A quick clamp conductive tool for hard chrome plating of shock absorber piston rod

CN224901599UActive Publication Date: 2026-10-27JINZHOU WANYOU MECHANICAL PARTS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522566062.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-03
Publication Date
2026-10-27
Estimated Expiration
2035-12-03

AI Technical Summary

Technical Problem

在传统的电镀生产线中,上导电基本采用的都是螺纹拧紧配合方式进行导电,此种导电方式人工上件劳动强度大,拧紧配合程度和人为的拧紧程度直接相关,经常出现电击伤或者导电不良的质量问题

Benefits of technology

[0028]本实用新型提供的用于减震器活塞杆镀硬铬的快夹导电工装,能够实现减震器活塞杆的快速装夹,提高减震器活塞杆工件的上件效率,降低人工劳动强度。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224901599U_ABST
    Figure CN224901599U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of for shock absorber piston rod hard chromium plating fast clamping electrically conductive tool, comprising: clamping rod, it includes first clamping arm and second clamping arm, first clamping arm and second clamping arm symmetrically set;Wherein, one end of first clamping arm and second clamping arm is fixedly connected, and the other end is free end;First connecting hole, it is set on first clamping arm, and it is close to the free end of first clamping arm setting;Second connecting hole, it is set on second clamping arm, and second connecting hole is coaxially arranged with first connecting hole;Wherein, second connecting hole is screw hole;Shielding cover, it is coaxially sleeved on clamping rod;First through-hole and second through-hole are set on shielding cover, and the position of first through-hole and second through-hole respectively with first connecting hole and second connecting hole corresponding;Connecting bolt, screw rod passes through first through-hole and first connecting hole in turn, and is connected on second connecting hole by screw thread.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of shock absorber piston rod electroplating technology, and specifically relates to a quick-clamp conductive tooling for hard chrome plating of shock absorber piston rods. Background Technology

[0002] In piston rod hard chrome plating production lines, there are two types based on the conductivity method: top conductivity and bottom conductivity. In traditional plating production lines, top conductivity is basically achieved through a threaded tightening connection. This method involves manual loading, which is labor-intensive, and the tightness of the tightening is directly related to the degree of manual tightening, often resulting in quality problems such as electric shock or poor conductivity. Utility Model Content

[0003] The purpose of this invention is to provide a quick-clamp conductive tooling for hard chrome plating of shock absorber piston rods, which enables rapid clamping of shock absorber piston rods, improves the loading efficiency of shock absorber piston rod workpieces, and reduces manual labor intensity.

[0004] The technical solution provided by this utility model is as follows:

[0005] A quick-clamp conductive tooling for hard chrome plating of shock absorber piston rods, comprising:

[0006] A clamping rod, comprising a first clamping arm and a second clamping arm, wherein the first clamping arm and the second clamping arm are symmetrically arranged;

[0007] Wherein, one end of the first clamping arm and the second clamping arm are fixedly connected, and the other end is a free end;

[0008] A first connecting hole is formed on the first clamping arm and is located near the free end of the first clamping arm;

[0009] The second connecting hole is formed on the second clamping arm, and the second connecting hole is coaxially arranged with the first connecting hole;

[0010] The second connecting hole is a threaded hole;

[0011] A shielding cover is coaxially sleeved on the clamping rod; the shielding cover has a first through hole and a second through hole, the positions of the first through hole and the second through hole corresponding to the first connecting hole and the second connecting hole, respectively.

[0012] The connecting bolt has its thread passing through the first through hole and the first connecting hole in sequence, and is connected to the second connecting hole by threads.

[0013] Preferably, the clamping rod is cylindrical in shape, and a slot is cut along the axial symmetry plane of the clamping rod to divide one end of the clamping rod into the first clamping arm and the second clamping arm.

[0014] Preferably, a first groove is formed on the side of the first clamping arm facing the second clamping arm along the central axis; one end of the first groove is located at the free end of the first clamping arm, and the other end extends to the first connecting hole; the cross-section of the first groove is arc-shaped and matches the size of the threaded end of the piston rod workpiece.

[0015] The second clamping arm has a second groove, which is symmetrically arranged with the first groove.

[0016] Preferably, the quick-clamp conductive tooling for hard chrome plating of the shock absorber piston rod further includes:

[0017] The connecting rod, which is a threaded rod, is coaxially fixedly connected to the clamping rod and is located at the connection end of the first clamping arm and the first clamping arm;

[0018] The diameter of the connecting rod is smaller than the diameter of the clamping rod.

[0019] Preferably, the shielding cover is cylindrical; and the shielding cover has at least one row of circular holes, which are evenly spaced along the circumference of the shielding cover.

[0020] The circular hole is located at one end near the shielding cover.

[0021] Preferably, a baffle is provided inside the shielding cover, the baffle being circular and coaxially arranged with the shielding cover;

[0022] The outer edge of the baffle is fixedly connected to the inner wall of the shield, and the diameter of the central through hole of the baffle matches the diameter of the threaded end of the piston rod workpiece.

[0023] Preferably, the baffle is positioned close to the circular hole.

