A ventilation system for a spray painting apparatus
Patent Information
- Application Number
- CN202522399692.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-12
- Publication Date
- 2026-10-23
- Estimated Expiration
- 2035-11-12
AI Technical Summary
传统的喷涂设备通风系统往往存在以下问题:首先,送风温度不稳定,容易受外界环境温度影响,导致喷涂过程中漆膜干燥不均匀,影响产品外观和质量;其次,送风洁净度不足,空气中可能含有灰尘、杂质等污染物,这些污染物会附着在湿漆表面,造成喷涂缺陷;此外,气流分布不均匀,容易在喷漆间和供漆间形成死区或涡流,导致漆雾滞留,增加清理难度和安全隐患
[0012]1、本实用新型中,通过设置地恒温送风机组,能够为供漆间和喷漆间持续提供洁净、恒温、稳定的工艺空气,有效避免温度波动对喷涂过程的影响,提高漆膜均匀性和附着力;
Smart Images

Figure CN224878388U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of ventilation system technology, and in particular to a ventilation system for spraying equipment. Background Technology
[0002] In brake disc spraying equipment, the ventilation system is a crucial component for ensuring spraying quality and a safe working environment. Traditional spraying equipment ventilation systems often suffer from the following problems: First, the supply air temperature is unstable and easily affected by the ambient temperature, leading to uneven drying of the paint film during spraying, affecting the product's appearance and quality. Second, the supply air cleanliness is insufficient; the air may contain dust, impurities, and other contaminants, which can adhere to the wet paint surface, causing spraying defects. Furthermore, uneven airflow distribution can easily create dead zones or eddies in the spray booth and paint supply room, causing paint mist retention, increasing cleaning difficulty and safety hazards. In existing technologies, some ventilation systems lack effective temperature control and air filtration mechanisms, failing to meet the stringent air quality requirements of high-precision spraying processes.
[0003] In summary, a ventilation system for spraying equipment is needed to address the shortcomings of existing technologies. Utility Model Content
[0004] To address the shortcomings of existing technologies, this utility model provides a ventilation system for spraying equipment, aiming to solve the aforementioned problems.
[0005] To achieve the above objectives, this utility model provides the following technical solution: a ventilation system for spraying equipment, comprising a body, a paint supply room, a spray booth, and a constant temperature air supply unit. The paint supply room, spray booth, and constant temperature air supply unit are all located on the body. The top of the paint supply room has a first air inlet for connecting to the constant temperature air supply unit, and the top of the spray booth has a second air inlet for connecting to the constant temperature air supply unit. The constant temperature air supply unit is used to continuously provide clean, constant temperature, and stable process air to the paint supply room and the spray booth. The constant temperature air supply unit includes a filter chamber, a heating chamber, and a pressure equalization chamber. The filter chamber is used to draw in outside air and pressurize it into the heating chamber. The heating chamber is used to heat the air from the filter chamber to the process set temperature. The pressure equalization chamber is used to stabilize and equalize the flow of the hot air from the heating chamber and evenly deliver it into the paint supply room and the spray booth. By integrating a constant-temperature air supply unit into the machine body and supplying air to the paint supply room and spray booth through the air inlet at the top, the core function of continuously providing clean, constant-temperature, and stable process air to the two key areas is achieved. This integrated structure effectively ensures the stability of the spraying environment parameters, thereby ensuring the uniformity of paint film quality and improving the overall quality of the sprayed products.
[0006] Furthermore, the filter chamber is equipped with a side plate filter, a fan, and a hose connector. The side plate filter is installed on the side wall of the filter chamber away from the heating chamber, and the air outlet of the fan is connected to the heating chamber through the hose connector.
[0007] Furthermore, the heating chamber is equipped with a first air duct, a hot air box, a second air duct, and a bend. One end of the first air duct is connected to a hose connector, and the other end of the first air duct is connected to the hot air box. The output end of the hot air box is connected to the bend through the second air duct, and the end of the bend away from the second air duct is connected to the pressure equalization chamber.
