Building heating pipe installation device

CN224886496UActive Publication Date: 2026-10-23QINGDAO GUOFA URBAN PROPERTY SERVICES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522636900.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-12
Publication Date
2026-10-23
Estimated Expiration
2035-12-12

AI Technical Summary

Technical Problem

[0006]针对现有技术中,楼宇供暖管道安装过程缺乏专用的高度调节支撑设备,主要依靠人力托举或通用千斤顶,存在调节高度费力、难以精确对准接口、且对圆形管道缺乏稳固夹持导致滚动滑落及划伤管道表面的问题,本实用新型旨在提供一种结构经过改良的、能够有效解决上述问题的楼宇供暖管道安装装置

Benefits of technology

1、本实用新型,通过在支撑座与支撑柱之间设置由连接杆、翘板和轴销组成的杠杆棘轮式升降结构,解决了现有技术中供暖管体安装时高度调节费力且难以精确停留在指定高度的问题,达到了利用杠杆原理显著降低人力消耗、通过轴销配合实现分级升降与自锁、从而提升管体安装效率与安全性的效果。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224886496U_ABST
    Figure CN224886496U_ABST
Patent Text Reader

Abstract

The utility model discloses a building heating pipeline mounting device belongs to the building construction equipment technical field, including elevating system and install fixed establishment in the top of elevating system, and elevating system includes support seat, and the support column of sliding connection in the inside of support seat and the fixed plate of fixed connection in the top of support column, and a plurality of shaft pins are installed to the outer wall of support column along the vertical direction, and the front side fixed connection of support seat has the support plate, and the outer wall rotationally connected of support plate has the connecting rod, and the connecting rod is connected with the warped board of arc groove and handle, and the warped board utilizes lever principle cooperation axle pin and drives support column to lift, the utility model discloses through lever ratchet type elevating structure cooperation flexible fixed frame, has realized the labor -saving adjustment, steady clamping and surface protection in the pipe body installation process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of building construction equipment technology, and in particular to a building heating pipe installation device. Background Technology

[0002] In modern building construction, the installation of heating systems is an essential part. As the carrier of heat transfer, the quality of the installation of heating pipes directly affects the subsequent heating effect and system safety. Since heating pipes are made of metal, they are heavy and long. On the construction site, the pipes need to be installed on supports or walls at a certain height above the ground, which places high demands on the support and positioning during the installation process.

[0003] However, in actual pipeline installation work, construction workers face the problem of difficulty in height adjustment. Currently, they mainly rely on manual handling in conjunction with ladders or simple supports for the operation. When it is necessary to make precise height adjustments to heavy pipelines to align with the interfaces, relying solely on manual lifting is not only extremely labor-intensive, but also difficult to maintain stability for a long time. The swinging of the arms can cause misalignment of the pipe interfaces, which seriously affects construction efficiency and welding quality. Although some construction sites use general-purpose hydraulic jacks for assistance, these general-purpose equipment lack special clamping structures for cylindrical pipelines. During the lifting process, the pipeline may roll or even slip, posing a significant safety hazard.

[0004] Furthermore, heating pipes are covered with anti-corrosion layers or need to be kept smooth. Existing simple metal support tools use hard contact, which can scratch the pipe surface and damage the anti-corrosion layer during adjustment or clamping. Moreover, in complex construction site environments, due to uneven ground, a single vertical support structure may shift its center of gravity and tip over when supporting long pipes, lacking effective auxiliary stabilization methods. In summary, the existing technology lacks a dedicated auxiliary device that can flexibly adjust the height through a labor-saving structure and provide stable and flexible clamping for the pipes.

[0005] Therefore, this utility model proposes a building heating pipe installation device to overcome the shortcomings of the prior art. Utility Model Content

[0006] In view of the fact that the existing technology for building heating pipe installation lacks dedicated height adjustment support equipment and mainly relies on manual lifting or general jacks, there are problems such as laborious height adjustment, difficulty in accurately aligning the interface, and lack of stable clamping for round pipes, which can lead to rolling and slipping and scratching of the pipe surface. The present invention aims to provide a building heating pipe installation device with an improved structure that can effectively solve the above problems.

[0007] This utility model provides a building heating pipe installation device, including: a lifting mechanism and a fixing mechanism installed on the top of the lifting mechanism. The lifting mechanism serves as a basic support component and includes a support base, a support column slidably connected inside the support base, and a fixing plate fixedly connected to the top of the support column. The outer wall of the support column is equipped with multiple shaft pins along the vertical direction, which are used to provide force support points during lifting and lowering.

