[0002]钢结构厂房进行返修加固的施工过程中,厂房内设备满布,传统施工/检修吊装采用叉车、吊车,对场地要求较高,地面存在障碍物时叉车无法通行,有限空间内吊车操作不便
本实用新型利用钢结构厂房的钢梁构件吊装平台,包括滑移绳形成的上方运转空间和和手拉绳形成的下方运作空间,从而在吊装时避免了地面障碍物的影响,吊装方便,易于操作,安全性也高,在吊装时也不会掉落。
Smart Images

Figure CN224900634U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to a hoisting device, belonging to the field of construction hoisting / factory maintenance. Background Technology
[0002] During the repair and reinforcement of steel structure workshops, the workshops are filled with equipment. Traditional construction / maintenance hoisting uses forklifts and cranes, which have high site requirements. Forklifts cannot pass when there are obstacles on the ground, and cranes are inconvenient to operate in limited spaces.
[0003] Therefore, there is an urgent need to design a hoisting device suitable for situations where there are obstacles on the ground and space is limited, to address the problem of hoisting, transporting and positioning reinforcement components under confined space conditions. Summary of the Invention
[0004] The technical problem to be solved by this utility model is to provide a lifting and sliding hoisting device based on the steel beams of a steel structure factory building that is not affected by ground obstacles and has a small hoisting space requirement.
[0005] To solve the above-mentioned technical problems, the technical solution adopted by this utility model is as follows: A lifting and sliding hoisting device based on steel beams of a steel structure factory building includes beam struts, a first connector, a second connector, a tie rod, a sliding rope, two pull ropes, and a hook pulley. The beam struts are fixed between two adjacent steel beams. The first connector is fixed to a first side steel beam, with a first pulley in the middle and a second pulley at the bottom. The second connector is fixed to a second side steel beam, with the tie rod in the middle and a third pulley at the bottom. The first pulley and tie rod are at the same horizontal level, as are the second and third pulleys. One end of the sliding rope is fixed to the tie rod, and the other end is connected to a winch via the first pulley. The two pull ropes are respectively mounted on the second and third pulleys. One end of each pull rope is a traction end, and the other end is connected to the component to be lifted. The hook pulley is mounted on the sliding rope to lift and slide the component along the rope.
[0006] The first connector fixes the lower surface of the lower flange of the first side steel beam; the second connector fixes the lower surface of the lower flange of the second side steel beam.
[0007] The traction end of the pull rope is operated by the construction personnel to pull the component.
[0008] The beam strut consists of a steel pipe and end screws, with internal threads at both ends of the steel pipe that connect to the end screws.
[0009] The inter-beam strut is located between two adjacent steel beams, perpendicular to the lower flange of the steel beam. The end screws are adjusted to ensure close contact between the inter-beam strut and the steel beam. It plays a supporting role during hoisting and balances the horizontal force generated during hoisting.
[0010] The first connecting member includes a first short column top plate, a first short column, a short column bottom plate, a U-shaped plate, a first connecting rod, and a first inverted U-shaped plate. The first short column top plate and the short column bottom plate are respectively fixed to the top and bottom of the first short column. The first short column top plate is fixed to the lower flange of the first side steel beam. The U-shaped plate, the first connecting rod, and the first inverted U-shaped plate are sequentially arranged at the lower end of the short column bottom plate. The first pulley is arranged inside the U-shaped plate, and the second pulley is arranged inside the first inverted U-shaped plate.
[0011] Stiffening ribs are provided on the first short column.
[0012] The second connector includes a second short column top plate, a second short column, a connecting sleeve, a second connecting rod, and a second inverted U-shaped plate. The second short column top plate and the connecting sleeve are respectively fixed to the top and bottom of the second short column. The tie rod is fixed inside the connecting sleeve. The second connecting rod and the second inverted U-shaped plate are sequentially arranged at the bottom of the connecting sleeve. The third pulley is arranged inside the second inverted U-shaped plate.
[0013] Stiffening ribs are provided on the second short column.
[0014] Compared with the prior art, the beneficial effects of this utility model are: This utility model utilizes a steel beam component hoisting platform in a steel structure factory building, including an upper operating space formed by a sliding rope and a lower operating space formed by a hand-pulled rope. This avoids the influence of ground obstacles during hoisting, making hoisting convenient, easy to operate, and highly safe, and preventing it from falling during hoisting. Attached Figure Description
[0015] Figure 1 This is a schematic diagram of the structure of this utility model; Figure 2 This is a structural schematic diagram of the first connector; Figure 3 This is a structural schematic diagram of the second connector.