[0008] Furthermore, a number of bottom plate filters for flow equalization filtration are installed at the bottom of the equalization chamber, and the bottom plate filters are located directly above the first air inlet and the second air inlet.
[0009] Furthermore, the top of the machine body is equipped with an exhaust system and an air tank. The exhaust system is used to filter and discharge the exhaust gas from the machine body, and the air tank is used to provide stable and clean compressed air to ensure the quality of the power source for the paint spraying room.
[0010] Furthermore, an exhaust port for connecting to the ventilation mechanism is provided in the middle of the top wall of the machine body.
[0011] The beneficial effects of this utility model are:
[0012] 1. In this utility model, by setting up a constant temperature air supply unit, clean, constant temperature and stable process air can be continuously provided to the paint supply room and the spraying room, effectively avoiding the influence of temperature fluctuations on the spraying process and improving the uniformity and adhesion of the paint film.
[0013] 2. In this utility model, the combination of side plate filters and fans in the ground filtration chamber efficiently removes particulate matter and impurities from the outside air, ensuring the cleanliness of the supplied air and reducing spraying defects. The heating chamber, through the design of a hot air box and air duct, quickly heats the air to the process set temperature and maintains a stable temperature to meet the needs of different spraying environments. Multiple bottom plate filters are installed at the bottom of the pressure equalization chamber to achieve pressure stabilization and uniform flow of hot air, ensuring that the airflow is evenly distributed in the paint supply room and spraying room, avoiding excessively strong or weak local airflow, and improving spraying consistency and efficiency. The overall system has a compact structure, reasonable layout, and is easy to install and maintain, possessing certain practical and promotional value. Attached Figure Description
[0014] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0015] Figure 1 This is a three-dimensional structural schematic diagram of the present invention.
[0016] Figure 2 This is an exploded view of the structure of this utility model.
[0017] Figure 3 This is a three-dimensional structural disassembly diagram of the constant temperature air supply unit of this utility model.
[0018] Figure 4 This is a cross-sectional schematic diagram of the hot air box structure of this utility model.
[0019] Figure 5 This is a three-dimensional structural diagram of the ventilation mechanism of this utility model.
[0020] In the diagram: 100-body, 101-exhaust port; 10-paint supply room, 11-first air inlet; 20-painting room, 21-second air inlet; 30-constant temperature air supply unit, 31-filter chamber, 311-side plate filter, 312-fan, 313-hose connector; 32-heating chamber, 321-first air duct, 322-hot air box, 3221-outer shell, 3222-top cover, 3223-finned heating tube, 3224-inlet, 3225-outlet; 323-second air duct, 324-bend; 33-pressure equalization chamber, 331-bottom plate filter; 40-exhaust mechanism, 41-exhaust hopper plate, 42-exhaust fan, 43-waste discharge elbow; 50-air storage tank. Detailed Implementation
[0021] To facilitate understanding of this utility model, a more detailed description is provided below with reference to the accompanying drawings and specific embodiments. It should be noted that when an element is described as "fixed to" another element, it can be directly on the other element, or one or more intermediate elements may exist between them. When an element is described as "connected to" another element, it can be directly connected to the other element, or one or more intermediate elements may exist between them. The terms "vertical," "horizontal," "left," "right," and similar expressions used in this specification are for illustrative purposes only.
[0022] Unless otherwise defined, all technical and scientific terms used in this specification have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains. The terminology used in this specification is for the purpose of describing particular embodiments only and is not intended to limit the scope of the invention. The term "and / or" as used in this specification includes any and all combinations of one or more of the associated listed items.
