A double-end positioning type new energy automobile seamless steel pipe compression resistance detection equipment
Patent Information
- Application Number
- CN202521951747.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-11
- Publication Date
- 2026-10-20
- Estimated Expiration
- 2035-09-11
AI Technical Summary
[0004]针对现有技术的不足,本实用新型提供了一种双端定位型新能源汽车无缝钢管抗压检测设备,具备能够对不同直径大小的钢管进行限位固定等优点,解决了背景技术中不方便对不同直径大小的钢管进行限位固定的问题
该双端定位型新能源汽车无缝钢管抗压检测设备,通过设置第一定位组件,在使用时,通过转动转钮,转钮将带动第一螺纹转杆转动,并且通过固定架对阻挡板的限位作用,使得螺纹块能够在第一螺纹转杆的外表面处移动,从而同步带动两组阻挡板相互靠近或者远离,实现对钢管本体的夹持固定或者松脱,能够对钢管本体的外壁进行限位固定,提高压力测试组件对钢管本体测试的稳定性。
Smart Images

Figure CN224873374U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of steel pipe testing technology, specifically a dual-end positioning seamless steel pipe pressure testing device for new energy vehicles. Background Technology
[0002] Seamless steel pipes are made by piercing a whole round steel bar and have no weld seams on the surface. According to the production method, seamless steel pipes can be divided into hot-rolled seamless steel pipes, cold-rolled seamless steel pipes, cold-drawn seamless steel pipes, extruded seamless steel pipes, jacking pipes, etc. Seamless steel pipes have a wide range of uses and are mainly used as pipelines for transporting fluids or structural parts.
[0003] According to a utility model patent with Chinese patent application number 202323315687.1, a steel pipe compressive strength testing device can prevent the fragments from splashing outwards and injuring people during the stamping process caused by the steel pipe breaking. However, this steel pipe compressive strength testing device is inconvenient to fix and limit pipes of different diameters during use, and can only be fixed by pipe sleeves, which makes the fixation and limiting of the steel pipe unstable. Therefore, it is necessary to propose a double-end positioning type seamless steel pipe compressive strength testing device for new energy vehicles to solve the above-mentioned problems. Utility Model Content
[0004] To address the shortcomings of existing technologies, this utility model provides a dual-end positioning seamless steel pipe compression testing device for new energy vehicles, which has the advantages of being able to limit and fix steel pipes of different diameters, thus solving the problem of inconvenience in limiting and fixing steel pipes of different diameters in the prior art.
[0005] To achieve the above-mentioned purpose of limiting and fixing steel pipes of different diameters, this utility model provides the following technical solution: a double-end positioning seamless steel pipe pressure resistance testing device for new energy vehicles, including a fixed frame, a first positioning component and a second positioning component are movably installed inside the fixed frame, and a fixed plate is fixedly installed on the right side of the fixed frame; The second positioning component includes a second threaded rotating rod. The second threaded rotating rod is movably installed inside the fixed frame. Two sets of positioning blocks are threadedly connected to the outer surface of the second threaded rotating rod. A first positioning plate and a second positioning plate are respectively provided on one side of the two sets of positioning blocks. Rubber pads are provided on the corresponding sides of the first positioning plate and the second positioning plate. A turntable is provided on the top of the second threaded rotating rod.
[0006] Furthermore, the first positioning component includes a first threaded rotating rod, which is movably mounted inside the fixing frame. A threaded block is threadedly connected to the outer surface of the first threaded rotating rod, and a blocking plate is provided on the top of the threaded block.
[0007] Furthermore, a knob is provided at the top of the first threaded rod, and two sets of both the first positioning component and the second positioning component are provided.
[0008] Furthermore, a through groove is provided on the side of the fixing frame, and a steel pipe body passes through the inside of the through groove.
[0009] Furthermore, a control panel is provided on the front of the mounting bracket, and a pressure testing component is provided on the bottom of the mounting bracket.
[0010] Furthermore, a lifting structure is movably installed inside the fixed plate, and a magnetic leakage detector is provided on the left side of the lifting structure.
[0011] Furthermore, a limiting cylinder is fixedly installed on the top of the fixing frame, and the second threaded rotating rod is movably installed inside the limiting cylinder.
[0012] Furthermore, the steel pipe body is positioned between the first positioning plate and the second positioning plate.
