上的支撑板将陶瓷推入炉腔内排胶烧结时,工作人员可将未加工的陶瓷放在另一个支撑板上,当上一组陶瓷烧结完成后,可将陶瓷从炉腔内移出后,立即将后一组陶瓷移入到炉腔内进行烧结,换料速度快。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224872861U_ABST
    Figure CN224872861U_ABST
Patent Text Reader

Abstract

The utility model provides a quick change formula ceramic glue discharging sintering integrated machine belongs to the technical field of ceramic production, including furnace body, the bottom of furnace body is linked with base, is installed the annular track in the top of base, the annular track penetrates furnace body, is equipped with at least two mobile seats above the annular track, and the mobile seat is linked with annular track through walking mechanism, and the top of every mobile seat all is connected with support plate through elevating system, the utility model discloses the annular track is set up below furnace body, and sets up multiple mobile seats on the annular track, and when the support plate on one of the mobile seats pushes ceramic into the furnace cavity and discharges glue and sinter, the staff can place the unprocessed ceramic on another support plate, when the last group of ceramic sintering is completed, can remove ceramic from the furnace cavity, immediately move the next group of ceramic into the furnace cavity and sinter, and the speed of changing material is fast.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the technical field of ceramic materials, specifically relating to a quick-change ceramic debinding and sintering integrated machine. Background Technology

[0002] Ceramic materials have wide applications in electronics, machinery, chemical industry, aerospace and other fields. Their preparation process usually includes two key steps: debinding and sintering. Therefore, ceramic debinding and sintering integrated machines are needed to process ceramics.

[0003] Existing integrated ceramic debinding and sintering machines typically use a trolley to move ceramics into the furnace cavity for debinding and sintering. However, during operation, it's cumbersome to wait for the previous batch of ceramics to complete debinding and sintering, remove it from the furnace cavity, and unload it from the trolley before placing the next batch onto the trolley and moving it into the furnace cavity for processing. Furthermore, during debinding and sintering, gas is generally supplied to the furnace cavity via pipes located at a specific point within the furnace. This uneven gas distribution, with gas initially accumulating near the pipes, and the low-temperature air supplied to the furnace cavity negatively impacts the furnace temperature, resulting in poor performance. Therefore, we propose a quick-change integrated ceramic debinding and sintering machine. Utility Model Content

[0004] The purpose of this invention is to provide a quick-change ceramic debinding and sintering integrated machine, which aims to solve the problems mentioned in the background art.

[0005] To achieve the above objectives, this utility model provides the following technical solution:

[0006] A quick-change ceramic debinding and sintering integrated machine includes a furnace body, the bottom of which is connected to a base. An annular track is installed on the top of the base and runs through the furnace body. At least two movable seats are provided above the annular track, and the movable seats are connected to the annular track through a walking mechanism.

[0007] Each of the movable seats is connected to a support plate via a lifting mechanism at its top, and a shelf is stacked on top of the support plate, with ceramics placed on the shelf.

[0008] The furnace body has a furnace cavity inside, a feed inlet is opened at the bottom of the furnace cavity, and a heating mechanism is installed on the inner wall of the furnace cavity;

[0009] A preheating groove is provided on the side of the furnace body, and a heat insulation baffle is installed on the side of the furnace body. The heat insulation baffle covers the opening of the preheating groove. A heat exchange tube is installed inside the preheating groove. One end of the heat exchange tube is connected to a gas source through an air inlet pipe, and the other end of the heat exchange tube is connected to a gas supply pipe.

[0010] An annular gas guiding channel is provided inside the furnace body. One end of the gas supply pipe is connected to the annular gas guiding channel, and several spray holes are provided at the bottom of the annular gas guiding channel. The spray holes are connected to the inside of the furnace cavity.

[0011] As a preferred embodiment of this utility model, the lifting mechanism includes an electric push rod fixed to the top of the movable seat, and a U-shaped heat insulation frame is installed at the bottom of the support plate, with the top of the electric push rod fixed to the bottom of the U-shaped heat insulation frame.

[0012] As a preferred embodiment of this utility model, a guide rod is installed on the bottom edge of the support plate, and several guide sleeves are installed on the top edge of the movable seat, with the bottom of each guide rod extending into the guide sleeve.

[0013] As a preferred embodiment of this utility model, grooves are provided on both sides of the bottom of the shelf.

[0014] As a preferred embodiment of the present invention, the heating mechanism includes a heating groove formed on the inner side wall of the furnace cavity, and a heating resistance wire is installed inside the heating groove;

[0015] An exhaust pipe is installed on the top of the furnace body, and one end of the exhaust pipe is connected to the furnace cavity.

