A kind of coating production line spray gun paint consumption precision metering equipment

CN224873116UActive Publication Date: 2026-10-20JILIN DENGKE AUTOMOBILE SERVICE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522679370.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-17
Publication Date
2026-10-20
Estimated Expiration
2035-12-17

AI Technical Summary

Technical Problem

传统油漆消耗计量多依赖批次估算或集中式流量统计,缺乏单喷枪精准计量手段,数据误差大,导致成本核算不准;同时计量设备与喷枪、供漆管道的连接方式复杂,拆装繁琐,影响设备维护与生产线换色效率;此外,涂装环境中油漆易渗漏,传统设备密封性能不足,不仅造成原料浪费,还会影响计量精度与生产环境整洁,难以兼顾计量精准性、维护便捷性与密封可靠性

Benefits of technology

[0018]1.本装置通过数据采集模块与供漆主管、分支管的精准对接结构,搭配连接法兰的定位销与螺栓固定设计,实现了油漆消耗的实时精准计量,解决了传统计量方式误差大、数据滞后的问题,提升了成本核算与生产管控的精准度。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224873116U_ABST
    Figure CN224873116U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of coating equipment especially relates to a kind of coating production line spray gun paint consumption precision metering equipment, including paint supply main pipe, the branch pipe is connected in paint supply main pipe, the branch pipe end is fixed with the connecting flange one, the connecting flange one is adapted to butt joint with the connecting flange two;The shell is fixed in the connecting flange two side;The real-time precision measurement of paint consumption is realized by the precise butt joint structure of data acquisition module and paint supply main pipe, branch pipe, the positioning pin of collocation connecting flange and bolt fixed design, the problem of big error and data lag of traditional measurement mode is solved, the precision of cost accounting and production control is improved, the quick release mechanism of pipe sleeve, quick release head, limit sliding block and spring is combined with the sealing gasket design of the shell two ends, the quick disassembly and sealing protection of measuring equipment and spray gun are realized, the problem of traditional equipment disassembly complicated, easy to leak paint is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of coating equipment technology, and in particular relates to a precise metering device for paint consumption of spray guns in a coating production line. Background Technology

[0002] Precise paint consumption metering equipment for spray guns in coating production lines is a core auxiliary device in industrial coating fields such as automobile manufacturing, furniture coating, and hardware processing. Primarily used in mass production scenarios, its core function is to accurately measure the paint consumption of single or multiple spray guns in real time. This provides data support for production cost accounting, raw material ratio optimization, and production process control, making it a key piece of equipment for ensuring efficient, energy-saving, and standardized operation of coating production. As industrial manufacturing transitions towards refined management, higher demands are placed on the accuracy of paint consumption metering, ease of equipment disassembly and assembly, and adaptability to various operating conditions, requiring compatibility with different types of spray guns and complex coating environments.

[0003] In industrial coating production scenarios, there are core technological pain points. Traditional paint consumption metering relies heavily on batch estimation or centralized flow statistics, lacking precise metering methods for individual spray guns, resulting in large data errors and inaccurate cost accounting. Furthermore, the connection methods between metering equipment and spray guns and paint supply pipelines are complex, cumbersome to disassemble and assemble, affecting equipment maintenance and production line color change efficiency. In addition, paint is prone to leakage in the coating environment, and traditional equipment has insufficient sealing performance, not only wasting raw materials but also affecting metering accuracy and the cleanliness of the production environment, making it difficult to balance metering accuracy, ease of maintenance, and sealing reliability. Therefore, we propose a precise paint consumption metering device for spray guns in coating production lines. Utility Model Content

[0004] The purpose of this invention is to provide a precise metering device for paint consumption of spray guns in a coating production line, so as to solve the problems mentioned in the background art.

[0005] To achieve the above objectives, this utility model provides the following technical solution:

[0006] A precise metering device for paint consumption of spray guns in a coating production line includes:

[0007] A paint supply main pipe, a branch pipe connected to the paint supply main pipe, a connecting flange one fixed to the end of the branch pipe, and a connecting flange two adapted to be connected to the connecting flange one.

[0008] A housing is fixed to one side of the connecting flange, and a data acquisition module is fixedly installed inside the housing;

[0009] A sleeve is fixed to one end of the outer shell away from the second connecting flange. A quick-release head is adapted and installed inside the sleeve. One end of the quick-release head is connected to the spray gun, and the other end is connected to the data acquisition module.

[0010] Preferably, bolt holes are provided on the first connecting flange and the second connecting flange, and fixing bolts are installed in the bolt holes.

