Building construction scaffolding
Patent Information
- Application Number
- CN202522607100.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-09
- Publication Date
- 2026-10-27
- Estimated Expiration
- 2035-12-09
AI Technical Summary
[0004]基于上述技术问题,本申请提供了一种建筑物施工吊架,以解决现有技术中的吊架在进行建筑物原材料卸料时需要进行两次吊装操作、以及不便于运输的技术问题
[0023]本申请提供的建筑物施工吊架包括底架、支撑臂、第一伸缩件、吊臂和第二伸缩件,底架的底部具有移动轮,侧部具有握持把手,支撑臂与底架之间通过第一伸缩件连接,吊臂和支撑臂之间通过第二伸缩件连接,第一伸缩件和第二伸缩件可以改变支撑臂和吊臂的角度和高度,实现货物的起吊和放下动作。
Smart Images

Figure CN224900717U_ABST
Abstract
Description
Technical Field
[0001] This application belongs to the field of construction scaffolding technology, specifically a building construction scaffolding. Background Technology
[0002] During the main construction and interior decoration of a building, various raw materials are used, such as bricks, bagged cement, precast slabs, and decorative panels. Most of these building materials are transported to the construction site by trucks. Once the trucks reach the unloading point, scaffolding is used to transfer the raw materials from the trucks to the ground. Using scaffolding for material transfer is easier and less labor-intensive than manual handling.
[0003] The conventional method for unloading raw materials is as follows: first, a crane is used to lift the material from the transport vehicle to a handcart, which then transports the material to the unloading location. Once at the unloading location, the material is then lifted from the handcart to the ground. On the one hand, this method requires two lifting operations. When the unloading location and the raw material storage location are far apart, cranes need to be installed at both locations to complete the unloading operation, which reduces operational convenience. On the other hand, existing cranes are bulky and inconvenient to transport between different sites. Utility Model Content
[0004] Based on the above-mentioned technical problems, this application provides a building construction scaffold to solve the technical problems of existing scaffolds requiring two hoisting operations when unloading building raw materials and being inconvenient to transport.
[0005] To achieve the above objectives, the technical solution adopted in this application is: to provide a building construction hoist, comprising:
[0006] The base frame has three or more casters at the bottom, a handle is provided on one side of the base frame, a receiving cavity is provided in the upper part of the base frame, and a fixed seat is provided on one side of the receiving cavity;
[0007] A support arm is located on the side of the receiving cavity opposite to the fixed seat, and its bottom is hinged to the base frame;
[0008] The first telescopic member has one end hinged to the inner wall of the receiving cavity, and the other end hinged to the support arm via a detachable first movable shaft.
[0009] A boom, one end of which is hinged to the top of the support arm, and the other end connected to a hook, the boom having a connecting portion detachably connected to the fixed base; and
[0010] The second telescopic component is hinged at one end to the support arm and at the other end to the boom;
[0011] The building construction scaffold has a folded state. When it is in the folded state, the first movable shaft is removed, the first telescopic member can rotate around its hinge axis with the base frame into the receiving cavity, and the support arm can rotate around its hinge axis with the base frame until the connecting part reaches the connection position with the fixed seat.
[0012] In one possible implementation, mounting plates are provided on both sides of the base frame, and the mounting plates are provided with a plurality of first mounting holes spaced apart along their own circumference.
[0013] The building construction scaffold also includes two opposing legs, each leg corresponding to a mounting plate and capable of rotating around the axis of the corresponding mounting plate. Each leg has a second mounting hole, and a first limiting pin is detachably provided in both the second mounting hole and the corresponding first mounting hole. The bottom of each leg is provided with a movable wheel.
[0014] In one possible implementation, a traction bracket is also provided on one side of the base frame.
[0015] In one possible implementation, the receiving cavity is threaded with push rods on its two opposite side walls with respect to the first telescopic member, and when in the folded state, the push rods abut against the first telescopic member.
[0016] In one possible implementation, the end of the boom away from its hinged portion with the support arm is provided with a groove, and the building construction scaffold also includes a sliding rod that slides in conjunction with the groove, and the hook is located at the end of the sliding rod away from the boom.
[0017] In one possible implementation, the slide bar has multiple third mounting holes along its length, and the sidewall of the slide groove has multiple fourth mounting holes that penetrate its own wall thickness. The third mounting holes and the corresponding fourth mounting holes are detachably provided with second limiting pins.