[0016] As a preferred embodiment of this utility model, a control cabinet is installed on one side of the furnace body, and several temperature sensors are installed inside the furnace cavity. The controller in the control cabinet is connected to the temperature sensors and the heating resistance wires respectively through wires.

[0017] As a preferred embodiment of this utility model, positioning sensors are installed on both sides of the furnace body near the feed inlet, and the positioning sensors are connected to the controller in the control cabinet via wires.

[0018] In a preferred embodiment of this utility model, a battery box is installed at the bottom of the movable base, and the battery inside the battery box is connected to the electric push rod via wires.

[0019] As a preferred embodiment of this utility model, the walking mechanism includes walking wheels rotatably connected to both sides of each of the movable seats, and the bottom of the walking wheels is in contact with the annular track.

[0020] As a preferred embodiment of this utility model, a limiting stop is installed on the top edge of the support plate, and the side of the limiting stop is in contact with the edge of the shelf.

[0021] Compared with the prior art, the beneficial effects of this utility model are:

[0022] 1. By setting up a circular track under the furnace body and multiple movable seats on the circular track, when the support plate on one of the movable seats pushes the ceramic into the furnace cavity for debinding and sintering, the workers can place the unprocessed ceramic on another support plate. After the previous set of ceramics is sintered, the ceramics can be removed from the furnace cavity and the next set of ceramics can be immediately moved into the furnace cavity for sintering, resulting in a fast material change speed.

[0023] 2. By setting a preheating tank around the furnace cavity, the external gas is preheated by the waste heat of the added resistance wire when it is delivered into the heat exchange tube. Then it is delivered into the annular gas guide channel and finally evenly sprayed into the furnace cavity through the nozzle. While providing gas to the furnace cavity, it will not have an excessive impact on the temperature inside the furnace cavity, thus improving the performance. Attached Figure Description

[0024] To more clearly illustrate the technical solutions of the embodiments of this utility model, the drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort. Among them:

[0025] Figure 1 This is a schematic diagram of the overall structure of the present invention. Figure 1 ;

[0026] Figure 2 This is a schematic diagram of the overall structure of the present invention. Figure 2 ;

[0027] Figure 3 This is a front view of the overall structure of this utility model;

[0028] Figure 4 This is a schematic diagram of the movable seat and support plate structure of this utility model;

[0029] Figure 5 This is a front sectional view of the furnace body structure of this utility model.

[0030] In the diagram: 1. Base; 2. Circular track; 3. Heat insulation baffle; 4. Furnace body; 5. Exhaust pipe; 6. Inlet pipe; 7. Control cabinet; 8. Movable seat; 9. Gas supply pipe; 10. U-shaped heat insulation frame; 11. Feed inlet; 12. Wheels; 13. Electric push rod; 14. Guide sleeve; 15. Guide rod; 16. Limiting stop; 17. Platform; 18. Groove; 19. Support plate; 20. Heating resistance wire; 21. Preheating tank; 22. Spray nozzle; 23. Circular gas guide channel; 24. Furnace cavity; 25. Heat exchange tube; 26. Heating tank; 27. Temperature sensor; 28. Positioning sensor; 29. ​​Battery box. Detailed Implementation

[0031] To make the above-mentioned objectives, features and advantages of this utility model more apparent and understandable, the specific embodiments of this utility model will be described in detail below with reference to the accompanying drawings.

[0032] Many specific details are set forth in the following description in order to provide a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Those skilled in the art can make similar extensions without departing from the spirit of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0033] Secondly, the term "an embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The phrase "in one embodiment" appearing in different places in this specification does not necessarily refer to the same embodiment, nor is it a single or selective embodiment that excludes other embodiments.

[0034] Example 1

[0035] Reference Figure 1-5 This is one embodiment of the present utility model, which provides a quick-change ceramic debinding sintering integrated machine, including a furnace body 4, a control cabinet 7 installed on one side of the furnace body 4, and a controller inside the control cabinet 7, which is either a control motherboard or a PLC logic controller.

[0036] like Figure 1 and Figure 2 As shown, the bottom of the furnace body 4 is connected to the base 1, and a ring track 2 is installed on the top of the base 1. The ring track 2 passes through the furnace body 4. At least two movable seats 8 are provided above the ring track 2. The movable seats 8 are connected to the ring track 2 through a walking mechanism. The walking mechanism includes walking wheels 12 that are rotatably connected to both sides of each movable seat 8. The bottom of the walking wheels 12 is in contact with the ring track 2. In actual use, the operator can move the movable seats 8 along the ring track 2 through the walking wheels 12.

