A multi-layer fabricated steel structure modular house node connecting device
Patent Information
- Application Number
- CN202522457148.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-19
- Publication Date
- 2026-10-23
- Estimated Expiration
- 2035-11-19
AI Technical Summary
[0006]本实用新型的目的是提供一种多层装配式钢结构模块化房屋节点连接装置,以解决技术中当模块化钢框架在安装之后容易出现一定的误差的时候,连接板无法有效对模块化刚框架进行连接,具有一定的局限性的问题
1.本实用新型通过首先将第二连接板固定在上下两组钢管柱之间,左右两侧钢管柱全部安装完成之后,此时将连接杆放置在相邻两组第二连接板之间,并通过转动第一调节块,配合第一连接套将调节螺杆向外推出,对连接杆进行延长,接着将两端的连接块与相邻两组第二连接板进行锁紧固定,进而将相邻两组钢管柱进行连接固定,可适用不同距离的两组钢管柱,提高作业便捷性,同时提高连接件的适应性;
Smart Images

Figure CN224884903U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of steel structure building technology, specifically to a node connection device for multi-story prefabricated steel structure modular houses. Background Technology
[0002] Prefabricated buildings are a type of building constructed by assembling components manufactured in factories and transported to the construction site. The advantages of this type of building include fast construction speed, less susceptibility to weather conditions, labor saving, and improved building quality. The development of prefabricated buildings is a key link in the industrialization of construction and also the ultimate path and fundamental characteristic of industrialized buildings.
[0003] The publication number CN106522363A discloses a modular steel frame connection device, which includes at least a first and a second hollow square steel pipe column. The first and second square steel pipe columns are connected by an inner sleeve, with a clearance fit between the inner sleeve and the first and second square steel pipe columns. The outer circumference of the inner sleeve is provided with positioning blocks parallel to the column openings of the first and second square steel pipe columns. The device also includes a connecting plate with assembly holes that mate with the inner sleeve. The modular steel frames are connected via the inner sleeve, eliminating the need for screws or bolts, saving on-site construction steps and shortening construction time. Welding the modular steel frames to the inner sleeve enhances the strength of the frames, avoiding risks caused by loose screws or bolts. By pre-processing the modular steel frames in the factory before on-site construction, on-site construction time is significantly shortened, and the impact on the site environment is minimal.
[0004] During use, this device uses connecting plates to bring together modular steel frames that are connected laterally or centrally, making it easier to form a regular modular steel frame and improving its strength. However, in actual use, the dimensions of the connecting plates are fixed, and the construction precision of the square steel pipe columns is particularly important. Due to the large amount of work and the influence of factors such as terrain, the modular steel frames are prone to certain errors after installation. In this case, the connecting plates cannot effectively connect the modular steel frames, which has certain limitations.
[0005] Therefore, it is necessary to invent a multi-layer prefabricated steel structure modular housing node connection device to solve the above problems. Utility Model Content
[0006] The purpose of this utility model is to provide a node connection device for multi-layer prefabricated steel structure modular houses, so as to solve the problem that the connecting plate cannot effectively connect the modular steel frame when certain errors easily occur after the modular steel frame is installed, which has certain limitations.
[0007] To achieve the above objectives, this utility model provides the following technical solution: a multi-layer prefabricated steel structure modular house node connection device, including steel pipe columns, with a first connecting plate welded and fixedly connected to the end of the steel pipe column, and a diagonal bracing plate welded between the steel pipe column and the first connecting plate. The surface of the first connecting plate is provided with multiple sets of first connecting holes, and a connector is provided between the upper and lower sets of steel pipe columns. The connector includes a second connecting plate, a connecting column, a second connecting hole, a third connecting hole, a connecting rod, a positioning groove, a first adjusting block, a first connecting sleeve, an adjusting screw, a positioning block, a connecting block, and a fourth connecting hole.