[0018] In one possible implementation, a fifth mounting hole is provided at the end of the slide rod away from the boom, and the hook is disposed in the fifth mounting hole via a detachable second movable shaft, with the slide rod constituting the connecting part; when in the folded state, the hook is removed, and the second movable shaft is connected to the fixed base and the slide rod.
[0019] In one possible implementation, the end of the second telescopic member that is hinged to the boom is provided with a third movable shaft.
[0020] In one possible implementation, the boom has a storage cavity on the side adjacent to the support arm, and when in the folded state, the second telescopic member is at least partially housed within the storage cavity.
[0021] In one possible implementation, two grip handles are provided opposite each other.
[0022] Compared with the prior art, the beneficial effects of the building construction scaffolding provided in this application are:
[0023] The building construction scaffolding provided in this application includes a base frame, a support arm, a first telescopic member, a boom, and a second telescopic member. The base frame has casters at the bottom and a handle on the side. The support arm is connected to the base frame via the first telescopic member, and the boom and support arm are connected via the second telescopic member. The first and second telescopic members can change the angle and height of the support arm and boom to achieve the lifting and lowering of goods.
[0024] From an operational convenience perspective, the base frame, equipped with casters and handles, allows for direct movement of the construction crane to the unloading position after lifting the goods. The construction crane simultaneously performs lifting and transport functions, eliminating the need for intermediate transfers and reducing the number of lifting operations. From a transportation perspective between different sites, the base frame has a fixed base, and the first telescopic component is hinged to the support arm via a detachable first movable shaft. When transportation is required, the first movable shaft can be removed, allowing the crane to be quickly folded into a more compact state, reducing its size and facilitating transportation and storage. After folding, the first telescopic component is stored within the receiving cavity, and the support arm and boom are fixed to the base frame, ensuring overall structural stability and reducing the risk of component damage during transportation. Attached Figure Description
[0025] To more clearly illustrate the technical solutions in the embodiments of this application, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0026] Figure 1 A schematic diagram of the usage status of the building construction scaffold provided in the embodiments of this application. Figure 1 ;
[0027] Figure 2 for Figure 1 Enlarged view of part A in the middle;
[0028] Figure 3 for Figure 1 Enlarged view of part B in the middle;
[0029] Figure 4 A schematic diagram of the usage status of the building construction scaffold provided in the embodiments of this application. Figure 2 ;
[0030] Figure 5 A schematic diagram of the usage status of the building construction scaffold provided in the embodiments of this application. Figure 3 ;
[0031] Figure 6 This is a schematic diagram of the folded state of the building construction scaffold provided in the embodiments of this application;
[0032] Figure 7 for Figure 6 Enlarged view of a section in the middle C;
[0033] Figure 8 for Figure 6 Enlarged view of a section in part D;
[0034] Explanation of reference numerals in the attached figures:
[0035] 10. Base frame; 11. Casters; 12. Handle; 13. Mounting base; 14. Mounting plate; 141. First mounting hole; 15. Traction bracket; 16. Top rod; 20. Support arm; 30. First telescopic component; 40. Boom; 41. Hook; 50. Second telescopic component; 60. Outrigger; 61. First limit pin; 70. Slide rod; 71. Second limit pin; 72. Second movable shaft. Detailed Implementation
[0036] To make the technical problems, technical solutions, and beneficial effects to be solved by this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and are not intended to limit the scope of this application.
[0037] It should be noted that when a component is referred to as being "fixed to" or "set on" another component, it can be directly on or indirectly on that other component. When a component is referred to as being "connected to" another component, it can be directly connected to or indirectly connected to that other component.
[0038] It should be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this application.
[0039] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this application, "multiple" or "several" means two or more, unless otherwise explicitly specified.
[0040] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains.
[0041] Please refer to the following: Figures 1 to 8 The following describes the building construction scaffolding provided in the embodiments of this application.
[0042] The building construction scaffold provided in this application includes a base frame 10, a support arm 20, a first telescopic member 30, a boom 40, and a second telescopic member 50.
[0043] The base frame 10 is constructed from shaped steel or steel plates to form a frame structure. The bottom of the base frame 10 has three or more casters 11. One side of the base frame 10 has a handle 12. The upper part of the base frame 10 has a receiving cavity, and a fixed seat 13 is provided on one side of the receiving cavity. The support arm 20 is located on the side of the receiving cavity opposite to the fixed seat 13, and its bottom is hinged to the base frame 10. One end of the first telescopic member 30 is hinged to the inner wall of the receiving cavity, and the other end is hinged to the support arm 20 through a detachable first movable shaft. One end of the boom 40 is hinged to the top of the support arm 20, and the other end is connected to a hook 41. The boom 40 has a connecting part that is detachably connected to the fixed seat 13. One end of the second telescopic member 50 is hinged to the support arm 20, and the other end is hinged to the boom 40.