[0011] Preferably, the second connecting flange is provided with a locating pin, and the first connecting flange is provided with a locating hole adapted to the locating pin, and the locating pin is inserted into the corresponding locating hole.

[0012] Preferably, the outer wall of the quick-release head is provided with an annular groove, and the inner wall of the sleeve is provided with a sliding groove.

[0013] Preferably, a limiting slider is slidably installed in the groove, and a spring is connected between the limiting slider and the inner wall of the groove. The limiting slider is adapted to be inserted into the annular groove.

[0014] Preferably, the sidewall of the annular groove is provided with a release port, which communicates with the slide groove and is used to limit the release of the slider.

[0015] Preferably, sealing gaskets are respectively embedded at both ends of the outer shell, and the sealing gaskets are tightly fitted to the connecting flange and the sleeve respectively.

[0016] Preferably, the data acquisition module is fixed to the mounting base inside the outer shell by bolts, and its two ends are connected to the branch pipe and quick-release head respectively through sealing joints.

[0017] Compared with the prior art, the present invention has the following beneficial effects:

[0018] 1. This device achieves real-time and accurate measurement of paint consumption through a precise docking structure between the data acquisition module and the main and branch pipes of the paint supply system, coupled with the positioning pin and bolt fixing design of the connecting flange. This solves the problems of large errors and data lag in traditional measurement methods, and improves the accuracy of cost accounting and production control.

[0019] 2. This device uses a quick-release mechanism consisting of a sleeve, quick-release head, limit slider and spring, combined with the sealing gasket design at both ends of the outer shell, to achieve quick disassembly and assembly of the metering equipment and spray gun and seal protection. It solves the problems of cumbersome disassembly and assembly and easy paint leakage of traditional equipment, and improves the maintenance efficiency of the production line and the cleanliness of the environment. Attached Figure Description

[0020] The above description is only an overview of the technical solution of this utility model. In order to better understand the technical means of this utility model and to implement it in accordance with the contents of the specification, the preferred embodiments of this utility model are described in detail below with reference to the accompanying drawings.

[0021] Figure 1 This is a schematic diagram of the overall structure of this utility model;

[0022] Figure 2This is a schematic diagram of the quick-release flange in this utility model;

[0023] Figure 3 This is a schematic diagram showing the connection between the spray gun and the outer casing in this utility model;

[0024] Figure 4 This is a schematic diagram of the quick-release mechanism in this utility model.

[0025] The markings in the diagram are as follows:

[0026] 1. Main paint supply pipe; 2. Branch pipe; 3. Outer casing; 4. Data acquisition module; 5. Spray gun; 6. Connecting flange one; 7. Connecting flange two; 8. Bolt hole; 9. Fixing bolt; 10. Locating pin; 11. Locating hole; 12. Pipe sleeve; 13. Quick release head; 14. Annular groove; 15. Slide groove; 16. Limiting slider; 17. Spring; 18. Release port. Detailed Implementation

[0027] This application provides a precise metering device for paint consumption of spray guns in industrial scenarios such as automobile manufacturing painting lines, furniture batch painting workshops, and hardware spraying production lines. It effectively solves the problems of large metering errors, inconvenient disassembly and assembly, and poor sealing of traditional paint.

[0028] Existing paint metering equipment suffers from inaccurate data, low maintenance efficiency, and material waste due to a lack of precise docking structure, convenient disassembly and assembly design, and reliable sealing components. It is difficult to meet the core usage requirements of accurate metering, rapid maintenance, and reliable sealing in refined production.

[0029] like Figure 1 - Figure 4 As shown, the overall concept of the embodiments of this application is as follows:

[0030] With precise metering, convenient disassembly and assembly, and sealed protection as its core design logic, the paint delivery channel is built through the main paint supply pipe 1 and the branch pipe 2. The positioning and fixing structure of the connecting flange 1 6 and the connecting flange 2 7 ensures the docking accuracy. The data acquisition module 4 inside the outer shell 3 realizes flow metering. With the quick-release mechanism, the spray gun 5 can be quickly loaded and unloaded. The protection is strengthened by the sealing gasket, taking into account the metering accuracy, ease of operation and adaptability to working conditions.

[0031] The structure, installation method, connection relationship and details of each part of this utility model are as follows, to ensure that those skilled in the art can fully implement it based on the following description: The paint conveying and docking assembly includes a paint supply main pipe 1, a branch pipe 2, a connecting flange 1 6, and a connecting flange 2 7, which realizes the diversion and conveying of paint and the precise docking of the metering equipment.

