Pier spraying maintenance water recycling structure

CN224901985UActive Publication Date: 2026-10-27GUANGDONG PROVINCIAL ARCHITECTURAL ENG MACHINERY CONSTR +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522213391.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-10-20
Publication Date
2026-10-27
Estimated Expiration
2035-10-20

AI Technical Summary

Technical Problem

[0003]本实用新型的目的之一在于提供一种桥墩喷淋养护水回收结构,以解决现有技术中水回收系统通常无法实现快速安装与拆卸,导致施工效率不够高的问题

Benefits of technology

第一收集架和第二收集架通过可拆卸围合的安装方式,使得第一收集架和第二收集架能够便捷、快速地围合形成蓄水槽,这种模块化的拼接使得蓄水槽的施工快速便捷,施工效率高;多个升降调节组件不仅能够为第一收集架和第二收集架提供稳定地支撑,确保施工过程中第一收集架和第二收集架能够稳固放置,各升降调节组件还能够通过调节支撑高度来适应不平整地形,实现稳固支撑,提高了水回收结构的适应性和实用性。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224901985U_ABST
    Figure CN224901985U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of pier spray maintenance water recovery structures, comprising: first collecting frame, second collecting frame and connecting assembly, and first collecting frame and second collecting frame are detachably enclosed on pier main body by connecting assembly, and form water storage tank;Multiple lifting adjusting components, each lifting adjusting component is respectively installed at the bottom of first collecting frame and second collecting frame, for supporting first collecting frame and second collecting frame, and adjusting support height.First collecting frame and second collecting frame are installed by detachable enclosure mode, so that first collecting frame and second collecting frame can be conveniently and quickly enclosed to form water storage tank, so that the construction of water storage tank is quick and convenient, and construction efficiency is high;Multiple lifting adjusting components not only provide stable support for first collecting frame and second collecting frame, ensure that first collecting frame and second collecting frame are stably placed during construction, but also can adapt to uneven terrain by adjusting support height, improve the adaptability and practicality of water recovery structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of automotive testing technology, and specifically to a bridge pier spray curing water recycling structure. Background Technology

[0002] Bridge piers and abutments are indispensable supporting structures in bridge engineering, mainly composed of piers and abutments. They bear the important functions of transferring loads and ensuring the stability of the bridge. Piers, located between spans, are the intermediate support structures of multi-span bridges. Their core function is to bear the loads from the superstructure and transfer the loads and their own weight to the foundation. Pier maintenance is a crucial process for ensuring the strength, stiffness, stability, and durability of the structure; its construction quality directly affects the structure's performance and lifespan. During pier maintenance, water spraying is required. To achieve environmental protection, water tanks are usually installed at the bottom of the piers to collect excess water for recycling. Existing water recycling systems often cannot be quickly installed and dismantled, resulting in low construction efficiency. Therefore, a water recycling structure that is easy to install and dismantle is needed to improve construction efficiency. Utility Model Content

[0003] One of the purposes of this utility model is to provide a water recycling structure for bridge pier spray curing, so as to solve the problem that the existing water recycling system usually cannot achieve rapid installation and disassembly, resulting in low construction efficiency.

[0004] To achieve the above objectives, the technical solution adopted by this utility model is as follows: A water recycling structure for bridge pier spraying maintenance, for installation on the main body of the bridge pier, includes: a first collection frame, a second collection frame, and a connecting assembly. The first collection frame and the second collection frame are detachably enclosed on the main body of the bridge pier through the connecting assembly to form a water storage tank for collecting excess water during the bridge pier spraying maintenance process; and multiple lifting and adjusting components, each of which is installed at the bottom of the first collection frame and the second collection frame to support the first collection frame and the second collection frame and adjust the support height.

[0005] Based on the aforementioned technical means, the first and second collection racks are installed in a detachable and enclosed manner, allowing them to be easily and quickly assembled to form a water storage tank. This modular assembly makes the construction of the water storage tank fast, convenient, and efficient. Multiple lifting and adjusting components not only provide stable support for the first and second collection racks, ensuring their stable placement during construction, but also allow each lifting and adjusting component to adapt to uneven terrain by adjusting the support height, thus achieving stable support and improving the adaptability and practicality of the water recycling structure.