[0044] Building construction scaffolding has such Figure 1 , Figure 4 and Figure 5 The usage status shown, and as Figure 6 The folded state is shown. When in the folded state, the first movable shaft is removed, the first telescopic member 30 can rotate about its hinge axis with the base frame 10 into the receiving cavity, and the support arm 20 can rotate about its hinge axis with the base frame 10 until the connecting part reaches the connection position with the fixed seat 13. The building construction scaffold in the folded state has a lower height and occupies less space, making it easier to move and transport.
[0045] Compared with the prior art, the beneficial effects of the building construction scaffolding provided in this application are:
[0046] The building construction scaffold provided in this application includes a base frame 10, a support arm 20, a first telescopic member 30, a boom 40, and a second telescopic member 50. The base frame 10 has casters 11 at its bottom and a handle 12 on its side. The support arm 20 is connected to the base frame 10 via the first telescopic member 30, and the boom 40 is connected to the support arm 20 via the second telescopic member 50. The first telescopic member 30 and the second telescopic member 50 can change the angle and height of the support arm 20 and the boom 40 to realize the lifting and lowering of goods.
[0047] From an operational convenience perspective, since the base frame 10 has casters 11 and handles 12, after the lifting operation is completed, the construction crane can be directly pushed to the unloading position. The construction crane simultaneously serves the functions of lifting and transportation, eliminating the need for intermediate transfers and reducing the number of lifting operations. From the perspective of transportation between different sites, the base frame 10 has a fixed seat 13, and the first telescopic member 30 is hinged to the support arm 20 via a detachable first movable shaft. When transportation is required, the first movable shaft can be removed, and the crane can be quickly folded into a more compact folded state, reducing its size and facilitating transportation and storage. After folding, the first telescopic member 30 is stored in the receiving cavity, and the support arm 20 and the boom 40 are fixed to the base frame 10, ensuring overall structural stability and reducing the risk of component damage during transportation.
[0048] The base frame 10 adopts a rectangular steel frame structure, with three or more casters 11 installed at the bottom. The casters 11 can be swivel casters with brakes or other types of wheels, as long as they can provide stable support. A handle 12 is provided on one side of the base frame 10. The handle 12 can be made of steel pipe with a non-slip rubber coating to improve grip. Two handles 12 are provided when two hands are needed for gripping.
[0049] The upper part of the base frame 10 has a receiving cavity, which is a groove or box-shaped structure welded from steel plates. The volume of the receiving cavity should be able to completely accommodate the first telescopic member 30 after it has retracted. A fixing seat 13 is provided on one side of the receiving cavity. The fixing seat 13 is a perforated steel plate or a hook-shaped structure, which can be connected to the boom 40 when folded, so that the base frame 10, the support arm 20 and the boom 40 form an approximately triangular structure, which reduces the volume and improves the stability, making it easier to load and transport.
[0050] The support arm 20 adopts a high-strength aluminum alloy or steel tubular structure. The bottom is hinged to the base frame 10 by a pin. Rolling bearings can be installed at the hinge point to ensure smooth rotation. During maintenance, lubricating oil is added to the rolling bearings for maintenance.
[0051] The first telescopic component 30 and the second telescopic component 50 can be hydraulic cylinders, pneumatic cylinders, or electric push rods (the drive method is selected according to the on-site power source). One end of the first telescopic component 30 is hinged to the inner wall of the receiving cavity via a pin, and the other end is hinged to the support arm 20 via a detachable first movable shaft. The first movable shaft can be a quick-release pin or bolt. One end of the second telescopic component 50 is hinged to the support arm 20 via a pin, and the other end is hinged to the boom 40 via a pin. The operation of the first telescopic component 30 and the second telescopic component 50 is independent of each other and does not affect each other. They can be controlled via a control panel or remote control.
[0052] The boom 40 is a telescopic or fixed steel boom, with one end hinged to the top of the support arm 20 via a pin, and the other end connected to a hook 41 for lifting goods. The hook 41 is a standard component of the prior art. The boom 40 is provided with a connecting part (such as a hole or hook groove) for detachable connection with the fixed base 13. In the folded state, the connecting part remains connected to the fixed base 13, such as by a pin or a lock.
