A construction project cost management display device
Patent Information
- Application Number
- CN202522180372.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-15
- Publication Date
- 2026-10-20
- Estimated Expiration
- 2035-10-15
AI Technical Summary
[0006]本实用新型提出一种建筑工程项目成本管理展示装置,通过限位板一、限位板二和定位杆之间的配合,解决了固定高度展示板不方便粘贴的问题
[0018]与现有技术相比,该建筑工程项目成本管理展示装置具备如下有益效果:
Smart Images

Figure CN224874012U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of architectural engineering display technology, specifically a display device for architectural engineering project cost management. Background Technology
[0002] The construction project cost management display device is a tool designed to intuitively present project cost data and assist in dynamic control. It is suitable for scenarios such as meeting room presentations and on-site construction verification. It can quickly locate the risk of cost overruns and link responsibility information, greatly improving the transparency and efficiency of cost control.
[0003] Currently, project costs are mostly presented through paper reports or ordinary blackboards. When displaying relevant information, paper information needs to be pasted in different locations. Existing display boards are mostly fixed structures, which means that paper information can only be displayed at a fixed height. Moreover, it is not convenient for office staff to paste. For example, when displaying in sections, specific information needs to be pasted at a high position on the display board. It is difficult to paste at a high position, and additional height-raising tools are required, especially in construction sites or office buildings.
[0004] To address these issues, we have provided a construction project cost management display device. Utility Model Content
[0005] 1) Technical problems to be solved
[0006] This utility model proposes a display device for cost management of construction projects. Through the cooperation between limiting plate one, limiting plate two and positioning rod, it solves the problem that it is inconvenient to stick the display board at a fixed height.
[0007] (ii) Technical Solution
[0008] To achieve the above objectives, this utility model provides the following technical solution: a construction project cost management display device, including a triangular support frame, a connecting plate slidably connected to the outer surface of the triangular support frame, a fixing plate fixedly installed on the outer surface of the connecting plate, a limiting groove opened inside the fixing plate, a display plate one slidably connected to the inner wall of the limiting groove, and a display plate two slidably connected to the inner wall of the limiting groove.
[0009] The outer surfaces of display panel one and display panel two are respectively fixedly installed with limit plate one and limit plate two and are slidably connected to each other. The internal thread of the fixed plate is connected with a positioning rod.
[0010] The display panel is internally threaded with a fixed cylinder, and a top plate is slidably connected to the inner wall of the fixed cylinder. A spring is installed on the outside of the top plate.
[0011] Furthermore, the triangular support frame has support rods inserted inside, and adjacent triangular support frames are supported by multiple sets of support rods.
[0012] Furthermore, a base plate is fixedly installed on the outer surface of the triangular support frame, the upper surface of the base plate is in contact with one end of the connecting plate, and a fixing screw is slidably connected inside the base plate, with the outer surface of the fixing screw being threadedly connected to the inside of the connecting plate.
[0013] Furthermore, the outer surface of display panel one is slidably connected to one side of display panel two, and one end of the positioning rod is in contact with and abuts against the outer surface of display panel two.
[0014] Furthermore, the first limiting plate and the second limiting plate are arranged in a straight line outside the first display plate and the second display plate, and adjacent first limiting plates and second limiting plates are arranged at intervals and in contact with each other.
[0015] Furthermore, a positioning ring is fixedly installed on the outer surface of the fixed cylinder, and one side of the positioning ring is in contact with one side of the display panel.
[0016] Furthermore, one end of the spring contacts the inner wall of the fixed cylinder, and one end of both the fixed cylinder and the top plate are configured as a stepped structure, with one end of the top plate contacting one side of the second display panel.
[0017] (iii) Beneficial effects:
[0018] Compared with existing technologies, this construction project cost management display device has the following beneficial effects:
[0019] I. This construction project cost management display device, through the cooperation of limiting plate one, limiting plate two, and positioning rod, allows display plate two to move when the positioning rod rotates, at which point display plate one and display plate two can be tightly attached. Under the contact limitation of limiting plate one and limiting plate two, display plate one and display plate two can be fixed. When controlling the movement of display plate two, the positioning rod rotates in the opposite direction, which can control display plate two to be released from fixation, making it convenient for office staff to paste paper information. It realizes the function of auxiliary adjustment of the high position when displaying the display plate in sections, making it convenient for construction personnel to paste and display.