[0008] By adopting the above technical solution, high-strength bolts are provided between the first connecting hole, the second connecting hole, the third connecting hole and the fourth connecting hole. The second connecting plate and the connecting column are set between the upper and lower sets of steel pipe columns and fixed by high-strength bolts. The adjacent sets of second connecting plates are connected and fixed by connecting rods and adjusting screws, thereby connecting and fixing the adjacent steel pipe columns.
[0009] Optionally, the connecting column is welded and fixed in the middle of the second connecting plate, and the connecting column is inserted and fixed to the steel pipe column.
[0010] By adopting the above technical solution, the upper and lower ends of the connecting column are respectively inserted into the interiors of the upper and lower sets of steel pipe columns.
[0011] Optionally, the surface of the second connecting plate is provided with multiple sets of second connecting holes and third connecting holes, wherein the first connecting holes and the second connecting holes are located on the same axis.
[0012] By adopting the above technical solution, high-strength bolts pass through the upper and lower sets of first connecting holes and the middle set of second connecting holes, locking and fixing the upper and lower sets of first connecting plates and second connecting plates, thereby connecting and fixing the upper and lower sets of steel pipe columns and support columns, and improving the connection strength of the two sets of steel pipe columns.
[0013] Optionally, the adjusting screw is slidably connected to the connecting rod, and a connecting block is fixedly connected to the opposite ends of the connecting rod and the adjusting screw, and the fourth connecting hole is opened on the surface of the connecting block.
[0014] By adopting the above technical solution, the adjusting screw can slide inside the connecting rod to extend the connecting rod. At the same time, the high-strength bolt passes through the fourth connecting hole and the third connecting hole, which can lock and fix the connecting block to the second connecting plate. With the connecting rod and the adjusting screw, two sets of second connecting plates at different distances can be connected and fixed, thereby connecting two adjacent sets of steel pipe columns.
[0015] Optionally, positioning grooves are provided on both the front and rear sides of the connecting rod surface, and two sets of positioning blocks are fixedly connected to the left end of the adjusting screw, with the positioning blocks slidably connected to the positioning grooves.
[0016] By adopting the above technical solution, the positioning block slides inside the positioning groove, which improves the stability of the adjusting screw during the extension and retraction process, and limits the adjusting screw to prevent it from rotating.
[0017] Optionally, the first adjusting block is rotatably connected to the right end of the connecting rod, the first connecting sleeve is fixedly connected to the right end of the first adjusting block, and the first connecting sleeve is threadedly connected to the adjusting screw.
[0018] By adopting the above technical solution, rotating the first adjusting block and the first connecting sleeve can push the adjusting screw outward or retract it inward to adjust the distance of the adjusting screw, and at the same time lock the distance of the adjusting screw.
[0019] Optionally, the side of the first connecting sleeve has multiple sets of threaded holes, and the internal threads of the threaded holes are connected to positioning screws.
[0020] Optionally, the surface of the adjusting screw is threadedly connected to a second adjusting block, and the left end of the second adjusting block is fixedly connected to a second connecting sleeve, the surface of the second connecting sleeve having multiple sets of limiting grooves.
[0021] By adopting the above technical solution, rotating the second adjusting block to the left will cause the second connecting sleeve to be fitted onto the outside of the first connecting sleeve, and cooperate with the positioning screw to lock the first and second connecting sleeves. At this time, the first connecting sleeve and the second adjusting block cooperate to further improve the stability of the adjusting screw.
