Laundry treating apparatus

CN224901784UActive Publication Date: 2026-10-27BEIJING XIAOMI MOBILE SOFTWARE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522111847.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-09-29
Publication Date
2026-10-27
Estimated Expiration
2035-09-29

AI Technical Summary

Technical Problem

[0003]然而,相关技术中,电解装置的电解水效果欠佳,影响衣物处理效果

Benefits of technology

[0059]本实施例中通过在第一电极片和第二电极片之间设置质子膜,由于质子膜不导电且能够传递质子,可以防止第一电极片和第二电极片接触短路,减小第一电极片和第二电极片之间的间距,进而减少能耗,提高电解效率。而且通过在第一电极片和第二电极片中的至少一个电极片设有沿第一方向贯通的连通孔,使得电解腔内的电解液可以扩散至电极片和质子膜之间,使电解反应持续进行并带走电解产物,进一步提高电解效率。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224901784U_ABST
    Figure CN224901784U_ABST
Patent Text Reader

Abstract

The present disclosure relates to the technical field of clothes treatment, and particularly relates to a clothes treatment device. The clothes treatment device comprises a cabinet, a treatment drum, a box, a water valve, a first water path, a second water path and an electrolytic device. The treatment drum is arranged in the cabinet and has a treatment cavity. The box is arranged in the cabinet and has a detergent cavity. The water valve is arranged in the cabinet. The inlet of the first water path and the inlet of the second water path are both communicated with the water valve. The water valve is used for supplying water with different flow rates to the first water path and the second water path. The water flow rate of the first water path is less than that of the second water path. The first water path and the second water path are both communicated with the treatment cavity. The electrolytic device is arranged in the first water path or a water path communicated with the first water path. The clothes treatment device of the present disclosure can improve the electrolysis efficiency of the electrolytic device, and further improve the clothes treatment effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This disclosure relates to the field of clothing processing technology, specifically to a clothing processing device. Background Technology

[0002] Clothing treatment equipment such as washing machines and washer-dryer combos incorporate an electrolysis device to electrolyze water in order to sterilize and disinfect the clothes inside the drum, increase the washing ratio, prevent color bleeding, bleach white clothes, and clean the drum. This electrolysis generates hydroxyl radicals and / or ozone, which have strong oxidizing activity, within the drum.

[0003] However, in related technologies, the electrolysis effect of the electrolysis device is not good, which affects the treatment effect of clothing. Utility Model Content

[0004] This disclosure aims to at least partially address one of the technical problems in the related art. To this end, embodiments of this disclosure provide a garment treatment apparatus that can improve the electrolysis efficiency of the electrolysis device, thereby improving the garment treatment effect.

[0005] The garment processing device of this disclosure includes: a housing; a processing cylinder disposed within the housing and having a processing chamber; a detergent box disposed within the housing and having a detergent chamber; a water valve disposed within the housing; a first water passage and a second water passage, the inlet of the first water passage and the inlet of the second water passage being connected to the water valve, the water valve being used to supply water of different flow rates to the first water passage and the second water passage, the water flow rate of the first water passage being less than the water flow rate of the second water passage, the first water passage and the second water passage being connected to the processing chamber; and an electrolysis device disposed within the first water passage or within a water passage connected to the first water passage.

[0006] The clothing treatment device of this embodiment supplies water at different flow rates to a first water path and a second water path via a water valve. An electrolysis device is located in the first water path or in a water path connected to the first water path. The electrolysis device electrolyzes the water entering the device, and the electrolyzed electrolyte enters the treatment chamber. In other words, the electrolysis device can electrolyze the water before it enters the treatment chamber, achieving flow-through electrolysis. Moreover, the water flow rate of the first water path is less than that of the second water path, which can prolong the residence time of the water in the electrolysis device, making the electrolysis reaction more complete, improving the electrolysis efficiency of the electrolysis device, and thus improving the clothing treatment effect.

[0007] In some embodiments, the first water path and the second water path are independent of each other, the electrolysis device is disposed in the first water path, and the second water path is connected to the detergent chamber.

[0008] In this embodiment, by making the first water path and the second water path independent of each other, it is convenient to adjust the water flow rate of the first water path and the water flow rate of the second water path respectively. This makes it easy to install the electrolysis device in the first water path with a small flow rate and use the water in the second water path with a large flow rate to rinse the detergent, thereby improving the electrolysis efficiency of the electrolysis device and the detergent dosing efficiency.

[0009] In some embodiments, the first water passage is at least partially located in the material box, and the material box is located downstream of the electrolysis device in the direction of water flow of the first water passage.

[0010] In this embodiment, by placing the material box downstream of the electrolysis device in the direction of water flow in the first water path, the electrolysis device is located between the water valve and the material box. This allows full utilization of the space between the water valve and the material box for installing the electrolysis device. Furthermore, by placing at least part of the first water path in the material box, the internal space of the material box can be used to form part of the first water path, reducing additional piping and improving structural compactness.

[0011] In some embodiments, the garment processing equipment further includes a mounting bracket disposed within the housing, and the electrolysis device is mounted on the mounting bracket. The mounting bracket on the housing prevents vibrations and shaking during equipment operation from being directly transmitted to the electrolysis device, and also prevents friction between the electrolysis device and the housing during operation, thereby improving the stability and service life of the electrolysis device.

[0012] In some embodiments, the mounting bracket is detachably connected to the housing, facilitating the disassembly and assembly of the electrolysis device and improving maintenance convenience. Furthermore, mounting brackets of different sizes can be used to accommodate electrolysis devices of varying sizes, allowing the device to be mounted on the housing and further enhancing installation ease.

[0013] In some embodiments, the mounting bracket has a connecting portion and a mounting portion that are connected to each other. The connecting portion is connected to the housing, and the mounting portion is used to mount the electrolysis device. The connecting portion connects the mounting bracket to the housing, and the mounting portion connects the electrolysis device to the mounting bracket, thereby achieving the connection between the electrolysis device and the housing.

[0014] In some embodiments, the mounting portion is lower than the connecting portion. By setting the mounting portion lower than the connecting portion, it is easier to reserve installation space for the electrolysis device, thereby allowing the electrolysis device to be lower than, flush with, or slightly protruding from the mounting portion, thus avoiding interference with the installation of the top plate of the garment processing equipment.

[0015] In some embodiments, the top of the inner wall of the housing has a flange, and the connecting portion is connected to the flange. The flange facilitates the connection between the top of the housing and the connecting portion, thereby avoiding the need for openings in the inner wall of the housing and improving the layout rationality of the mounting bracket.

[0016] In some embodiments, the mounting portion includes a clearance portion for avoiding the inlet and outlet of the electrolysis device. The inlet and outlet of the electrolysis device pass through the mounting bracket via the clearance portion, improving the ease of connection between the electrolysis device and the pipeline. Furthermore, the clearance portion can provide positioning for the installation of the electrolysis device, further enhancing its ease of installation.

[0017] In some embodiments, the mounting bracket includes a first plate, a second plate, and a third plate, the second plate extending vertically, the first plate extending from the upper end of the second plate toward the inner wall surface of the housing, and the third plate extending from the lower end of the second plate in a direction away from the inner wall surface of the housing. At least one of the first plate and the second plate forms the connecting portion, and the third plate forms the mounting portion.

[0018] This embodiment, through the sequential connection of a first plate, a second plate, and a third plate, utilizes the first plate extending towards the housing to form a connecting portion, thereby increasing the contact area between the housing's flange and the first plate, and improving the stability of the connection between the first plate and the housing. The second plate extending vertically increases the contact area between the second plate and the inner wall of the housing, improving the stability of the connection between the mounting bracket and the housing. The third plate extending away from the housing facilitates the installation of the electrolysis device, improving the ease of installation.

[0019] In some embodiments, the second plate has a first snap-fit ​​portion, and the inner wall surface of the housing is disposed on the second snap-fit ​​portion, wherein the first snap-fit ​​portion and the second snap-fit ​​portion engage in a snap-fit ​​relationship. The first and second snap-fit ​​portions facilitate the installation of the mounting bracket onto the housing via a snap-fit ​​mechanism, achieving convenient installation while simultaneously enabling the positioning of the mounting bracket, thus improving installation efficiency and accuracy.

[0020] In some embodiments, the first water passage is at least partially located in the material box, and the electrolysis device is located in the portion of the first water passage in the material box.

[0021] In this embodiment, by placing at least a portion of the first water path in the material box and the electrolysis device in the portion of the first water path within the material box, the internal space of the material box can be used to form part of the first water path, reducing the need for additional pipe layout, making reasonable use of the space inside the casing, and improving the rationality of the layout and the compactness of the structure.

[0022] In some embodiments, the first water channel is independent of the material box.

[0023] In this embodiment, by making the first water path and the material box independent of each other, the electrolysis device is only located in the first water path and the material box is only located in the second water path, so that the detergent and electrolyte can be dispensed simultaneously and independently. Moreover, the water flow rate of the first water path is less than that of the second water path. The electrolysis device is located in the low-flow-rate first water path, and the detergent chamber is connected to the high-flow-rate second water path, which improves the electrolysis efficiency while ensuring the dispensing efficiency.

[0024] In some embodiments, the second water passage is at least partially located in the feed box.

[0025] In this embodiment, by at least partially placing the second water path in the detergent box, the space inside the detergent box can be used to form part of the second water path, reducing the need for additional piping, improving structural compactness, and facilitating the connection between the second water path and the detergent chamber, thereby improving the detergent dispensing efficiency.

[0026] In some embodiments, the container includes a housing and a dispensing box, the detergent chamber is formed in the dispensing box, the housing has a receiving cavity, and the dispensing box is disposed in the receiving cavity and movable relative to the housing; or, the container includes a housing, and the detergent chamber is formed in the housing.

[0027] In this embodiment, by placing the feed box inside the receiving cavity and making it movable relative to the outer shell, it is convenient for the user to pull out the feed box from the front of the clothing processing equipment to add detergent into the detergent chamber. Alternatively, by forming the detergent chamber in the outer shell, the space in the height direction of the feed box can be fully utilized, thereby improving space utilization.