[0020] II. This construction project cost management display device, through the setting of components such as fixing screws and top plates, uses fixing screws to fix the connecting plate and the bottom plate, which can be quickly installed at this time, and can be disassembled for storage, making it convenient to move quickly in the construction site. Springs can push the top plate to press against one side of the display plate. When the display plate is not squeezed by the positioning rod, it can move under the push of the top plate, which can assist the movement of the display plate and facilitate the adjustment of the position of the display plate. Attached Figure Description
[0021] To more clearly illustrate the specific embodiments of this utility model or the technical solutions in the prior art, the drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, the elements or parts are not necessarily drawn to scale.
[0022] Figure 1 This is a structural diagram of the present invention;
[0023] Figure 2 This is a structural diagram of the fixing screw of this utility model;
[0024] Figure 3 This is a structural diagram of the fixing plate component of this utility model;
[0025] Figure 4 This utility model Figure 3 A magnified view of a section at point A in the middle;
[0026] Figure 5 This is a structural diagram of the top plate component of this utility model.
[0027] In the diagram: 1. Triangular support frame; 2. Connecting plate; 3. Fixing plate; 4. Limiting groove; 5. Display board one; 6. Display board two; 7. Limiting plate one; 8. Limiting plate two; 9. Positioning rod; 10. Fixing cylinder; 11. Top plate; 12. Spring; 13. Support rod; 14. Base plate; 15. Fixing screw; 16. Positioning ring. Detailed Implementation
[0028] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0029] like Figure 1 - Figure 5 As shown, this utility model provides a technical solution: a construction project cost management display device, including a triangular support frame 1, with a support rod 13 inserted inside the triangular support frame 1. Adjacent triangular support frames 1 are supported by multiple sets of support rods 13. Adjacent triangular support frames 1 can form a whole under the connection of support rods 13. At this time, the whole triangular support frame 1 is opened, which improves the stability of the overall support structure. Conversely, the triangular support frame 1 can be disassembled for quick storage and movement.
[0030] A connecting plate 2 is slidably connected to the outer surface of the triangular support frame 1, and a base plate 14 is fixedly installed on the outer surface of the triangular support frame 1. The upper surface of the base plate 14 is in contact with one end of the connecting plate 2. A fixing screw 15 is slidably connected inside the base plate 14. The outer surface of the fixing screw 15 is threadedly connected to the inside of the connecting plate 2. After assembling the triangular support frame 1, the connecting plate 2 is placed outside the base plate 14, and then the base plate 14 and the connecting plate 2 are fixed by the fixing screw 15. At this time, the connecting plate 2 and the base plate 14 are quickly connected by surface contact and fixing by the fixing screw 15. Conversely, they can be disassembled.
[0031] A fixing plate 3 is fixedly installed on the outer surface of the connecting plate 2. A limiting groove 4 is opened inside the fixing plate 3. A display plate 5 is slidably connected to the inner wall of the limiting groove 4, and a display plate 6 is slidably connected to the inner wall of the limiting groove 4. By setting up two sets of display structures, display plate 5 and display plate 6, after the connecting plate 2 is installed, display plate 5 and display plate 6 are placed inside the fixing plate 3 respectively, with display plate 5 located at the rear end. The two sets of display structures facilitate the display of different information. In construction engineering, the cost of each project can be displayed separately.
[0032] Limiting plates 7 and 8 are fixedly installed on the outer surfaces of display panel 5 and display panel 6 respectively and are slidably connected to each other. A positioning rod 9 is threadedly connected to the inside of the fixing plate 3. The outer surface of display panel 5 is slidably connected to one side of display panel 6. One end of the positioning rod 9 is in contact with the outer surface of display panel 6 and they are pressed together. Limiting plates 7 and 8 are arranged in a straight line outside display panels 5 and 6. Adjacent limiting plates 7 and 8 are spaced apart and in contact with each other. A handle is installed on one end of the positioning rod 9. When the positioning rod 9 is rotated, one end of the positioning rod 9 can approach and press display panel 6. At this time, display panels 5 and 6 can be fixed to each other by limiting plates 7 and 8. When the positioning rod 9 rotates in the opposite direction and does not contact display panel 6, display panel 6 can move up and down freely, which is convenient for pasting eye-catching important information on display panel 6 at a high position.
[0033] The display panel 5 has an internal threaded connection to a fixed cylinder 10. A positioning ring 16 is fixedly installed on the outer surface of the fixed cylinder 10. One side of the positioning ring 16 is in contact with one side of the display panel 5. The positioning ring 16 can limit the movement of the fixed cylinder 10, making it convenient to control one end of the fixed cylinder 10.
