AI Technical Summary

Technical Problem

[0004]基于以上检索,结合现有技术发现,现有技术中类似于以上公开的预埋结构包括几百个埋件(锚杆),整体埋件几吨重,其垂直度控制不准,导致顶部锚板连接困难,且连接后的水平度难以保证

Benefits of technology

1、本实用新型中,通过辅助调平组件的设置,施工时,首先将下锚板固定在预定位置,并完成下锚板的调平,然后将上锚板对应放置于下锚板的上侧,此后将多个定位杆对应插接上锚板上的第二安装孔和下锚板上的第一安装孔中,并使得定位杆与下锚板相固定,与此同时,将螺纹杆螺纹贯穿第二安装架后插至第一安装架中;再将多个锚杆对应插接上锚板上的第二安装孔和下锚板上的第一安装孔中,然后将锚杆与下锚板相固定,此后利用驱动电机驱动螺纹杆转动,转动的螺纹杆则驱动上锚板竖直上移,实现对多个锚杆垂直度的同步调节,同时保证上锚板调节后自身的水平度。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224884768U_ABST
    Figure CN224884768U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of wind power foundation integral embedded parts leveling device, it is related to wind power tower cylinder construction technology field, by including the setting of positioning rod, support frame, threaded rod and drive motor, during construction, first, the lower anchor plate is fixed in predetermined position, and the leveling of lower anchor plate is completed, then the upper anchor plate is placed on the upside of lower anchor plate correspondingly, after this, multiple positioning rods are inserted into second mounting hole on the upper anchor plate and first mounting hole on lower anchor plate correspondingly, and positioning rod is fixed with lower anchor plate, at the same time, threaded rod is inserted into first mounting frame after threaded through second mounting frame;Again, multiple anchor rods are inserted into second mounting hole on the upper anchor plate and first mounting hole on lower anchor plate correspondingly, then anchor rod is fixed with lower anchor plate, after this, threaded rod is rotated using drive motor, and the threaded rod is rotated then drives the vertical upward of upper anchor plate, the synchronous adjustment of the perpendicularity of multiple anchor rods is realized, while ensuring the levelness of upper anchor plate after adjustment itself.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of wind turbine tower construction technology, and in particular to a leveling device for an integral pre-embedded component of a wind turbine foundation. Background Technology

[0002] A wind turbine tower is the support structure of a wind turbine generator. It primarily supports the turbine and absorbs vibrations. The foundation ring beneath the tower bears immense vertical pressure and lateral bending moments. Existing foundation rings are generally buried... It is set in the corresponding concrete foundation, and the upper end of the tower foundation ring is connected to the bottom of the generator tower through a locking flange.

[0003] A search revealed, for example, a wind turbine tower foundation ring reinforcement node structure disclosed in patent publication number CN220285909U, comprising a fixed ring, an internal connecting ring, and four connecting plates fixedly connected to the outer surface of the connecting ring. The end of each connecting plate furthest from the connecting ring is fixedly connected to the inner wall of the fixed ring. A fixed cylinder is fixedly connected to the upper surface of the connecting ring, and a mounting flange is fixedly connected to the top of the fixed cylinder. The fixed ring and the foundation are cast together using fixing lugs on the fixed ring in conjunction with embedded parts.

[0004] Based on the above search and combined with existing technology, it was found that existing pre-embedded structures similar to those disclosed above include hundreds of embedded parts (anchor rods), with the entire embedded part weighing several tons. Inaccurate verticality control leads to difficulties in connecting the top anchor plate, and the levelness after connection is difficult to guarantee. Therefore, a leveling device for the overall pre-embedded parts of wind power foundations is proposed to improve the above problems. Utility Model Content

[0005] The purpose of this application is to provide a leveling device for integral embedded parts of wind power foundations to solve the problems mentioned in the background art.