[0032] The main paint supply pipe 1 is the main paint supply channel of the coating production line. Several branch pipes 2 are connected to it, and the branch pipes 2 are used to distribute the paint to each spray gun 5. A connecting flange 6 is fixed to the end of the branch pipe 2. A connecting flange 7 is adapted to be connected to the connecting flange 6. Bolt holes 8 are opened on both of them, and fixing bolts 9 are installed in the bolt holes 8 to achieve a stable connection between the two. A positioning pin 10 is protruding on the connecting flange 7. A positioning hole 11 adapted to the positioning pin 10 is opened on the connecting flange 6. The positioning pin 10 and the corresponding positioning hole 11 are inserted and matched to ensure coaxiality during docking and prevent leakage during paint delivery.

[0033] The metering and protection components include a housing 3, a data acquisition module 4, and a sealing gasket, which are used to measure paint consumption and provide sealing protection for the equipment.

[0034] A housing 3 is fixed to one side of the connecting flange 2 7. The housing 3 is a hollow cavity structure with a mounting base inside. The data acquisition module 4 is fixed to the mounting base by bolts. Its two ends are connected to the branch pipe 2 and the quick-release head 13 through sealing joints, respectively. It can collect the paint flow data in real time and complete the consumption measurement. Sealing gaskets are embedded at both ends of the housing 3. The sealing gaskets are tightly fitted to the connecting flange 2 7 and the pipe sleeve 12, respectively, to form a double seal, prevent paint leakage and external impurities from entering, and ensure the stable operation of the equipment in the coating environment.

[0035] The quick-release mechanism includes a sleeve 12, a quick-release head 13, a limit slider 16, and a spring 17, which enables the rapid assembly and disassembly of the metering equipment and the spray gun 5.

[0036] A sleeve 12 is fixed to the end of the outer casing 3 away from the connecting flange 7. A quick-release head 13 is fitted inside the sleeve 12. One end of the quick-release head 13 is connected to the spray gun 5, and the other end is connected to the data acquisition module 4 to achieve smooth paint delivery. An annular groove 14 is formed on the outer wall of the quick-release head 13, and a sliding groove 15 is formed on the inner wall of the sleeve 12. A limit slider 16 is slidably installed in the sliding groove 15. A spring 17 is connected between the limit slider 16 and the inner wall of the sliding groove 15. The spring 17 is always in a compressed state, pushing the limit slider 16 to fit into the annular groove 14 to fix the quick-release head 13 and the sleeve 12. A release port 18 is formed on the side wall of the annular groove 14. The release port 18 is connected to the sliding groove 15. When disassembly is required, the limit slider 16 is pushed through the release port 18 to compress the spring 17, causing it to disengage from the annular groove 14, so that the quick-release head 13 and the spray gun 5 can be quickly pulled out.

[0037] Additional details on scene adaptation:

[0038] 1. User and Equipment Compatibility: For spray guns 5 of different diameters, quick-release heads 13 of corresponding specifications can be replaced to improve equipment compatibility; for multi-spray gun production lines, multiple branch pipes 2 can be connected to the main paint supply pipe 1, and multiple sets of metering equipment can be used to achieve simultaneous metering of multiple spray guns; for high-viscosity paint scenarios, wear-resistant sealing joints and quick-release heads 13 can be selected to ensure smooth delivery.

[0039] II. Durability and Adaptability: The main paint supply pipe 1 and branch pipe 2 are made of corrosion-resistant metal with rust-proof surface treatment; the connecting flange 1 6 and connecting flange 2 7 are made of high-strength carbon steel; the positioning pin 10 and fixing bolt 9 are made of stainless steel, which is corrosion-resistant and has high strength; the limit slider 16 is made of wear-resistant engineering plastic to extend the sliding service life; the spring 17 is made of fatigue-resistant elastic material to ensure the elastic performance for long-term use.

[0040] III. Convenience and Adaptability: A data display window is added to the outer shell 3, allowing for intuitive viewing of real-time measurement data; the fixing bolt 9 is designed as a hand-tightening structure, enabling flange fixing and disassembly without tools; the connection end between the quick-release head 13 and the spray gun 5 adopts an anti-detachment design to ensure connection stability during the spraying process.