[0006] Furthermore, the connecting component includes a connecting block and a locking block. The connecting block is mounted on the first collection rack and has a locking hole formed thereon. The locking block is mounted on the second collection rack. The locking block can be inserted into or released from the locking hole so that the first collection rack and the second collection rack can be locked together or released from locking together.

[0007] Based on the above-mentioned technical means, the connection method of inserting or de-inserting the connecting block and the card block can realize the rapid connection and separation of the first collection rack and the second collection rack. The operation is simple and convenient, and the efficiency of connecting and disassembling the first collection rack and the second collection rack is improved.

[0008] Furthermore, the connecting block includes a housing, an insert, a push rod, a handle, and a spring. The housing is mounted on the first collection rack and forms a cavity inside. The insert is mounted inside the cavity. One end of the push rod is mounted on the insert, and the other end extends out of the housing and is connected to the handle. The spring is sleeved on the push rod, and its two ends abut against the inner wall of the housing and the insert, respectively. When the locking block is inserted into the locking hole, the insert engages with the locking block.

[0009] Based on the above technical means, the insert block, push rod, and spring together form a spring self-locking structure. When the locking block is inserted into the locking hole, the insert block is locked and engaged with the locking block under the action of the spring, achieving a continuous and stable connection. When it is necessary to release the locking block from the insert block, pull the handle in the direction that compresses the spring, causing the push rod to move the insert block away from the locking block. Then, pull the locking block out of the locking hole to separate the first collection rack and the second collection rack. This makes the connection between the first collection rack and the second collection rack reliable and the disassembly and assembly quick and convenient.

[0010] Furthermore, a push plate is formed on the side of the insert block that is connected to the push rod, and one end of the spring abuts against the push plate.

[0011] Based on the above technical means, the push plate provides a stable contact surface for one end of the spring, which increases the stability of the spring contact without affecting the structure of the insert block.

[0012] Furthermore, a slot is formed on the card block, and when the card block is inserted into the card hole, the insert block is engaged in the slot.

[0013] Based on the above technical means, the slot provides installation limits for the engagement of the insert block and the card block, ensuring the effectiveness of the engagement between the insert block and the card block.

[0014] Furthermore, a positioning hole is formed on the first collection rack, and a positioning block is formed on the second collection rack, or a positioning block is formed on the first collection rack and a positioning hole is formed on the second collection rack; the positioning block can be inserted into the positioning hole for positioning the first collection rack and the second collection rack during installation.

[0015] According to the above technical means, the positioning block and positioning hole play an initial positioning and precise guiding role in the connection between the first collection rack and the second collection rack, and can increase the connection strength during the connection process of the first collection rack and the second collection rack, prevent damage to the connection components, and improve the durability of the connection components.

[0016] Furthermore, it also includes a drain valve, which is installed on the first collection rack and / or the second collection rack, for draining excess water collected in the water storage tank.

[0017] Based on the above-mentioned technical means, when there is too much water in the water storage tank, the water can be drained through the drain valve, realizing the active discharge of water in the water storage tank and improving the convenience and efficiency of drainage.

[0018] Furthermore, each of the lifting and adjusting components includes a support block, a threaded rod, and a support foot. The support block is installed at the bottom of the first collection rack / second collection rack. A threaded hole is formed at one end of the support block away from the first collection rack / second collection rack. One end of the threaded rod is threaded into the threaded hole, and the other end is connected to the support foot.

[0019] Based on the above technical means, the support block and the threaded rod work together to adjust the support height of the lifting adjustment component and achieve a self-locking effect, thus realizing the purpose of support on uneven ground and improving the versatility of the water storage tank; the support feet can increase the support area and prevent the threaded rod from inserting into the ground.

[0020] Furthermore, a wrench is formed on the support foot so that construction personnel can tighten the support foot and the threaded rod.

[0021] Based on the above technical means, construction workers can easily and effortlessly adjust the support height by using a wrench to tighten the support feet and threaded rods.