[0006] To achieve the above objectives, this application provides the following technical solution: a leveling device for an integral pre-embedded component of a wind power foundation, comprising an auxiliary leveling assembly disposed between a lower anchor plate, an upper anchor plate, and multiple anchor rods; The lower anchor plate and the upper anchor plate are respectively provided with multiple first mounting holes and second mounting holes at equal intervals along their own circumference, and the multiple first mounting holes on the lower anchor plate are provided in a one-to-one correspondence with the second mounting holes on the upper anchor plate. The first mounting holes and the second mounting holes are respectively inserted and matched with multiple anchor rods. After the upper anchor plate is placed on the upper side of the lower anchor plate and the auxiliary leveling component is fixed to the upper end of the lower anchor plate, the auxiliary leveling component drives the upper anchor plate to move vertically upward.

[0007] As a further supplement to this solution, the auxiliary leveling components include a positioning rod, a support frame, a threaded rod, and a drive motor; Multiple positioning rods are provided, and the multiple positioning rods are fixed at equal intervals to the side end of the support frame. The first mounting hole and the second mounting hole are respectively inserted and engaged with the multiple positioning rods. The threaded rod is rotatably installed in the middle of the bottom end of the support frame. The drive motor is detachably installed in the top end of the support frame, and the output end of the drive motor is coaxially connected with the threaded rod. The inner side of the lower anchor plate is fixed with a first mounting bracket for the threaded rod to rotate and connect, and the inner side of the upper anchor plate is fixed with a second mounting bracket for the threaded rod to pass through.

[0008] As a further supplement to this solution, a positioning structure is provided between the lower anchor plate and the upper anchor plate.

[0009] As a further supplement to this solution, the positioning structure includes multiple positioning posts that are circumferentially fixed at the lower end of the upper anchor plate, and multiple positioning holes that are circumferentially fixed at the lower anchor plate, with the multiple positioning posts and multiple positioning holes corresponding and matching one-to-one.

[0010] As a further supplement to this solution, multiple positioning sleeves are fixed at equal intervals around the upper circumference of the lower anchor plate. The multiple positioning sleeves are located at multiple positioning holes, and the positioning sleeves are inserted into the positioning posts.

[0011] As a further supplement to this solution, a protective cover is movably inserted into the upper end of the positioning sleeve.

[0012] In summary, the technical effects and advantages of this utility model are as follows: 1. In this utility model, by setting up an auxiliary leveling component, during construction, the lower anchor plate is first fixed in a predetermined position and leveled. Then, the upper anchor plate is placed on the upper side of the lower anchor plate. Subsequently, multiple positioning rods are inserted into the second mounting holes on the upper anchor plate and the first mounting holes on the lower anchor plate, fixing the positioning rods to the lower anchor plate. At the same time, the threaded rod is threaded through the second mounting bracket and inserted into the first mounting bracket. Then, multiple anchor rods are inserted into the second mounting holes on the upper anchor plate and the first mounting holes on the lower anchor plate, fixing the anchor rods to the lower anchor plate. Subsequently, the threaded rods are driven to rotate by a drive motor, and the rotating threaded rods drive the upper anchor plate to move vertically upward, realizing the synchronous adjustment of the verticality of multiple anchor rods while ensuring the horizontality of the upper anchor plate after adjustment.

[0013] 2. In this utility model, by using the insertion and connection between the positioning sleeve and the positioning column, mud is less likely to splash into the positioning sleeve during the process of fixing the lower anchor plate. Thus, the insertion and connection between the positioning sleeve and the positioning column can improve the initial levelness of the upper anchor plate. Attached Figure Description

[0014] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0015] Figure 1 This is a three-dimensional structural diagram of the lower anchor plate in this embodiment; Figure 2 This is a three-dimensional structural diagram of the upper anchor plate in this embodiment; Figure 3 This is a structural schematic diagram of the lower anchor plate, upper anchor plate, and auxiliary leveling component in the assembled state of this embodiment; Figure 4 This is a structural diagram of the lower anchor plate, upper anchor plate, auxiliary leveling component, and anchor bolt in the assembled state of this embodiment; Figure 5 This is a structural diagram of the wind power foundation with the pre-embedded components installed in this embodiment.