[0016] The components include: 1. Beam strut; 2. First connector; 21. First short column top plate; 22. First short column; 23. First stiffening rib; 24. Short column bottom plate; 25. First U-shaped plate; 26. First pulley; 27. First connecting rod; 28. First inverted U-shaped plate; 29. Second pulley; 3. Second connector; 31. Second short column top plate; 32. Second short column; 33. Second stiffening rib; 34. Connecting sleeve; 35. Second connecting rod; 36. Second inverted U-shaped plate; 37. Third pulley; 4. Tie rod; 5. Sliding rope; 6. Pull rope; 7. Hook pulley; 8. End screw; 9. Hand chain hoist; 10. Winch; 11. Ground; 12. Connecting screw; 13. Steel beam; 14. Components with lifting mechanism. Detailed Implementation
[0017] The present invention will now be described in detail with reference to the accompanying drawings. Figure 1 As shown, this utility model relates to a lifting and sliding hoisting device for steel beams in a steel structure factory building. It includes a beam support rod 1, a first connecting member 2, a second connecting member 3, a tie rod 4, a sliding rope 5, two pull ropes 6, and a hook pulley 7. The beam support rod 1 is fixed between two adjacent steel beams 13. The first connecting member 2 is fixed to the first side steel beam, with a first pulley 26 in the middle and a second pulley 29 at the bottom. The second connecting member 3 is fixed to the second side steel beam, with a tie rod 4 in the middle. A third pulley 37 is provided at the lower part of 3; the first pulley 26 and the tie rod 4 are at the same horizontal position, and the second pulley 29 and the third pulley 37 are at the same horizontal position; one end of the sliding rope 5 is fixed to the tie rod 4, and the other end of the sliding rope 5 is connected to the winch 10 via the first pulley 26; two pull ropes 6 are respectively provided on the second pulley 29 and the third pulley 27; one end of the pull rope 6 is the traction end, and the other end of the pull rope 6 is connected to the component 14 to be hoisted; the hook pulley 7 is provided on the sliding rope 5 and performs the hoisting and translating operation of the component 14 along the sliding rope 5.
[0018] The structure of the first connector 2 is as follows: Figure 2 As shown, it includes, from top to bottom, a first short column top plate 21, a first short column 22, a first stiffening rib 23, a short column bottom plate 24, a first U-shaped plate 25, a first pulley 26, a first connecting rod 27, a first inverted U-shaped plate 28, and a second pulley 29.
[0019] The first short column 22 is a cylindrical or square steel pipe, the bottom plate and the top plate of the short column are square steel plates, and the components of the first connecting piece 2 are mainly connected by welding.
[0020] The structure of the second connector 3 is as follows: Figure 3As shown, it includes, from top to bottom, a second short column top plate 31, a second short column 32, a second stiffening rib 33, a connecting sleeve 34, a second connecting rod 35, a second inverted U-shaped plate 36, and a third pulley 37.
[0021] The second short column 32 is a cylindrical or square steel pipe, and the base plate and top plate of the short column are square steel plates. The components of the second connecting piece 3 are mainly connected by welding. The connecting sleeve 34 has circular threads inside.
[0022] Both the first connector 2 and the second connector 3 are connected to the steel beam 13 via four connecting bolts 12 located on the top plate of the short column.
[0023] The tie rod 4 consists of a circular connecting ring at the end, a square plate, and a threaded rod. The threaded rod has an installation hole on the side near the circular ring, which facilitates insertion and tightening of the rod.
[0024] The hook pulley 7 consists of a pulley, a hook, and an inverted U-shaped plate belt. The pulley is installed inside the inverted U-shaped plate belt; the pulley is mounted on the sliding rope 5 and slides along the sliding rope 5; the inverted U-shaped plate belt is fixed to the pulley; the hook is located at the lower end of the inverted U-shaped plate belt. The number of hook pulleys 7 is determined by actual needs, but not less than two. Figure 1 In this embodiment, the number of hook pulleys 7 is 3.
