A working platform attached to a steel pipe column

CN224902000UActive Publication Date: 2026-10-27CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522614407.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-10
Publication Date
2026-10-27
Estimated Expiration
2035-12-10

AI Technical Summary

Technical Problem

[0004]本实用新型提供一种附着于钢管立柱上的作业平台,可以解决上述背景技术中提出的存在吊篮悬空作业时稳定性差,易晃动倾覆,人员高空坠落风险突出,安全隐患严重的问题

Benefits of technology

该附着于钢管立柱上的作业平台通过牛腿组件直接连接于钢管立柱并提供稳固承力支撑,配合顶部连接的平台框架及固定于框架内部的平台面板,形成了与钢管立柱刚性连接的稳定作业基面,解决了传统吊篮悬空作业易晃动倾覆的问题,大幅降低人员高空坠落风险;通过爬梯组件上部与平台框架连接、下部通过连接杆与钢管立柱固定,形成了独立且稳固的人员上下通道,无需依赖起重设备吊运人员,有效减少了对起重设备的占用时间,避免了关键设备资源紧张、调度效率低的问题,同时省去了吊篮吊运的耗时环节,显著加快施工整体进度。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224902000U_ABST
    Figure CN224902000U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of operation platform attached to steel pipe stand column, it is related to bridge engineering technical field.The device includes corbel assembly, platform frame, platform panel, ladder stand assembly and guardrail assembly.The operation platform attached to steel pipe stand column is directly connected to steel pipe stand column and provides firm force support by corbel assembly, cooperate with the platform frame connected to top and the platform panel fixed in frame inside, formed the stable operation base surface with the rigidity connection of steel pipe stand column, solved the problem that traditional basket suspended operation is easy to shake and overturn, greatly reduce personnel high-altitude falling risk;Through the upper portion of ladder stand assembly and platform frame connection, lower portion is fixed with steel pipe stand column by connecting rod, formed independent and firm personnel up and down passage, without relying on hoisting equipment to hoist personnel, effectively reduce the occupied time to hoisting equipment, avoid the problem that key equipment resource is short, scheduling efficiency is low, simultaneously, the time-consuming link of basket hoisting is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of bridge engineering technology, and in particular to a working platform attached to a steel pipe column. Background Technology

[0002] In large-scale bridge construction projects, large-scale temporary support scaffolds made of steel pipes are typically erected to complete the erection of cast-in-place concrete beams or steel beams. These scaffolds are tall, and the on-site connection of the steel pipe columns, weld inspection, and subsequent maintenance all fall under the category of high-altitude work, requiring a stable and safe working surface for construction personnel.

[0003] In traditional construction, simple suspended scaffolds are often used as high-altitude work platforms, where a crane lifts the scaffold carrying personnel to the work location. However, this method suffers from poor stability when the scaffold is suspended in the air, making it prone to swaying and overturning, posing a significant risk of personnel falling from heights and serious safety hazards. Furthermore, it requires the crane to occupy the equipment for extended periods, leading to shortages of critical equipment resources, reduced scheduling efficiency, and the time-consuming lifting process directly hinders the overall construction progress, impacting project efficiency and economy. Utility Model Content

[0004] This utility model provides a working platform attached to a steel pipe column, which can solve the problems mentioned in the background art, such as poor stability, easy swaying and overturning, high risk of personnel falling from height, and serious safety hazards.

[0005] A working platform attached to a steel pipe column includes a bracket assembly, a platform frame, a platform panel, a ladder assembly, and a guardrail assembly. The bracket assembly is connected to the steel pipe column to provide load-bearing support. The platform frame is connected to the top of the bracket assembly. The platform panel is fixed inside the platform frame. The upper part of the ladder assembly is connected to the platform frame, and its lower part is fixedly connected to the steel pipe column via a connecting rod. The guardrail assembly is connected to the periphery of the platform frame.