[0028] In some embodiments, the housing includes a bottom shell and an upper shell, the upper shell being snapped onto the bottom shell to form the receiving cavity or detergent cavity.

[0029] In this embodiment, by fastening the upper shell to the lower shell to form a receiving cavity or detergent cavity, space can be utilized more effectively while maintaining the clarity and orderliness of the internal structure of the container.

[0030] In some embodiments, the container further includes a top cover that covers the upper shell and defines, together with the upper shell, at least a portion of the first water passage in the container and / or a portion of the second water passage in the container.

[0031] In this embodiment, when the material box is only located in the first water channel, the top cover and the upper shell define at least a portion of the first water channel located in the material box. When the material box is located in both the first and second water channels, the top cover and the upper shell define at least a portion of the first water channel located in the material box and a portion of the second water channel located in the material box. When the material box is only located in the second water channel, the top cover and the upper shell define a portion of the second water channel located in the material box. By setting the top cover and the upper shell, the space inside the material box is fully utilized to form a portion of the first water channel and / or a portion of the second water channel, reducing the pipe arrangement of the first and / or second water channels and improving the rationality of the layout and the compactness of the structure.

[0032] In some embodiments, the detergent dispenser has a first liquid inlet channel disconnected from the detergent chamber, the first liquid inlet channel communicating with the receiving chamber, and the first liquid inlet channel and the receiving chamber forming at least a portion of the first water path disposed in the detergent dispenser.

[0033] In this embodiment, by disconnecting the first liquid inlet channel from the detergent chamber and connecting it to the receiving chamber, the first liquid inlet channel and the detergent chamber are independent of each other, and the detergent and the electrolyte in the first liquid inlet channel flow separately, so as to realize the synchronous and independent dispensing of detergent and electrolyte. Moreover, the first liquid inlet channel and the receiving chamber form a first water path in at least part of the material box, which further improves the space utilization rate in the material box.

[0034] In some embodiments, the material box further has a discharge port and a discharge port, the discharge port being connected to the receiving cavity and the first liquid inlet channel, and the discharge port being connected to the receiving cavity and connected to the processing cavity via a second connecting pipe.

[0035] In this embodiment, the connection between the first liquid inlet channel and the receiving cavity is achieved through the setting of the discharge port, and the connection between the receiving cavity and the processing cavity is achieved through the setting of the discharge port and the second connecting pipe, thereby realizing the connection between the first liquid inlet channel and the processing cavity.

[0036] In some embodiments, at least a portion of the electrolysis device is disposed within the first liquid inlet channel. By disposing at least a portion of the electrolysis device within the first liquid inlet channel, it facilitates the electrolysis of water within the first liquid inlet channel.

[0037] In some embodiments, the feed box further includes a second liquid inlet channel, which communicates with the detergent chamber and forms part of the second water path in the feed box.

[0038] In this embodiment, by connecting the second liquid inlet channel to the detergent chamber, the water flow in the second liquid inlet channel can flush the detergent. The large flow of water in the second liquid inlet channel enables the detergent and water to mix quickly and evenly, thereby improving the dispensing efficiency.

[0039] In some embodiments, the second liquid inlet channel has a liquid outlet, which is connected to the processing chamber via a first connecting pipe. This establishes communication between the second liquid inlet channel and the processing chamber.

[0040] In some embodiments, the feed box is provided with a feed inlet, which is connected to the second liquid inlet channel and the detergent chamber, and the detergent in the detergent chamber enters the second liquid inlet channel through the feed inlet.

[0041] In this embodiment, the detergent chamber and the second liquid inlet channel are connected by the setting of the feed inlet, thereby enabling the detergent in the detergent chamber to be transported to the second liquid inlet channel and mixed with the water in the second liquid inlet channel.

[0042] In some embodiments, the electrolysis device is disposed on the material box, the electrolysis device has an electrolysis chamber, the material box has an inlet channel and an outlet channel, the material box is also provided with a first water inlet and a first water outlet, the first water inlet is connected to the inlet channel and the electrolysis chamber, and the first water outlet is connected to the outlet channel and the electrolysis chamber.

[0043] In this embodiment, the electrolysis device is placed on the material box, so that the water in the first water channel enters the material box through the liquid inlet channel. The water in the liquid inlet channel enters the electrolysis chamber of the electrolysis device through the first water inlet on the material box, and electrolysis occurs in the electrolysis chamber. Electrolysis produces an electrolyte that generates strong oxidizing active products such as hydroxyl radicals and / or ozone. The electrolyte enters the liquid outlet channel through the first water outlet channel and then enters the treatment chamber of the treatment cylinder. It is used for sterilization and disinfection of clothing, increasing the washing ratio, preventing color bleeding, etc., and improving the treatment effect of clothing.

[0044] In some embodiments, the garment processing device further includes a collecting water channel, wherein the outlets of the first water channel and the second water channel are both connected to the processing chamber through the collecting water channel, and the electrolysis device is disposed in the first water channel or in the collecting water channel.

[0045] In this embodiment, the inlet of the first water path and the inlet of the second water path are both connected to a water valve, and the outlet of the first water path and the outlet of the second water path are both connected to a collecting water path. The collecting water path is connected to the treatment chamber, which facilitates the separate control of the first water path and the second water path. The water flow rate in the collecting water path can be adjusted as needed to meet the water intake requirements under different working conditions such as electrolysis, spraying, or detergent dosing.

[0046] In some embodiments, the electrolysis device is located upstream of the material box in the direction of water flow; or, the electrolysis device is disposed on the material box.

[0047] In this embodiment, the electrolysis device is located upstream of the material box in the direction of water flow, or the electrolysis device is placed on the material box. This makes it convenient to install the electrolysis device between the material box and the water valve, or to install the electrolysis device on the material box. This allows for flexible determination of the installation position of the electrolysis device based on the space available in the garment processing equipment.

[0048] In some embodiments, at least a portion of the water collection path is located in the material box.

[0049] This embodiment incorporates at least a portion of the water collection path within the material box, allowing water to flow out of the material box. This facilitates the use of the existing pipes between the material box and the treatment cylinder, reducing the need for pipework in the water collection path while simultaneously enabling detergent dispensing.

[0050] In some embodiments, the connection between the first water path and the collecting water path and / or the connection between the second water path and the collecting water path is inside the material box; or, the connection between the first water path and the collecting water path and / or the connection between the second water path and the collecting water path is located upstream of the material box in the water flow direction.

[0051] In this embodiment, the connection between the water path and the collecting water path is located inside the material box or upstream of the material box, so that at least part of the collecting water path flows through the material box. This facilitates the use of the existing pipes between the material box and the treatment cylinder, reducing the pipe layout of the collecting water path while enabling detergent dispensing.

[0052] In some embodiments, the water valve includes a first water valve and a second water valve. The outlet of the first water valve is connected to the inlet of the first water passage, and the outlet of the second water valve is connected to the inlet of the second water passage. The rated outlet flow rate of the first water valve is less than the rated outlet flow rate of the second water valve. The first water valve is connected to the first water passage to supply water, and the second water valve is connected to the second water passage to supply water, facilitating the supply of water at different flow rates to the first and second water passages.

[0053] In some embodiments, the rated outflow rate of the first water valve is 2-4 L / min. In this embodiment, by limiting the rated outflow rate of the first water valve, the residence time of water in the electrolysis chamber is extended, the electrolysis reaction is more complete, and the electrolysis effect of the electrolysis device is improved.

[0054] In some embodiments, the rated outflow rate of the second water valve is 7-9 L / min.

[0055] In this embodiment, the rated outflow rate of the second water valve is limited to meet the high flow rate requirement of the treatment cylinder, thereby improving the detergent dosing efficiency and spray uniformity.

[0056] In some embodiments, the electrolysis device includes a first electrode plate, a second electrode plate, a first connector, and a second connector. The first electrode plate and the second electrode plate are stacked in a first direction. The first connector and the second connector both pass through the first electrode plate and the second electrode plate along the first direction. One end of the first connector extends out of the electrolysis cavity to form a first terminal. The first connector is in conductive contact with the first electrode plate. One end of the second connector extends out of the electrolysis cavity to form a second terminal. The second connector is in conductive contact with the second electrode plate.

[0057] In this embodiment, by having both the first and second connectors pass through the first and second electrode plates along a first direction, it facilitates the installation of the first and second electrode plates. One end of the first connector extends out of the electrolysis cavity to form a first terminal, and one end of the second connector extends out of the electrolysis cavity to form a second terminal. The first electrode plate is energized through conductive contact with the first connector, and the second electrode plate is energized through conductive contact with the second connector. Compared to related technologies that require separate clamping and energizing parts, the electrolysis assembly in this embodiment, through the provision of the first and second connectors, achieves both the installation and fixation of the first and second electrode plates while simultaneously energizing them separately. This simplifies the structure of the electrolysis assembly, making it more streamlined and easier to install.

[0058] In some embodiments, the electrolysis assembly further includes a proton exchange membrane disposed between the first electrode plate and the second electrode plate. At least one of the first electrode plate and the second electrode plate has a through hole extending along the first direction, so that the electrolyte in the electrolysis chamber diffuses through the through hole to the space between the electrode plate and the proton exchange membrane.

[0059] In this embodiment, a proton exchange membrane is disposed between the first electrode sheet and the second electrode sheet. Since the proton exchange membrane is non-conductive and can transfer protons, it can prevent short circuits between the first and second electrode sheets, reduce the distance between the first and second electrode sheets, thereby reducing energy consumption and improving electrolysis efficiency. Furthermore, by providing a through hole along a first direction in at least one of the first and second electrode sheets, the electrolyte in the electrolysis chamber can diffuse between the electrode sheet and the proton exchange membrane, allowing the electrolysis reaction to continue and carrying away electrolysis products, further improving electrolysis efficiency. Attached Figure Description

[0060] Figure 1 This is a schematic diagram of a garment processing device according to an embodiment of the present disclosure.