[0053] Please see Figure 2 and Figure 4 In some possible embodiments, mounting plates 14 are provided on both sides of the base frame 10. The mounting plates 14 are circular, made of steel plate, and have a thickness of 5-10mm. The mounting plates 14 are provided with a plurality of first mounting holes 141 at intervals along the arc direction, for example, 4-8 holes, with a hole diameter of 10-20mm.
[0054] The building construction scaffold also includes two steel support legs 60 arranged opposite each other. Each support leg 60 corresponds to a mounting plate 14 and can rotate around the axis of the corresponding mounting plate 14. Each support leg 60 has a second mounting hole, and a first limiting pin 61 is detachably installed within both the second mounting hole and the corresponding first mounting hole 141. The bottom of each support leg 60 is equipped with a caster wheel 11, which can be a universal wheel. When the support leg 60 rotates to the desired angle, the second mounting hole aligns with the corresponding first mounting hole 141, and the first limiting pin 61 (such as a spring pin or bolt) can be inserted to fix the position of the support leg 60. The caster wheel 11, which can be a universal wheel, is installed at the bottom of the support leg 60 and has a braking function.
[0055] In this embodiment, the outrigger 60 can be rotated to adjust the support angle, enlarging the support base and enhancing stability during hoisting, preventing the hoist from tipping over, especially suitable for uneven ground. The outrigger 60 and the mounting plate 14 are fixed by the first limiting pin 61, which has a simple and reliable structure, is easy to operate, and allows for quick locking of the outrigger 60 position. Figure 6 As shown, when in the folded state, the support leg 60 can be rotated to a position close to the base frame 10, reducing space occupation and facilitating transportation.
[0056] Please see Figure 1 and Figure 3The underframe 10 is also equipped with a towing bracket 15 on one side, which can be connected to a transport vehicle and towed to a designated location by the transport vehicle. The towing bracket 15 is an existing structure and is fixed to the underframe 10 by bolts or welding.
[0057] Please see Figure 6 and Figure 8 To prevent the first telescopic member 30 from swaying significantly within the receiving cavity during the transfer of the building construction scaffold, top rods 16 are threadedly connected to the two side walls of the receiving cavity opposite to the first telescopic member 30 (i.e., the left and right side walls of the receiving cavity). When in the folded state, the top rods 16 abut against the first telescopic member 30.
[0058] The position of the push rod 16 can be adjusted by screwing it in or out. When in the folded state, the first telescopic member 30 is housed in the receiving cavity, and the push rod 16 is tightened so that its end abuts against the surface of the first telescopic member 30. The push rod 16 can press the first telescopic member 30 to prevent it from shaking or shifting in the receiving cavity, ensuring stability during transportation and reducing component wear and noise.
[0059] Please see Figure 1 , Figure 4 and Figure 5 The boom 40 has a groove at the end away from its hinge point with the support arm 20. The building construction scaffold also includes a slide rod 70, which slides in conjunction with the groove. A hook 41 is located at the end of the slide rod 70 away from the boom 40 via a connector, allowing adjustment of the extension length of the slide rod 70. The movement of the slide rod 70 can be adjusted manually or driven by a drive structure (such as an electric telescopic rod).
[0060] Please see Figure 1 , Figure 4 and Figure 5 The slide rod 70 has multiple third mounting holes along its length, and the side wall of the slide groove has multiple fourth mounting holes that penetrate its own wall thickness. Second limiting pins 71 are detachably installed in the third mounting holes and the corresponding fourth mounting holes. When the slide rod 70 slides to the desired position, the third mounting holes align with the corresponding fourth mounting holes, and the second limiting pins 71 (such as spring pins or bolts) can be inserted to fix the position of the slide rod 70.
[0061] A fifth mounting hole is provided at the end of the slide rod 70 away from the boom 40. The hook 41 is mounted in the fifth mounting hole via a detachable second movable shaft 72, and the slide rod 70 forms the connecting part. When in the folded state, the hook 41 is removed, and the end of the slide rod 70 can be connected to the fixed seat 13. The second movable shaft 72 is removed from the hook 41 and inserted into the fifth mounting hole of the fixed seat 13 and the slide rod 70, connecting the slide rod 70 to the fixed seat 13. Using the same second movable shaft 72 to connect the hook 41 or the fixed seat 13 simplifies the hanger structure, reduces the number of parts, and lowers costs and maintenance difficulty.