[0022] Furthermore, it also includes a sealing ring, which is installed at the junction of the first collection rack and the second collection rack to prevent water leakage into the water storage tank.

[0023] Based on the above technical means, the sealing ring can ensure the sealing of the connection between the first and second collection racks, preventing water leakage and waste of water resources.

[0024] The beneficial effects of this utility model are as follows: The first and second collection racks are installed in a detachable and enclosed manner, allowing them to be easily and quickly assembled to form a water storage tank. This modular assembly makes the construction of the water storage tank fast, convenient, and efficient. Multiple lifting and adjusting components not only provide stable support for the first and second collection racks, ensuring their secure placement during construction, but also allow the lifting and adjusting components to adapt to uneven terrain by adjusting the support height, thus improving the adaptability and practicality of the water recycling structure. Attached Figure Description

[0025] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0026] Figure 1 This is a schematic diagram of the overall structure and installation of this utility model; Figure 2 This is a schematic diagram of the structure of the first and second collection racks of this utility model; Figure 3 for Figure 2 Enlarged view of the structure at point A in the middle; Figure 4 for Figure 2 Enlarged schematic diagram of the structure at point B; Figure 5 This is a schematic diagram of the structure of the housing of the hidden part of the connecting block in this utility model; Figure 6 This is an exploded structural diagram of the lifting and adjusting component of this utility model.

[0027] in, 001. Pier main body; 100. First collection rack; 110. Positioning hole; 200. Second collection rack; 210. Positioning block; 300. Connecting assembly; 310. Connecting block; 311. Locking hole; 312. Housing; 313. Insert block; 3131. Push plate; 314. Push rod; 315. Handle; 316. Spring; 320. Locking block; 321. Locking groove; 400. Lifting and adjusting assembly; 410. Support block; 411. Threaded hole; 420. Threaded rod; 430. Support foot; 431. Wrench; 500. Drain valve. Detailed Implementation

[0028] The embodiments of the present invention will be described below with reference to the accompanying drawings and preferred embodiments. The drawings are for illustrative purposes only and should not be construed as limiting the present invention. Those skilled in the art can easily understand other advantages and effects of the present invention from the content disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and various details in this specification can also be modified or changed based on different viewpoints and applications without departing from the spirit of the present invention. It should be understood that the preferred embodiments are only for illustrating the present invention and not for limiting the scope of protection of the present invention.

[0029] It should be noted that the illustrations provided in the following embodiments are only schematic representations of the basic concept of the present invention. Therefore, the drawings only show the components related to the present invention and are not drawn according to the actual number, shape and size of the components in the actual implementation. In the actual implementation, the form, quantity and proportion of each component can be arbitrarily changed, and the layout of the components may also be more complex.

[0030] This embodiment provides, as follows: Figures 1 to 6 The diagram shows a bridge pier spray curing water recycling structure, which is installed on the bridge pier body 001. It includes: a first collection frame 100, a second collection frame 200, and a connecting component 300. The first collection frame 100 and the second collection frame 200 are detachably enclosed on the bridge pier body 001 by the connecting component 300 to form a water storage tank for collecting excess water during the bridge pier spray curing process; and multiple lifting adjustment components 400, each of which is installed at the bottom of the first collection frame 100 and the second collection frame 200 to support the first collection frame 100 and the second collection frame 200 and adjust the support height.

[0031] Before spraying and curing the main body 001 of the bridge pier, the first collection rack 100 and the second collection rack 200 are attached to the main body 001 of the bridge pier and connected to each other by the connecting component 300 to form a water storage tank, which collects curing water during the curing process of the main body 001 of the bridge pier. When installing the water storage tank of this embodiment on uneven terrain, the height of each lifting adjustment component 400 can be adjusted to adapt to the uneven terrain, so that the first collection rack 100 and the second collection rack 200 can be attached to the outer surface of the main body 001 of the bridge pier. When it is necessary to disassemble the water storage tank, the connection relationship of the connecting component 300 can be released to complete the disassembly of the first collection rack 100 and the second collection rack 200.