[0016] In the diagram: 1. Lower anchor plate; 101. First mounting hole; 11. First mounting bracket; 12. Positioning sleeve; 13. Protective cover; 2. Upper anchor plate; 201. Second mounting hole; 21. Second mounting bracket; 22. Positioning post; 3. Anchor rod; 4. Positioning rod; 5. Support frame; 6. Threaded rod; 7. Drive motor. Detailed Implementation

[0017] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0018] Example 1: Reference Figures 1-5 The wind power foundation integral embedded part leveling device shown includes an auxiliary leveling component set between the lower anchor plate 1, the upper anchor plate 2 and multiple anchor rods 3. It should be noted that the actual number of anchor rods 3 during construction is much greater than the number of anchor rods 3 shown in the figure.

[0019] The lower anchor plate 1 and the upper anchor plate 2 are respectively provided with a plurality of first mounting holes 101 and second mounting holes 201 at equal intervals along their own circumference. The plurality of first mounting holes 101 on the lower anchor plate 1 are provided in a one-to-one correspondence with the second mounting holes 201 on the upper anchor plate 2. The first mounting holes 101 and the second mounting holes 201 are all inserted into and engaged with a plurality of anchor rods 3.

[0020] Regarding the auxiliary leveling components, specifically, such as Figure 3 As shown, the auxiliary leveling assembly includes positioning rods 4, support frame 5, threaded rods 6, and drive motor 7. A conventional electric motor, such as a TZ155X020 model, can be used. Multiple positioning rods 4 are provided, equidistantly fixed to the side ends of the support frame 5. The first mounting hole 101 and the second mounting hole 201 are correspondingly inserted into the multiple positioning rods 4. The threaded rod 6 is rotatably mounted at the bottom center of the support frame 5. The drive motor 7 is detachably mounted at the top of the support frame 5, for example, by bolt connection (not shown in the figure). The output end of the drive motor 7 is coaxially connected to the threaded rod 6, for example, by a locking block and a locking slot (not shown in the figure). A first mounting bracket 11 for rotatably connecting the threaded rod 6 is fixed to the inner side of the lower anchor plate 1. Of course, a bearing adapted to the end of the threaded rod 6 can be provided on the first mounting bracket 11. A second mounting bracket 21 for the threaded rod 6 to thread through is fixed to the inner side of the upper anchor plate 2.

[0021] Based on the above structural arrangement, during construction, the lower anchor plate 1 is first fixed in the predetermined position, and leveled using conventional techniques, such as using a level. Then, the upper anchor plate 2 is placed on the upper side of the lower anchor plate 1. Subsequently, multiple positioning rods 4 are inserted into the second mounting holes 201 on the upper anchor plate 2 and the first mounting holes 101 on the lower anchor plate 1, fixing the positioning rods 4 to the lower anchor plate 1. At the same time, the threaded rod 6 is threaded through the second mounting bracket 21 and inserted into the first mounting bracket 11. Then, multiple anchor rods 3 are inserted into the second mounting holes 201 on the upper anchor plate 2 and the first mounting holes 101 on the lower anchor plate 1, fixing the anchor rods 3 to the lower anchor plate 1. Subsequently, the drive motor 7 drives the threaded rod 6 to rotate, and the rotating threaded rod 6 drives the upper anchor plate 2 to move vertically upward, achieving synchronous adjustment of the verticality of multiple anchor rods 3 while ensuring the levelness of the upper anchor plate 2 after adjustment.

[0022] A positioning structure is provided between the lower anchor plate 1 and the upper anchor plate 2 to ensure that the multiple second mounting holes 201 on the upper anchor plate 2 correspond accurately to the multiple first mounting holes 101 on the lower anchor plate 1.

[0023] Specifically, the positioning structure includes multiple positioning posts 22 that are circumferentially fixed at the lower end of the upper anchor plate 2, and multiple positioning holes that are circumferentially fixed at the lower anchor plate 1. The multiple positioning posts 22 and the multiple positioning holes are matched one-to-one.