[0023] like Figures 1-5 As shown, a ventilation system for spraying equipment includes a body 100, a paint supply room 10, a spray booth 20, and a constant temperature air supply unit 30. The paint supply room 10, spray booth 20, and constant temperature air supply unit 30 are all mounted on the body 100. The top of the paint supply room 10 has a first air inlet 11 for connecting to the constant temperature air supply unit 30, and the top of the spray booth 20 has a second air inlet 21 for connecting to the constant temperature air supply unit 30. The constant temperature air supply unit 30 is used for… To continuously provide clean, constant-temperature, and stable process air to the paint supply room 10 and the spray painting room 20, the constant-temperature air supply unit 30 includes a filter chamber 31, a heating chamber 32, and a pressure equalization chamber 33. The filter chamber 31 is used to draw in outside air and pressurize it into the heating chamber 32. The heating chamber 32 is used to heat the air from the filter chamber 31 to the process set temperature. The pressure equalization chamber 33 is used to stabilize and equalize the flow of the hot air from the heating chamber 32 and deliver it evenly into the paint supply room 10 and the spray painting room 20.
[0024] In one embodiment, the filter chamber 31 is provided with a side plate filter 311, a fan 312 and a hose connector 313. The side plate filter 311 is installed on the side wall of the filter chamber 31 away from the heating chamber 32, and the air outlet of the fan 312 is connected to the heating chamber 32 through the hose connector 313.
[0025] In one embodiment, the heating chamber 32 is provided with a first air duct 321, a hot air box 322, a second air duct 323, and a bend 324. One end of the first air duct 321 is connected to a hose connector 313, and the other end of the first air duct 321 is connected to the hot air box 322. The output end of the hot air box 322 is connected to the bend 324 through the second air duct 323. The end of the bend 324 away from the second air duct 323 is connected to the pressure equalization chamber 33.
[0026] In one embodiment, the hot air box 322 includes a shell 3221, a top cover 3222, a finned heating tube 3223, an inlet 3224, and an outlet 3225. The top cover 3222 is fixedly installed on the shell 3221, and a mounting seat for fixing the finned heating tube 3223 is provided on the side of the top cover 3222 near the inside of the shell 3221. The inlet 3224 and the outlet 3225 are respectively opened on the left and right sides of the hot air box 322. The inlet 3224 is connected to the first air guide duct 321, and the outlet 3225 is connected to the second air guide duct 323.
[0027] In one embodiment, a plurality of bottom plate filters 331 for flow equalization filtration are installed at the bottom of the equalization chamber 33, and the bottom plate filters 331 are located directly above the first air inlet 11 and the second air inlet 21.
[0028] In one implementation, the top of the machine body 100 is equipped with an exhaust mechanism 40 and an air tank 50. The exhaust mechanism 40 is used to filter and discharge the exhaust gas from the machine body 100, and the air tank 50 is used to provide stable and clean compressed air to ensure the quality of the power source of the paint booth 20.
[0029] In one embodiment, an exhaust port 101 for connecting to the ventilation mechanism 40 is provided in the middle of the top wall of the body 100.
[0030] In one embodiment, the exhaust mechanism 40 includes an exhaust hopper plate 41, an exhaust fan 42, and a waste discharge elbow 43. The exhaust hopper plate 41 is installed on the body 100 directly above the exhaust port 101. The exhaust fan 42 is fixedly installed on the exhaust hopper plate 41, and the waste discharge elbow 43 is installed at the air outlet of the exhaust fan 42.
[0031] The working principle of this utility model is as follows: During use, outside air is first drawn into the filter chamber 31 and preliminarily filtered by the side plate filter 311 to remove dust and impurities. Then, the fan 312 forces the filtered air into the heating chamber 32 through the hose connector 313. Inside the heating chamber 32, the air enters the hot air box 322 through the first air duct 321, is heated to the process set temperature, and is then transported to the pressure equalization chamber 33 through the second air duct 323 and the bend 324. The pressure equalization chamber 33 stabilizes and equalizes the flow of the hot air, and further filters and evenly distributes it through the bottom plate filter 331. Finally, the air is delivered to the paint supply room 10 and the spray booth 20 through the first air inlet 11 and the second air inlet 21 respectively, providing constant-temperature, clean process air for the spraying process. Simultaneously, the exhaust mechanism 40 extracts and filters exhaust gas through the exhaust port 101 at the top of the body 100, while the air storage tank 50 provides stable and clean compressed air, ensuring the quality of the power source for the spray booth 20. The entire system achieves closed-loop air management, ensuring the stability of the spraying environment and product quality.