[0062] The second telescopic member 50, hinged to the boom 40, has a third movable shaft at one end. This third movable shaft is detachably mounted, and its arrangement is similar to that of the first movable shaft, so it will not be described further here. When the second telescopic member 50 affects the folding of the hanger, the third movable shaft can be removed. The boom 40 has a storage cavity on its side adjacent to the support arm 20. When folded, the second telescopic member 50 is at least partially housed within this cavity, further compressing the volume of the folded hanger. The second telescopic member 50 can be temporarily secured to the support arm 20 using ropes, cable ties, or similar means.
[0063] It is understood that the parts in the above embodiments can be freely combined or deleted to form different combined embodiments. The specific contents of each combined embodiment will not be repeated here. After this description, it can be considered that the present utility model specification has recorded each combined embodiment and can support different combined embodiments.
[0064] The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.
Claims
1. A building construction scaffold, characterized in that, include: The base frame (10) has three or more casters (11) at the bottom. A handle (12) is provided on one side of the base frame (10). A receiving cavity is provided on the upper part of the base frame (10), and a fixed seat (13) is provided on one side of the receiving cavity. A support arm (20) is provided on the side of the receiving cavity opposite to the fixed seat (13), and its bottom is hinged to the base frame (10); The first telescopic member (30) is hinged at one end to the inner wall of the receiving cavity and at the other end to the support arm (20) via a detachable first movable shaft. A boom (40), one end of which is hinged to the top of the support arm (20), and the other end of which is connected to a hook (41), the boom (40) having a connecting part detachably connected to the fixed base (13); and The second telescopic member (50) is hinged at one end to the support arm (20) and at the other end to the boom (40); The building construction scaffold has a folded state. When it is in the folded state, the first movable shaft is removed, the first telescopic member (30) can rotate around its hinge axis with the base frame (10) into the receiving cavity, and the support arm (20) can rotate around its hinge axis with the base frame (10) to make the connecting part reach the connection position with the fixed seat (13).
2. The building construction scaffolding according to claim 1, characterized in that, The base frame (10) is provided with mounting plates (14) on both sides respectively, and the mounting plates (14) are provided with a plurality of first mounting holes (141) at intervals along their own circumference. The building construction scaffold also includes two opposing legs (60), each leg (60) corresponding to a mounting plate (14) and capable of rotating around the axis of the corresponding mounting plate (14). Each leg (60) has a second mounting hole, and a first limiting pin (61) is detachably provided in the second mounting hole and the corresponding first mounting hole (141). The bottom of each leg (60) is provided with a moving wheel (11).
3. The building construction scaffolding according to claim 1, characterized in that, A traction bracket (15) is also provided on one side of the base frame (10).
4. The building construction scaffolding according to claim 1, characterized in that, The receiving cavity is threaded with top rods (16) on both sides opposite to the first telescopic member (30). When in the folded state, the top rods (16) abut against the first telescopic member (30).
5. The building construction scaffolding according to claim 1, characterized in that, The boom (40) has a sliding groove at the end away from the hinged part with the support arm (20). The building construction hoist also includes a sliding rod (70), which slides in conjunction with the sliding groove. The hook (41) is located at the end of the sliding rod (70) away from the boom (40).
6. The building construction scaffolding according to claim 5, characterized in that, The slide rod (70) has multiple third mounting holes along its length, and the side wall of the slide groove has multiple fourth mounting holes that penetrate its own wall thickness. The third mounting holes and the corresponding fourth mounting holes are detachably provided with second limiting pins (71).
7. The building construction scaffolding according to claim 5, characterized in that, The slide rod (70) has a fifth mounting hole at the end away from the boom (40), and the hook (41) is provided in the fifth mounting hole through a detachable second movable shaft (72). The slide rod (70) constitutes the connecting part. When in the folded state, the hook (41) is removed, and the second movable shaft (72) is connected to the fixed seat (13) and the slide rod (70).
8. The building construction scaffolding according to claim 1, characterized in that, The second telescopic member (50) is provided with a third movable shaft at one end where it is hinged to the boom (40).
9. The building construction scaffolding according to claim 8, characterized in that, The boom (40) has a storage cavity on the side adjacent to the support arm (20). When in the folded state, the second telescopic member (50) is at least partially housed in the storage cavity.
10. The building construction scaffolding according to claim 1, characterized in that, The grip handle (12) is provided in two opposite directions.