A hull platform structure strength verification tool

CN224888394UActive Publication Date: 2026-10-23HUBEI GUOKE INTELLIGENT ENVIRONMENTAL PROTECTION ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522181149.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-10-15
Publication Date
2026-10-23
Estimated Expiration
2035-10-15

AI Technical Summary

Technical Problem

[0003]本实用新型要解决的技术问题是提供一种船体平台结构强度校验工装,解决船体零件二次飞射,拦截件自身受冲击断裂、崩裂,产生新的碎片危险源零件的技术问题

Benefits of technology

通过设置防护结构和注水组件,启动第一抽水泵,使其将水箱内的水充入环形水囊内,从而使得环形水囊膨胀,立于工装本体的外侧,在船体零件飞射时,借助环形水囊自身弹性亿内部水对船体零件进行缓存,尽量避免了船体零件的二次飞射,若环形水囊被船体零件扎破,同样不会产生新的碎片危险源零件;

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224888394U_ABST
    Figure CN224888394U_ABST
Patent Text Reader

Abstract

The utility model provides a ship body platform structure strength calibration frock belongs to ship body platform structure strength calibration technical field. The ship body platform structure strength calibration frock includes frock body, and the outside of frock body is provided with the protection structure, and the protection structure includes the collection box, and the collection box is provided with annular water bag, and the surface of annular water bag is connected with annular plate;The outside of collection box is provided with support assembly;One side of frock body is provided with water injection assembly. Through set up protection structure and water injection assembly, start first water pump, make it fill in annular water bag in water tank, thereby make annular water bag swell, stand in the outside of frock body, when the ship body spare flys, with the help of annular water bag's own elasticity inside water to the ship body spare and store, try to avoid the secondary fly of ship body spare, if annular water bag is punctured by ship body spare, also can not produce new fragment danger source spare.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of ship platform structure strength verification technology, and in particular to a tooling for ship platform structure strength verification. Background Technology

[0002] The strength verification of the hull platform structure is a core part of the ship design, construction and operation and maintenance stages. Its purpose is to ensure that the platform structure does not suffer from strength failure, excessive deformation or fatigue failure under various expected loads, so as to ensure the safety of ship navigation and service life. During this process, a scaled-down model of the hull is typically positioned on a structural strength verification fixture on the hull platform for strength verification. If the hull is not properly designed and results in insufficient stability, the hull may break. In the test, the hull and the fixture platform are subjected to strong shaking due to simulated wind, waves, and impacts. Therefore, broken parts are prone to flying out, causing damage to electronic equipment and injuries to personnel. To address this, protective structures are provided. Currently, most protective structures use materials such as steel plates and tempered glass as interceptors. These relatively hard materials rely on their own rigidity to directly block broken parts, which can easily cause parts to bounce back rigidly, creating a secondary flying hazard. Additionally, the interceptors themselves may break or shatter upon impact, generating new sources of debris hazards. Therefore, this application provides a tooling for verifying the structural strength of a ship platform to meet the requirements. Utility Model Content

[0003] The technical problem to be solved by this utility model is to provide a tooling for verifying the structural strength of a ship platform, thereby solving the technical problem of secondary launch of ship parts, impact fracture and breakage of the interceptor itself, and the generation of new debris hazard sources.

[0004] To solve the above-mentioned technical problems, this utility model provides the following technical solution: A structural strength verification fixture for a ship platform includes a fixture body, a protective structure on the outside of the fixture body, a collection box, an annular water bladder in the collection box, and an annular plate connected to the surface of the annular water bladder. The outside of the collection box is provided with a support assembly; A water injection assembly is provided on one side of the tool body. The water injection assembly includes a water tank located in the collection box, a first water pump, and a second water pump. The input end of the first water pump is equipped with a first water pipe that communicates with the inside of the water tank, and the output end of the first water pump is equipped with a second water pipe that communicates with the annular water bladder. A water collection component is installed on the outside of the collection box.

[0005] By filling the annular water bladder inside the protective structure with water through the water injection component, the annular water bladder expands and bulges, making the annular water bladder stand on the outside of the tool body. This can achieve gradient dissipation of impact load and avoid secondary risks caused by broken parts bouncing back or intercepting parts breaking apart.

[0006] Optionally, the support assembly includes a support frame on which a hydraulic rod is mounted, and a connecting plate is mounted on the telescopic end of the hydraulic rod, the connecting plate being connected to an annular plate.

[0007] The support frame is used to support the hydraulic rod, and the hydraulic rod is also used to adjust the height of the top of the annular water bladder via the connecting plate, making it easy to stand the annular water bladder upright.

[0008] Optionally, a base plate is installed at the bottom of the support frame, and a positioning hole is provided through the base plate.