[0032] It should be noted that while the preferred embodiments of this utility model are provided in the specification and accompanying drawings, this utility model can be implemented in many different forms and is not limited to the embodiments described in this specification. These embodiments are not intended to impose additional limitations on the content of this utility model; their purpose is to provide a more thorough and comprehensive understanding of the disclosure of this utility model. Furthermore, the above-mentioned technical features can be combined with each other to form various embodiments not listed above, all of which are considered to be within the scope of this utility model specification. Moreover, those skilled in the art can make improvements or modifications based on the above description, and all such improvements and modifications should fall within the protection scope of the appended claims.
Claims
1. A ventilation system for a spraying equipment, comprising a body (100), a paint supply room (10), a spray booth (20), and a constant temperature air supply unit (30), wherein the paint supply room (10), the spray booth (20), and the constant temperature air supply unit (30) are all located on the body (100), characterized in that, The top of the paint supply room (10) is provided with a first air inlet (11) for connecting to the constant temperature air supply unit (30), and the top of the spray painting room (20) is provided with a second air inlet (21) for connecting to the constant temperature air supply unit (30). The constant temperature air supply unit (30) is used to continuously provide clean, constant temperature and stable process air to the paint supply room (10) and the spray painting room (20). The constant temperature air supply unit (30) includes a filter chamber (31), a heating chamber (32) and a pressure equalization chamber (33). The filter chamber (31) is used to draw in outside air and press it into the heating chamber (32). The heating chamber (32) is used to heat the air from the filter chamber (31) to the process set temperature. The pressure equalization chamber (33) is used to stabilize and equalize the hot air from the heating chamber (32) and send it evenly into the paint supply room (10) and the spray painting room (20).
2. The ventilation system for a spraying equipment according to claim 1, characterized in that, The filter chamber (31) is equipped with a side plate filter (311), a fan (312) and a hose connector (313). The side plate filter (311) is installed on the side wall of the filter chamber (31) away from the heating chamber (32). The air outlet of the fan (312) is connected to the heating chamber (32) through the hose connector (313).
3. The ventilation system for a spraying equipment according to claim 2, characterized in that, The heating chamber (32) is equipped with a first air duct (321), a hot air box (322), a second air duct (323), and a bend (324). One end of the first air duct (321) is connected to a hose connector (313), and the other end of the first air duct (321) is connected to the hot air box (322). The output end of the hot air box (322) is connected to the bend (324) through the second air duct (323). The end of the bend (324) away from the second air duct (323) is connected to the equalizing chamber (33).
4. The ventilation system for a spraying equipment according to claim 3, characterized in that, The bottom of the equalizing chamber (33) is equipped with several bottom plate filters (331) for equalizing flow filtration, and the bottom plate filters (331) are located directly above the first air inlet (11) and the second air inlet (21).
5. The ventilation system for a spraying equipment according to claim 1, characterized in that, The top of the machine body (100) is equipped with a ventilation mechanism (40) and an air storage tank (50). The ventilation mechanism (40) is used to filter and discharge the exhaust gas of the machine body (100), and the air storage tank (50) is used to provide stable and clean compressed air to ensure the quality of the power source of the paint spraying room (20).
6. The ventilation system for a spraying equipment according to claim 5, characterized in that, The top wall of the body (100) has an exhaust port (101) for connecting to the ventilation mechanism (40).