[0032] The first collection rack 100 and the second collection rack 200 are installed in a detachable and enclosed manner, allowing them to be easily and quickly assembled to form a water storage tank. This modular assembly makes the construction of the water storage tank fast, convenient, and efficient. Multiple lifting and adjusting components 400 not only provide stable support for the first collection rack 100 and the second collection rack 200, ensuring that they can be placed securely during construction, but each lifting and adjusting component 400 can also adapt to uneven terrain by adjusting the support height, achieving stable support and improving the stability of the water storage tank during use. At the same time, it improves the adaptability and practicality of the water recycling structure.

[0033] The water recycling structure in this embodiment is simple and can be repeatedly disassembled and reused, resulting in low cost and high economic efficiency. When spraying and curing bridge pier bodies 001 of different diameters, a first collection rack 100 and a second collection rack 200 adapted to the outer surface of the bridge pier body 001 can be customized to ensure that the first collection rack 100 and the second collection rack 200 can fit the outer surface of the bridge pier body 001.

[0034] In this embodiment, the cross-sections of the first collection rack 100 and the second collection rack 200 are both U-shaped, so that when the first collection rack 100 and the second collection rack 200 are enclosed, they form an annular water storage tank surrounding the pier body 001.

[0035] like Figure 2 As shown, in this embodiment, the connecting component 300 includes a connecting block 310 and a locking block 320. The connecting block 310 is mounted on the first collection rack 100, and a locking hole 311 is formed on the connecting block 310. The locking block 320 is mounted on the second collection rack 200. The locking block 320 can be inserted into or released from the locking hole 311, so that the first collection rack 100 and the second collection rack 200 can be locked together or released. The connection method of inserting or releasing the connecting block 310 and the locking block 320 enables the quick connection and separation of the first collection rack 100 and the second collection rack 200, which is simple and convenient to operate and improves the efficiency of connecting and disassembling the first collection rack 100 and the second collection rack 200. Of course, the connecting block 310 and the locking block 320 can also be installed in reverse, so that the connecting block 310 is mounted on the second collection rack 200 and the locking block 320 is mounted on the first collection rack 100, which also enables the first collection rack 100 and the second collection rack 200 to be locked together or released.

[0036] like Figure 5As shown, in this embodiment, the connecting block 310 includes a housing 312, an insert block 313, a push rod 314, a handle 315, and a spring 316. The housing 312 is mounted on the first collection rack 100 and forms a cavity inside. The insert block 313 is mounted inside the cavity. One end of the push rod 314 is mounted on the insert block 313, and the other end extends out of the housing 312 and is connected to the handle 315. The spring 316 is sleeved on the push rod 314, and both ends abut against the inner wall of the housing 312 and the insert block 313, respectively. When the locking block 320 is inserted into the locking hole 311, the insert block 313 and the locking block 320 are locked together. The insert block 313, push rod 314, and spring 316 together form a spring 316 self-locking structure. When the locking block 320 is inserted into the locking hole 311, the insert block 313 is locked and engaged with the locking block 320 under the action of the spring 316, achieving a continuous and stable connection. To release the engagement between the locking block 320 and the insert block 313, pull the handle 315 in the direction that compresses the spring 316. This causes the push rod 314 to move the insert block 313 away from the locking block 320, and then the locking block 320 can be pulled out of the locking hole 311 to separate the first collection rack 100 and the second collection rack 200. This ensures a reliable connection between the first collection rack 100 and the second collection rack 200, and allows for quick and convenient assembly and disassembly. To release the engagement between the locking block 320 and the insert block 313, the operator needs to pull the handle 315.

[0037] In this embodiment, both the first collection rack 100 and the second collection rack 200 are semi-circular structures. In order to ensure that the first collection rack 100 and the second collection rack 200 can be stably installed together, a connecting block 310 and a locking block 320 are provided at both connection points of the first collection rack 100 and the second collection rack 200. When disassembling the first collection rack 100 and the second collection rack 200, two workers need to pull the handle 315 at the same time to disengage the insert block 313 from the locking block 320. Then, the first collection rack 100 / second collection rack 200 with the locking block 320 installed can be pulled out to complete the disassembly of the first collection rack 100 and the second collection rack 200.