[0009] By setting positioning holes and using fasteners such as bolts, the base plate is fixed in a designated position to effectively support the hydraulic rod.

[0010] Optionally, the input end of the second water pump is equipped with a fourth water pipe that communicates with the inside of the annular water bladder, and the output end of the second water pump is equipped with a third water pipe that communicates with the inside of the water tank.

[0011] By setting up a fourth and third water pipe, and cooperating with a second water pump, after the hull strength test is completed, the water in the annular water bladder is pumped back into the water tank, causing the annular water bladder to deflate, thus utilizing the retraction of the annular water bladder.

[0012] Optionally, the water collection assembly includes an interception box with an annular groove, a cover plate placed on the annular groove, and multiple filter holes through the cover plate.

[0013] By designing the interception box, annular trough, cover plate, and multiple filter holes, if the annular water bladder ruptures, the water inside can be discharged into the interception box for collection, minimizing the risk of water flowing everywhere.

[0014] Optionally, a water pumping pipe is installed on the cover plate, and a threaded plug is connected to the internal thread of the water pumping pipe.

[0015] By installing a water pump pipe, the hose connected to the pump's pumping end can be inserted into the interception box, making it easier to pump out the water collected in the interception box. The presence of a threaded plug is also used to block the inside of the water pump pipe.

[0016] Compared with the prior art, this utility model has at least the following beneficial effects: By setting up a protective structure and water injection components, the first water pump is started to fill the water tank into the annular water bladder, thereby causing the annular water bladder to expand and stand on the outside of the tool body. When the hull parts are launched, the elasticity of the annular water bladder and the water inside it will buffer the hull parts and minimize the secondary launch of the hull parts. If the annular water bladder is punctured by the hull parts, no new fragments or dangerous parts will be generated. By setting up a support component, while water is being filled into the annular water bladder, the hydraulic rod is activated, causing its telescopic end to pull up the top of the annular water bladder, thereby assisting in the standing of the annular water bladder and improving its stability. By setting up a water collection component, if the annular water bladder is punctured by a hull part, water will flow out from inside the annular water bladder. At this time, the water will enter the interception box through the filter holes for collection, thus minimizing water spillage. Attached Figure Description

[0017] The accompanying drawings, which are incorporated herein and form part of the specification, illustrate embodiments of the present invention and, together with the specification, further serve to explain the principles of the present invention and enable those skilled in the art to implement and use the present invention.

[0018] Figure 1 A schematic diagram of the overall structure of the tooling for verifying the structural strength of the ship platform. Figure 2 A schematic diagram of the working status of the protective structure of the tooling for verifying the structural strength of the ship platform. Figure 3 A cross-sectional schematic diagram of the annular water bladder structure used for verifying the structural strength of a ship platform. Figure 4 A schematic diagram of the water collection component for the tooling used to verify the structural strength of the ship platform. Figure 5 Fixtures for verifying the structural strength of ship platforms Figure 4 Enlarged view of point A in the middle.

[0019] 1. Protective structure; 101. Collection box; 102. Annular water bladder; 103. Annular plate; 2. Support components; 201. Support frame; 202. Base plate; 203. Positioning holes; 204. Hydraulic rod; 205. Connecting plate; 3. Water injection assembly; 301. Water tank; 302. First water pump; 303. First water pipe; 304. Second water pipe; 305. Second water pump; 306. Third water pipe; 307. Fourth water pipe; 4. Water collection assembly; 401. Interception box; 402. Annular groove; 403. Cover plate; 404. Filter hole; 405. Pumping pipe; 406. Threaded plug; 5. Tooling body.

[0020] As shown in the figure, specific structures and devices are marked in the figure to clearly illustrate the structure of the embodiment of this utility model. However, this is only for illustrative purposes and is not intended to limit this utility model to this specific structure, device and environment. Those skilled in the art can adjust or modify these devices and environments according to specific needs. Detailed Implementation

[0021] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0022] In the description of this application, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the stated features. In the description of this application, "multiple" means two or more, unless otherwise explicitly specified.

[0023] In the description of this application, it should also be noted that, unless otherwise expressly specified and limited, the terms "set up," "install," "connect," and "link" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this technology based on the specific circumstances.

[0024] In the description of this application, spatial relation terms such as "below," "under," "below," "below," "above," "over," etc., are used herein to describe the relationship between one element or feature shown in the figures and other elements or features. It should be understood that, in addition to the orientation shown in the figures, spatial relation terms also include different orientations of the device in use and operation. For example, if the device in the figures is flipped, an element or feature described as "below" or "under" or "below" of other elements or features will be oriented "above" other elements or features. Therefore, the exemplary terms "below" and "under" can include both upper and lower orientations. Furthermore, the device may also include other orientations (e.g., rotated 90 degrees or other orientations), and the spatial descriptive terms used herein are interpreted accordingly.