[0061] Figure 2This is a top view of the garment processing apparatus according to an embodiment of the present disclosure.

[0062] Figure 3 This is a schematic diagram of the mounting bracket for the garment processing equipment according to an embodiment of the present disclosure.

[0063] Figure 4 This is a schematic diagram from another perspective of the mounting bracket of the clothing processing device according to an embodiment of the present disclosure.

[0064] Figure 5 This is a simplified diagram of a garment processing apparatus according to a first embodiment of the present disclosure.

[0065] Figure 6 This is a simplified diagram of a garment processing apparatus according to a second embodiment of the present disclosure.

[0066] Figure 7 This is a simplified diagram of a garment processing apparatus according to a third embodiment of the present disclosure.

[0067] Figure 8 This is a schematic diagram of the material box of the garment processing device according to an embodiment of the present disclosure.

[0068] Figure 9 This is a cross-sectional view of the material box of the garment processing device according to an embodiment of the present disclosure.

[0069] Figure 10 This is a schematic diagram of the material box of a garment processing device according to another embodiment of the present disclosure.

[0070] Figure 11 This is a cross-sectional view of the material box of a garment processing apparatus according to another embodiment of this disclosure.

[0071] Figure 12 This is a simplified diagram of a garment processing apparatus according to a fourth embodiment of the present disclosure.

[0072] Figure 13 This is a simplified diagram of a garment processing apparatus according to the fifth embodiment of this disclosure.

[0073] Figure 14 This is a simplified diagram of a garment processing apparatus according to the sixth embodiment of this disclosure.

[0074] Figure 15 This is a simplified diagram of a garment processing apparatus according to the seventh embodiment of this disclosure.

[0075] Figure 16 This is a schematic diagram of an electrolysis apparatus according to an embodiment of the present disclosure.

[0076] Figure 17 This is a cross-sectional view of an electrolysis apparatus according to an embodiment of this disclosure.

[0077] Figure 18 This is a perspective view of an electrolysis apparatus according to an embodiment of the present disclosure.

[0078] Figure 19 This is a schematic diagram of an electrolysis component according to an embodiment of the present disclosure.

[0079] Figure 20 This is an exploded schematic diagram of the electrolysis component according to an embodiment of this disclosure.

[0080] Figure label:

[0081] Casing 1, Flanged edge 11

[0082] Processing cylinder 2, processing chamber 21,

[0083] Material box 3, detergent chamber 31, first liquid inlet channel 32,

[0084] Liquid inlet channel 33, liquid outlet channel 34, first inlet 35, first outlet 36.

[0085] Second liquid inlet channel 37, liquid outlet 371.

[0086] Outer shell 381, receiving cavity 3811, bottom shell 3812, upper shell 3813, feeding box 382, ​​top cover 383, discharge port 384, outlet 385, feed inlet 386.

[0087] Water valve 4, first water valve 41, second water valve 42,

[0088] First waterway 51, second waterway 52, converging waterway 53

[0089] Electrolysis unit 6,

[0090] Shell 61, electrolysis chamber 611, water inlet 6111, water outlet 6112,

[0091] First shell 612, outer peripheral flange 6121, chamber 6122, second shell 613, baffle 614.

[0092] Electrolysis assembly 62, first electrode plate 621, second electrode plate 622, first connector 623, second connector 624.

[0093] Proton membrane 625, connecting pores 626,

[0094] First insulating gasket 6271, second insulating gasket 6272, first conductive gasket 6273, second conductive gasket 6274, body portion 6275, annular flange portion 6276.

[0095] First conductive end plate 6281, first connecting groove 62811, second conductive end plate 6282, second connecting groove 62821.

[0096] First nut 6291, second nut 6292

[0097] Third nut 631, fourth nut 632, sealing ring 64.

[0098] Mounting bracket 7, connecting part 71, mounting part 72, clearance part 721, first plate 73, second plate 74, first snap-fit ​​part 741, third plate 75, reinforcing rib 76, connecting protrusion 77. Detailed Implementation

[0099] Embodiments of this disclosure are described in detail below, with examples of these embodiments illustrated in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to explain this disclosure, and should not be construed as limiting it.

[0100] The following is in conjunction with the appendix Figures 1-20 The garment processing apparatus according to embodiments of the present disclosure will be described in detail.

[0101] The garment processing device of this embodiment includes a housing 1, a processing cylinder 2, a detergent box 3, a water valve 4, a first water passage 51, a second water passage 52, and an electrolysis device 6. The processing cylinder 2 is disposed within the housing 1 and has a processing chamber 21. The detergent box 3 is disposed within the housing 1 and has a detergent chamber 31. The water valve 4 is disposed within the housing 1. The inlet of the first water passage 51 and the inlet of the second water passage 52 are both connected to the water valve 4. The water valve 4 supplies water of different flow rates to the first water passage 51 and the second water passage 52, with the water flow rate of the first water passage 51 being less than the water flow rate of the second water passage 52. Both the first water passage 51 and the second water passage 52 are connected to the processing chamber 21. The electrolysis device 6 is disposed within the first water passage 51 or within a water passage connected to the first water passage 51.

[0102] The clothing treatment device of this embodiment supplies water of different flow rates to the first water channel 51 and the second water channel 52 through the water valve 4. The electrolysis device 6 is located in the first water channel 51 or in a water channel connected to the first water channel 51. The electrolysis device 6 electrolyzes the water entering the electrolysis device 6. The electrolyzed electrolyte enters the treatment chamber 21. That is to say, the electrolysis device 6 can electrolyze the water before the water enters the treatment chamber 21, realizing flow-through electrolysis. Moreover, the water flow rate of the first water channel 51 is less than the water flow rate of the second water channel 52, which can prolong the residence time of the water in the electrolysis device 6, making the electrolysis reaction more complete, improving the electrolysis efficiency of the electrolysis device 6, and thus improving the clothing treatment effect.

[0103] Specifically, such as Figure 1 and Figure 2 As shown, the water valve 4 is located on the inner rear wall of the housing 1 for connection to a water source. The detergent box 3 is located in front of the water valve 4, allowing the user to easily add detergent into the detergent box 3 from the front of the garment processing equipment.

[0104] In some embodiments, the first water path 51 and the second water path 52 are independent of each other, the electrolysis device 6 is disposed in the first water path 51, and the second water path 52 is connected to the detergent chamber 31.

[0105] In this embodiment, by making the first water path 51 and the second water path 52 independent of each other, it is convenient to adjust the water flow rate of the first water path 51 and the water flow rate of the second water path 52 respectively. This makes it convenient to install the electrolysis device 6 in the first water path 51 with a small flow rate and use the water in the second water path 52 with a large flow rate to rinse the detergent, thereby improving the electrolysis efficiency of the electrolysis device 6 and the detergent dispensing efficiency.

[0106] In some embodiments, such as Figure 5 As shown, the first water channel 51 is at least partially located in the material box 3, and the material box 3 is located downstream of the electrolysis device 6 in the direction of water flow in the first water channel 51.

[0107] In this embodiment, by placing the material box 3 downstream of the electrolysis device 6 in the direction of water flow in the first water passage 51, the electrolysis device 6 is located between the water valve 4 and the material box 3. This allows full utilization of the space between the water valve 4 and the material box 3 to install the electrolysis device 6. Furthermore, by placing at least part of the first water passage 51 in the material box 3, the internal space of the material box 3 can be used to form part of the first water passage 51, reducing additional pipe layout and improving structural compactness.

[0108] In some embodiments, such as Figures 3-4 As shown, the garment processing equipment also includes a mounting bracket 7, which is located inside the housing 1, and the electrolysis device 6 is mounted on the mounting bracket 7. The mounting bracket 7 prevents vibrations and shaking during equipment operation from being directly transmitted to the electrolysis device 6, and also prevents friction between the electrolysis device 6 and the housing 1 during operation, thus improving the stability and service life of the electrolysis device 6.

[0109] In some embodiments, such as Figures 3-4 As shown, the mounting bracket 7 is detachably connected to the housing 1, facilitating the disassembly and assembly of the electrolysis device 6 and improving maintenance convenience. Furthermore, different sizes of mounting brackets 7 can be used to accommodate electrolysis devices 6 of varying sizes, allowing the electrolysis device 6 to be mounted on the housing 1 via the mounting bracket 7, thus enhancing installation convenience.

[0110] In this embodiment, the electrolysis device 6 is detachably connected to the housing 1 by means of the mounting bracket 7, which facilitates the installation of the electrolysis device 6 on the clothing processing equipment and also facilitates the disassembly of the electrolysis device 6 for cleaning, thereby improving the service life of the electrolysis device 6.

[0111] In some embodiments, such as Figures 3-4As shown, the mounting bracket 7 has a connecting part 71 and a mounting part 72 that are connected to each other. The connecting part 71 is connected to the housing 1, and the mounting part 72 is used to mount the electrolysis device 6. The connection between the mounting bracket 7 and the housing 1 is achieved through the connecting part 71, and the connection between the electrolysis device 6 and the mounting bracket 7 is achieved through the mounting part 72, thereby realizing the connection between the electrolysis device 6 and the housing 1.

[0112] In some embodiments, such as Figures 3-4 As shown, the mounting portion 72 is lower than the connecting portion 71. By setting the mounting portion 72 to be lower than the connecting portion 71, it is easier to reserve installation space for the electrolysis device 6, so that the electrolysis device 6 is lower than the mounting portion 72, flush with the mounting portion 72, or slightly protruding from the mounting portion 72, thereby avoiding affecting the installation of the top plate of the garment processing equipment.

[0113] In some embodiments, such as Figures 3-4 As shown, the top of the inner wall of the housing 1 has a flange 11, and the connecting part 71 is connected to the flange 11. The flange 11 facilitates the connection between the top of the housing 1 and the connecting part 71, thereby avoiding the need for opening holes in the inner wall of the housing 1 and improving the layout rationality of the mounting bracket 7.