[0006] The present invention provides a working platform attached to a steel pipe column, which, compared with the prior art, has the following beneficial effects, but is not limited to: The work platform attached to the steel pipe column is directly connected to the column via a bracket assembly, providing stable load-bearing support. Combined with the platform frame connected at the top and the platform panel fixed inside the frame, it forms a stable working surface rigidly connected to the steel pipe column. This solves the problem of easy swaying and overturning in traditional suspended platform operations, significantly reducing the risk of personnel falling from heights. The ladder assembly connects to the platform frame at the top and is fixed to the steel pipe column at the bottom via connecting rods, forming an independent and stable personnel access route. This eliminates the need for lifting equipment to transport personnel, effectively reducing the time spent on lifting equipment and avoiding the problems of scarce critical equipment resources and low scheduling efficiency. It also eliminates the time-consuming process of lifting the platform, significantly accelerating the overall construction progress.

[0007] Furthermore, the bracket assembly includes a horizontally arranged bracket crossbar and an inclined bracket diagonal bar. One end of the bracket crossbar is connected to the steel pipe column, one end of the bracket diagonal bar is connected to the bottom of the bracket crossbar, and the other end of the bracket diagonal bar is connected to the steel pipe column.

[0008] Furthermore, the platform frame includes an outer ring crossbar and an inner ring crossbar, with multiple reinforcing rods connecting the outer ring crossbar and the inner ring crossbar. Both the outer ring crossbar and the inner ring crossbar are connected to the top of the corbel crossbar.

[0009] Furthermore, the platform panel is made of steel plate, and the edge platform frame of the platform panel is connected.

[0010] Furthermore, the ladder assembly includes two vertical plates, with multiple treads connecting the two vertical plates. A protective frame is connected to the outside of each vertical plate. The upper part of each vertical plate is connected to the platform frame via a ladder side crossbar, and the lower part of each vertical plate is connected to a steel pipe column via a connecting rod.

[0011] Furthermore, the guardrail assembly includes multiple protective vertical bars and multiple protective horizontal bars. The bottom end of the protective vertical bars is connected to the platform frame. Multiple mounting holes are opened in the vertical direction of the protective vertical bars. The multiple protective horizontal bars are detachably connected to the mounting holes of the protective vertical bars by bolts.

[0012] Furthermore, four of each of the corbel crossbars and four corbel diagonal braces are provided, and the four corbel crossbars and four corbel diagonal braces are circumferentially welded at equal intervals to the steel pipe column.

[0013] Furthermore, the outer ring crossbar is located outside the inner ring crossbar.

[0014] Furthermore, the ladder side crossbar is connected to the platform frame via a fixed rod, and the bottom of the ladder side crossbar is connected to the top of the bracket assembly.

[0015] Furthermore, multiple safety rope fixing rings are fixed inside the protective frame. Attached Figure Description

[0016] Figure 1 This is a schematic diagram of the working platform attached to the steel pipe column according to an embodiment of the present invention; Figure 2 for Figure 1 A schematic diagram of the platform framework; Figure 3 for Figure 1 Schematic diagram of the structure of the middle bracket assembly; Figure 4 for Figure 1 A schematic diagram of the structure of the ladder component.

[0017] Explanation of reference numerals in the attached figures: 1. Bracket assembly; 2. Platform frame; 3. Platform panel; 4. Ladder assembly; 5. Guardrail assembly; 6. Connecting rod; 7. Steel pipe column; 8. Fixing rod; 9. Safety rope fixing ring; 101. Bracket crossbar; 102. Bracket diagonal bar; 201. Outer ring crossbar; 202. Inner ring crossbar; 203. Reinforcing rod; 41. Vertical plate; 42. Step bar; 43. Protective frame; 44. Ladder side crossbar; 51. Protective vertical bar; 52. Protective horizontal bar; 53. Mounting hole. Detailed Implementation

[0018] To make the objectives, technical solutions, and advantages of this application clearer, the technical solutions in the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings showing multiple embodiments according to this application. It should be understood that the described embodiments are only a part of the embodiments of this application, and not all of the embodiments. All other embodiments obtained by those skilled in the art based on the embodiments described in this application without creative effort will fall within the scope of protection of this application.