[0022] The technical effects and advantages provided by this utility model in the above technical solution are as follows: 1. This utility model first fixes the second connecting plate between the upper and lower sets of steel pipe columns. After all the steel pipe columns on the left and right sides are installed, the connecting rod is placed between the two adjacent sets of second connecting plates. By rotating the first adjusting block, the adjusting screw is pushed outward in conjunction with the first connecting sleeve to extend the connecting rod. Then, the connecting blocks at both ends are locked and fixed to the two adjacent sets of second connecting plates, thereby connecting and fixing the two adjacent sets of steel pipe columns. It can be used for two sets of steel pipe columns with different distances, improving the convenience of operation and the adaptability of the connecting parts. 2. By rotating the second adjusting block to the left, the second connecting sleeve is fitted onto the outside of the first connecting sleeve, and in conjunction with the positioning screw, the first connecting sleeve and the second connecting sleeve are locked together. At this time, the first connecting sleeve and the second adjusting block cooperate to further improve the stability of the adjusting screw. Attached Figure Description
[0023] Figure 1 This is a schematic diagram of the overall structure of this utility model; Figure 2 This is a schematic diagram of the steel pipe column structure of this utility model; Figure 3 This is a schematic diagram of the connecting component structure of this utility model; Figure 4 This is a schematic diagram of the second connecting plate structure of this utility model; Figure 5 This is a schematic diagram of the connecting rod structure of this utility model; Figure 6 This is a schematic diagram of the adjusting screw structure of this utility model.
[0024] Explanation of reference numerals in the attached figures: 1. Steel pipe column; 11. First connecting plate; 12. First connecting hole; 13. Diagonal brace plate; 2. Connector; 21. Second connecting plate; 22. Connecting column; 23. Second connecting hole; 24. Third connecting hole; 25. Connecting rod; 251. Positioning groove; 252. First adjusting block; 253. First connecting sleeve; 254. Threaded hole; 255. Positioning screw; 26. Adjusting screw; 261. Positioning block; 262. Second adjusting block; 263. Second connecting sleeve; 264. Limiting groove; 27. Connecting block; 28. Fourth connecting hole. Detailed Implementation
[0025] To enable those skilled in the art to better understand the technical solution of this utility model, the present utility model will be further described in detail below with reference to the accompanying drawings.
[0026] This utility model provides, for example Figures 1 to 6 The diagram shows a multi-layer prefabricated steel structure modular house node connection device, including a steel pipe column 1. A first connecting plate 11 is welded and fixed to the end of the steel pipe column 1. A diagonal bracing plate 13 is welded between the steel pipe column 1 and the first connecting plate 11. Multiple sets of first connecting holes 12 are opened on the surface of the first connecting plate 11. A connector 2 is provided between the upper and lower sets of steel pipe columns 1. The connector 2 includes a second connecting plate 21, a connecting column 22, a second connecting hole 23, a third connecting hole 24, a connecting rod 25, a positioning groove 251, a first adjusting block 252, a first connecting sleeve 253, an adjusting screw 26, a positioning block 261, a connecting block 27, and a fourth connecting hole 28. The connecting column 22 is welded and fixed to the middle of the second connecting plate 21. The connecting column 22 is inserted and fixed to the steel pipe column 1. Multiple sets of second connecting holes 23 and third connecting holes 24 are opened on the surface of the second connecting plate 21. The first connecting holes 12 and the second connecting holes 23 are located on the same axis.
[0027] The diagonal bracing plate 13 improves the stability of the welding between the first connecting plate 11 and the steel pipe column 1. During the installation of the steel pipe column 1, the lower steel pipe column 1 is installed first, then the connecting column 22 is inserted into the upper end of the steel pipe column 1, and then the lower end of the upper steel pipe column 1 is fitted onto the upper end of the connecting column 22. At this time, the second connecting plate 21 is located between the upper and lower sets of steel pipe columns 1. Then, high-strength bolts are inserted through the first connecting holes 12 on the surface of the upper and lower sets of first connecting plates 11 and the second connecting holes 23 on the surface of the second connecting plate 21 to lock and fix the first connecting plate 11 and the second connecting plate 21, thereby connecting and fixing the upper and lower sets of steel pipe columns 1 and improving the stability of the connection between the upper and lower sets of steel pipe columns 1.
[0028] In addition, when it is necessary to connect and fix two adjacent sets of steel pipe columns 1, the connecting rod 25 and the adjusting screw 26 are fixed between the two adjacent sets of second connecting plates 21. At this time, the connecting rod 25, the adjusting screw 26 and the second connecting plate 21 are used to connect the two adjacent sets of steel pipe columns 1, so that the two adjacent sets of steel pipe columns 1 are combined into a whole, which effectively improves the structural strength of the steel structure assembly block and the stability of the building.
