A drainage pressure relief structure for treating uneven deformation of a subgrade of a soft foundation section

CN224902135UActive Publication Date: 2026-10-27QINGHAI HAIXI HIGHWAY & BRIDGE ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522356204.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-06
Publication Date
2026-10-27
Estimated Expiration
2035-11-06

AI Technical Summary

Technical Problem

[0003]现有技术中,通常将多个排水板插入地底,每两个排水板的顶端共同连接至连体板,该连体板上开设有通槽,且连体板上还设有圆形连接块,每个连接块均连接两根连管,排水作业时,先向路基变形处施加压力,使鼓起路段下压,在此压力作用下,软基中的水分会通过排水板向上输送至地面的连管内,然而,在此输水过程中,连接块与连管的连接处易出现连接不稳的情况,导致输水效率下降甚至漏水,严重影响排水减压效果,整体实用性较差

Benefits of technology

[0010]与现有技术相比,本实用新型的有益效果是:通过速锁机构内部各部件的联动配合,可同步对排水板与连接管形成加固限位,便捷性大幅提升,同时,该加固结构能有效增强排水板与连接管的连接稳定性,从根本上避免输水过程中因连接松动导致的漏水、输水不畅等问题,保障排水减压作业稳定高效。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224902135U_ABST
    Figure CN224902135U_ABST
Patent Text Reader

Abstract

The utility model relates to soft base drainage technology field, concretely is a kind of soft base road section roadbed uneven deformation treatment and uses drainage pressure-relieving structure, including two drainage plates, common sliding connection has connecting plate on the drainage plate, the connecting plate top wall is equipped with through slot, the connecting plate top end is fixedly connected with connecting block at corresponding through slot position, two connecting pipes are slidably connected on the connecting block;The opposite end of the connecting pipe is fixedly connected with rubber ring, speed lock mechanism is equipped on the connecting block, the speed lock mechanism includes two thread rings and multiple pressure rods, the one end of thread ring is fixedly connected with rotating handle, the utility model has beneficial effect: can be reinforced and positioned to drainage plate and connecting pipe simultaneously, and convenience is greatly improved, simultaneously, the reinforcing structure can effectively enhance the connection stability of drainage plate and connecting pipe, fundamentally avoid the problems, such as water leakage, water transport not smooth, caused by connection loosening in water transport process, ensure that drainage pressure-relieving operation is stable and efficient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of soft soil drainage technology, specifically a drainage and pressure relief structure for treating uneven deformation of roadbed in soft soil road sections. Background Technology

[0002] When uneven deformation occurs in the subgrade of soft soil sections, drainage measures are usually required to reduce pressure, which is one of the core technical means of soft soil treatment and deformation control.

[0003] In existing technologies, multiple drainage boards are typically inserted into the ground, with the tops of every two drainage boards connected to a connecting plate. This connecting plate has a through groove and a circular connecting block, with each connecting block connecting two pipes. During drainage operations, pressure is first applied to the deformed parts of the roadbed to press down the bulging sections. Under this pressure, water in the soft soil is transported upward through the drainage boards to the connecting pipes on the ground. However, during this water transport process, the connection between the connecting block and the connecting pipe is prone to instability, leading to a decrease in water transport efficiency or even leakage, which seriously affects the drainage and pressure reduction effect and results in poor overall practicality. Utility Model Content

[0004] The purpose of this utility model is to provide a drainage and pressure relief structure for treating uneven deformation of the roadbed in soft soil sections, so as to solve the problems mentioned in the background art.

[0005] To achieve the above objectives, this utility model provides the following technical solution: a drainage and pressure-reducing structure for treating uneven deformation of roadbed in soft soil sections, comprising two drainage plates, a connecting plate slidably connected to the drainage plates, a through groove on the top wall of the connecting plate, a connecting block fixedly connected to the top of the connecting plate at the position corresponding to the through groove, and two connecting pipes slidably connected to the connecting block; Rubber rings are fixedly connected to the opposite ends of the connecting pipes. A quick-locking mechanism is provided on the connecting block. The quick-locking mechanism includes two threaded rings and multiple pressure rods. A rotating handle is fixedly connected to one end of each threaded ring.

[0006] Preferably, the integral plate communicates with the connecting block through a through groove.

[0007] Preferably, the threaded ring is symmetrically threaded inside the connecting block, and the rotating handle is located at the side end of the connecting block.

[0008] Preferably, the rubber rings are all slidably connected inside the connecting block, and the threaded rings abut against the corresponding rubber rings at the corresponding positions inside the connecting block.

[0009] Preferably, all the pressure rods are slidably connected to the connecting block and the connecting plate, and the top of each pressure rod is spherical.

[0010] Compared with the prior art, the beneficial effects of this utility model are: through the linkage and cooperation of the internal components of the quick-lock mechanism, the drainage plate and the connecting pipe can be reinforced and limited simultaneously, which greatly improves convenience. At the same time, the reinforcement structure can effectively enhance the connection stability between the drainage plate and the connecting pipe, fundamentally avoiding problems such as water leakage and poor water delivery caused by loose connection during water delivery, and ensuring stable and efficient drainage pressure reduction operation. Attached Figure Description

[0011] Figure 1 This is a schematic diagram of the main structure of this utility model; Figure 2 This is a cross-sectional view of the connecting block and a schematic diagram of the separated components of this utility model; Figure 3 This is a cross-sectional view of the integrated plate and connecting block of this utility model, showing its structure separated from the pressure rod.