[0019] Unless otherwise defined, all technical and scientific terms used in this application have the same meaning as commonly understood by one of ordinary skill in the art to which this application pertains; the terminology used in the description of this application is for the purpose of describing specific embodiments only and is not intended to limit this application; the terms "comprising," "including," "having," "containing," etc., in the description, claims, and accompanying drawings of this application are open-ended terms. Therefore, "comprising," "including," or "having" refers to, for example, a method or apparatus having one or more steps or elements, but is not limited to having only these one or more elements. The terms "first," "second," etc., in the description, claims, or accompanying drawings of this application are used to distinguish different objects, not to describe a specific order or hierarchy. Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this application, unless otherwise stated, "a plurality of" means two or more.

[0020] In the description of this utility model, it should be understood that the terms "upper", "lower", "left", "right", "front", "rear", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model.

[0021] In the description of this application, it should be noted that, unless otherwise expressly specified and limited, the terms "installation," "connection," "linking," and "attachment" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal communication between two components. Those skilled in the art can understand the specific meaning of the above terms in this application according to the specific circumstances.

[0022] It should be emphasized that when the term "comprising / including" is used in this specification, it is used to explicitly indicate the presence of the stated feature, integer, step, or component, but does not exclude the presence or addition of one or more other features, integers, steps, parts, or groups of features, integers, steps, or parts.

[0023] In this application, the term "and / or" is merely a description of the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent: A existing alone, A and B existing simultaneously, or B existing alone. Additionally, in this application, the character " / " generally indicates that the preceding and following related objects have an "or" relationship.

[0024] like Figures 1-4 As shown, a working platform attached to a steel pipe column includes a bracket assembly 1, a platform frame 2, a platform panel 3, a ladder assembly 4, and a guardrail assembly 5. The bracket assembly 1 is connected to the steel pipe column 7 to provide load-bearing support; the platform frame 2 is connected to the top of the bracket assembly 1; the platform panel 3 is fixed inside the platform frame 2; the upper part of the ladder assembly 4 is connected to the platform frame 2, and its lower part is fixedly connected to the steel pipe column 7 through a connecting rod 6; the guardrail assembly 5 is connected to the periphery of the platform frame 2.

[0025] In this embodiment, the bracket assembly 1 is directly connected to the steel pipe column 7 and provides stable load-bearing support. Together with the platform frame 2 connected to the top and the platform panel 3 fixed inside the frame, a stable working base rigidly connected to the steel pipe column 7 is formed, solving the problem of easy swaying and overturning in traditional suspended platform operations and significantly reducing the risk of personnel falling from heights. The ladder assembly 4 is connected to the platform frame 2 at the top and fixed to the steel pipe column 7 at the bottom through the connecting rod 6, forming an independent and stable personnel access channel. It does not require the use of lifting equipment to transport personnel, effectively reducing the time occupied by lifting equipment and avoiding the problems of tight resources and low scheduling efficiency of key equipment. At the same time, it eliminates the time-consuming process of hoisting the suspended platform, significantly accelerating the overall construction progress. The guardrail assembly 5 connected to the platform frame 2 further strengthens the safety line. Together with the rigid connection structure of each component, it not only ensures the safety of construction personnel but also simplifies the installation process and improves the convenience of construction.

[0026] Specifically, the platform panel 3 is made of steel plate, and the edge of the platform panel 3 is connected to the platform frame 2.

[0027] like Figure 1 and Figure 2 As shown, the bracket assembly 1 includes a horizontally arranged bracket crossbar 101 and an inclined bracket diagonal bar 102. One end of the bracket crossbar 101 is connected to the steel pipe column 7, one end of the bracket diagonal bar 102 is connected to the bottom of the bracket crossbar 101, and the other end of the bracket diagonal bar 102 is connected to the steel pipe column 7.