[0024] Example 2: In order to prevent mud from splashing onto the upper surface of the lower anchor plate 1 during the fixing process, which would prevent the upper anchor plate 2 from being placed flat, multiple positioning sleeves 12 are fixed at equal intervals around the upper circumference of the lower anchor plate 1. The multiple positioning sleeves 12 are located at multiple positioning holes. The positioning sleeves 12 are inserted into the positioning posts 22. During the fixing of the lower anchor plate 1, mud is less likely to splash into the positioning sleeves 12. In this way, the insertion and cooperation between the positioning sleeves 12 and the positioning posts 22 can improve the initial levelness of the upper anchor plate 2.

[0025] To further prevent mud from splashing into the positioning sleeve 12, a protective cover 13 is movably inserted into the upper end of the positioning sleeve 12. During the process of fixing the lower anchor plate 1, the protective cover 13 can be used to cover the top of the positioning sleeve 12. After the lower anchor plate 1 is fixed, the protective cover 13 can be removed, and the positioning sleeve 12 can be inserted and matched with the positioning column 22.

[0026] It should be noted that the specific models and specifications of the electrical equipment involved in this solution need to be selected and determined based on the actual specifications of the device. The specific selection and calculation methods adopt existing technologies in this field, so they will not be described in detail here. The power supply and principles of the electrical equipment involved are clear to those skilled in the art, and will not be described in detail here.

[0027] Finally, it should be noted that the above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Although the present utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.

Claims

1. A leveling device for integral embedded parts of a wind turbine foundation, characterized in that, Includes an auxiliary leveling assembly disposed between the lower anchor plate (1), the upper anchor plate (2), and multiple anchor rods (3); The lower anchor plate (1) and the upper anchor plate (2) are respectively provided with a plurality of first mounting holes (101) and second mounting holes (201) at equal intervals along their own circumference. The plurality of first mounting holes (101) on the lower anchor plate (1) are provided in a one-to-one correspondence with the second mounting holes (201) on the upper anchor plate (2). The first mounting holes (101) and the second mounting holes (201) are all inserted into and cooperate with a plurality of anchor rods (3). The upper anchor plate (2) is placed on the upper side of the lower anchor plate (1). After the auxiliary leveling component is fixed to the upper end of the lower anchor plate (1), the auxiliary leveling component drives the upper anchor plate (2) to move vertically upward.

2. The leveling device for an integral embedded part of a wind power foundation according to claim 1, characterized in that: The auxiliary leveling assembly includes a positioning rod (4), a support frame (5), a threaded rod (6), and a drive motor (7). The positioning rod (4) is provided in multiple ways. The multiple positioning rods (4) are fixed at equal intervals to the side end of the support frame (5). The first mounting hole (101) and the second mounting hole (201) are respectively inserted and engaged with the multiple positioning rods (4). The threaded rod (6) is rotatably installed at the middle of the bottom end of the support frame (5). The drive motor (7) is detachably installed at the top of the support frame (5), and the output end of the drive motor (7) is coaxially connected with the threaded rod (6). The inner side of the lower anchor plate (1) is fixed with a first mounting bracket (11) for the threaded rod (6) to be rotatably connected, and the inner side of the upper anchor plate (2) is fixed with a second mounting bracket (21) for the threaded rod (6) to be threaded through.

3. The leveling device for an integral embedded part of a wind power foundation according to claim 1, characterized in that: A positioning structure is provided between the lower anchor plate (1) and the upper anchor plate (2).

4. A leveling device for an integral embedded part of a wind power foundation according to claim 3, characterized in that: The positioning structure includes multiple positioning posts (22) circumferentially fixed at the lower end of the upper anchor plate (2) and multiple positioning holes circumferentially set on the lower anchor plate (1), with the multiple positioning posts (22) and the multiple positioning holes corresponding to each other.

5. A leveling device for an integral embedded part of a wind power foundation according to claim 3, characterized in that: The upper end of the lower anchor plate (1) is fixed with multiple positioning sleeves (12) at equal intervals. The multiple positioning sleeves (12) are located at multiple positioning holes respectively, and the positioning sleeves (12) are inserted into the positioning post (22).

6. A leveling device for an integral embedded part of a wind power foundation according to claim 5, characterized in that: The upper end of the positioning sleeve (12) is movably connected to a protective cover (13).

Citation Information

Patent Citations

  • Wind power fan tower drum foundation ring reinforcing node structure

    CN220285909U