Intelligent lifting net rack for petanque

CN224877263UActive Publication Date: 2026-10-23GUANGDONG PODIYEEN SPORTS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522078115.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-09-26
Publication Date
2026-10-23
Estimated Expiration
2035-09-26

AI Technical Summary

Technical Problem

我国商业自助球场近年来逐步兴起,这类场地通常采用按时计费模式,依赖无人值守运营以控制成本,但现有匹克球网架的智能性不足,导致运营过程中人工成本居高不下,核心痛点集中在两方面:

Benefits of technology

[0019]在本实用新型中,在网架主体的支撑立柱内设置有升降传动系统,通过升降传动系统与时间管理模块的相结合,实现了可按预设时间自动控制网体组件升降,无需人工手动调整,节省人力并提升操作的便捷性;而且,在时间管理模块的作用下,本实用新型实现了网架主体集成时间管理功能,可以根据使用场景的需求,简化使用流程。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224877263U_ABST
    Figure CN224877263U_ABST
Patent Text Reader

Abstract

The utility model relates to the pick ball equipment technical field especially a kind of pick ball intelligent lifting net rack, including net rack main body and time management module;Net rack main body includes base and the support column of setting on base, support column is connected with the lifting transmission system of net body subassembly and is provided in it;Lifting transmission system and time management module electric connection, time management module is set at the side of support column, preset time is provided in time management module, when time reaches preset time, time management module triggers lifting transmission system control net body subassembly to rise and drop.In the utility model, by the combination of lifting transmission system and time management module, it realizes that net body subassembly can be automatically controlled lifting according to preset time, without manual adjustment, save manpower and improve the convenience of operation;Moreover, under the action of time management module, net rack main body integrates time management function, can simplify use process according to the demand of use scene.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of pickle equipment technology, and specifically to a smart lifting frame for pickles. Background Technology

[0002] As an emerging ball sport, peakball demands increasingly sophisticated and intelligent netting systems for its facilities, particularly in commercial self-service courts where efficient management and cost reduction are key priorities. Commercial self-service courts have gradually gained popularity in my country in recent years. These courts typically operate on an hourly billing model, relying on unattended operation to control costs. However, the existing peakball netting systems lack sufficient intelligence, resulting in high labor costs during operation. The core pain points are concentrated in two aspects:

[0003] First, users are prone to exceeding the time limit for using the venue. Exceeding the time limit will not only delay subsequent orders, but also require staff to remind them manually, which increases manpower input and is prone to disputes between users and operators.

[0004] Secondly, the height adjustment of the net frame generally relies on manual operation. Whether it is daily maintenance or adjustment according to usage needs, it requires a dedicated person to operate on-site, which is not only inefficient but also further increases the burden on manpower. Therefore, there is an urgent need for an intelligent peak ball net frame that can automatically calculate the site usage time and automatically adjust the height during use to solve the operational shortcomings of traditional net frames. Utility Model Content

[0005] The purpose of this invention is to provide a smart lifting frame for a peak ball in order to solve the problems existing in the prior art.

[0006] In order to solve the problems existing in the prior art, the present invention adopts the following technical solution:

[0007] A smart lifting net frame for peak balls includes a net frame body and a time management module; the net frame body includes a base and a support column set on the base, and the support column is provided with a lifting transmission system connected to the net body assembly;

[0008] The lifting transmission system is electrically connected to the time management module, which is located on one side of the support column. The time management module has a preset time. When the preset time is reached, the time management module triggers the lifting transmission system to control the raising and lowering of the net assembly.

[0009] As an improvement to the technical solution of the intelligent lifting net frame for the Peak Ball of this utility model, the time management module includes a user interaction layer, a control layer and an execution drive layer;

[0010] The user interaction layer is wirelessly connected to the control layer. The user interaction layer is used to receive user payment instructions and transmit the user payment instructions to the control layer.

[0011] The control layer has a built-in timing chip. The control layer is used to receive the user's payment instruction, start the timing chip to start timing, and trigger control signals to the execution driver layer.