[0028] In this embodiment, the horizontally arranged bracket crossbar 101 is directly connected at one end to the steel pipe column 7, providing a flat and rigid support base for the upper platform frame 2. This avoids the problem of base surface swaying during traditional suspended platform operations and ensures the flatness of the platform panel 3 after its installation. The inclined bracket diagonal bar 102 is connected at one end to the bottom of the bracket crossbar 101 and fixed at the other end to the steel pipe column 7. This not only effectively distributes the vertical load borne by the bracket crossbar 101 but also evenly transfers the load to the steel pipe column 7, preventing the bracket from... The crossbar 101 deformed due to excessive local stress, but the stability characteristics of the triangular structure significantly improved the overturning resistance of the entire working platform. At the same time, the combined structure of the corbel crossbar 101 and the corbel diagonal bar 102 does not require the use of lifting equipment for auxiliary support, reducing the occupation of lifting equipment. Moreover, the structure itself is easy to install and can be quickly connected and fixed to the steel pipe column 7, which helps to speed up the construction progress. Compared with the traditional suspended platform hoisting and construction method, it not only improves the structural load-bearing reliability, but also takes into account the construction economy and efficiency.

[0029] There are four corbel crossbars 101 and four corbel diagonal braces 102, which are circumferentially welded to the steel pipe column 7 at equal intervals.

[0030] like Figure 1 and Figure 2 As shown, the platform frame 2 includes an outer ring crossbar 201 and an inner ring crossbar 202. Multiple reinforcing bars 203 are connected between the outer ring crossbar 201 and the inner ring crossbar 202. Both the outer ring crossbar 201 and the inner ring crossbar 202 are connected to the top of the corbel crossbar 101.

[0031] In this embodiment, the inner ring crossbar 202 is connected to the top of the corbel crossbar 101, which can closely fit the outer side of the steel pipe column 7 to form the inner support boundary, providing a precise inner installation reference for the platform panel 3, while enhancing the connection tightness between the frame and the load-bearing foundation, and avoiding misalignment of the working surface; the outer ring crossbar 201 is simultaneously connected to the top of the corbel crossbar 101, which not only defines the outer range of the working platform and provides a stable installation carrier for the subsequent guardrail assembly 5, but also forms an inner and outer double frame structure with the inner ring crossbar 202, which greatly improves the overall resistance to lateral deformation of the platform; the outer ring crossbar 201 and the inner ring crossbar 101 form a double frame structure, which greatly improves the overall resistance to lateral deformation of the platform; the outer ring crossbar 201 and the inner ring crossbar 102 form a double frame structure, which enhances the connection tightness between the frame and the load-bearing foundation, and prevents misalignment of the working surface. Multiple reinforcing bars 203 connecting the horizontal bars 202 can firmly connect the inner and outer ring frames into one, so that the force after the platform panel 3 is laid is evenly distributed to each corbel horizontal bar 101, avoiding structural damage caused by localized force concentration. Compared with the traditional single suspended load method of the suspended platform, this frame structure has a stronger load-bearing capacity and higher stability. Moreover, it does not require the assistance of lifting equipment for construction. During installation, it can be quickly assembled directly based on the corbel component 1, reducing the time occupied by lifting equipment. This not only ensures the safety of construction personnel working on the platform panel 3, but also improves the construction efficiency, taking into account both project stability and economy.

[0032] Specifically, the outer ring crossbar 201 is located outside the inner ring crossbar 202.

[0033] like Figure 1 and Figure 4 As shown, the ladder assembly 4 includes two vertical plates 41, with multiple steps 42 connected between the two vertical plates 41. A protective frame 43 is connected to the outside of the vertical plates 41. The upper part of the vertical plates 41 is connected to the platform frame 2 through the ladder side crossbar 44, and the lower part of the vertical plates 41 is connected to the steel pipe column 7 through the connecting rod 6.

[0034] In this embodiment, multiple footrests 42 connected between two symmetrically arranged vertical plates 41 form a uniformly distributed and stable stepping surface, ensuring balanced force on the feet of construction workers during the climbing process. The protective frame 43 connected to the outside of the vertical plates 41 can prevent personnel from losing balance and tipping over during climbing, effectively avoiding the risk of falling from height. The upper part of the vertical plates 41 is firmly connected to the platform frame 2 through the ladder side crossbars 44, and the lower part is fixed to the steel pipe column 7 through the connecting rods 6, forming a stable structure with rigid fixation at both the top and bottom points. This eliminates the problem of swaying in the air, similar to traditional suspended baskets, and further improves the safety of passage. At the same time, this ladder component can be installed and used without the aid of lifting equipment. Personnel can independently climb the ladder to and from the work platform, greatly reducing the time occupied by lifting equipment and avoiding the problem of tight equipment scheduling.