[0008] Furthermore, a support plate is fixedly connected to the front side of the support base, and connecting rods are rotatably connected to both the left and right sides of the outer wall of the support plate. A rocker arm is rotatably connected to the end of the connecting rod away from the support plate. A handle is fixedly connected to the front side of the rocker arm, and an arc-shaped groove that mates with the shaft pin is opened on the rear side of the rocker arm. Through the lever structure formed by the handle, the rocker arm, the connecting rod, and the support plate, the arc-shaped groove can be used to engage below the shaft pin, thereby driving the support column to move upward.

[0009] Preferably, a guide rod is vertically installed inside the support base, and the support column is sleeved on the outside of the guide rod and slides in cooperation with the guide rod. The guide rod can restrict the movement path of the support column and prevent the support column from deflecting during the lifting and lowering process.

[0010] Preferably, a support rod is fixedly connected between the middle of the two connecting rods. The support rod connects the connecting rods on both sides, which can ensure that the force-bearing structures on the left and right sides maintain synchronous movement and improve the stability of the device operation.

[0011] Preferably, the fixing mechanism includes a fixing frame, the bottom of which is fixed to the top of the fixing plate by a threaded connection, so that the fixing frame can be adjusted in height synchronously with the fixing plate.

[0012] Preferably, sponge pads are fixedly connected to both the left and right sides of the inside of the fixing frame. The sponge pads can provide a flexible contact surface for the tube body and reduce hard impacts.

[0013] Preferably, protective pads are fixedly connected to the middle of both the left and right sides of the fixing frame. The protective pads have an arc-shaped structure to fit the outer wall of the tube, thereby increasing the contact area with the tube and effectively preventing wear on the tube surface while fixing the tube.

[0014] Preferably, the fixing frame has an expansion slot in the middle of the front and rear sides. The expansion slot serves as a reserved observation window, which allows the installer to directly observe the connection status at the bottom of the pipe without disassembling the device.

[0015] Preferably, a ball joint is fixedly connected to the bottom rear side of the fixed frame, and a support rod is fixedly connected to the bottom of the ball joint. By utilizing the rotational characteristics of the ball joint, the support rod can adapt to different angles of the ground for auxiliary support, thereby improving the overall anti-overturning ability of the device.

[0016] This utility model has the following beneficial effects: 1. This utility model solves the problem of laborious height adjustment and difficulty in accurately stopping at a specified height during the installation of heating pipes in the prior art by setting a lever ratchet-type lifting structure composed of a connecting rod, a rocker plate, and a pivot pin between the support base and the support column. It achieves the effect of significantly reducing manpower consumption by utilizing the lever principle, realizing graded lifting and self-locking through the pivot pin cooperation, thereby improving the efficiency and safety of pipe installation.

[0017] 2. This utility model solves the problems of scratching the anti-corrosion layer or surface of the tube body and rolling displacement of the circular tube body during the clamping and fixing process by setting a sponge pad inside the fixing frame and an arc-shaped protective pad that fits the outer wall of the tube body. It achieves the effect of firmly clamping the tube body to prevent the tube body from rotating, while effectively protecting the surface of the tube body from wear through flexible contact.

[0018] 3. This utility model solves the problems of tilting due to the shift of the center of gravity after the device is raised while carrying a heavy pipe body, and the difficulty of support caused by uneven construction ground, by setting a ball joint connected support rod at the bottom of the rear side of the fixed frame. It achieves the effect of flexibly adjusting the auxiliary support angle according to the terrain, effectively sharing the load of the lifting mechanism, and significantly improving the overall anti-overturning ability of the device. Attached Figure Description

[0019] Figure 1 This is a perspective view of a building heating pipe installation device proposed in this utility model; Figure 2 This is a front view of a building heating pipe installation device proposed in this utility model; Figure 3 This utility model presents a diagram illustrating the lifting mechanism of a building heating pipe installation device. Figure 4 This is a partial structural diagram of a building heating pipe installation device proposed in this utility model.