[0012] The execution drive layer includes a relay and a power supply connected to the lifting management system. The execution drive layer is connected to the control layer. After receiving the control signal, the execution drive layer is used to control the power supply of the lifting management system according to the control signal.

[0013] As an improvement to the technical solution of the intelligent lifting frame for the Peak Ball of this utility model, a protective main electrical box is provided on one side of the supporting column, and the time management module is integrated into the protective main electrical box.

[0014] As an improvement to the technical solution of the intelligent lifting frame for the Peak Ball in this utility model, the control layer includes a circuit board, the relay is electrically connected to the circuit board, and the power supply is connected to the relay to form a power supply circuit; after the circuit board receives the user's payment instruction, it triggers the relay to engage to supply power to the lifting transmission system.

[0015] As an improvement to the technical solution of the intelligent lifting net frame for peak balls of this utility model, the intelligent lifting net frame for peak balls is equipped with a control terminal, the control terminal has a pre-set control module, and the control module is wirelessly connected to the billing system.

[0016] As an improvement to the technical solution of the intelligent lifting net frame for the pickle ball of this utility model, the lifting transmission system includes a lead screw drive rod and a motor for driving the lead screw drive rod to extend and retract. The main shaft of the motor is connected to a winch, and the winch is connected to the lead screw drive rod.

[0017] As an improvement to the technical solution of the intelligent lifting net frame of the present invention, the lifting transmission system further includes a limit switch, which is set at the upper and lower limit positions of the support column to prevent the net assembly from detaching from the support column.

[0018] The beneficial effects of this utility model are:

[0019] In this invention, a lifting transmission system is installed in the supporting columns of the main body of the space frame. By combining the lifting transmission system with the time management module, the lifting and lowering of the space frame components can be automatically controlled according to a preset time, eliminating the need for manual adjustment, saving manpower and improving the convenience of operation. Moreover, under the function of the time management module, this invention realizes the integration of time management function into the main body of the space frame, which can simplify the usage process according to the needs of the usage scenario. Attached Figure Description

[0020] Figure 1 This is a schematic diagram of the mesh component in the present invention in an elevated state.

[0021] Figure 2 This is a schematic diagram of the mesh component in the present invention in a descending state.

[0022] Figure 3 This is a structural diagram of the base and supporting column in this utility model;

[0023] Figure 4 This is a schematic diagram showing the connection between the main body of the grid structure, the time management module, and the billing system in this utility model.

[0024] Explanation of reference numerals in the attached drawings: 1-Main body of the grid frame; 2-Base; 3-Supporting column; 4-Grid assembly; 5-Protective main electrical box; 6-Hydraulic telescopic mechanism; 7-Power supply. Detailed Implementation

[0025] To make the invention objective, technical solution and beneficial effects of this utility model clearer, the technical solutions of this utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of this utility model. Obviously, the described embodiments are only some embodiments of this utility model, and not all embodiments.

[0026] like Figures 1 to 4 As shown, a smart lifting net frame for a peak ball includes a net frame body 1 and a time management module; the net frame body 1 includes a base 2 and a support column 3 set on the base 2, and a lifting transmission system connected to the net body component 4 is set in the support column 3.

[0027] The lifting transmission system is electrically connected to the time management module, which is located on one side of the support column 3. The time management module has a preset time. When the preset time is reached, the time management module triggers the lifting transmission system to control the net body component 4 to rise and fall.

[0028] In this utility model, a lifting transmission system is provided in the support column 3 of the main body 1 of the space frame. By combining the lifting transmission system with the time management module, the lifting of the space frame component 4 can be automatically controlled according to the preset time, without the need for manual adjustment, saving manpower and improving the convenience of operation. Moreover, under the action of the time management module, the main body 1 of the space frame integrates time management function, simplifying the usage process.

[0029] In detail, when this utility model is in use, after the user enters the site, he / she can send a control signal and a preset usage time (such as a preset usage of 1 hour, 2 hours, etc.) to the time management module. After the time management module receives the control signal, it starts timing and at the same time controls the net assembly 4 to rise through the lifting transmission system to prepare the net frame.