[0041] The working principle of this device is as follows:

[0042] This device, centered on precise metering and rapid assembly / disassembly, achieves precise control over paint consumption during coating production through the coordinated operation of paint delivery, metering data acquisition, multi-spray gun connection, and equipment maintenance. The specific process is as follows:

[0043] Paint delivery and docking: The main paint supply pipe 1 delivers paint to each branch pipe 2. The positioning holes 11 of the connecting flange 1 6 are aligned with the positioning pins 10 of the connecting flange 2 7 to complete the positioning docking. Then, the fixing bolts 9 are inserted into the bolt holes 8 and tightened to achieve a stable connection between the branch pipe 2 and the outer shell 3. The sealing gaskets at both ends of the outer shell 3 are tightly fitted to the connecting flange 2 7 and the pipe sleeve 12 respectively to ensure sealing performance.

[0044] Metering and data acquisition: The paint flows into the data acquisition module 4 inside the outer casing 3 through the branch pipe 2. The data acquisition module 4 detects the paint flow in real time and accurately measures the paint consumption of a single spray gun 5, providing data support for production management.

[0045] Connection of the spray nozzle: Insert one end of the quick-release head 13 into the sleeve 12. Under the action of the spring 17, the limiting slider 16 automatically engages in the annular groove 14 of the quick-release head 13, thus fixing the quick-release head 13 to the sleeve 12. The other end of the quick-release head 13 is connected to the spray gun 5, and the spray gun 5 can be started to perform the spraying operation.

[0046] Equipment maintenance and disassembly: When it is necessary to replace the spray gun 5 or maintain the metering equipment, push the limit slider 16 out of the annular groove 14 through the release port 18 to quickly pull out the quick-release head 13 and the spray gun 5; loosen the fixing bolts 9, separate the connecting flange 1 6 and the connecting flange 2 7, and the data acquisition module 4 can be maintained or replaced. The operation is convenient and efficient.

[0047] The embodiments of this application have been described above with reference to the accompanying drawings. Unless otherwise specified, the embodiments and features in the embodiments of this application can be combined with each other. This application is not limited to the specific embodiments described above. The specific embodiments described above are merely illustrative and not restrictive. Those skilled in the art can make many other forms under the guidance of this application without departing from the spirit and scope of the claims, and all of these forms are within the protection scope of this application.

Claims

1. A precise metering device for paint consumption of spray guns in a coating production line, characterized in that, include: The main paint supply pipe (1) is connected to a branch pipe (2), and a connecting flange (6) is fixed at the end of the branch pipe (2). The connecting flange (6) is adapted to be connected to a connecting flange (7). A housing (3) is fixed to one side of the connecting flange (7), and a data acquisition module (4) is fixedly installed inside the housing (3). The outer shell (3) is fixed with a sleeve (12) at one end away from the connecting flange (7). A quick-release head (13) is adapted to be installed inside the sleeve (12). One end of the quick-release head (13) is connected to the spray gun (5), and the other end is connected to the data acquisition module (4).

2. The precise metering device for paint consumption of spray guns in a coating production line according to claim 1, characterized in that, Bolt holes (8) are provided on the first connecting flange (6) and the second connecting flange (7), and fixing bolts (9) are installed in the bolt holes (8).

3. The precise metering device for paint consumption of spray guns in a coating production line according to claim 2, characterized in that, The second connecting flange (7) is provided with a positioning pin (10), and the first connecting flange (6) is provided with a positioning hole (11) that is adapted to the positioning pin (10). The positioning pin (10) is inserted into the corresponding positioning hole (11).

4. The precise metering device for paint consumption of spray guns in a coating production line according to claim 1, characterized in that, The quick-release head (13) has an annular groove (14) on its outer wall, and the sleeve (12) has a sliding groove (15) on its inner wall.

5. The precise metering device for paint consumption of spray guns in a coating production line according to claim 4, characterized in that, A limiting slider (16) is slidably installed in the groove (15). A spring (17) is connected between the limiting slider (16) and the inner wall of the groove (15). The limiting slider (16) is adapted to be inserted into the annular groove (14).

6. The precise metering device for paint consumption of spray guns in a coating production line according to claim 5, characterized in that, The annular groove (14) has a release port (18) on its side wall. The release port (18) is connected to the slide groove (15) and is used to limit the release of the slider (16).

7. The precise metering device for paint consumption of spray guns in a coating production line according to claim 1, characterized in that, The outer shell (3) is fitted with sealing gaskets at both ends, and the sealing gaskets are tightly fitted to the connecting flange (7) and the sleeve (12).

8. The precise metering device for paint consumption of spray guns in a coating production line according to claim 1, characterized in that, The data acquisition module (4) is fixed to the mounting base inside the outer shell (3) by bolts, and its two ends are connected to the branch pipe (2) and quick-release head (13) respectively through sealing joints.