[0038] like Figure 5 As shown, in this embodiment, a push plate 3131 is formed on the side where the insert block 313 is connected to the push rod 314, and one end of the spring 316 abuts against the push plate 3131. The push plate 3131 provides a stable abutting surface for one end of the spring 316, increasing the stability of the spring 316 abutting without affecting the structure of the insert block 313.

[0039] like Figure 4 As shown, in this embodiment, a slot 321 is formed on the card block 320. When the card block 320 is inserted into the card hole 311, the insert block 313 is engaged in the slot 321. The slot 321 provides an installation limit for the engagement of the insert block 313 and the card block 320, ensuring the effectiveness of the engagement between the insert block 313 and the card block 320.

[0040] like Figure 2 and Figure 3 As shown, in this embodiment, a positioning hole 110 is formed on the first collection rack 100, and a positioning block 210 is formed on the second collection rack 200; or, a positioning block 210 is formed on the first collection rack 100, and a positioning hole 110 is formed on the second collection rack 200. The positioning block 210 can be inserted into the positioning hole 110 for positioning the first collection rack 100 and the second collection rack 200 during installation. The positioning block 210 and the positioning hole 110 provide initial positioning and precise guidance for the connection between the first collection rack 100 and the second collection rack 200, and can increase the connection strength during the connection process, prevent damage to the connecting component 300, and improve the durability of the connecting component 300.

[0041] like Figure 1 and Figure 2 As shown, this embodiment also includes a drain valve 500. The drain valve 500 is installed on the first collection rack 100 and / or the second collection rack 200 to drain excess water collected in the water storage tank. When there is too much water in the water storage tank, the drain valve 500 can drain the water, achieving active drainage of the water in the water storage tank and improving the convenience and efficiency of drainage. Of course, the drain valve 500 in this embodiment can also be a faucet connected to the inside of the water storage tank.

[0042] like Figure 6 As shown, in this embodiment, each lifting adjustment component 400 includes a support block 410, a threaded rod 420, and a support foot 430. The support block 410 is installed at the bottom of the first collection rack 100 / second collection rack 200; a threaded hole 411 is formed at the end of the support block 410 away from the first collection rack 100 / second collection rack 200; one end of the threaded rod 420 is threaded into the threaded hole 411, and the other end is connected to the support foot 430. The support block 410 and the threaded rod 420 cooperate to adjust the support height of the lifting adjustment component 400 and achieve a self-locking effect, realizing the purpose of support on uneven ground and improving the versatility of the water tank; the support foot 430 can increase the support area and prevent the threaded rod 420 from inserting into the ground.

[0043] like Figure 6 As shown, in this embodiment, a wrench 431 is formed on the support foot 430 so that the construction personnel can tighten the support foot 430 and the threaded rod 420. The construction personnel can tighten the support foot 430 and the threaded rod 420 by using the wrench 431, which is labor-saving and convenient, and improves the efficiency of adjusting the support height.

[0044] In this embodiment, a sealing ring (not shown in the figure) is also included. The sealing ring is installed at the junction of the first collection rack 100 and the second collection rack 200 to prevent water leakage from the water storage tank. The sealing ring can ensure the sealing of the junction of the first collection rack 100 and the second collection rack 200, preventing water leakage from causing water waste.

[0045] In summary, before spraying the bridge piers, the first collection rack 100 and the second collection rack 200 are brought close together from both sides of the pier body 001. At this time, the positioning blocks 210 will be fully inserted into the positioning holes 110, and the locking blocks 320 will also be inserted into the locking holes 311 of the connecting blocks 310. In the locking holes 311, the locking blocks 320 push the insert blocks 313 in the direction that compresses the spring 316. When the locking blocks 320 are further inserted, the insert blocks 313 are locked into the locking grooves 321 on the locking blocks 320 under the action of the spring 316. At this time, the locking blocks 320 and the connecting blocks 310 are fixed together, and the spraying curing of the pier body 001 can be carried out. During the curing process, if too much water accumulates in the water tank and needs to be drained, the drain valve 500 can be opened to drain the water. After the main body of the pier 001 is maintained, when it is necessary to disassemble the water storage tank, the construction personnel pull the handle 315 to make the push rod 314 drive the insert block 313 to disengage from the slot 321, and then separate the first collection frame 100 and the second collection frame 200 to complete the disassembly.