[0020] Legend: 1. Tube body; 2. Lifting mechanism; 201. Support base; 202. Support column; 203. Fixing plate; 204. Guide rod; 205. Shaft pin; 206. Support plate; 207. Connecting rod; 208. Support rod; 209. Rocker; 210. Handle; 211. Arc groove; 3. Fixing mechanism; 301. Fixing frame; 302. Sponge pad; 303. Protective pad; 304. Expansion groove; 305. Ball joint; 306. Support rod. Detailed Implementation

[0021] To make the objectives, technical solutions, and advantages of this utility model clearer, the technical solutions in the embodiments of this utility model will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of this utility model, and not all of them. All other embodiments obtained by those skilled in the art based on the embodiments of this utility model without creative effort are within the scope of protection of this utility model.

[0022] Example: Please refer to Figures 1 to 4 This utility model provides a building heating pipe installation device, which aims to solve the structural defects of the existing technology, such as the difficulty in adjusting the height of the building heating pipe body 1 during installation and the lack of stable support and protection.

[0023] Please refer to Figure 1 and Figure 2 A building heating pipe installation device includes a lifting mechanism 2 as a basic support platform and a fixing mechanism 3 installed on the top of the lifting mechanism 2. The lifting mechanism 2 is used to adjust the vertical height of the pipe body 1 according to the needs of the construction site, while the fixing mechanism 3 is used to support and firmly clamp the pipe body 1. The two work together to form an organic whole, which can adapt to the installation needs of the pipe body 1 at different heights and angles.

[0024] Please refer to Figure 2 and Figure 3The lifting mechanism 2 mainly consists of a support base 201, a support column 202 slidably connected inside the support base 201, and a fixing plate 203 fixedly connected to the top of the support column 202. The support base 201 serves as a base placed on the ground. The support column 202 can slide vertically inside the support base 201 to change the overall height of the device. Multiple pins 205 are installed vertically on the outer wall of the support column 202. The pins 205 serve as force fulcrums and locking points during height adjustment. To ensure the smoothness and straightness of the movement of the support column 202, a guide rod 204 is also vertically installed inside the support base 201. The support column 202 is sleeved on the outside of the guide rod 204 and slides in cooperation with the guide rod 204. The guide rod 204 restricts the deflection and swaying of the support column 202. The front side of the support base 201 is fixedly connected to... A support plate 206 is provided, and connecting rods 207 are rotatably connected to both sides of the outer wall of the support plate 206. A rocker arm 209 is rotatably connected to the end of the connecting rod 207 away from the support plate 206. A lever structure is formed by the support plate 206, the connecting rods 207 and the rocker arm 209. A handle 210 is fixedly connected to the front side of the rocker arm 209 for the operator to hold and apply force. An arc-shaped groove 211 is provided on the rear side of the rocker arm 209 to cooperate with the shaft pin 205. The arc-shaped groove 211 is used to lock into the bottom of the shaft pin 205 during the lifting process to prevent the rocker arm 209 from disengaging from the shaft pin 205 and to ensure the stability of the lifting process. In addition, a support rod 208 is fixedly connected between the middle of the two connecting rods 207. The support rod 208 is used to connect the connecting rods 207 on both sides simultaneously to ensure that the connecting rods 207 on both sides are subjected to uniform force and move in a consistent manner.

[0025] Please refer to Figure 1 , Figure 2 and Figure 4 A building heating pipe installation device also includes a fixing mechanism 3. The fixing mechanism 3 and the aforementioned lifting mechanism 2 form a specific structural cooperation and connection relationship. The top of the fixing plate 203 is fixed to the bottom of the fixing frame 301 by a threaded connection. The lifting movement of the fixing plate 203 can drive the fixing frame 301 to move synchronously to adapt to different pipe body 1 installation heights. The left and right sides of the inside of the fixing frame 301 are fixedly connected with sponge pads 302. The middle of the left and right sides of the fixing frame 301 are fixedly connected with protective pads 303. The protective pads 303 are set with an arc-shaped structure to fit the outer wall of the pipe body 1. The cooperation between the sponge pads 302 and the protective pads 303 can not only increase the friction to prevent the pipe body 1 from rotating, but also protect the surface of the pipe body 1 from metal wear. The middle of the front and rear sides of the fixing frame 301 is provided with an expansion groove 304. The expansion groove 304 can provide an observation window for the installation process of the pipe body 1 so as to check whether the connection of the pipe body 1 is firm and whether there is a potential for leakage.