[0114] Furthermore, the contact surface between the flange 11 and the connecting part 71 is a plane, which further improves the stability of the connection between the mounting bracket 7 and the housing 1.

[0115] In some embodiments, such as Figures 3-4 As shown, the mounting part 72 has a clearance part 721, which is used to avoid the inlet 6111 and outlet 6112 of the electrolysis device 6. The inlet 6111 and outlet 6112 of the electrolysis device 6 pass through the mounting bracket 7 via the clearance part 721, which improves the ease of connection between the electrolysis device 6 and the pipeline. Moreover, the clearance part 721 can provide positioning for the installation of the electrolysis device 6, further improving the ease of installation.

[0116] In some embodiments, such as Figures 3-4 As shown, the mounting bracket 7 includes a first plate 73, a second plate 74, and a third plate 75. The second plate 74 extends vertically, the first plate 73 extends from the upper end of the second plate 74 toward the inner wall surface of the housing 1, and the third plate 75 extends from the lower end of the second plate 74 in a direction away from the inner wall surface of the housing 1. At least one of the first plate 73 and the second plate 74 forms a connecting portion 71, and the third plate 75 forms a mounting portion 72.

[0117] In this embodiment, the sequentially connected first plate 73, second plate 74, and third plate 75 increase the contact area between the flange 11 of the housing 1 and the first plate 73, thereby improving the stability of the connection between the first plate 73 and the housing 1. The second plate 74 extends vertically, increasing the contact area between the second plate 74 and the inner wall of the housing 1, thus improving the stability of the connection between the mounting bracket 7 and the housing 1. The third plate 75 extends away from the housing 1 to facilitate the installation of the electrolysis device 6, improving the ease of installation of the electrolysis device 6.

[0118] Furthermore, a connecting protrusion 77 is provided below the third plate 75. The connecting protrusion 77 extends in the vertical direction, and the bolt passes through the electrolysis device 6, the third plate 75 and the connecting protrusion 77 from top to bottom to connect them, thereby improving the stability of the connection between the electrolysis device 6 and the mounting bracket 7.

[0119] Furthermore, cross-arranged reinforcing ribs 76 are provided below the third plate 75 to enhance the structural strength of the third plate 75.

[0120] In some embodiments, such as Figures 3-4 As shown, the second plate 74 has a first snap-fit ​​portion 741, and the inner wall surface of the housing 1 is located at the second snap-fit ​​portion. The first snap-fit ​​portion 741 and the second snap-fit ​​portion engage with each other. Through the first snap-fit ​​portion 741 and the second snap-fit ​​portion, the mounting bracket 7 can be easily installed on the housing 1 by snap-fit, achieving convenient installation while positioning the mounting bracket 7, thus improving installation efficiency and accuracy.

[0121] In some embodiments, such as Figure 6 As shown, the first water channel 51 is at least partially located in the material box 3, and the electrolysis device 6 is located in the portion of the first water channel 51 within the material box 3.

[0122] In this embodiment, by at least partially arranging the first water channel 51 in the material box 3 and arranging the electrolysis device 6 in the portion of the first water channel 51 in the material box 3, the internal space of the material box 3 can be used to form part of the first water channel 51, reducing the need for additional pipe layout, making reasonable use of the space inside the casing 1, and improving the rationality of the layout and the compactness of the structure.

[0123] In some embodiments, such as Figure 7 As shown, the first water channel 51 and the material box 3 are independent of each other.

[0124] In this embodiment, by making the first water path 51 and the material box 3 independent of each other, the electrolysis device 6 is only located in the first water path 51 and the material box 3 is only located in the second water path 52, so that the detergent and electrolyte can be dispensed simultaneously and independently. Moreover, the water flow rate of the first water path 51 is less than the water flow rate of the second water path 52. The electrolysis device 6 is located in the low-flow first water path 51, and the detergent chamber 31 is connected to the high-flow second water path 52, which improves the electrolysis efficiency while ensuring the dispensing efficiency.

[0125] In some embodiments, such as Figures 5-7 As shown, the second water channel 52 is at least partially located in the material box 3.

[0126] In this embodiment, by at least partially locating the second water channel 52 within the material box 3, a portion of the second water channel 52 can be formed using the space within the material box 3. This reduces the need for additional pipework, improves structural compactness, and facilitates communication between the second water channel 52 and the detergent chamber 31, thereby improving the detergent dispensing efficiency.

[0127] In some embodiments, such as Figures 8-11 As shown, the material box 3 includes a housing 381 and a feeding box 382, ​​a detergent chamber 31 is formed in the feeding box 382, ​​the housing 381 has a receiving cavity 3811, and the feeding box 382 is disposed in the receiving cavity 3811 and is movable relative to the housing 381; or, the material box 3 includes a housing 381, and the detergent chamber 31 is formed in the housing 381.

[0128] In this embodiment, by placing the feeding box 382 inside the receiving cavity 3811 and making it movable relative to the outer shell 381, it is convenient for the user to pull out the feeding box 382 from the front of the clothing processing equipment to add detergent into the detergent cavity 31. Alternatively, by forming the detergent cavity 31 in the outer shell 381, the space in the height direction of the feeding box 3 can be fully utilized, thereby improving space utilization.

[0129] In some embodiments, such as Figures 8-11 As shown, the outer casing 381 includes a bottom casing 3812 and an upper casing 3813, with the upper casing 3813 fastened to the bottom casing 3812 to form a receiving cavity 3811 or a detergent cavity 31.

[0130] In this embodiment, by fastening the upper shell 3813 to the bottom shell 3812 to form the receiving cavity 3811 or detergent cavity 31, space can be utilized more effectively while maintaining the clarity and orderliness of the internal structure of the material box 3.

[0131] Specifically, Figures 8-9 A schematic diagram of the material box 3 according to an embodiment of the present disclosure is shown. The upper shell 3813 is fastened to the bottom shell 3812 to form a receiving cavity 3811. The feeding box 382 is disposed in the receiving cavity 3811 and is movable relative to the outer shell 381. Figures 10-11A schematic diagram of the material box 3 according to another embodiment of the present disclosure is shown, wherein the upper shell 3813 is fastened to the bottom shell 3812 to form a detergent cavity 31.

[0132] In some embodiments, such as Figures 8-11 As shown, the material box 3 also includes a top cover 383, which covers the upper shell 3813 and defines at least a portion of the first water passage 51 in the material box 3 and / or a portion of the second water passage 52 in the material box 3.

[0133] In this embodiment, when the material box 3 is only provided in the first water channel 51, the top cover 383 and the upper shell 3813 define at least a portion of the first water channel 51 provided in the material box 3. When the material box 3 is provided in the first water channel 51 and the second water channel 52, the top cover 383 and the upper shell 3813 define at least a portion of the first water channel 51 provided in the material box 3 and a portion of the second water channel 52 provided in the material box 3. When the material box 3 is only provided in the second water channel 52, the top cover 383 and the upper shell 3813 define a portion of the second water channel 52 provided in the material box 3. By setting the top cover 383 and the upper shell 3813, the space inside the material box 3 is fully utilized to form a portion of the first water channel 51 and / or a portion of the second water channel 52, reducing the pipe arrangement of the first water channel 51 and / or the second water channel 52, and improving the rationality of the layout and the compactness of the structure.

[0134] In some embodiments, such as Figures 8-9 As shown, the material box 3 has a first liquid inlet channel 32 that is disconnected from the detergent chamber 31. The first liquid inlet channel 32 is connected to the receiving chamber 3811. The first liquid inlet channel 32 and the receiving chamber 3811 form a first water passage 51 in at least a portion of the material box 3.

[0135] In this embodiment, by disconnecting the first liquid inlet channel 32 from the detergent chamber 31 and connecting it to the receiving chamber 3811, the first liquid inlet channel 32 and the detergent chamber 31 are independent of each other, and the detergent and the electrolyte in the first liquid inlet channel 32 flow separately, so as to realize the synchronous and independent dispensing of detergent and electrolyte. Moreover, the first liquid inlet channel 32 and the receiving chamber 3811 form a first water path 51 in at least part of the material box 3, which further improves the space utilization rate in the material box 3.

[0136] Specifically, such as Figures 8-9 As shown, the first liquid inlet channel 32 is formed between the top cover 383 and the upper shell 3813. Water in the first liquid inlet channel 32 can flow downward into the receiving cavity 3811 and from the receiving cavity 3811 to the processing cavity 21.

[0137] In some embodiments, the material box 3 also has a discharge port 384 and a discharge port 385. The discharge port 384 is connected to the receiving cavity 3811 and the first liquid inlet channel 32, and the discharge port 385 is connected to the receiving cavity 3811 and to the processing cavity 21 through the second connecting pipe.

[0138] In this embodiment, the first liquid inlet channel 32 is connected to the receiving cavity 3811 by setting the discharge port 384, and the receiving cavity 3811 is connected to the processing cavity 21 by setting the discharge port 385 and the second connecting pipe, thereby realizing the connection between the first liquid inlet channel 32 and the processing cavity 21.

[0139] Specifically, such as Figures 8-9 As shown, the discharge port 384 is located on the upper shell 3813 and extends through the upper shell 3813 in the vertical direction, so that the liquid in the first liquid inlet channel 32 flows into the receiving cavity 3811 through the discharge port 384. The discharge port 385 is located on the bottom shell 3812. The bottom wall surface of the receiving cavity 3811 and the outer peripheral surface of the feeding box 382 are arranged at intervals, so that the liquid in the receiving cavity 3811 flows from the rear end of the receiving cavity 3811 to the front end of the receiving cavity 3811 and flows out of the receiving cavity 3811 from the discharge port 385 at the front end of the receiving cavity 3811.

[0140] In some embodiments, at least a portion of the electrolysis device 6 is disposed within the first liquid inlet channel 32. By disposing at least a portion of the electrolysis device 6 within the first liquid inlet channel 32, it is convenient for the electrolysis device 6 to electrolyze the water within the first liquid inlet channel 32.