[0029] See Figure 3 , Figure 5 and Figure 6 The adjusting screw 26 is slidably connected to the connecting rod 25. The opposite ends of the connecting rod 25 and the adjusting screw 26 are fixedly connected to the connecting block 27. The fourth connecting hole 28 is opened on the surface of the connecting block 27. The front and rear sides of the surface of the connecting rod 25 are provided with positioning grooves 251. The left end of the adjusting screw 26 is fixedly connected to two sets of positioning blocks 261. The positioning blocks 261 are slidably connected to the positioning grooves 251. The first adjusting block 252 is rotatably connected to the right end of the connecting rod 25. The first connecting sleeve 253 is fixedly connected to the right end of the first adjusting block 252. The first connecting sleeve 253 is threadedly connected to the adjusting screw 26.
[0030] Specifically, during the connection of the connecting rod 25 and the adjusting screw 26, the connecting block 27 at the left end of the connecting rod 25 is first clamped onto the surface of the second connecting plate 21 on the left. At this time, the high-strength bolt is passed through the third connecting hole 24 and the fourth connecting hole 28 on the left to lock the left connecting block 27 to the second connecting plate 21 on the left. Then, according to the distance between the two sets of second connecting plates 21, the first adjusting block 252 and the first connecting sleeve 253 are rotated. The first adjusting block 252 and the first connecting sleeve 253 cooperate to push the adjusting screw 26 to the right until the right connecting block 27 is clamped onto the surface of the second connecting plate 21 on the right. At this time, the high-strength bolt is used to lock the right connecting block 27 to the second connecting plate 21 on the right, thereby connecting and fixing the two adjacent sets of steel pipe columns 1, which can adapt to two sets of steel pipe columns 1 at different distances.
[0031] Meanwhile, after the connecting rod 25 and the adjusting screw 26 are connected to the two adjacent sets of steel pipe columns 1, the first adjusting block 252 and the first connecting sleeve 253 are rotated in the opposite direction to retract the adjusting screw 26 inward by a certain distance, thereby locking the adjusting screw 26 and improving the stability of the connection.
[0032] After the uppermost steel pipe column 1 is completed, the connecting rod 25 and the adjusting screw 26 can be connected and fixed to the first connecting plate 11 at the upper end of the steel pipe column 1, so that the upper ends of the two adjacent sets of steel pipe columns 1 can be connected and fixed. There is no need to connect the second connecting plate 21, which improves the convenience of installation.
[0033] See Figure 5 and Figure 6 The first connecting sleeve 253 has multiple sets of threaded holes 254 on its side. The threaded holes 254 are internally threaded with positioning screws 255. The surface of the adjusting screw 26 is threaded with a second adjusting block 262. The left end of the second adjusting block 262 is fixedly connected with a second connecting sleeve 263. The surface of the second connecting sleeve 263 has multiple sets of limiting grooves 264.
[0034] In addition, after locking and fixing the connecting rod 25 and the adjusting screw 26, the second adjusting block 262 and the second connecting sleeve 263 are rotated to the left so that the second connecting sleeve 263 covers the surface of the first connecting sleeve 253. At this time, the positioning screw 255 passes through the limiting groove 264 and is threadedly connected to the threaded hole 254, thereby locking and fixing the first connecting sleeve 253 and the second connecting sleeve 263, connecting the first connecting sleeve 253 and the second adjusting block 262 into a whole. The cooperation of the first connecting sleeve 253 and the second adjusting block 262 further improves the stability of the adjusting screw 26.