[0013] Compared with the prior art, the technical solution of this application has the following beneficial effects: This dual-end positioning seamless steel pipe pressure testing equipment for new energy vehicles, by setting up a first positioning component, allows the first threaded rod to rotate when the knob is turned during use. The fixed frame limits the movement of the baffle plate, allowing the threaded block to move on the outer surface of the first threaded rod. This simultaneously moves the two sets of baffle plates closer or further apart, achieving clamping, fixing, or releasing of the steel pipe body. It can limit and fix the outer wall of the steel pipe body, improving the stability of the pressure testing component for the steel pipe body.
[0014] This dual-end positioning seamless steel pipe pressure testing equipment for new energy vehicles, by setting up a second positioning component, allows for the rotation of a turntable during use. The turntable rotates the second threaded rod, which in turn moves the positioning blocks up and down on the external threads. The two sets of positioning blocks move the first and second positioning plates closer or further apart. As the first and second positioning plates move closer together, they can position both ends of the steel pipe body, further improving the stability of the steel pipe body and ultimately enhancing the accuracy of the pressure testing component in testing the steel pipe body. Attached Figure Description
[0015] Figure 1 This is a three-dimensional schematic diagram of the compressive strength testing equipment of this utility model; Figure 2 This is a front sectional view of the compressive strength testing equipment of this utility model; Figure 3 This utility model Figure 2 Enlarged view of the structure at point A in the middle.
[0016] In the diagram: 1. Fixing frame; 2. Control panel; 3. Through slot; 4. First positioning component; 401. Knob; 402. First threaded rotating rod; 403. Threaded block; 404. Blocking plate; 5. Limiting cylinder; 6. Second positioning component; 601. Second threaded rotating rod; 602. Turntable; 603. Positioning block; 604. First positioning plate; 605. Rubber pad; 606. Second positioning plate; 7. Fixing plate; 8. Lifting structure; 9. Ultrasonic detector; 10. Pressure testing component; 11. Steel pipe body. Detailed Implementation
[0017] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0018] Please see Figure 1-3 The dual-end positioning type seamless steel pipe pressure testing equipment for new energy vehicles in this embodiment includes a fixed frame 1, a first positioning component 4 and a second positioning component 6 are movably installed inside the fixed frame 1, and a fixed plate 7 is fixedly installed on the right side of the fixed frame 1. The second positioning component 6 includes a second threaded rotating rod 601. The second threaded rotating rod 601 is movably installed inside the fixing frame 1. Two sets of positioning blocks 603 are threadedly connected to the outer surface of the second threaded rotating rod 601. A first positioning plate 604 and a second positioning plate 606 are respectively provided on one side of the two sets of positioning blocks 603. Rubber pads 605 are provided on the corresponding sides of the first positioning plate 604 and the second positioning plate 606. A turntable 602 is provided on the top of the second threaded rotating rod 601.
[0019] In the implementation of the case, by setting the first positioning component 4, when in use, by rotating the knob 401, the knob 401 will drive the first threaded rod 402 to rotate, and through the limiting effect of the fixing frame 1 on the blocking plate 404, the threaded block 403 can move at the outer surface of the first threaded rod 402, thereby synchronously driving the two sets of blocking plates 404 to move closer or further away from each other, realizing the clamping and fixing or loosening of the steel pipe body 11, and limiting and fixing the outer wall of the steel pipe body 11, improving the stability of the pressure testing component 10 in testing the steel pipe body 11.
[0020] In the implementation of the case, by setting up the second positioning component 6, when in use, by rotating the turntable 602, the turntable 602 will drive the second threaded rotating rod 601 to rotate, and the second threaded rotating rod 601 will drive the positioning block 603 to move up and down on the external thread. The two sets of positioning blocks 603 will drive the first positioning plate 604 and the second positioning plate 606 to move away from or towards each other. When the first positioning plate 604 and the second positioning plate 605 move closer, they can position the two ends of the steel pipe body 11, further improving the stability of the steel pipe body 11, and ultimately improving the testing accuracy of the pressure testing component 10 on the steel pipe body 11.
[0021] In the implementation of the case, the lifting structure 8 can drive the magnetic flux leakage detector to rise and fall, match the steel pipe body 11 of different diameters, and detect the steel pipe body 11 through the magnetic flux leakage detector; after magnetizing the steel pipe body 11, the metal loss and dent deformation are detected by the change of the magnetic flux leakage field; the dent will cause magnetic field leakage, which is manifested as a single peak bulge in the radial signal and a dent in the cosine curve of the axial signal.
[0022] In the case implementation, the pressure of the pressure testing component 10 is controlled by the control panel 2 to facilitate the determination of the pressure borne by the steel pipe body 11.