[0026] As a preferred embodiment, to further improve the support stability of the fixing frame 301 and prevent the device from tipping over, please refer to... Figure 1 , Figure 2 and Figure 4 A ball joint 305 is fixedly connected to the bottom rear side of the fixed frame 301. A support rod 306 is fixedly connected to the bottom of the ball joint 305. The structure of the ball joint 305 allows the support rod 306 to rotate freely at multiple angles around the ball joint 305. The end of the support rod 306 away from the ball joint 305 extends to the ground or other supporting plane. By adjusting the angle of the support rod 306, it can form an auxiliary support for the suspended fixed frame 301. The auxiliary support effectively shares the eccentric load on the lifting mechanism 2.

[0027] Working principle: When the height of the tube body 1 needs to be adjusted, the operator holds the handle 210 and rotates the connecting rod 207 around the connection between the support plate 206 and the connecting rod 207. The operator moves the rocker 209 to below the pin 205 on the support column 202, so that the arc groove 211 on the rear side of the rocker 209 contacts the pin 205. Then, the operator tilts the rocker 209 upward around the connection between the handle 210 and the connecting rod 207. The rocker 209 uses the lever principle to drive the support column 202 to slide upward inside the support seat 201. The guide rod 204 restricts the offset of the support column 202 during this process. After the support column 202 moves the top fixing plate 203 and the fixing frame 301 to the required height, the operator inserts the pin 205 into the support column 202 and locks it above the support seat 201. The pin 205 prevents the support column 202 from falling back downward, thus completing the height fixation. During the fixing process of the pipe body 1, the operator places the pipe body 1 inside the fixing frame 301. The sponge pads 302 on the left and right sides of the fixing frame 301 and the arc-shaped protective pad 303 in the middle are used to tightly fit the outer wall of the pipe body 1. The sponge pads 302 and the protective pad 303 prevent the pipe body 1 from rotating and protect the surface of the pipe body 1 from wear. The installer observes the connection status of the pipe body 1 through the expansion slots 304 on the front and rear sides of the fixing frame 301. After the installer confirms that the installation is firm and there is no leakage, the installer adjusts the angle of the ball joint 305 on the rear side of the fixing frame 301 so that the bottom end of the support rod 306 is supported on the ground. The support rod 306 provides auxiliary support to share the force of the fixing frame 301 and ensures the overall stability of the device.

Claims

1. A building heating pipe installation device, characterized in that, It includes a lifting mechanism (2) and a fixing mechanism (3) installed on the top of the lifting mechanism (2); The lifting mechanism (2) includes a support base (201), a support column (202) slidably connected inside the support base (201), and a fixing plate (203) fixedly connected to the top of the support column (202). Multiple shaft pins (205) are installed on the outer wall of the support column (202) in the vertical direction. A support plate (206) is fixedly connected to the front side of the support base (201). Connecting rods (207) are rotatably connected to the left and right sides of the outer wall of the support plate (206). A rocker (209) is rotatably connected to the end of the connecting rod (207) away from the support plate (206). A handle (210) is fixedly connected to the front side of the rocker (209). An arc groove (211) that cooperates with the shaft pins (205) is opened on the rear side of the rocker (209).

2. The building heating pipe installation device according to claim 1, characterized in that, Inside the support base (201), a guide rod (204) is also vertically installed. The support column (202) is sleeved on the outside of the guide rod (204) and slides in cooperation with the guide rod (204).

3. The building heating pipe installation device according to claim 1, characterized in that, A support rod (208) is fixedly connected between the middle parts of the two connecting rods (207).

4. The building heating pipe installation device according to claim 1, characterized in that, The fixing mechanism (3) includes a fixing frame (301), the bottom of which is fixed to the top of the fixing plate (203) by means of a threaded connection.

5. A building heating pipe installation device according to claim 4, characterized in that, The fixing frame (301) has sponge pads (302) fixedly connected to both the left and right sides inside.

6. The building heating pipe installation device according to claim 4, characterized in that, Protective pads (303) are fixedly connected to the middle of the left and right sides of the fixing frame (301). The protective pads (303) have an arc-shaped structure to fit the outer wall of the tube body (1).

7. A building heating pipe installation device according to claim 4, characterized in that, The fixing frame (301) has an expansion slot (304) in the middle of the front and rear sides.

8. A building heating pipe installation device according to claim 4, characterized in that, A ball joint (305) is fixedly connected to the bottom rear side of the fixed frame (301), and a support rod (306) is fixedly connected to the bottom of the ball joint (305).