[0035] like Figure 1 and Figure 3As shown, the guardrail assembly 5 includes multiple protective vertical bars 51 and multiple protective horizontal bars 52. The bottom end of the protective vertical bars 51 is connected to the platform frame 2. Multiple mounting holes 53 are opened in the vertical direction of the protective vertical bars 51. Multiple protective horizontal bars 52 are detachably connected to the mounting holes 53 of the protective vertical bars 51 by bolts.

[0036] In this embodiment, the bottom end of the protective vertical bar 51 is firmly connected to the platform frame 2 to form a uniformly distributed vertical protective support, constructing the first safety barrier around the work platform and effectively preventing construction personnel from accidentally falling outwards. Multiple protective horizontal bars 52 cooperate with the protective vertical bars 51 to form a complete crisscross protective net, further reducing the protective gaps and preventing personnel limbs or construction tools from falling from the edge of the platform. At the same time, they provide reliable handrail support for workers and enhance their physical stability during operation. Multiple mounting holes 53 opened vertically in the protective vertical bar 51 allow the protective horizontal bars 52 to be detachably connected and height adjusted by bolts. This not only allows for flexible adjustment of the protective height according to the construction scenario to adapt to different operational needs, but also facilitates component transportation, rapid on-site assembly, and subsequent maintenance and replacement.

[0037] like Figure 2 and Figure 4 As shown, the ladder side crossbar 44 is connected to the platform frame 2 via the fixing rod 8, and the bottom of the ladder side crossbar 44 is connected to the top of the bracket assembly 1.

[0038] In this embodiment, the side crossbar 44 of the ladder is connected to the platform frame 2 through the fixing rod 8, forming a secondary reinforcement connection between the ladder assembly 4 and the platform frame 2, avoiding lateral swaying caused by the ladder being only connected at a single point; the bottom of the side crossbar 44 of the ladder is connected to the top of the bracket assembly 1, and the stable triangular load-bearing structure of the bracket assembly 1 itself provides a solid bottom support for the ladder, forming a double stable structure, which greatly improves the load-bearing capacity of the ladder and can stably bear the weight of construction personnel and tools.

[0039] like Figure 4 As shown, multiple safety rope fixing rings 9 are fixed inside the protective frame 43.

[0040] In this embodiment, the protective frame 43 itself provides lateral anti-tipping protection for the climbing ladder assembly 4. The safety rope fixing ring 9 fixed inside provides a dedicated and stable safety rope suspension point for construction workers when climbing. Construction workers can tie one end of the safety rope to themselves and hang the other end on the safety rope fixing ring 9, which greatly reduces the risk of accidental falls.

[0041] Working principle: First, weld one end of the horizontal bracket crossbar 101 in the bracket assembly 1 to the steel pipe column 7. Then, connect the bottom of the bracket crossbar 101 to the steel pipe column 7 through the inclined bracket diagonal bar 102 to form a stable triangular load-bearing foundation. Subsequently, fix the platform frame 2, which consists of the outer ring crossbar 201, the inner ring crossbar 202, and the reinforcing bar 203, to the top of the bracket crossbar 101. Lay and fix the platform panel 3 inside the platform frame 2 to create a flat high-altitude work base. Simultaneously assemble the climbing ladder assembly 4, using two vertical plates 41 as the supporting base, connecting the steps 42 between them to form a climbing passage. Fix the protective frame 43 to the outside of the vertical plates 41 and install safety ropes on the inside for fixation. The upper part of the ring 9 and the vertical plate 41 are connected to the platform frame 2 via the ladder side crossbar 44 and the fixing rod 8, and the lower part is fixed to the steel pipe column 7 via the connecting rod 6. The bottom of the ladder side crossbar 44 is connected to the top of the bracket assembly 1 to enhance stability. Finally, the guardrail assembly 5 is installed on the outside of the platform frame 2, and the bottom end of the protective vertical bar 51 is fixed to the platform frame 2. The protective horizontal bar 52 is detachably connected with bolts through the mounting holes 53 on the protective vertical bar 51 to form a complete protection system. During operation, the construction personnel hang the safety rope on the safety rope fixing ring 9, climb to the platform panel 3 through the ladder assembly 4, and carry out high-altitude operations within the protection range of the guardrail assembly 5. The entire process does not require hoisting equipment.