[0023] When implementing this procedure, please follow these steps: 1) First, insert the steel pipe body 11 through the through groove 3; 2) Then the steel pipe body 11 is positioned by the first positioning component 4 and the second positioning component 6; 3) Then, the steel pipe body 11 is subjected to pressure test by the pressure test assembly 10; 4) Finally, use the magnetic flux leakage detector 9 to check whether the steel pipe body 11 is damaged.
[0024] In summary, this dual-positioning seamless steel pipe pressure testing equipment for new energy vehicles, by setting up a first positioning component 4, allows the first threaded rotating rod 402 to rotate when the knob 401 is turned during use. The fixed frame 1 limits the movement of the blocking plate 404, enabling the threaded block 403 to move at the outer surface of the first threaded rotating rod 402. This simultaneously moves the two sets of blocking plates 404 closer together or further apart, achieving clamping, fixing, or releasing of the steel pipe body 11. This limits and fixes the outer wall of the steel pipe body 11, improving the stability of the pressure testing component 10's testing of the steel pipe body 11.
[0025] Furthermore, by setting the second positioning component 6, during use, rotating the turntable 602 will drive the second threaded rotating rod 601 to rotate, and the second threaded rotating rod 601 will drive the positioning block 603 to move up and down on the external thread. The two sets of positioning blocks 603 will drive the first positioning plate 604 and the second positioning plate 606 to move away from or closer to each other. During the process of the first positioning plate 604 and the second positioning plate 605 approaching each other, the two ends of the steel pipe body 11 can be positioned, further improving the stability of the steel pipe body 11, and ultimately improving the testing accuracy of the pressure testing component 10 on the steel pipe body 11.
[0026] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.
[0027] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A dual-end positioning type seamless steel pipe compression testing device for new energy vehicles, comprising a fixing frame (1), characterized in that: The first positioning component (4) and the second positioning component (6) are movably installed inside the fixed frame (1), and a fixed plate (7) is fixedly installed on the right side of the fixed frame (1). The second positioning component (6) includes a second threaded rotating rod (601). The second threaded rotating rod (601) is movably installed inside the fixing frame (1). The outer surface of the second threaded rotating rod (601) is threaded with two sets of positioning blocks (603). A first positioning plate (604) and a second positioning plate (606) are respectively provided on one side of the two sets of positioning blocks (603). Rubber pads (605) are provided on the corresponding sides of the first positioning plate (604) and the second positioning plate (606). A turntable (602) is provided on the top of the second threaded rotating rod (601).
2. The dual-end positioning type seamless steel pipe compression testing equipment for new energy vehicles according to claim 1, characterized in that: The first positioning component (4) includes a first threaded rotating rod (402). The first threaded rotating rod (402) is movably installed inside the fixing frame (1). A threaded block (403) is threadedly connected to the outer surface of the first threaded rotating rod (402). A blocking plate (404) is provided on the top of the threaded block (403).
3. The dual-end positioning seamless steel pipe compression testing equipment for new energy vehicles according to claim 2, characterized in that: The top of the first threaded rod (402) is provided with a knob (401), and the number of the first positioning component (4) and the second positioning component (6) are both provided in two sets.
4. The dual-end positioning seamless steel pipe compression testing equipment for new energy vehicles according to claim 1, characterized in that: The side of the fixing frame (1) is provided with a through groove (3), and the steel pipe body (11) runs through the inside of the through groove (3).
5. The dual-end positioning seamless steel pipe compression testing equipment for new energy vehicles according to claim 1, characterized in that: The front of the fixture (1) is provided with a control panel (2), and the bottom of the fixture (1) is provided with a pressure testing component (10).
6. The dual-end positioning type seamless steel pipe compression testing equipment for new energy vehicles according to claim 1, characterized in that: The fixed plate (7) is equipped with a lifting structure (8), and a magnetic leakage detector (9) is provided on the left side of the lifting structure (8).
7. The dual-end positioning type seamless steel pipe compression testing equipment for new energy vehicles according to claim 1, characterized in that: The top of the fixed frame (1) is fixedly installed with a limiting cylinder (5), and the second threaded rotating rod (601) is movably installed inside the limiting cylinder (5).
8. The dual-end positioning type seamless steel pipe compression testing equipment for new energy vehicles according to claim 1, characterized in that: A steel pipe body (11) is provided between the first positioning plate (604) and the second positioning plate (606).
Citation Information
Patent Citations
Device for detecting compressive property of steel pipe
CN221405198U