[0024] Preferably, the distance between the baffle and the central axis of the first through hole is greater than the distance between the free end of the first clamping arm and the central axis of the first connecting hole.

[0025] Preferably, the diameter of the circular hole is 12 mm.

[0026] Preferably, the head of the connecting bolt is equipped with a handle.

[0027] The beneficial effects of this utility model are:

[0028] The quick-clamp conductive tooling for hard chrome plating of shock absorber piston rods provided by this utility model can realize the rapid clamping of shock absorber piston rods, improve the loading efficiency of shock absorber piston rod workpieces, and reduce the intensity of manual labor. Attached Figure Description

[0029] Figure 1 This is a schematic diagram of the structure of the clamping rod and the connecting bolt described in this utility model.

[0030] Figure 2 This is a front view of the clamping rod and connecting bolt mating structure described in this utility model.

[0031] Figure 3 This is a bottom view of the clamping rod and connecting bolt mating structure described in this utility model.

[0032] Figure 4 This is a schematic diagram of the structure of the shielding cover described in this utility model.

[0033] Figure 5 This is a front view of the shielding cover described in this utility model.

[0034] Figure 6 This is a bottom view of the shielding cover described in this utility model.

[0035] Figure 7 This is a photograph of the actual clamping rod described in this utility model.

[0036] Figure 8 This is a photograph showing the working state of the quick-clamp conductive tooling with hard chrome plated piston rod of the shock absorber described in this utility model. Detailed Implementation

[0037] The present invention will now be described in further detail with reference to the accompanying drawings, so that those skilled in the art can implement it based on the description.

[0038] like Figure 1-8 As shown, this utility model provides a quick-clamp conductive tooling for hard chrome plating of shock absorber piston rods, including: a clamping rod 100, a shielding cover 200, and a connecting bolt 300.

[0039] The clamping rod 100 includes a first clamping arm 110 and a second clamping arm 120, which are symmetrically arranged. One end of the first clamping arm 110 and the second clamping arm 120 are fixedly connected, while the other end is a free end.

[0040] In this embodiment, the clamping rod 100 is cylindrical in shape, and an elongated slot is cut along the axial symmetry plane of the clamping rod 100 to divide one end of the clamping rod 100 into a first clamping arm 110 and a second clamping arm 120. The thickness of the elongated slot, i.e., the gap between the first clamping arm 110 and the second clamping arm 120, is 4 mm; the length of the unslotted portion of the clamping rod 100 is at least 10 mm.

[0041] A first connecting hole 111 is formed on the first clamping arm 110 and is located near the free end of the first clamping arm 110. The first connecting hole 111 is formed radially along the clamping rod 100 and along the thickness direction of the elongated groove. A second connecting hole 121 is formed on the second clamping arm 120 and is coaxially arranged with the first connecting hole 111; wherein, the second connecting hole 121 is a threaded hole.

[0042] The shield 200 is coaxially sleeved on the clamping rod 100; the shield 200 has a first through hole 210 and a second through hole 220, the first through hole 210 and the second through hole 220 are coaxial, and the positions of the first through hole 210 and the second through hole 220 correspond to the first connecting hole 111 and the second connecting hole 121, respectively.

[0043] The connecting bolt 300 thread passes through the first through hole 210 and the first connecting hole 111 in sequence, and is threaded onto the second connecting hole 121. The free end of the thread passes through the second through hole 220 and extends to the outside of the second through hole 220.

[0044] As a preferred embodiment, the head of the connecting bolt 300 is equipped with a handle to facilitate tightening the connecting bolt 300. The handle may be made of thermosetting plastic or thermoplastic plastic.

[0045] A first groove 112 is formed along the central axis on the side of the first clamping arm 110 facing the second clamping arm 120. One end of the first groove 112 is located at the free end of the first clamping arm 110, and the other end extends to the first connecting hole 111. The cross-section of the first groove 112 is arc-shaped and matches the size of the threaded end of the piston rod workpiece to be clamped. A second groove 122 is formed on the second clamping arm 120, and the second groove 122 and the first groove 112 are symmetrically arranged about the central axis of the clamping rod 100.

[0046] The quick-clamp conductive tooling for hard chrome plating of the shock absorber piston rod further includes a connecting rod 400, which is a threaded rod coaxially fixedly connected to the clamping rod 100 and located at the connection end of the first clamping arm 110 and the first clamping arm 120 (i.e., the unslotted end of the clamping rod 100). The diameter of the connecting rod 400 is smaller than the diameter of the clamping rod 100. The connecting rod 400 is threadedly connected to the conductive seat of the electroplating equipment.

[0047] Preferably, the shielding cover 200 has at least one row of circular holes 230, with the holes 230 in the same row evenly spaced along the circumference of the shielding cover 200. The circular holes 230 are located close to the lower end of the shielding cover 200. In this embodiment, the diameter of the circular holes 230 is set to 12mm. By providing the circular holes 230, electric field lines can be shielded, resulting in a more uniform plating thickness on the electroplated product. Figure 8 As shown, in one embodiment, two rows of circular holes are provided, which are arranged along the circumference of the shield and are located near the lower end of the shield.