[0025] In the description of this application, the term "for example" is used to mean "used as an example, illustration, or description." Any embodiment described as "for example" in this application is not necessarily to be construed as being more preferred or advantageous than other embodiments. The following description is provided to enable any person skilled in the art to implement and use the present invention. Details are set forth in the following description for purposes of explanation. It should be understood that those skilled in the art will recognize that the present invention can be implemented without using these specific details. In other instances, well-known structures and processes will not be described in detail to avoid obscuring the description of the present invention with unnecessary detail. Therefore, the present invention is not intended to be limited to the embodiments shown, but is consistent with the broadest scope of the principles and features disclosed in this application.

[0026] The hull platform structure strength verification fixture provided in this embodiment of the invention aims to solve the problem of secondary ejection of hull parts, impact fracture and breakage of the interceptor components, and the generation of new debris hazard sources by providing the following technical solution. The hull platform structure strength verification fixture is composed of a protective structure, a water injection assembly, and other components. These components work together to minimize secondary ejection of hull parts and the generation of new debris hazard sources by the interceptor components.

[0027] like Figures 1-3 As shown, an embodiment of this utility model provides a hull platform structure strength verification fixture. The fixture includes a fixture body 5, a protective structure 1 on the outer side of the fixture body 5, a collection box 101, and an annular water bladder 102. The bottom surface of the annular water bladder 102 is connected to the inner bottom wall of the collection box 101, and an annular plate 103 is connected to the surface of the annular water bladder 102. A support assembly 2 is provided on the outer side of the collection box 101, and a water injection assembly 3 is provided on one side of the fixture body 5. The water injection assembly 3 includes a water tank 301 located in the collection box 101, a first water pump 302, and a second water pump 305. The water tank 301 is used to hold water, and the first water pump 302... The input end of the first pump 302 is equipped with a first water pipe 303 that is connected to the inside of the water tank 301, and the output end of the first pump 302 is equipped with a second water pipe 304 that is connected to the annular water bladder 102. According to the above technical solution, specifically, by starting the first pump 302, water is drawn out of the water tank 301 through the first water pipe 303, and then water is filled into the annular water bladder 102 through the second water pipe 304, thereby causing the annular water bladder 102 to expand and stand on the outside of the tool body 5. When the hull parts are launched, the elasticity of the annular water bladder 102 and the water inside it are used to buffer the hull parts, so as to avoid secondary launch of the hull parts. If the annular water bladder 102 is punctured by the hull parts, no new fragments or dangerous parts will be generated. It should be noted that the annular water bladder 102 is made of high-strength reinforced rubber composite material of model XC-HC-08 produced by Qingdao Xincheng Rubber Products Co., Ltd., with a thickness of 1000mm. In addition, a pit is dug in the ground, and the collection box 101 is located in the pit. When the annular plate 103 is attached to the top of the collection box 101, the top of the annular plate 103 should be level with the ground.

[0028] like Figure 2 As shown, the support assembly 2 includes a support frame 201, on which a hydraulic rod 204 is mounted. A connecting plate 205 is mounted on the telescopic end of the hydraulic rod 204. The connecting plate 205 is connected to the annular plate 103. When water is filled into the annular water bladder 102, the hydraulic rod 204 is activated, causing its telescopic end to move the connecting plate 205 upward. The upward movement of the connecting plate 205 causes the annular plate 103 to move upward. The upward movement of the annular plate 103 causes the top of the annular water bladder 102 to be pulled up, thereby assisting the annular water bladder 102 to stand up, which is beneficial to improving the stability of the annular water bladder 102. A base plate 202 is installed at the bottom of the support frame 201. A positioning hole 203 is provided through the base plate 202. The positioning hole 203 is used in conjunction with fasteners, such as bolts, to fix the base plate 202 in a designated position for effective support of the hydraulic rod 204.

[0029] like Figure 2 As shown, the input end of the second water pump 305 is equipped with a fourth water pipe 307 that communicates with the inside of the annular water bladder 102, and the output end of the second water pump 305 is equipped with a third water pipe 306 that communicates with the inside of the water tank 301. When the tooling body 5 completes the strength verification of the hull, the second water pump 305 is started to draw water out of the annular water bladder 102 through the fourth water pipe 307, and then discharged back into the water tank 301 for collection through the third water pipe 306.