[0035] The working principle of this utility model is as follows: By placing the connecting rod 25 between two adjacent sets of second connecting plates 21, and by rotating the first adjusting block 252, the adjusting screw 26 is pushed outward in conjunction with the first connecting sleeve 253, extending the connecting rod 25. Then, the connecting blocks 27 at both ends are locked and fixed to the two adjacent sets of second connecting plates 21, thereby connecting and fixing the two adjacent sets of steel pipe columns 1. This can be applied to two sets of steel pipe columns 1 at different distances, improving the convenience of operation and the adaptability of the connecting parts 2. At the same time, by rotating the second adjusting block 262 to the left, the second connecting sleeve 263 is fitted onto the outside of the first connecting sleeve 253, and in conjunction with the positioning screw 255, the first connecting sleeve 253 and the second connecting sleeve 263 are locked. At this time, the first connecting sleeve 253 and the second adjusting block 262 cooperate to further improve the stability of the adjusting screw 26.
[0036] The foregoing has shown and described the basic principles, main features, and advantages of this utility model. Those skilled in the art should understand that this utility model is not limited to the above embodiments. The embodiments and descriptions in the specification are merely preferred examples and are not intended to limit the utility model. Various changes and modifications can be made to this utility model without departing from its spirit and scope, and all such changes and modifications fall within the scope of the claimed utility model.
Claims
1. A multi-story prefabricated steel structure modular house node connection device, comprising steel pipe columns (1), characterized in that: The end of the steel pipe column (1) is welded and fixedly connected to a first connecting plate (11). A diagonal brace (13) is welded between the steel pipe column (1) and the first connecting plate (11). The surface of the first connecting plate (11) is provided with multiple sets of first connecting holes (12). A connector (2) is provided between the upper and lower sets of the steel pipe columns (1). The connector (2) includes a second connecting plate (21), a connecting column (22), a second connecting hole (23), a third connecting hole (24), a connecting rod (25), a positioning groove (251), a first adjusting block (252), a first connecting sleeve (253), an adjusting screw (26), a positioning block (261), a connecting block (27), and a fourth connecting hole (28).
2. The multi-layer prefabricated steel structure modular house node connection device according to claim 1, characterized in that: The connecting column (22) is welded and fixed in the middle of the second connecting plate (21), and the connecting column (22) is inserted and fixed to the steel pipe column (1).
3. The multi-layer prefabricated steel structure modular house node connection device according to claim 1, characterized in that: The surface of the second connecting plate (21) has multiple sets of second connecting holes (23) and third connecting holes (24), and the first connecting hole (12) and the second connecting hole (23) are located on the same axis.
4. The multi-layer prefabricated steel structure modular house node connection device according to claim 1, characterized in that: The adjusting screw (26) is slidably connected to the connecting rod (25). The connecting rod (25) and the adjusting screw (26) are fixedly connected to a connecting block (27) at opposite ends. The fourth connecting hole (28) is opened on the surface of the connecting block (27).
5. The multi-layer prefabricated steel structure modular house node connection device according to claim 1, characterized in that: The connecting rod (25) has positioning grooves (251) on both the front and rear sides of its surface. The left end of the adjusting screw (26) is fixedly connected to two sets of positioning blocks (261), and the positioning blocks (261) are slidably connected to the positioning grooves (251).
6. The multi-layer prefabricated steel structure modular house node connection device according to claim 1, characterized in that: The first adjusting block (252) is rotatably connected to the right end of the connecting rod (25), the first connecting sleeve (253) is fixedly connected to the right end of the first adjusting block (252), and the first connecting sleeve (253) is threadedly connected to the adjusting screw (26).
7. A multi-story prefabricated steel structure modular housing node connection device according to claim 6, characterized in that: The first connecting sleeve (253) has multiple sets of threaded holes (254) on its side, and the threaded holes (254) are internally threaded with positioning screws (255).
8. A multi-story prefabricated steel structure modular house node connection device according to claim 7, characterized in that: The surface of the adjusting screw (26) is threadedly connected to a second adjusting block (262), and the left end of the second adjusting block (262) is fixedly connected to a second connecting sleeve (263). The surface of the second connecting sleeve (263) is provided with multiple sets of limiting grooves (264).
Citation Information
Patent Citations
Modular steel frame connection device and connection method thereof
CN106522363A