[0025] The installation process of this utility model's lifting and sliding hoisting device based on steel beams of a steel structure factory building is as follows: (1) Opening of steel beam 13: Determine the steel beam and fixing position for fixing the connector according to the hoisting requirements and actual site conditions, and make openings at the bottom of the steel beam; (2) Install beam strut 1: Assemble beam strut 1, screw the end screws into both ends of the round steel pipe, and then install it on the lower flange of the steel beam. Adjust the end screws to tighten them. (3) Install the first connector 2 and the second connector 3: Connect and fix the first connector 2 and the second connector 3 to the lower flange of the steel beam 13 by connecting bolts 12; (4) Installing the sliding rope 5 and the hook pulley 7: The sliding rope 5 starts from the winch 10 on the ground 11, first passes through the first pulley 26, then is installed on the hook pulley 7, and finally is connected to the second connector 3 through the tie rod 4. (5) Install the pull rope 6: One pull rope 6 passes through the second pulley 29 and is connected to the component 14; the other pull rope 6 passes through the third pulley 37 and is connected to the component 14. (6) Install the hand chain hoist 9: Install the hand chain hoist 9 onto the beam support rod 1, and set one hand chain hoist at the lifting point and the lifting end point respectively; (7) Lifting component 14: Tie component 14 in place, reserve the rope or sling for lifting the hook pulley, then use the hand chain hoist 9 to lift component 14 to a certain height, connect the reserved rope or sling to the hook of the hook pulley 7, and after the connection is secure, slowly lower the hand chain hoist 9 and lift component 14 by the hook pulley 7; (8) Sliding component: After the hook pulley 7 is hoisted and stabilized, the ground personnel pull the rope 6 to move the component 14 to the designated position, and then install the component 14 in place by using the hand hoist 9 at the hoisting end point.
[0026] (9) Pulley return: After component 14 is in place, tie the pull rope 6 to the hook of the hook pulley 7, and then pull the hook pulley 7 back to the lifting point by operating the pull rope 6; Repeat steps (8) to (9) until the hoisting is completed; After the hoisting is completed, the following components are removed in sequence: hand rope 6, sliding rope 5, ground winch 10, first connector 2, second connector 3, hand chain hoist 9, and beam support 1.
Claims
1. A lifting and sliding hoisting device based on steel beams of a steel structure factory building, characterized in that, The system includes beam struts, a first connector, a second connector, a tie rod, a sliding rope, two pull ropes, and a hook pulley. The beam struts are fixed between two adjacent steel beams. The first connector is fixed to a first side steel beam, with a first pulley in the middle and a second pulley at its lower part. The second connector is fixed to a second side steel beam, with the tie rod in the middle and a third pulley at its lower part. The first pulley and tie rod are at the same horizontal level, as are the second and third pulleys. One end of the sliding rope is fixed to the tie rod, and the other end is connected to a winch via the first pulley. The two pull ropes are respectively mounted on the second and third pulleys. One end of each pull rope is a traction end, and the other end is connected to the component to be lifted. The hook pulley is mounted on the sliding rope to lift and move the component along it.
2. The lifting and sliding hoisting device based on steel beams of a steel structure factory building according to claim 1, characterized in that, The first connector fixes the lower surface of the lower flange of the first side steel beam; the second connector fixes the lower surface of the lower flange of the second side steel beam.
3. The lifting and sliding hoisting device based on steel beams of a steel structure factory building according to claim 1, characterized in that, The first connecting member includes a first short column top plate, a first short column, a short column bottom plate, a U-shaped plate, a first connecting rod, and a first inverted U-shaped plate. The first short column top plate and the short column bottom plate are respectively fixed to the top and bottom of the first short column. The first short column top plate is fixed to the lower flange of the first side steel beam. The U-shaped plate, the first connecting rod, and the first inverted U-shaped plate are sequentially arranged at the lower end of the short column bottom plate. The first pulley is arranged inside the U-shaped plate, and the second pulley is arranged inside the first inverted U-shaped plate.
4. The lifting and sliding hoisting device based on steel beams of a steel structure factory building according to claim 3, characterized in that, Stiffening ribs are provided on the first short column.
5. The lifting and sliding hoisting device based on steel beams of a steel structure factory building according to claim 1, characterized in that, The second connector includes a second short column top plate, a second short column, a connecting sleeve, a second connecting rod, and a second inverted U-shaped plate. The second short column top plate and the connecting sleeve are respectively fixed to the top and bottom of the second short column. The tie rod is fixed inside the connecting sleeve. The second connecting rod and the second inverted U-shaped plate are sequentially arranged at the bottom of the connecting sleeve. The third pulley is arranged inside the second inverted U-shaped plate.
6. The lifting and sliding hoisting device based on steel beams of a steel structure factory building according to claim 5, characterized in that, Stiffening ribs are provided on the second short column.
7. The lifting and sliding hoisting device based on steel beams of a steel structure factory building according to claim 1, characterized in that, The traction end of the pull rope is operated by the construction personnel to pull the component.
8. The lifting and sliding hoisting device based on steel beams of a steel structure factory building according to claim 1, characterized in that, The beam strut consists of a steel pipe and end screws, with internal threads at both ends of the steel pipe that connect to the end screws.