[0048] A baffle 240 is provided inside the shielding cover 200. The baffle 240 is annular and coaxially arranged with the shielding cover 200. The outer edge of the baffle 240 is fixedly connected to the inner wall of the shielding cover 200. The diameter of the central through hole 241 of the baffle 240 matches the diameter of the threaded end of the piston rod workpiece to be clamped. The baffle 240 is located above and close to the circular hole 230. The distance between the baffle 240 and the central axis of the first through hole 210 is greater than the distance between the free end of the first clamping arm 110 and the central axis of the first connecting hole 111. In this embodiment, the thickness of the baffle 240 is set to 5 mm.

[0049] In use, the baffle 240 is positioned below the free ends of the first clamping arm 110 and the second clamping arm 120. The threaded end of the piston rod workpiece to be clamped passes through the central through hole 221 of the baffle 240 and is inserted between the first groove 112 and the second groove 122. By tightening the connecting bolt 300, the piston rod workpiece is fixedly clamped between the first clamping arm 110 and the second clamping arm 120, thus completing the loading process.

[0050] The quick-clamp conductive tooling for hard chrome plating of shock absorber piston rods provided by this utility model can realize the quick clamping of shock absorber piston rods, which not only improves loading efficiency and reduces manual labor intensity, but also solves the quality problem of inconsistent conductivity, while avoiding the problem of electric shock.

[0051] Although the embodiments of this utility model have been disclosed above, they are not limited to the applications listed in the specification and embodiments. They can be applied to various fields suitable for this utility model. For those skilled in the art, other modifications can be easily made. Therefore, without departing from the general concept defined by the claims and their equivalents, this utility model is not limited to the specific details and the illustrations shown and described herein.

Claims

1. A quick-clamp conductive tooling for hard chrome plating of shock absorber piston rods, characterized in that, include: A clamping rod, comprising a first clamping arm and a second clamping arm, wherein the first clamping arm and the second clamping arm are symmetrically arranged; Wherein, one end of the first clamping arm and the second clamping arm are fixedly connected, and the other end is a free end; A first connecting hole is formed on the first clamping arm and is located near the free end of the first clamping arm; The second connecting hole is formed on the second clamping arm, and the second connecting hole is coaxially arranged with the first connecting hole; The second connecting hole is a threaded hole; A shielding cover is coaxially sleeved on the clamping rod; the shielding cover has a first through hole and a second through hole, the positions of the first through hole and the second through hole corresponding to the first connecting hole and the second connecting hole, respectively. The connecting bolt has its thread passing through the first through hole and the first connecting hole in sequence, and is connected to the second connecting hole by threads.

2. The quick-clamp conductive tooling for hard chrome plating of a shock absorber piston rod according to claim 1, characterized in that, The clamping rod is cylindrical in shape, and a slot is cut along the axial symmetry plane of the clamping rod to divide one end of the clamping rod into the first clamping arm and the second clamping arm.

3. The quick-clamp conductive tooling for hard chrome plating of a shock absorber piston rod according to claim 2, characterized in that, A first groove is formed on the side of the first clamping arm facing the second clamping arm along the central axis; one end of the first groove is located at the free end of the first clamping arm, and the other end extends to the first connecting hole; the cross-section of the first groove is arc-shaped and matches the size of the threaded end of the piston rod workpiece. The second clamping arm has a second groove, which is symmetrically arranged with the first groove.

4. The quick-clamp conductive tooling for hard chrome plating of a shock absorber piston rod according to claim 3, characterized in that, Also includes: The connecting rod, which is a threaded rod, is coaxially fixedly connected to the clamping rod and is located at the connection end of the first clamping arm and the first clamping arm; The diameter of the connecting rod is smaller than the diameter of the clamping rod.

5. The quick-clamp conductive tooling for hard chrome plating of a shock absorber piston rod according to claim 3 or 4, characterized in that, The shielding cover is cylindrical; and the shielding cover has at least one row of circular holes, which are evenly spaced along the circumference of the shielding cover. The circular hole is located at one end near the shielding cover.

6. The quick-clamp conductive tooling for hard chrome plating of a shock absorber piston rod according to claim 5, characterized in that, The shielding cover is provided with a baffle plate, which is circular and coaxial with the shielding cover. The outer edge of the baffle is fixedly connected to the inner wall of the shield, and the diameter of the central through hole of the baffle matches the diameter of the threaded end of the piston rod workpiece.

7. The quick-clamp conductive tooling for hard chrome plating of a shock absorber piston rod according to claim 6, characterized in that, The baffle is positioned close to the circular hole.

8. The quick-clamp conductive tooling for hard chrome plating of a shock absorber piston rod according to claim 7, characterized in that, The distance between the baffle and the central axis of the first through hole is greater than the distance between the free end of the first clamping arm and the central axis of the first connecting hole.

9. The quick-clamp conductive tooling for hard chrome plating of a shock absorber piston rod according to claim 8, characterized in that, The diameter of the circular hole is 12mm.

10. The quick-clamp conductive tooling for hard chrome plating of a shock absorber piston rod according to claim 9, characterized in that, The head of the connecting bolt is equipped with a handle.