[0012] In the diagram: 1. Drainage board; 2. Connecting plate; 3. Through groove; 4. Connecting block; 5. Connecting pipe; 6. Rubber ring; 7. Quick lock mechanism; 71. Threaded ring; 72. Pressure rod; 73. Rotary handle. Detailed Implementation

[0013] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0014] Please see Figure 1-3 The present invention provides the following technical solution: Example 1: A drainage and pressure relief structure for treating uneven deformation of roadbed in soft soil sections includes two drainage plates 1, with a connecting plate 2 slidably connected to the drainage plates 1. A through groove 3 is opened on the top wall of the connecting plate 2, and a connecting block 4 is fixedly connected to the top of the connecting plate 2 at the position corresponding to the through groove 3. Two connecting pipes 5 are slidably connected to the connecting block 4, and the connecting plate 2 communicates with the connecting block 4 through the through groove 3. In use, the drainage board 1 is driven into the roadbed that needs drainage by an external power device. Then, the connecting plate 2 is connected to the drainage board 1, and the connecting block 4 is connected to the connecting pipe 5. The external equipment applies pressure to the ground, causing the ground to settle. The pressure will cause the water from the ground to flow upward along the drainage board 1 and eventually flow into the interior of the connecting plate 2. Then, it enters the two connecting pipes 5 on the connecting block 4 through the through groove 3 and is discharged through the connecting pipes 5. Multiple sets of drainage boards 1 can be set up to drain and reduce pressure together.

[0015] Example 2: The technical solution that differs from Example 1 in this example includes: rubber rings 6 are fixedly connected to the opposite ends of the connecting pipe 5, and a quick-locking mechanism 7 is provided on the connecting block 4. The quick-locking mechanism 7 includes two threaded rings 71 and multiple pressure rods 72. A rotating handle 73 is fixedly connected to one end of each threaded ring 71. The threaded ring 71 is symmetrically threaded inside the connecting block 4. The rotating handle 73 is located at the side end of the connecting block 4. The rubber rings 6 are all slidably connected inside the connecting block 4. The threaded ring 71 abuts against the corresponding rubber ring 6 at the corresponding position inside the connecting block 4. The pressure rod 72 is slidably connected to the connecting block 4 and the connecting plate 2. The top of the pressure rod 72 is spherical. In use, the top of the drainage plate 1 is inserted into the connecting plate 2. At this time, the bottom of the pressure rod 72 will abut against the corresponding drainage plate 1. Then, when the connecting pipe 5 is connected to the connecting block 4, the connecting pipe 5 will drive the rubber ring 6 to connect to the inside of the connecting block 4. As the rubber ring 6 enters the connecting block 4, it will abut against the top of the pressure rod 72. As the rubber ring 6 goes deeper, it will deform and thus go beyond the pressure rod 72 and continue to go deeper into the connecting block 4. Then, the threaded ring 71 is screwed into the side of the connecting block 4. The rotating handle 73 drives the threaded ring 71 to rotate and slowly push it into the connecting block 4 through the thread. When the threaded ring 71 is connected to the connecting block 4, it will abut against the rubber ring 6. At the same time, as the threaded ring 71 pushes into the connecting block 4, it will also squeeze the spherical position at the top of the pressure rod 72. At this time, the pressure rod 72 will be forced to move down. The downward movement of the pressure rod 72 will squeeze and deform the drainage plate 1, thereby improving the connection between the drainage plate 1 and the connecting plate 2 and preventing it from falling off during operation.

[0016] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A drainage and pressure relief structure for treating uneven deformation of roadbed in soft soil road sections, comprising two drainage plates (1), a connecting plate (2) slidably connected to the drainage plates (1), a through groove (3) opened on the top wall of the connecting plate (2), a connecting block (4) fixedly connected to the top of the connecting plate (2) at the position corresponding to the through groove (3), and two connecting pipes (5) slidably connected to the connecting block (4); Its features are: The connecting pipe (5) is fixedly connected to the opposite ends of the rubber ring (6), and the connecting block (4) is provided with a quick lock mechanism (7). The quick lock mechanism (7) includes two threaded rings (71) and multiple pressure rods (72). One end of each threaded ring (71) is fixedly connected to a rotating handle (73).

2. The drainage and pressure-reducing structure for treating uneven deformation of roadbed in soft soil sections according to claim 1, characterized in that: The connecting plate (2) is connected to the connecting block (4) through the through groove (3).

3. The drainage and pressure-reducing structure for treating uneven deformation of roadbed in soft soil sections according to claim 1, characterized in that: The threaded ring (71) is symmetrically threaded inside the connecting block (4), and the rotating handle (73) is located at the side end of the connecting block (4).

4. The drainage and pressure-reducing structure for treating uneven deformation of roadbed in soft soil sections according to claim 1, characterized in that: The rubber rings (6) are all slidably connected inside the connecting block (4), and the threaded rings (71) abut against the corresponding rubber rings (6) at the corresponding positions inside the connecting block (4).

5. A drainage and pressure-reducing structure for treating uneven deformation of roadbed in soft soil sections according to claim 1, characterized in that: The pressure rods (72) are all slidably connected to the connecting block (4) and the connecting plate (2), and the top of each pressure rod (72) is spherical.