[0037] like Figure 3 , Figure 4 and Figure 5As shown, each movable seat 8 is connected to a support plate 19 via a lifting mechanism. A platform 17 is stacked on top of the support plate 19, and ceramics are placed on the platform 17. The lifting mechanism includes an electric push rod 13 fixed to the top of the movable seat 8, and a U-shaped heat insulation frame 10 is installed at the bottom of the support plate 19. The top of the electric push rod 13 is fixed to the bottom of the U-shaped heat insulation frame 10. The furnace body 4 has a furnace cavity 24 inside, and a feed inlet 11 is opened at the bottom of the furnace cavity 24. In actual use, the operator can move the movable seat 8 along the circular track 2 to below the feed inlet 11, and then control the electric push rod 13 to extend. The electric push rod 13 can push the support plate 19 upward, moving the platform 17 from the feed inlet 11 into the furnace cavity 24, so that the ceramics on the platform 17 are located in the furnace cavity 24 for processing.

[0038] like Figure 3 As shown, a limiting stop 16 is installed on the top edge of the support plate 19. The side of the limiting stop 16 is in contact with the edge of the shelf 17. The limiting stop 16 can limit the shelf 17 so that the shelf 17 will not shift.

[0039] It should be noted that, as Figure 3 As shown, a battery box 29 is installed at the bottom of the movable base 8. The battery inside the battery box 29 is connected to the electric push rod 13 through a wire. The battery inside the battery box 29 can power the electric push rod 13, so that the electric push rod 13 can work normally.

[0040] It should be noted that positioning sensors 28 are installed on both sides of the furnace body 4 near the feed inlet 11. The positioning sensors 28 are connected to the controller in the control cabinet 7 through wires. The position of the moving seat 8 can be detected by the positioning sensors 28. When the moving seat 8 moves to the preset position, the positioning sensors 28 can transmit the data to the controller. The controller will remind the staff through the alarm mechanism such as the buzzer, so that the position of the moving seat 8 will not be deviated.

[0041] A heating mechanism is installed on the inner wall of the furnace cavity 24. The heating mechanism includes a heating groove 26 opened on the inner side wall of the furnace cavity 24. A heating resistance wire 20 is installed inside the heating groove 26. Several temperature sensors 27 are installed inside the furnace cavity 24. The heating resistance wire 20 and the temperature sensors 27 are connected to the controller through wires. In actual use, the temperature inside the furnace cavity 24 can be detected by the temperature sensors 27 and the data is transmitted to the controller. The controller controls the heating power of the heating resistance wire 20 so that when the ceramic is debinding, the controller can control the heating resistance wire 20 to heat the inside of the furnace cavity 24 to the preset temperature to debind the ceramic. After the debinding is completed, the controller can control the heating resistance wire 20 to increase the power so that the temperature inside the furnace cavity 24 reaches the preset sintering temperature to sinter the ceramic.

[0042] It should be noted that an exhaust pipe 5 is installed on the top of the furnace body 4. One end of the exhaust pipe 5 is connected to the furnace cavity 24. During the debinding and sintering process, the binder inside the ceramic will be vaporized by high temperature and discharged into the furnace cavity 24. It will be discharged from the exhaust pipe 5 together with the excess gas inside the furnace cavity 24.

[0043] like Figure 5 As shown, a preheating groove 21 is provided on the side of the furnace body 4. A heat insulation baffle 3 is installed on the side of the furnace body 4, covering the opening of the preheating groove 21. A heat exchange tube 25 is installed inside the preheating groove 21. One end of the heat exchange tube 25 is connected to the gas source through the air inlet pipe 6, and the other end of the heat exchange tube 25 is connected to the gas supply pipe 9. An annular gas guide channel 23 is provided inside the furnace body 4. One end of the gas supply pipe 9 is connected to the annular gas guide channel 23, and an opening is provided at the bottom of the annular gas guide channel 23. There are several nozzles 22, which are connected to the inside of the furnace cavity 24. In actual use, the gas from the external gas source can be transported to the heat exchange tube 25 through the air inlet pipe 6. At this time, part of the heat generated by the heating resistance wire 20 is transferred to the preheating tank 21 to preheat the gas in the heat exchange tube 25. The preheated air can be transported to the annular air guide channel 23 through the air delivery pipe 9, and finally sprayed into the furnace cavity 24 through the nozzles 22 to uniformly replenish the gas inside the furnace cavity 24.