[0141] In some embodiments, the feed box 3 further includes a second liquid inlet channel 37, which communicates with the detergent chamber 31 and forms a portion of the second water path 52 disposed in the feed box 3.

[0142] In this embodiment, by connecting the second liquid inlet channel 37 with the detergent chamber 31, the water flow in the second liquid inlet channel 37 can rinse the detergent. The large flow of water in the second liquid inlet channel 37 enables the detergent and water to mix quickly and evenly, thereby improving the dispensing efficiency.

[0143] like Figure 5 As shown, when the electrolysis device 6 is located upstream of the material box 3, the water flow rate in the first liquid inlet channel 32 of the material box 3 is less than the water flow rate in the second liquid inlet channel 37 of the material box 3. By placing the electrolysis device 6 in the first water channel 51 and connecting the detergent chamber 31 with the second liquid inlet channel 37, the electrolysis efficiency of the electrolysis device 6 is improved while ensuring the detergent dispensing efficiency.

[0144] like Figure 6As shown, when at least a portion of the electrolysis device 6 is located in the first liquid inlet channel 32 of the material box 3, the water flow rate in the first liquid inlet channel 32 of the material box 3 is less than the water flow rate in the second liquid inlet channel 37 of the material box 3. By locating at least a portion of the electrolysis device 6 in the first liquid inlet channel 32 and connecting the detergent chamber 31 with the second liquid inlet channel 37, the small flow rate of water from the first liquid inlet channel 32 can be used to electrolyze the water through the electrolysis device 6, which can prolong the residence time of water in the electrolysis device 6, make the electrolysis reaction more complete, and improve the electrolysis efficiency of the electrolysis device 6. At the same time, the large flow rate of the second liquid inlet channel 37 can be used to flush the detergent, realize the rapid and uniform mixing of detergent and water, and improve the dosing efficiency.

[0145] like Figure 7 As shown, the electrolysis device 6 is located in the first water channel 51, and the material box 3 is located only in the second water channel 52. The first water channel 51 and the second water channel 52 are independent of each other, so as to realize the simultaneous addition of detergent and electrolyte.

[0146] In some embodiments, the second liquid inlet channel 37 has a liquid outlet 371, which is connected to the processing chamber 21 via a first connecting pipe. This enables communication between the second liquid inlet channel 37 and the processing chamber 21.

[0147] In some embodiments, such as Figure 8 As shown, the material box 3 is provided with a feed inlet 386, which is connected to the second liquid inlet channel 37 and the detergent chamber 31. The detergent in the detergent chamber 31 enters the second liquid inlet channel 37 through the feed inlet 386.

[0148] In this embodiment, the detergent chamber 31 is connected to the second liquid inlet channel 37 by setting the feed port 386, thereby enabling the detergent in the detergent chamber 31 to be transported to the second liquid inlet channel 37 and mixed with the water in the second liquid inlet channel 37.

[0149] Optionally, the detergent in the detergent chamber 31 is delivered to the second liquid inlet channel 37 by a delivery pump. The delivery pump can precisely control the amount and time of detergent delivery, improve the accuracy of detergent dosing, and precisely control the amount of detergent delivered, which can reduce waste, lower costs, and reduce the impact on the environment.

[0150] In some embodiments, such as Figures 10-11 As shown, the electrolysis device 6 is mounted on the material box 3. The electrolysis device 6 has an electrolysis chamber 611. The material box 3 has an inlet channel 33 and an outlet channel 34. The material box 3 is also provided with a first water inlet 35 and a first water outlet 36. The first water inlet 35 is connected to the inlet channel 33 and the electrolysis chamber 611, and the first water outlet 36 is connected to the outlet channel 34 and the electrolysis chamber 611.

[0151] In this embodiment, the electrolysis device 6 is installed on the material box 3, so that the water in the first water channel 51 enters the material box 3 through the liquid inlet channel 33. The water in the liquid inlet channel 33 enters the electrolysis chamber 611 of the electrolysis device 6 through the first water inlet 35 on the material box 3, and electrolysis occurs in the electrolysis chamber 611. Electrolysis produces an electrolyte containing strong oxidizing active products such as hydroxyl radicals and / or ozone. The electrolyte enters the liquid outlet channel 34 through the first water outlet 36 and then enters the treatment chamber 21 of the treatment cylinder 2. It is used for sterilization and disinfection of clothing, increasing the washing ratio, preventing color bleeding, etc., and improving the treatment effect of clothing.

[0152] In some embodiments, such as Figures 12-15 As shown, the garment processing equipment also includes a water collection channel 53. The outlets of the first water channel 51 and the second water channel 52 are both connected to the processing chamber 21 through the water collection channel 53. The electrolysis device 6 is located in the first water channel 51 or in the water collection channel 53.

[0153] In this embodiment, the inlet of the first water path 51 and the inlet of the second water path 52 are both connected to the water valve 4, and the outlet of the first water path 51 and the outlet of the second water path 52 are both connected to the collecting water path 53. The collecting water path 53 is connected to the treatment chamber 21, which facilitates the individual control of the first water path 51 and the second water path 52. The water flow rate in the collecting water path 53 can be adjusted as needed to meet the water intake requirements under different working conditions such as electrolysis, spraying or detergent dosing.

[0154] In some embodiments, the electrolysis device 6 is located upstream of the material box 3 in the direction of water flow; or, the electrolysis device 6 is disposed on the material box 3.

[0155] In this embodiment, the electrolysis device 6 is located upstream of the material box 3 in the direction of water flow, or the electrolysis device 6 is placed on the material box 3. This makes it convenient to install the electrolysis device 6 between the material box 3 and the water valve 4, or to install the electrolysis device 6 on the material box 3. This makes it convenient to flexibly determine the installation position of the electrolysis device 6 according to the space of the garment processing equipment.

[0156] Specifically, such as Figures 12-14 As shown, in Figure 12 In this configuration, the electrolysis device 6 is located in the first water channel 51, and the connection between the first water channel 51 and the second water channel 52 is located inside the material box 3. That is, the first water channel 51 and the second water channel 52 converge inside the material box 3, and the electrolysis device 6 is located upstream of the material box 3. Figure 13 In this configuration, the electrolysis device 6 is located in the first water channel 51, and the material box 3 is located in the collecting water channel 53. Since the outlet of the first water channel 51 is connected to the collecting water channel 53, the electrolysis device 6 is positioned upstream of the collecting water channel 53. Figure 14 In this configuration, both the electrolysis device 6 and the material box 3 are located in the water collection channel 53, with the electrolysis device 6 situated upstream of the water collection channel 53. Figure 15In the middle, the material box 3 is located in the water collection channel 53, and the electrolysis device 6 is located on the material box 3.

[0157] In some embodiments, at least a portion of the water collection path 53 is located in the material box 3. In this embodiment, by locating at least a portion of the water collection path 53 in the material box 3, the water in the water collection path 53 flows out from the material box 3, which facilitates the use of the existing pipes between the material box 3 and the treatment cylinder 2, reducing the pipe layout of the water collection path 53 while achieving detergent dispensing.

[0158] In some embodiments, the connection between the first water passage 51 and the collecting water passage 53 and / or the connection between the second water passage 52 and the collecting water passage 53 is inside the material box 3; or, the connection between the first water passage 51 and the collecting water passage 53 and / or the connection between the second water passage 52 and the collecting water passage 53 is located upstream of the material box 3 in the water flow direction.

[0159] In this embodiment, the connection between the water path and the collecting water path 53 is located inside the material box 3 or upstream of the material box 3, so that at least part of the collecting water path 53 flows through the material box 3. This facilitates the use of the existing pipes between the material box 3 and the treatment cylinder 2, reducing the pipe layout of the collecting water path 53 while realizing the addition of detergent.

[0160] The connection points of the first water channel 51 and the collecting water channel 53, and the connection points of the second water channel 52 and the collecting water channel 53 are both inside the material box 3. The water in the first liquid inlet channel 32 flows downward into the receiving cavity 3811 through the discharge port 384 of the material box 3. The water in the second liquid inlet channel 37 flows into the receiving cavity 3811 through the through hole on the bottom surface of the second liquid inlet channel 37, thereby realizing the collection of the water in the first liquid inlet channel 32 and the water in the second liquid inlet channel 37 in the material box 3, and thus realizing the collection of the water in the first water channel 51 and the water in the second water channel 52 in the material box 3.

[0161] Optionally, the second liquid inlet channel 37 is a labyrinth channel, which helps to improve the mixing uniformity of water and detergent within the second liquid inlet channel 37. For example, multiple spaced-apart turbulence columns are provided within the second liquid inlet channel 37. These turbulence columns are used to agitate the mixed liquid of water and detergent within the second liquid inlet channel 37. The turbulence columns can break the laminar flow state of the fluid and generate turbulence, which is beneficial for the detergent and water in the second liquid inlet channel 37 to mix thoroughly, thereby improving the mixing uniformity and mixing efficiency.

[0162] In some embodiments, such as Figure 2As shown, water valve 4 includes a first water valve 41 and a second water valve 42. The outlet of the first water valve 41 is connected to the inlet of the first water passage 51, and the outlet of the second water valve 42 is connected to the inlet of the second water passage 52. The rated outflow rate of the first water valve 41 is less than the rated outflow rate of the second water valve 42. Water is supplied to the first water passage 51 through the connection of the first water valve 41 and to the second water passage 52 through the connection of the second water valve 42, which facilitates the supply of water with different flow rates to the first water passage 51 and the second water passage 52.

[0163] In some embodiments, the rated outflow rate of the first water valve 41 is 2-4 L / min.

[0164] In this embodiment, by limiting the rated outflow of the first water valve 41, the residence time of water in the electrolysis chamber 611 is extended, the electrolysis reaction is more complete, and the electrolysis effect of the electrolysis device 6 is improved.

[0165] Optionally, the rated outflow rate of the first water valve 41 is 2L / min, 2.3L / min, 2.5L / min, 3L / min, 3.5L / min, or 4L / min.

[0166] In some embodiments, the rated outflow rate of the second water valve 42 is 7-9 L / min.