[0030] like Figure 1 , Figure 4 and Figure 5 As shown, a water collection assembly 4 is provided on the outside of the collection box 101. The water collection assembly 4 includes an interception box 401. The support assembly 2 is located between the water collection assembly 4 and the protective structure 1. An annular groove 402 is provided on the interception box 401. A cover plate 403 is placed on the annular groove 402. Multiple filter holes 404 are provided through the cover plate 403. According to the above technical solution, if the annular water bag 102 is punctured by a hull part, water will flow out from the inside of the annular water bag 102. At this time, the water enters the interception box 401 through the filter holes 404 for collection, thus avoiding water overflow as much as possible. A water-drawing pipe 405 is installed on the cover plate 403. The internal thread of the water-drawing pipe 405 is connected to a threaded plug 406, which allows the hose connected to the water pump's pumping end to be inserted into the interception box 401 to facilitate the extraction of water collected in the interception box 401. The threaded plug 406 is used to block the inside of the water-drawing pipe 405. The ground needs to be dug again, and the interception box 401 is placed in the pit. The top of the cover plate 403 should be level with the ground.

[0031] Working principle like Figures 1-5 As shown, by starting the first water pump 302, water is drawn out of the water tank 301 through the first water pipe 303, and then water is filled into the annular water bladder 102 through the second water pipe 304, thereby causing the annular water bladder 102 to expand and stand on the outside of the tool body 5. When the hull parts are launched, the elasticity of the annular water bladder 102 and the water inside it buffer the hull parts, thus avoiding secondary launch of the hull parts as much as possible. If the annular water bladder 102 is punctured by the hull parts, no new fragments or dangerous parts will be generated. While water is being filled into the annular water bladder 102, the hydraulic rod 204 is activated, causing its telescopic end to move the connecting plate 205 upward. The upward movement of the connecting plate 205 causes the annular plate 103 to move upward, and the upward movement of the annular plate 103 causes the top of the annular water bladder 102 to be pulled up, thereby assisting the annular water bladder 102 to stand up, which is beneficial to improving the stability of the annular water bladder 102. If the annular water bladder 102 is punctured by a hull part, water will flow out from inside the annular water bladder 102. At this time, the water will enter the interception box 401 through the filter hole 404 for collection, thus avoiding water overflow as much as possible.

[0032] While embodiments or examples of this disclosure have been described with reference to the accompanying drawings, it should be understood that the above embodiments are merely exemplary embodiments or examples, and the scope of this utility model is not limited by these embodiments or examples, but only by the granted claims and their equivalents. Various elements in the embodiments or examples may be omitted or replaced by their equivalents. Furthermore, the steps may be performed in a different order than that described in this disclosure. Further, various elements in the embodiments or examples may be combined in various ways. Importantly, as the technology evolves, many elements described herein can be replaced by equivalents that appear after this disclosure.

Claims

1. A tooling for verifying the structural strength of a ship hull platform, characterized in that, The hull platform structure strength verification fixture includes a fixture body (5), and a protective structure (1) is provided on the outside of the fixture body (5). The protective structure (1) includes a collection box (101), and the collection box (101) is provided with an annular water bladder (102). An annular plate (103) is connected to the surface of the annular water bladder (102). A support assembly (2) is provided on the outside of the collection box (101); A water injection assembly (3) is provided on one side of the tool body (5). The water injection assembly (3) includes a water tank (301) located in the collection box (101), a first water pump (302), and a second water pump (305). The input end of the first water pump (302) is equipped with a first water pipe (303) that communicates with the inside of the water tank (301), and the output end of the first water pump (302) is equipped with a second water pipe (304) that communicates with the annular water bag (102). A water collection component (4) is provided on the outside of the collection box (101).

2. The hull platform structure strength verification fixture according to claim 1, characterized in that, The support assembly (2) includes a support frame (201), on which a hydraulic rod (204) is mounted. A connecting plate (205) is mounted on the telescopic end of the hydraulic rod (204), and the connecting plate (205) is connected to the annular plate (103).

3. The hull platform structure strength verification fixture according to claim 2, characterized in that, The bottom of the support frame (201) is equipped with a base plate (202), and a positioning hole (203) is provided through the base plate (202).

4. The hull platform structure strength verification fixture according to claim 1, characterized in that, The second water pump (305) has a fourth water pipe (307) connected to the inside of the annular water bladder (102) installed at its input end, and a third water pipe (306) connected to the inside of the water tank (301) installed at its output end.

5. The hull platform structure strength verification fixture according to claim 1, characterized in that, The water collection component (4) includes an interception box (401), an annular groove (402) is provided on the interception box (401), a cover plate (403) is placed on the annular groove (402), and multiple filter holes (404) are provided through the cover plate (403).

6. The hull platform structure strength verification fixture according to claim 5, characterized in that, A water pumping pipe (405) is installed on the cover plate (403), and a threaded plug (406) is connected to the internal thread of the water pumping pipe (405).