[0030] When the preset usage time is up, the time management module controls the net assembly 4 to descend via the lifting transmission system, thereby managing the usage time of the net frame field. In this invention, the net assembly 4 is a peak net.

[0031] In some embodiments of this utility model, the time management module includes a user interaction layer, a control layer, and an execution drive layer;

[0032] The user interaction layer is wirelessly connected to the control layer. The user interaction layer is used to receive user payment instructions and transmit them to the control layer.

[0033] The control layer has a built-in timing chip. The control layer is used to receive user payment instructions, start the timing chip to start timing, and trigger control signals to the execution driver layer.

[0034] The execution drive layer includes a relay and a power supply 7 connected to the lifting management system. The execution drive layer is connected to the control layer. After receiving the control signal, the execution drive layer is used to control the power supply of the lifting management system according to the control signal.

[0035] In this utility model, the time management module includes a user interaction layer, a control layer, and an execution drive layer. This not only solves the pain points of manual timing, manual adjustment of the height of the net component 4, and the linkage between payment and function in the use of the peak ball net frame, but also ensures the ease of operation and the stability of function. The overall design upgrades the net frame from manual operation to intelligent linkage control, adapting to commercial operation (such as paid use scenarios) or standardized training needs, and improving the user experience and management efficiency.

[0036] In some embodiments of this utility model, the Peak Ball intelligent lifting frame is equipped with a control terminal, which has a pre-set control module and is wirelessly connected to the billing system.

[0037] In detail, in this invention, the user can send a payment instruction to the user interaction layer via a control terminal. The user interaction layer receives the payment instruction and transmits it to the control layer. The user interaction layer can achieve this by using an existing billing program. The billing program pre-sets the fee corresponding to the venue usage time. This billing program is an existing program, such as the Yunyitong billing system or other existing billing systems.

[0038] That is, in this utility model, under the joint action of the main body 1 of the grid frame, the time management module and the billing system, an automated control is formed, which includes order payment, the billing system feedback payment completion, the time management module starting the timer and driving the lifting transmission system to raise the grid component 4, the timer ending, and the time management module driving the lifting transmission system to lower the grid component 4 to the standby position.

[0039] Furthermore, a protective main power box 5 is installed on one side of the supporting column 3. The time management module is integrated into the protective main power box 5 to protect the time management module. It also further adapts to the long-term use needs of the Peak ball net frame in outdoor or public scenarios, and enhances the reliability and practicality of the equipment operation.

[0040] In some embodiments of this utility model, the control layer includes a circuit board, a relay and the circuit board are electrically connected, and the power supply 7 is connected to the relay to form a power supply circuit; after the circuit board receives the user's payment instruction, it triggers the relay to engage to supply power to the lifting transmission system.

[0041] In detail, the power supply circuit formed by the circuit board, relays, and power supply 7 in the control layer can trigger the relay to activate and supply power to the lifting transmission system based on the user's payment instruction. This not only realizes the control of activating the lifting function after payment, preventing unauthorized use of the grid structure, and ensuring the standardization of equipment use and ease of management, but also uses the relay as a power switch to stably control the on / off of the power supply circuit, preventing abnormal current from damaging the lifting transmission system. At the same time, it simplifies the power supply control logic, improves the overall system reliability, and adapts to the orderly use needs of the Peak Ball grid structure in public places and other scenarios.

[0042] In some embodiments of this utility model, the lifting transmission system includes a lead screw drive rod and a motor for driving the lead screw drive rod to extend and retract. The main shaft of the motor is connected to a winch, and the winch is connected to the lead screw drive rod.

[0043] In detail, the lifting transmission system of this utility model provides stable power for the lifting and lowering of the net assembly 4 through the cooperation of a motor, winch, and lead screw drive. The motor drives the winch to rotate, which in turn drives the lead screw drive to extend and retract. The lead screw drive prevents slippage during lifting and ensures the precise positioning of the net assembly 4. Simultaneously, the motor drive replaces manual adjustment, saving effort. The combination of the winch and lead screw also allows for flexible control of lifting speed and stroke, adapting to different usage scenarios. The overall structure is stable and has a low probability of failure, solving the problems of low efficiency and poor accuracy of manual adjustment, and ensuring the long-term reliable operation of the net structure.