[0167] In this embodiment, the rated outflow rate of the second water valve 42 is limited to meet the high flow rate requirement of the treatment cylinder 2, thereby improving the detergent dosing efficiency and spray uniformity.

[0168] Optionally, the rated outflow rate of the second water valve 42 is 7L / min, 7.3L / min, 7.5L / min, 8L / min, 8.5L / min, or 9L / min.

[0169] In some embodiments, such as Figures 16-20 As shown, the electrolysis device 6 includes a housing 61 and an electrolysis assembly 62. An electrolysis chamber 611 is formed in the housing 61, and at least a portion of the electrolysis assembly 62 is disposed within the electrolysis chamber 611.

[0170] In this embodiment, at least a portion of the electrolysis component 62 is disposed within the housing 61, and the electrolysis device 6 is installed by connecting the housing 61 with the housing 1 or the material box 3. By modularizing the electrolysis device 6, the ease of installation of the electrolysis device 6 is improved.

[0171] Specifically, the shell 61 has an inlet 6111 and an outlet 6112. The electrolysis chamber 611 is connected to the inlet 6111 and the outlet 6112. The inlet 6111 is used to transport water into the electrolysis chamber 611, and the outlet 6112 is used to output the electrolyte after electrolysis by the electrolysis component 62.

[0172] In some embodiments, such as Figure 19 and Figure 20 As shown, the electrolysis assembly 62 includes a first electrode plate 621, a second electrode plate 622, a first connector 623, and a second connector 624. The first electrode plate 621 and the second electrode plate 622 are stacked in a first direction. The first connector 623 and the second connector 624 both pass through the first electrode plate 621 and the second electrode plate 622 along the first direction. One end of the first connector 623 extends out of the electrolysis cavity 611 to form a first terminal. The first connector 623 is in conductive contact with the first electrode plate 621. One end of the second connector 624 extends out of the electrolysis cavity 611 to form a second terminal. The second connector 624 is in conductive contact with the second electrode plate 622.

[0173] In this embodiment, the first connector 623 and the second connector 624 are both inserted through the first electrode plate 621 and the second electrode plate 622 along the first direction, which facilitates the installation of the first electrode plate 621 and the second electrode plate 622. Moreover, one end of the first connector 623 extends out of the electrolysis cavity 611 to form a first terminal, and one end of the second connector 624 extends out of the electrolysis cavity 611 to form a second terminal. The first electrode plate 621 is energized through the conductive contact between the first connector 623 and the first electrode plate 621, and the second electrode plate 622 is energized through the conductive contact between the second connector 624 and the second electrode plate 622. Compared to the structure in related technologies that requires separate clamping and energizing parts, the electrolysis assembly 62 in this embodiment, through the provision of the first connector 623 and the second connector 624, achieves the simultaneous installation and fixation of the first electrode plate 621 and the second electrode plate 622, and simultaneously energizes the first electrode plate 621 and the second electrode plate 622. This simplifies the structure of the electrolysis assembly 62, making it simpler and easier to install.

[0174] Furthermore, by extending one end of the first connector 623 out of the electrolysis chamber 611 to form a first terminal block, and extending one end of the second connector 624 out of the electrolysis chamber 611 to form a second terminal block, the first and second terminals are prevented from contacting the liquid inside the electrolysis chamber 611, thereby preventing short circuits under the impact of water flow and improving electrical safety.

[0175] In some embodiments, the electrolysis assembly 62 further includes a proton exchange membrane 625 disposed between the first electrode plate 621 and the second electrode plate 622.

[0176] In this embodiment, a proton exchange membrane 625 is provided between the first electrode plate 621 and the second electrode plate 622. Since the proton exchange membrane 625 is non-conductive and can transfer protons, it can prevent the first electrode plate 621 and the second electrode plate 622 from short-circuiting, reduce the distance between the first electrode plate 621 and the second electrode plate 622, thereby reducing energy consumption and improving electrolysis efficiency.

[0177] Specifically, such as Figures 18-20 As shown, the first connector 623 and the second connector 624 are both inserted through the proton exchange membrane 625. The proton exchange membrane 625 is used to separate the first electrode plate 621 and the second electrode plate 622.

[0178] When the electrolysis component 62 electrolyzes water, water molecules ionize to generate cations and anions. At least one of the cations and anions can migrate through the proton exchange membrane 625. For example, hydrogen ions can migrate through the proton exchange membrane 625, resulting in high-concentration cation regions and high-concentration anion regions forming on both sides of the proton exchange membrane 625 in the first direction, respectively. When the first electrode plate 621 is set as the anode and the second electrode plate 622 is set as the cathode, hydroxyl radicals and / or ozone, which have strong oxidizing activity, are generated on the surface of the anode, and hydrogen gas is generated on the surface of the cathode. The hydroxyl radicals and / or ozone, as well as hydrogen gas, are directed to the processing chamber 21 by the water flow. Ozone and hydroxyl radicals are used to sterilize and disinfect clothing and decolorize dyes. Hydrogen gas is used to penetrate into the clothing fibers, causing them to explode, be adsorbed, and float to the surface. This achieves the functions of sterilization, disinfection, and colorfastness prevention for clothing while improving the washing ratio of the clothing processing equipment.

[0179] In some embodiments, at least one of the first electrode sheet 621 and the second electrode sheet 622 is provided with a through hole 626 extending in a first direction, so that the electrolyte in the electrolysis chamber 611 diffuses through the through hole 626 to the space between the electrode sheet and the proton exchange membrane 625.

[0180] In this embodiment, at least one of the first electrode plates 621 and the second electrode plate 622 is provided with a through hole 626 extending in the first direction, so that the electrolyte in the electrolysis chamber 611 can diffuse between the electrode plate and the proton exchange membrane 625, so that the electrolysis reaction can continue and carry away the electrolysis products, thereby improving the electrolysis efficiency.

[0181] Specifically, such as Figures 19-20 As shown, at least one of the first electrode sheet 621 and the second electrode sheet 622 is provided with a through hole 626 extending along the first direction. This can be understood as: the first electrode sheet 621 is provided with a through hole 626, or the second electrode sheet 622 is provided with a through hole 626, or both the first electrode sheet 621 and the second electrode sheet 622 are provided with a through hole 626.

[0182] Optionally, there may be one or more connecting holes 626, for example, there may be three connecting holes 626.

[0183] In some embodiments, such as Figures 19-20 As shown, the electrolysis assembly 62 also includes a first insulating pad 6271 and a second insulating pad 6272. The first insulating pad 6271 is disposed between the first connector 623 and the second electrode plate 622 to electrically isolate the first connector 623 and the second electrode plate 622. The second insulating pad 6272 is disposed between the second connector 624 and the first electrode plate 621 to electrically isolate the second connector 624 and the first electrode plate 621.

[0184] In this embodiment, by providing a first insulating gasket 6271 between the first connector 623 and the second electrode plate 622, electrical isolation between the first connector 623 and the second electrode plate 622 is achieved, so that the first connector 623 is only electrically connected to the first electrode plate 621. By using a second insulating gasket 6272 between the second connector 624 and the first electrode plate 621, the second connector 624 is only electrically connected to the second electrode plate 622. This achieves electrical connection between the first connector 623 and the first electrode plate 621, and between the second connector 624 and the second electrode plate 622, ensuring the normal progress of the electrolysis reaction.

[0185] In some embodiments, such as Figures 19-20 As shown, the electrolysis assembly 62 also includes a first conductive pad 6273 and a second conductive pad 6274. The first conductive pad 6273 is arranged around the first connector 623 and is in electrical contact with the first electrode plate 621. The second conductive pad 6274 is arranged around the second connector 624 and is in electrical contact with the second electrode plate 622.

[0186] In this embodiment, by setting the first conductive pad 6273 and the second conductive pad 6274, the contact area between the first connector 623 and the first electrode plate 621 and the contact area between the second connector 624 and the second electrode plate 622 are increased, thereby improving the conductivity between the first connector 623 and the first electrode plate 621 and the conductivity between the second connector 624 and the second electrode plate 622.

[0187] In some embodiments, the electrolysis assembly 62 further includes a first conductive end plate 6281, which is disposed on the side of the first electrode plate 621 away from the second electrode plate 622 and is electrically connected to the first electrode plate 621 and the first connector 623.

[0188] In this embodiment, a first conductive end plate 6281 is provided on the side of the first electrode plate 621 away from the second electrode plate 622, so that the first conductive end plate 6281 can evenly distribute the current to the first electrode plate 621, avoid local overload, and the first conductive end plate 6281 can disperse stress and protect the first electrode plate 621.

[0189] Optionally, such as Figures 19-20 As shown, the first conductive end plate 6281 is attached to the first electrode plate 621, and a low-resistance busbar is formed between the first conductive end plate 6281 and the first electrode plate 621, which helps to reduce resistance. For example, the first conductive end plate 6281 is a titanium plate, and the high conductivity of titanium plate can improve the conductivity efficiency.

[0190] Optionally, the first conductive end plate 6281 is provided with a first connecting groove 62811 corresponding to and connected to the connecting hole 626, so as to ensure that the electrolyte in the electrolysis chamber 611 can diffuse between the first electrode plate 621 and the proton exchange membrane 625.

[0191] In some embodiments, the electrolysis assembly 62 further includes a second conductive end plate 6282, which is disposed on the side of the second electrode sheet 622 away from the first electrode sheet 621 and is electrically connected to the second electrode sheet 622 and the second connector 624.

[0192] In this embodiment, a second conductive end plate 6282 is provided on the side of the second electrode plate 622 away from the first electrode plate 621, so that the second conductive end plate 6282 can evenly distribute the current to the second electrode plate 622, avoid local overload, and the second conductive end plate 6282 can disperse stress and protect the second electrode plate 622.

[0193] Optionally, such as Figures 19-20 As shown, the second conductive end plate 6282 is attached to the second electrode plate 622, and a low-resistance busbar is formed between the second conductive end plate 6282 and the second electrode plate 622, which helps to reduce resistance. For example, the second conductive end plate 6282 is a titanium plate, and the high conductivity of titanium plate can improve the conductivity efficiency.