[0042] The above-disclosed embodiments are only a few specific examples of the present utility model. However, the embodiments of the present utility model are not limited thereto. Any changes that can be conceived by those skilled in the art should fall within the protection scope of the present utility model.

Claims

1. A working platform attached to a steel pipe column, characterized in that, include: Bracket assembly (1), which is connected to the steel pipe column (7) to provide load-bearing support; Platform frame (2), which is connected to the top of the cow leg assembly (1); Platform panel (3), which is fixed inside the platform frame (2); The upper part of the climbing ladder assembly (4) is connected to the platform frame (2), and the lower part is fixedly connected to the steel pipe column (7) through the connecting rod (6); Guardrail assembly (5), which is connected to the periphery of the platform frame (2).

2. The working platform attached to the steel pipe column as described in claim 1, characterized in that, The bracket assembly (1) includes a horizontally arranged bracket crossbar (101) and an inclined bracket diagonal bar (102). One end of the bracket crossbar (101) is connected to the steel pipe column (7), one end of the bracket diagonal bar (102) is connected to the bottom of the bracket crossbar (101), and the other end of the bracket diagonal bar (102) is connected to the steel pipe column (7).

3. The working platform attached to the steel pipe column as described in claim 2, characterized in that, The platform frame (2) includes an outer ring crossbar (201) and an inner ring crossbar (202). Multiple reinforcing bars (203) are connected between the outer ring crossbar (201) and the inner ring crossbar (202). Both the outer ring crossbar (201) and the inner ring crossbar (202) are connected to the top of the corbel crossbar (101).

4. The working platform attached to the steel pipe column as described in claim 1, characterized in that, The platform panel (3) is made of steel plate, and the edge platform frame (2) of the platform panel (3) is connected.

5. The working platform attached to the steel pipe column as described in claim 1, characterized in that, The ladder assembly (4) includes two vertical plates (41), and multiple steps (42) are connected between the two vertical plates (41). A protective frame (43) is connected to the outside of the vertical plates (41). The upper part of the vertical plate (41) is connected to the platform frame (2) through the ladder side crossbar (44), and the lower part of the vertical plate (41) is connected to the steel pipe column (7) through the connecting rod (6).

6. The working platform attached to the steel pipe column as described in claim 1, characterized in that, The guardrail assembly (5) includes multiple protective vertical bars (51) and multiple protective horizontal bars (52). The bottom end of the protective vertical bars (51) is connected to the platform frame (2). Multiple mounting holes (53) are provided in the vertical direction of the protective vertical bars (51). The multiple protective horizontal bars (52) are detachably connected to the mounting holes (53) of the protective vertical bars (51) by bolts.

7. The working platform attached to the steel pipe column as described in claim 2, characterized in that, There are four of each of the corbel crossbar (101) and corbel diagonal bar (102), and the four corbel crossbars (101) and the four corbel diagonal bars (102) are welded circumferentially at equal intervals on the steel pipe column (7).

8. The working platform attached to the steel pipe column as described in claim 3, characterized in that, The outer ring crossbar (201) is located outside the inner ring crossbar (202).

9. The working platform attached to the steel pipe column as described in claim 5, characterized in that, The ladder side crossbar (44) is connected to the platform frame (2) via a fixing rod (8), and the bottom of the ladder side crossbar (44) is connected to the top of the bracket assembly (1).

10. The working platform attached to the steel pipe column as described in claim 5, characterized in that, Multiple safety rope fixing rings (9) are fixed inside the protective frame (43).