[0044] Alternatively, the lifting transmission system in this utility model includes a hydraulic telescopic mechanism 6 connected to the power supply 7, which provides stable power for the lifting of the net assembly 4.

[0045] In addition, in this utility model, as an embodiment of this utility model, after the execution drive layer receives the control signal, the execution drive layer is used to control the power supply of the lifting management system according to the control signal. When the power supply is disconnected, the motor loses the power to drive the winch and the screw drive push rod. The net assembly 4 will lose power and, under the action of gravity, descend along the screw drive push rod.

[0046] In another embodiment of this utility model, after the execution drive layer receives the control signal, the execution drive layer is used to control the motor in the lifting transmission system to rotate in the opposite direction according to the control signal, so as to achieve the effect of lowering the net assembly 4.

[0047] Furthermore, the lifting transmission system also includes limit switches, which are set at the upper and lower limits of the support column 3 to prevent the net assembly 4 from detaching from the support column 3. Moreover, when the net assembly 4 is at the upper or lower limit, its horizontal height can be used as a reference standard height. Under the action of the reference standard height, the height of the net assembly 4 in the rising and falling states is standardized.

[0048] In detail, when the net assembly 4 is raised to the highest position or lowered to the lowest position, the limit switch can be triggered in time to stop the operation of the lifting transmission system, so as to prevent the net assembly 4 from detaching from the support column 3 due to excessive lifting. This not only solves the safety hazard of the net assembly 4 being prone to overtravel and dislocation during the lifting process, but also ensures that the lifting transmission system will not be damaged due to overload, thus ensuring the long-term stable use of the grid structure.

[0049] Based on the embodiments of this utility model, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this utility model.

Claims

1. A smart lifting frame for a peak ball, characterized in that, It includes a main body of a space frame and a time management module; the main body of the space frame includes a base and a support column set on the base, and the support column is provided with a lifting transmission system connected to the space frame components; The lifting transmission system is electrically connected to the time management module, which is located on one side of the support column. The time management module has a preset time. When the preset time is reached, the time management module triggers the lifting transmission system to control the raising and lowering of the net assembly.

2. The intelligent lifting frame for peak balls according to claim 1, characterized in that, The time management module includes a user interaction layer, a control layer, and an execution-driven layer; The user interaction layer is wirelessly connected to the control layer. The user interaction layer is used to receive user payment instructions and transmit the user payment instructions to the control layer. The control layer has a built-in timing chip. The control layer is used to receive the user's payment instruction, start the timing chip to start timing, and trigger control signals to the execution driver layer. The execution drive layer includes a relay and a power supply connected to the lifting management system. The execution drive layer is connected to the control layer. After receiving the control signal, the execution drive layer is used to control the power supply of the lifting management system according to the control signal.

3. The intelligent lifting frame for peak balls according to claim 2, characterized in that, A protective main electrical box is installed on one side of the supporting column, and the time management module is integrated into the protective main electrical box.

4. The intelligent lifting frame for peak balls according to claim 2, characterized in that, The control layer includes a circuit board, the relay is electrically connected to the circuit board, and the power supply is connected to the relay to form a power supply circuit; after the circuit board receives the user's payment instruction, it triggers the relay to engage to supply power to the lifting transmission system.

5. The intelligent lifting frame for peak balls according to claim 2, characterized in that, The intelligent lifting frame for the Peak Ball is equipped with a control terminal, which contains a pre-installed control module. The control module is wirelessly connected to the billing system.

6. The intelligent lifting frame for peak balls according to claim 1, characterized in that, The lifting transmission system includes a lead screw drive rod and a motor for driving the lead screw drive rod to extend and retract. The main shaft of the motor is connected to a winch, and the winch is connected to the lead screw drive rod.

7. The intelligent lifting frame for peak balls according to claim 1, characterized in that, The lifting transmission system also includes limit switches, which are set at the upper and lower limits of the support column to prevent the net assembly from detaching from the support column.