[0194] Optionally, the second conductive end plate 6282 is provided with a second connecting groove 62821 corresponding to and connected to the connecting hole 626, so as to ensure that the electrolyte in the electrolysis chamber 611 can diffuse between the second electrode plate 622 and the proton membrane 625.

[0195] In some embodiments, such as Figures 19-20As shown, both the first connector 623 and the second connector 624 are bolts. The electrolysis assembly 62 also includes a first nut 6291 and a second nut 6292. The first nut 6291 fits around the outer periphery of the first connector 623 to press the first conductive pad 6273 onto the first conductive end plate 6281. The second nut 6292 fits around the outer periphery of the second connector 624 to press the second insulating pad 6272 onto the first conductive end plate 6281.

[0196] In this embodiment, the threaded engagement between the first nut 6291 and the first connector 623 achieves a tight connection between the first conductive pad 6273, the first conductive end plate 6281, the first electrode plate 621, the proton exchange membrane 625, the second electrode plate 622, the second conductive end plate 6282, and the first insulating pad 6271. The threaded engagement between the second nut 6292 and the second connector 624 achieves a tight connection between the second insulating pad 6272, the first conductive end plate 6281, the first electrode plate 621, the proton exchange membrane 625, the second electrode plate 622, the second conductive end plate 6282, and the second conductive pad 6274, preventing misalignment under the impact of water flow and improving the structural stability of the electrolysis assembly 62.

[0197] In some embodiments, such as Figures 19-20 As shown, both the first insulating gasket 6271 and the second insulating gasket 6272 include a body portion 6275 and an annular flange portion 6276. The annular flange portion 6276 is connected to the body portion 6275. The body portion 6275 of the first insulating gasket 6271 is sandwiched between the head of the first connector 623 and the second conductive end plate 6282. The annular flange portion 6276 of the first insulating gasket 6271 surrounds the first connector 623 and extends through the second conductive end plate 6282 into the second electrode plate 622. The body portion 6275 of the second insulating gasket 6272 is sandwiched between the second nut 6292 and the first conductive end plate 6281. The annular flange portion 6276 of the second insulating gasket 6272 surrounds the second connector 624 and extends through the first conductive end plate 6281 into the first electrode plate 621.

[0198] In this embodiment, the body portion 6275 of the first insulating pad 6271 is sandwiched between the head of the first connector 623 and the second conductive end plate 6282 to electrically isolate the head of the first connector 623 from the second conductive end plate 6282 in a first direction. The annular flange portion 6276 of the first insulating pad 6271 surrounds the first connector 623 and extends through the second conductive end plate 6282 into the second electrode plate 622 to electrically isolate the first connector 623 from the second conductive end plate 6282 and from the second electrode plate 622 in the radial direction of the first connector 623, thereby achieving complete electrical isolation between the first connector 623 and the second electrode plate 622. By clamping the body portion 6275 of the second insulating gasket 6272 between the second nut 6292 and the first conductive end plate 6281, the second nut 6292 and the first conductive end plate 6281 are electrically isolated in a first direction. By surrounding the second connector 624 and passing through the first conductive end plate 6281 into the first electrode plate 621, the second connector 624 and the first conductive end plate 6281 are electrically isolated in the radial direction, and the second connector 624 and the first electrode plate 621 are completely electrically isolated.

[0199] Specifically, the first connector 623 is sequentially inserted through the first insulating gasket 6271, the second conductive end plate 6282, the second electrode plate 622, the proton exchange membrane 625, the first electrode plate 621, the first conductive end plate 6281, the first conductive gasket 6273, and the first nut 6291; the second connector 624 is sequentially inserted through the second conductive gasket 6274, the second conductive end plate 6282, the second electrode plate 622, the proton exchange membrane 625, the first electrode plate 621, the first conductive end plate 6281, the second insulating gasket 6272, and the second nut 6292.

[0200] In some embodiments, such as Figure 16 and Figure 17 As shown, the housing 61 includes a first housing 612 and a second housing 613, which are connected to define an electrolysis chamber 611. A first connector 623 and a second connector 624 are connected to the first housing 612.

[0201] The housing 61 in this embodiment includes a first housing 612 and a second housing 613. The electrolysis assembly 62 is installed inside the housing 61 by connecting the first connector 623 and the second connector 624 to the first housing 612, thereby improving the ease of installation.

[0202] Optionally, the first shell 612 has an outer peripheral flange 6121 defining the cavity 6122 on the side opposite to the second shell 613, and the end of the first connector 623 extending out of the electrolysis cavity 611 and the end of the second connector 624 extending out of the electrolysis cavity 611 are both located inside the cavity 6122.

[0203] The electrolysis device 6 also includes two sealing rings 64. One sealing ring 64 is fitted on the first connecting member 623 and seals with the first shell 612, and the other sealing ring 64 is fitted on the second connecting member 624 and seals with the first shell 612.

[0204] In some embodiments, at least one of the inner wall of the first shell 612 and the inner wall of the second shell 613 is provided with a baffle 614, the free end of the baffle 614 extending toward the adjacent electrode sheet and spaced apart from each other.

[0205] In this embodiment, the baffle 614 gathers the liquid in the electrolysis chamber 611 toward the connecting hole 626, which can increase the water flow rate and thus increase the diffusion rate of water in the electrolysis chamber 611 to the electrode plate and the proton exchange membrane 625, thereby further improving the electrolysis efficiency.

[0206] Specifically, such as Figure 17 As shown, at least one of the inner walls of the first shell 612 and the second shell 613 is provided with a baffle 614. This can be understood as: the inner wall of the first shell 612 is provided with a baffle 614, or the inner wall of the second shell 613 is provided with a baffle 614, or both the inner walls of the first shell 612 and the inner walls of the second shell 613 are provided with baffles 614. In this embodiment, both the inner walls of the first shell 612 and the inner walls of the second shell 613 are provided with baffles 614. The baffle 614 extends along a first direction.

[0207] In some embodiments, such as Figures 16-18 As shown, the electrolysis device 6 also includes a third nut 631 and a fourth nut 632. The third nut 631 is engaged with one end of the first connector 623 that extends out of the electrolysis chamber 611, and the fourth nut 632 is engaged with one end of the second connector 624 that extends out of the electrolysis chamber 611, so that the electrolysis assembly 62 is suspended in the electrolysis chamber 611 by the first connector 623 and the second connector 624.

[0208] In this embodiment, the first connector 623 extends out of the electrolysis chamber 611 and engages with the third nut 631, and the second connector 624 extends out of the electrolysis chamber 611 and engages with the fourth nut 632, so as to suspend the electrolysis component 62 inside the electrolysis chamber 611, avoid the electrolysis component 62 from contacting the inner wall surface of the housing 61, block stray current circuit, and thus extend the overall service life of the electrolysis device 6.

[0209] Optionally, the third nut 631 and the fourth nut 632 are both located within the chamber 6122.

[0210] In some embodiments, the first electrode sheet 621 and the second electrode sheet 622 both include a substrate and a coating disposed on the substrate. The coating is disposed on both the surface of the substrate of the first electrode sheet 621 facing the second electrode sheet 622 and the surface away from the second electrode sheet 622, or the coating is disposed only on the surface of the substrate of the first electrode sheet 621 facing the second electrode sheet 622.

[0211] In this embodiment, a coating is provided on both the surface of the substrate of the first electrode sheet 621 facing the second electrode sheet 622 and the surface away from the second electrode sheet 622, or a coating is provided only on the surface of the substrate of the first electrode sheet 621 facing the second electrode sheet 622. The coating reduces the charge transfer resistance and avoids substrate exposure, thereby improving the stability and reliability of the electrolysis assembly 62.

[0212] Optionally, the surface of the substrate of the first electrode sheet 621 facing the second electrode sheet 622 is coated. Since the surface of the substrate of the first electrode sheet 621 facing away from the second electrode sheet 622 is covered by the first conductive end plate 6281 and has no contact with the outside, the surface of the substrate of the first electrode sheet 621 facing away from the second electrode sheet 622 does not need to be coated, which helps to reduce manufacturing costs.

[0213] Optionally, the substrate of the first electrode sheet 621 is a silicon substrate, and the coating of the first electrode sheet 621 is a diamond coating.

[0214] In some embodiments, both the first electrode sheet 621 and the second electrode sheet 622 include a substrate and a coating disposed on the substrate. The coating is disposed on both the surface of the substrate of the second electrode sheet 622 facing the first electrode sheet 621 and the surface away from the first electrode sheet 621, or the coating is disposed only on the surface of the substrate of the second electrode sheet 622 facing the first electrode sheet 621.

[0215] In this embodiment, a coating is provided on both the surface of the substrate of the second electrode sheet 622 facing the first electrode sheet 621 and the surface away from the first electrode sheet 621, or a coating is provided only on the surface of the substrate of the second electrode sheet 622 facing the first electrode sheet 621. The coating reduces the charge transfer resistance and avoids substrate exposure, thereby improving the stability and reliability of the electrolysis assembly 62.

[0216] Optionally, the surface of the substrate of the second electrode sheet 622 facing the first electrode sheet 621 is coated. Since the surface of the substrate of the second electrode sheet 622 facing away from the first electrode sheet 621 is covered by the second conductive end plate 6282 and has no contact with the outside world, the surface of the substrate of the second electrode sheet 622 facing away from the first electrode sheet 621 does not need to be coated, which helps to reduce manufacturing costs.

[0217] Optionally, the substrate of the second electrode 622 is a silicon substrate, and the coating of the second electrode 622 is a diamond coating.

[0218] In the description of this disclosure, it should be understood that the terms "center," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," and "circumferential" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing this disclosure and simplifying the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this disclosure.

[0219] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this disclosure, "a plurality of" means at least two, such as two, three, etc., unless otherwise explicitly specified.