[0044] In use, the staff places the ceramic-containing platform 17 on the support plate 19, and then pushes the movable seat 8 to move it along the circular track 2 to below the feed inlet 11. When the movable seat 8 moves to the preset position, the positioning sensor 28 can detect the position information of the movable seat 8 and transmit the detection data to the controller. The controller reminds the staff through the warning device, and the staff stops moving the movable seat 8. Then, the staff controls the electric push rod 13 to extend, and the electric push rod 13 pushes the support plate 19 upward, pushing the platform 17 from the feed inlet 11 into the furnace chamber 24.

[0045] At this time, the controller controls the heating resistance wire 20 to work, the heating resistance wire 20 heats the furnace cavity 24, and the temperature inside the furnace cavity 24 is detected by the temperature sensor 27 and the detection data is transmitted to the controller. The controller controls the heating resistance wire 20 to heat the temperature inside the furnace cavity 24 to the preset value, and performs glue removal on the ceramic on the platform 17. After the glue removal is completed, the controller controls the heating resistance wire 20 to increase the power and raise the temperature inside the furnace cavity 24 to sinter the ceramic.

[0046] During the debinding and sintering process, an external gas source can be delivered to the heat exchange tube 25 through the air inlet pipe 6. At this time, part of the heat generated by the heating resistance wire 20 is transferred to the preheating tank 21 to heat the heat exchange tube 25. In this way, the gas flowing through the heat exchange tube 25 is preheated by the waste heat of the heating resistance wire 20. Then, the high-temperature gas is delivered to the annular gas guide channel 23 through the gas delivery pipe 9. After that, the high-temperature gas is sprayed into the furnace cavity 24 through the nozzle 22, so that the furnace cavity 24 is evenly filled with gas without affecting the temperature of the furnace cavity 24, thus improving the performance.

[0047] During the sintering process, the worker can place the unsintered ceramic on the platform 17 and place the platform 17 on another support plate 19. At the same time, the worker moves the support plate 19 and the movable seat 8 along the circular track 2 to the waiting area of ​​the furnace body 4. After sintering is completed, the controller controls the heating resistance wire 20 to reduce the power and lower the temperature in the furnace cavity 24 to a safe value. Then, the worker controls the electric push rod 13 to retract, the support plate 19 to move down, and the sintered ceramic is moved out of the furnace cavity 24. Then, the worker moves the movable seat 8 out from under the furnace body 4 and moves the subsequent movable seat 8 to a preset position under the furnace body 4. Then, by extending the electric push rod 13, the ceramic is moved into the furnace cavity 24 for debinding and sintering processing.

[0048] Furthermore, a guide rod 15 is installed on the bottom edge of the support plate 19, and several guide sleeves 14 are installed on the top edge of the movable seat 8. The bottom of each guide rod 15 extends into the guide sleeve 14. Through the cooperation of the guide sleeve 14 and the guide rod 15, the support plate 19 can be guided, so that the support plate 19 remains stable.

[0049] Furthermore, such as Figure 4 As shown, grooves 18 are provided on both sides of the bottom of the shelf 17, which can be used to easily remove the shelf 17 from the support plate 19.

[0050] It is important to note that the constructions and arrangements of this application shown in several different exemplary embodiments are merely illustrative. Although only a few embodiments are described in detail in this disclosure, those who consult this disclosure will readily understand that many modifications are possible without substantially departing from the novel teachings and advantages of the subject matter described in this application (e.g., variations in the size, dimensions, structure, shape, and proportions of various elements, as well as parameter values ​​(e.g., temperature, pressure, etc.), installation arrangements, use of materials, color, orientation, etc.). For example, an element shown as integrally formed may be composed of multiple parts or elements, the position of elements may be inverted or otherwise altered, and the nature or number or position of discrete elements may be changed or altered. Therefore, all such modifications are intended to be included within the scope of this utility model. The order or sequence of any process or method steps may be changed or rearranged according to alternative embodiments. In the claims, any "device plus function" clause is intended to cover the structure described herein that performs the function, and not only structurally equivalent but also equivalent in structure. Other substitutions, modifications, alterations, and omissions may be made in the design, operation, and arrangement of the exemplary embodiments without departing from the scope of this utility model. Therefore, this invention is not limited to the specific embodiments, but extends to various modifications that still fall within the scope of the appended claims.

[0051] Furthermore, in order to provide a concise description of exemplary embodiments, not all features of actual embodiments may be omitted, i.e., those features that are not relevant to the currently considered best mode for carrying out the present invention, or those features that are not relevant to implementing the present invention.