[0034] A top plate 11 is slidably connected to the inner wall of the fixed cylinder 10. A spring 12 is installed on the outside of the top plate 11. One end of the spring 12 is in contact with the inner wall of the fixed cylinder 10. Both the fixed cylinder 10 and the top plate 11 are set with a stepped structure. One end of the top plate 11 is in contact with one side of the display panel 6. One end of the fixed cylinder 10 is stepped inward, and one end of the top plate 11 is stepped outward. At this time, the top plate 11 will not disengage from the inside of the fixed cylinder 10 under the push of the spring 12. The spring 12 can push the top plate 11 to press against one side of the display panel 6. When the display panel 6 is not squeezed by the positioning rod 9, it can move under the push of the top plate 11, which can assist the movement of the display panel 6 and facilitate the adjustment of the position of the display panel 6.
[0035] Working principle: When in use, the two triangular support frames 1 on both sides are first opened by the support rod 13, and then the connecting plate 2 is fixed to the outside of the base plate 14 by the fixing screw 15. At this time, the display plate 1 5 and the display plate 2 6 are placed into the limiting groove 4 in sequence. By rotating the positioning rod 9, one end is pressed against the display plate 2 6 to fix the position of the display plate 1 5 and the display plate 2 6.
[0036] When pasting at a high position, one end of the control positioning rod 9 is released from contact with the second display board 6. Under the push of the spring 12, the top plate 11 pushes the second display board 6 away from the first display board 5. When the first limiting plate 7 and the second limiting plate 8 are no longer in contact, the position of the second display board 6 can be adjusted. At this time, the height can be adjusted for pasting. Then, repeat the above operation.
[0037] In the description of this utility model, it should be understood that the terms "left", "right", "up", "down", "top", "bottom", "front", "back", "inner", "outer", "back", "middle", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model.
[0038] However, the above description is only a specific embodiment of this utility model and should not be construed as limiting the scope of implementation of this utility model. Therefore, any substitution of equivalent components or equivalent changes and modifications made in accordance with the scope of protection of this utility model should still fall within the scope of the claims of this utility model.
Claims
1. A construction project cost management display device, comprising a triangular support frame (1), characterized in that: The outer surface of the triangular support frame (1) is slidably connected to a connecting plate (2), and a fixing plate (3) is fixedly installed on the outer surface of the connecting plate (2). A limiting groove (4) is opened inside the fixing plate (3), and a display plate one (5) is slidably connected to the inner wall of the limiting groove (4). A display plate two (6) is slidably connected to the inner wall of the limiting groove (4). The outer surfaces of the first display panel (5) and the second display panel (6) are respectively fixedly installed with the first limiting plate (7) and the second limiting plate (8) and are slidably connected to each other. The internal thread of the fixed plate (3) is connected with a positioning rod (9). The display panel (5) is internally threaded with a fixing cylinder (10), and the inner wall of the fixing cylinder (10) is slidably connected with a top plate (11), and a spring (12) is installed on the outside of the top plate (11).
2. The construction project cost management display device according to claim 1, characterized in that: The triangular support frame (1) has a support rod (13) inserted inside, and adjacent triangular support frames (1) are supported by multiple sets of support rods (13).
3. The construction project cost management display device according to claim 1, characterized in that: A base plate (14) is fixedly installed on the outer surface of the triangular support frame (1). The upper surface of the base plate (14) is in contact with one end of the connecting plate (2). A fixing screw (15) is slidably connected inside the base plate (14). The outer surface of the fixing screw (15) is threadedly connected to the inside of the connecting plate (2).
4. The construction project cost management display device according to claim 1, characterized in that: The outer surface of the first display panel (5) is slidably connected to one side of the second display panel (6), and one end of the positioning rod (9) is in contact with the outer surface of the second display panel (6) and they abut against each other.
5. The construction project cost management display device according to claim 1, characterized in that: The first limiting plate (7) and the second limiting plate (8) are arranged in a straight line outside the first display plate (5) and the second display plate (6), and the adjacent first limiting plate (7) and second limiting plate (8) are arranged at intervals and in contact with each other.
6. The construction project cost management display device according to claim 1, characterized in that: A positioning ring (16) is fixedly installed on the outer surface of the fixed cylinder (10), and one side of the positioning ring (16) is in contact with one side of the display panel (5).
7. The construction project cost management display device according to claim 1, characterized in that: One end of the spring (12) is in contact with the inner wall of the fixed cylinder (10). One end of both the fixed cylinder (10) and the top plate (11) is set as a stepped structure. One end of the top plate (11) is in contact with one side of the display panel (6).