[0220] In this disclosure, unless otherwise expressly specified and limited, the terms "installation," "connection," "linking," "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection, an electrical connection, or a connection that allows communication between components; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components, unless otherwise expressly limited. Those skilled in the art can understand the specific meaning of the above terms in this disclosure according to the specific circumstances.

[0221] In this disclosure, unless otherwise expressly specified and limited, "above" or "below" the second feature can mean that the first and second features are in direct contact, or that the first and second features are in indirect contact through an intermediate medium. Furthermore, "above," "on top of," and "over" the second feature can mean that the first feature is directly above or diagonally above the second feature, or simply that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature can mean that the first feature is directly below or diagonally below the second feature, or simply that the first feature is at a lower horizontal level than the second feature.

[0222] In this disclosure, the terms "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., refer to a specific feature, structure, material, or characteristic described in connection with that embodiment or example, which is included in at least one embodiment or example of this disclosure. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.

[0223] Although embodiments of the present disclosure have been shown and described above, it is to be understood that the above embodiments are exemplary and should not be construed as limiting the present disclosure. Those skilled in the art can make changes, modifications, substitutions and variations to the above embodiments within the scope of the present disclosure.

Claims

1. A garment processing device, characterized in that, include: Casing (1); Processing cylinder (2), the processing cylinder (2) is disposed inside the housing (1) and has a processing cavity (21); A detergent box (3) is disposed in the housing (1) and has a detergent chamber (31); Water valve (4), the water valve (4) is located in the housing (1); The first water path (51) and the second water path (52) are connected to the water valve (4). The water valve (4) is used to supply water of different flow rates to the first water path (51) and the second water path (52). The water flow rate of the first water path (51) is less than that of the second water path (52). The first water path (51) and the second water path (52) are both connected to the processing chamber (21). An electrolysis device (6) is provided in the first water channel (51) or in a water channel connected to the first water channel (51).

2. The garment processing equipment according to claim 1, characterized in that, The first water path (51) and the second water path (52) are independent of each other. The electrolysis device (6) is located in the first water path (51), and the second water path (52) is connected to the detergent chamber (31).

3. The garment processing equipment according to claim 2, characterized in that, The first water channel (51) is at least partially located in the material box (3), and the material box (3) is located downstream of the electrolysis device (6) in the water flow direction of the first water channel (51).

4. The garment processing equipment according to claim 3, characterized in that, It also includes a mounting bracket (7), which is disposed inside the housing (1), and the electrolysis device (6) is disposed on the mounting bracket (7).

5. The garment processing equipment according to claim 4, characterized in that, The mounting bracket (7) is detachably connected to the housing (1).

6. The garment processing equipment according to claim 4, characterized in that, The mounting bracket (7) has a connecting part (71) and a mounting part (72) connected to each other. The connecting part (71) is connected to the housing (1), and the mounting part (72) is used to mount the electrolysis device (6).

7. The garment processing equipment according to claim 6, characterized in that, The mounting part (72) is lower than the connecting part (71).

8. The garment processing equipment according to claim 7, characterized in that, The top of the inner wall of the housing (1) has a flange (11), and the connecting part (71) is connected to the flange (11).

9. The garment processing equipment according to claim 6, characterized in that, The mounting part (72) has a clearance part (721) for avoiding the water inlet (6111) and water outlet (6112) of the electrolysis device (6).

10. The garment processing equipment according to claim 6, characterized in that, The mounting bracket (7) includes a first plate (73), a second plate (74), and a third plate (75). The second plate (74) extends vertically. The first plate (73) extends from the upper end of the second plate (74) toward the inner wall of the housing (1). The third plate (75) extends from the lower end of the second plate (74) in a direction away from the inner wall of the housing (1). At least one of the first plate (73) and the second plate (74) forms the connecting portion (71), and the third plate (75) forms the mounting portion (72).

11. The garment processing equipment according to claim 10, characterized in that, The second plate (74) has a first snap-fit ​​part (741), and the inner wall surface of the housing (1) is provided with a second snap-fit ​​part, and the first snap-fit ​​part (741) and the second snap-fit ​​part are snap-fitted together.

12. The garment processing equipment according to claim 2, characterized in that, The first water channel (51) is at least partially located in the material box (3), and the electrolysis device (6) is located in the portion of the first water channel (51) in the material box (3).

13. The garment processing equipment according to claim 2, characterized in that, The first water channel (51) and the material box (3) are independent of each other.

14. The garment processing apparatus according to any one of claims 3-13, characterized in that, The second water channel (52) is at least partially located in the material box (3).

15. The garment processing equipment according to claim 1, characterized in that, The detergent box (3) includes a housing (381) and a dispensing box (382), the detergent chamber (31) is formed in the dispensing box (382), the housing (381) has a receiving cavity (3811), and the dispensing box (382) is disposed within the receiving cavity (3811) and is movable relative to the housing (381); or, The detergent box (3) includes a housing (381), and the detergent cavity (31) is formed in the housing (381).

16. The garment processing equipment according to claim 15, characterized in that, The outer casing (381) includes a bottom shell (3812) and an upper shell (3813), the upper shell (3813) being fastened to the bottom shell (3812) to form the receiving cavity (3811) or detergent cavity (31).

17. The garment processing equipment according to claim 16, characterized in that, The material box (3) also includes a top cover (383), which covers the upper shell (3813) and defines, together with the upper shell (3813), at least a portion of the first water passage (51) in the material box (3) and / or a portion of the second water passage (52) in the material box (3).

18. The garment processing equipment according to claim 17, characterized in that, The container (3) has a first liquid inlet channel (32) disconnected from the detergent chamber (31), the first liquid inlet channel (32) is connected to the receiving chamber (3811), and the first liquid inlet channel (32) and the receiving chamber (3811) form the first water path (51) located in at least part of the container (3).

19. The garment processing equipment according to claim 18, characterized in that, The material box (3) also has a discharge port (384) and a discharge port (385). The discharge port (384) is connected to the receiving cavity (3811) and the first liquid inlet channel (32). The discharge port (385) is connected to the receiving cavity (3811) and is connected to the processing cavity (21) through a second connecting pipe.

20. The garment processing equipment according to claim 18, characterized in that, At least a portion of the electrolysis device (6) is located within the first liquid inlet channel (32).

21. The garment processing apparatus according to any one of claims 17-20, characterized in that, The material box (3) further includes a second liquid inlet channel (37), which is connected to the detergent chamber (31). The second liquid inlet channel (37) forms part of the second water path (52) located in the material box (3).

22. The garment processing equipment according to claim 21, characterized in that, The second liquid inlet channel (37) has a liquid outlet (371), which is connected to the processing chamber (21) through a first connecting pipe.

23. The garment processing equipment according to claim 21, characterized in that, The material box (3) is provided with a feed inlet (386), which is connected to the second liquid inlet channel (37) and the detergent chamber (31). The detergent in the detergent chamber (31) enters the second liquid inlet channel (37) through the feed inlet (386).

24. The garment processing equipment according to claim 17, characterized in that, The electrolysis device (6) is mounted on the material box (3). The electrolysis device (6) has an electrolysis chamber (611). The material box (3) has an inlet channel (33) and an outlet channel (34). The material box (3) is also provided with a first water inlet (35) and a first water outlet (36). The first water inlet (35) is connected to the inlet channel (33) and the electrolysis chamber (611). The first water outlet (36) is connected to the outlet channel (34) and the electrolysis chamber (611).

25. The garment processing equipment according to claim 1, characterized in that, It also includes a water collection channel (53), the outlet of the first water channel (51) and the outlet of the second water channel (52) are both connected to the processing chamber (21) through the water collection channel (53), and the electrolysis device (6) is located in the first water channel (51) or in the water collection channel (53).

26. The garment processing equipment according to claim 25, characterized in that, The electrolysis device (6) is located upstream of the feed box (3) in the direction of water flow; or, The electrolysis device (6) is mounted on the material box (3).

27. The garment processing equipment according to claim 25, characterized in that, At least a portion of the water collection channel (53) is located in the material box (3).

28. The garment processing equipment according to claim 27, characterized in that, The connection between the first water channel (51) and the collecting water channel (53) and / or the connection between the second water channel (52) and the collecting water channel (53) is located within the material box (3); or, The connection between the first water channel (51) and the collecting water channel (53) and / or the connection between the second water channel (52) and the collecting water channel (53) are located upstream of the material box (3) in the direction of water flow.

29. The garment processing equipment according to claim 1, characterized in that, The water valve (4) includes a first water valve (41) and a second water valve (42). The outlet of the first water valve (41) is connected to the inlet of the first water passage (51), and the outlet of the second water valve (42) is connected to the inlet of the second water passage (52). The rated outflow rate of the first water valve (41) is less than the rated outflow rate of the second water valve (42).

30. The garment processing equipment according to claim 29, characterized in that, The rated flow rate of the first water valve (41) is 2-4 L / min; and / or, The rated outflow rate of the second water valve (42) is 7-9 L / min.

31. The garment processing equipment according to claim 24, characterized in that, The electrolysis device (6) includes a first electrode plate (621), a second electrode plate (622), a first connector (623), and a second connector (624). The first electrode plate (621) and the second electrode plate (622) are stacked in a first direction. The first connector (623) and the second connector (624) both pass through the first electrode plate (621) and the second electrode plate (622) along the first direction. One end of the first connector (623) extends out of the electrolysis chamber (611) to form a first terminal. The first connector (623) is in conductive contact with the first electrode plate (621). One end of the second connector (624) extends out of the electrolysis chamber (611) to form a second terminal. The second connector (624) is in conductive contact with the second electrode plate (622).

32. The garment processing equipment according to claim 31, characterized in that, The electrolysis device (6) further includes a proton exchange membrane (625), which is disposed between the first electrode plate (621) and the second electrode plate (622). At least one of the first electrode plates (621) and the second electrode plate (622) is provided with a through hole (626) extending along the first direction, so that the electrolyte in the electrolysis chamber (611) diffuses through the through hole (626) to the space between the electrode plate and the proton exchange membrane (625).