[0052] It should be understood that numerous specific implementation decisions can be made during the development of any practical implementation, such as in any engineering or design project. Such development efforts may be complex and time-consuming, but for those skilled in the art who benefit from this disclosure, the development effort will be a routine work of design, manufacturing, and production without requiring much experimentation.

[0053] It should be noted that the above embodiments are only used to illustrate the technical solution of this utility model and are not intended to limit it. Although this utility model has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solution of this utility model without departing from the spirit and scope of the technical solution of this utility model, and all such modifications or substitutions should be covered within the scope of the claims of this utility model.

Claims

1. A quick-change ceramic debinding and sintering integrated machine, characterized in that: The furnace includes a furnace body (4), the bottom of which is connected to a base (1). A ring track (2) is installed on the top of the base (1). The ring track (2) passes through the furnace body (4). At least two movable seats (8) are provided above the ring track (2). The movable seats (8) are connected to the ring track (2) through a walking mechanism. Each of the movable seats (8) is connected to a support plate (19) via a lifting mechanism. A shelf (17) is stacked on top of the support plate (19), and ceramics are placed on the shelf (17). The furnace body (4) has a furnace cavity (24) inside, and a feed inlet (11) is opened at the bottom of the furnace cavity (24). A heating mechanism is installed on the inner wall of the furnace cavity (24). A preheating groove (21) is provided on the side of the furnace body (4). A heat insulation baffle (3) is installed on the side of the furnace body (4). The heat insulation baffle (3) covers the opening of the preheating groove (21). A heat exchange tube (25) is installed inside the preheating groove (21). One end of the heat exchange tube (25) is connected to the gas source through the air inlet pipe (6), and the other end of the heat exchange tube (25) is connected to the gas supply pipe (9). An annular gas guiding channel (23) is provided inside the furnace body (4). One end of the gas supply pipe (9) is connected to the annular gas guiding channel (23), and several spray holes (22) are provided at the bottom of the annular gas guiding channel (23). The spray holes (22) are connected to the inside of the furnace cavity (24).

2. The quick-change ceramic debinding and sintering integrated machine according to claim 1, characterized in that: The lifting mechanism includes an electric push rod (13) fixed to the top of the movable seat (8), and a U-shaped heat insulation frame (10) is installed at the bottom of the support plate (19), with the top of the electric push rod (13) fixed to the bottom of the U-shaped heat insulation frame (10).

3. The quick-change ceramic debinding and sintering integrated machine according to claim 2, characterized in that: The bottom edge of the support plate (19) is equipped with a guide rod (15), and a number of guide sleeves (14) are installed on the top edge of the movable seat (8), with the bottom of each guide rod (15) extending into the guide sleeve (14).

4. The quick-change ceramic debinding and sintering integrated machine according to claim 3, characterized in that: The bottom of the shelf (17) is provided with grooves (18) on both sides.

5. The quick-change ceramic debinding and sintering integrated machine according to claim 1, characterized in that: The heating mechanism includes a heating groove (26) opened on the inner side wall of the furnace cavity (24), and a heating resistance wire (20) is installed inside the heating groove (26). The top of the furnace body (4) is equipped with an exhaust pipe (5), one end of which is connected to the furnace cavity (24).

6. The quick-change ceramic debinding and sintering integrated machine according to claim 5, characterized in that: A control cabinet (7) is installed on one side of the furnace body (4). Several temperature sensors (27) are installed inside the furnace cavity (24). The controller in the control cabinet (7) is connected to the temperature sensors (27) and the heating resistance wire (20) respectively through wires.

7. A quick-change ceramic debinding and sintering integrated machine according to claim 6, characterized in that: Positioning sensors (28) are installed on both sides of the furnace body (4) near the feed inlet (11). The positioning sensors (28) are connected to the controller in the control cabinet (7) via wires.

8. The quick-change ceramic debinding and sintering integrated machine according to claim 1, characterized in that: A battery box (29) is installed at the bottom of the movable seat (8), and the battery inside the battery box (29) is connected to the electric push rod (13) through a wire.

9. The quick-change ceramic debinding and sintering integrated machine according to claim 1, characterized in that: The walking mechanism includes walking wheels (12) rotatably connected to both sides of each of the moving seats (8), and the bottom of the walking wheels (12) is in contact with the circular track (2).

10. A quick-change ceramic debinding and sintering integrated machine according to claim 1, characterized in that: A limiting stop (16) is installed on the top edge of the support plate (19), and the side of the limiting stop (16) is in contact with the edge of the shelf (17).