[0046] Obviously, the above embodiments of this utility model are merely examples for clearly illustrating the present utility model, and are not intended to limit the implementation of the present utility model. Those skilled in the art can make other variations or modifications based on the above description. It is neither necessary nor possible to exhaustively list all possible implementations here. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of this utility model should be included within the protection scope of the claims of this utility model.

Claims

1. A bridge pier spray curing water recycling structure, used for installation on the main body of the bridge pier (001), characterized in that, include: A first collection rack (100), a second collection rack (200), and a connecting assembly (300) are provided. The first collection rack (100) and the second collection rack (200) are detachably enclosed on the pier body (001) by the connecting assembly (300) to form a water storage tank for collecting excess water during the pier spraying maintenance process. Multiple lifting adjustment components (400) are installed at the bottom of the first collection rack (100) and the second collection rack (200) respectively, for supporting the first collection rack (100) and the second collection rack (200) and adjusting the support height.

2. The bridge pier spray curing water recycling structure according to claim 1, characterized in that, The connecting component (300) includes a connecting block (310) and a locking block (320). The connecting block (310) is mounted on the first collection rack (100) and has a locking hole (311) formed thereon. The locking block (320) is mounted on the second collection rack (200). The locking block (320) can be inserted into or uninserted into the locking hole (311) so that the first collection rack (100) and the second collection rack (200) can be locked together or unlocked.

3. The bridge pier spray curing water recycling structure according to claim 2, characterized in that, The connecting block (310) includes a housing (312), an insert (313), a push rod (314), a handle (315), and a spring (316). The housing (312) is mounted on the first collection rack (100) and forms a cavity inside. The insert (313) is mounted inside the cavity. One end of the push rod (314) is mounted on the insert (313), and the other end extends out of the housing (312) and is connected to the handle (315). The spring (316) is sleeved on the push rod (314), and both ends abut against the inner wall of the housing (312) and the insert (313), respectively. When the locking block (320) is inserted into the locking hole (311), the insert (313) is locked with the locking block (320).

4. The bridge pier spray curing water recycling structure according to claim 3, characterized in that, A push plate (3131) is formed on the side where the insert (313) is connected to the push rod (314), and one end of the spring (316) abuts against the push plate (3131).

5. The bridge pier spray curing water recycling structure according to claim 3, characterized in that, The card block (320) has a card slot (321) formed on it. When the card block (320) is inserted into the card hole (311), the insert block (313) is engaged in the card slot (321).

6. The bridge pier spray curing water recycling structure according to claim 1, characterized in that, The first collection rack (100) has a positioning hole (110), and the second collection rack (200) has a positioning block (210), or the first collection rack (100) has a positioning block (210), and the second collection rack (200) has a positioning hole (110); the positioning block (210) can be inserted into the positioning hole (110) for positioning the first collection rack (100) and the second collection rack (200) during installation.

7. The bridge pier spray curing water recycling structure according to claim 1, characterized in that, It also includes a drain valve (500), which is installed on the first collection rack (100) and / or the second collection rack (200) for draining excess water collected in the water storage tank.

8. The bridge pier spray curing water recycling structure according to claim 1, characterized in that, Each of the lifting adjustment components (400) includes a support block (410), a threaded rod (420), and a support foot (430). The support block (410) is installed at the bottom of the first collection rack (100) / second collection rack (200). A threaded hole (411) is formed at one end of the support block (410) away from the first collection rack (100) / second collection rack (200). One end of the threaded rod (420) is threaded into the threaded hole (411), and the other end is connected to the support foot (430).

9. A bridge pier spray curing water recycling structure according to claim 8, characterized in that, A wrench (431) is formed on the support foot (430) so that the construction personnel can tighten the support foot (430) and the threaded rod (420).

10. A bridge pier spray curing water recycling structure according to claim 1, characterized in that, It also includes a sealing ring, which is installed at the junction of the first collection rack (100) and the second collection rack (200) to prevent water leakage into the water storage tank.