AI Technical Summary

Technical Problem

[0003]抗拔桩在安装时,抗拔桩的底部通常都是插入到河道下方的土壤层内,利用桩身与河道下方的土壤层产生的摩擦力进行固定;但是,在实际的使用中,抗拔桩通常会产生向上的浮力;以使抗拔桩向上悬浮,导致松动的现象,影响正常的使用

Benefits of technology

若干个支护桩以及若干个抗拔桩的顶部安装有同一个安装框架,以使若干个抗拔桩与若干个支护桩形成一个整体的结构,能够有效防止抗拔桩在使用的过程中,向上悬浮的现象;在安装框架上安装底板以及在底板上安装有混凝土层,利用混凝土层的自身重力能够对若干根抗拔桩进一步的施压,起到对抗拔桩进一步固定的作用,能够有效防止抗拔桩在使用的过程中出现悬浮的现象。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224902251U_ABST
    Figure CN224902251U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of uplift pile, and disclose a kind of collaborative anti-floating structure based on double-row pile and uplift pile, including several support piles, and several support piles are distributed to form double-row pile in two rows;And the front side of double-row pile is provided with several uplift piles, the top of several support piles and several uplift piles is equipped with same mounting frame, mounting frame is used to fix several support piles and several uplift piles, the top of mounting frame is provided with bottom plate, the edge of bottom plate is fixed with frame, and frame and bottom plate form a pouring groove, and the inside of pouring groove is poured with concrete layer, the top of several support piles and several uplift piles is equipped with same mounting frame, to make several uplift piles and several support piles form an integral structure, can effectively prevent uplift pile in the process of use, upward suspended phenomenon.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of anti-uplift pile technology, specifically to a synergistic anti-buoyancy structure based on double-row piles and anti-uplift piles. Background Technology

[0002] Tension-resistant piles, also known as anti-buoyancy piles, are piles installed in building construction to counteract the buoyancy force exerted on the structure by soil water when the underground structure is below the surrounding water level. Tension-resistant piles primarily rely on the friction between the pile and the soil layer to resist axial tensile forces, ensuring the stability and safety of the structure.

[0003] When installing tension piles, the bottom of the pile is usually inserted into the soil layer below the river channel, and it is fixed by the friction between the pile and the soil layer below the river channel. However, in actual use, tension piles usually generate upward buoyancy, causing them to float upwards and become loose, which affects normal use.

[0004] Therefore, we propose a synergistic anti-buoyancy structure based on double-row piles and anti-uplift piles to solve the problems mentioned above. Utility Model Content

[0005] The purpose of this utility model is to solve the technical problems mentioned above.

[0006] To achieve the above objectives, the present invention adopts the following technical solution: A synergistic anti-buoyancy structure based on double-row piles and tension piles includes several support piles arranged in two rows to form a double-row pile structure. Several tension piles are provided on the front side of the double-row piles. The tops of the support piles and tension piles are fitted with the same mounting frame, which is used to fix the support piles and tension piles. A base plate is provided on the top of the mounting frame, and a frame is fixed to the edge of the base plate. The frame and the base plate form a casting groove, and a concrete layer is poured inside the casting groove. The front part of the concrete layer is used to apply downward pressure to the tension piles.

[0007] Furthermore: the support pile includes a first mounting base buried in the ground, and a support beam is vertically fixed to the top of the first mounting base, and the top of the support beam is set through the ground.

[0008] Furthermore: the anti-uplift pile includes a second mounting base buried in the lower part of the river channel, and an anti-uplift beam is vertically fixed to the top of the second mounting base, and the height of the anti-uplift beam is lower than that of the support beam.

[0009] Furthermore: the mounting frame includes several fixed supports and several mounting supports; the fixed supports are respectively fixed to the top of the support beam, and the mounting supports are respectively fixed to the top of the pull-out beam; crossbeams are fixed between adjacent fixed supports, between adjacent mounting supports, and between fixed supports and mounting supports.

[0010] Furthermore: the center of the mounting support is a hollow structure, and the top of the tensile beam is fixed with several reinforcing bars extending into the mounting support, and the interior of the tensile beam is filled with concrete that has solidified with the several reinforcing bars.

[0011] Furthermore: the base plate includes several precast slabs, and the several precast slabs are respectively built on two opposite crossbeams.

[0012] Furthermore, the interior of the casting trough is also provided with a reinforcing layer solidified within the concrete layer, which is used to reinforce the concrete layer.

[0013] Furthermore: the reinforcement layer includes several steel bars, which are placed horizontally and vertically, and the intersection of every two steel bars is bound with tie wire or welded. This utility model is in A common mounting frame is installed on the top of several support piles and several tension piles, so that the tension piles and support piles form an integral structure, which can effectively prevent the tension piles from floating upwards during use. A base plate is installed on the mounting frame, and a concrete layer is installed on the base plate. The weight of the concrete layer can further compress the tension piles, which can further fix the tension piles and effectively prevent the tension piles from floating during use. Attached Figure Description

[0014] Figure 1 This is a three-dimensional structural diagram of the present invention (including the frame and concrete layer). Figure 2 This is a top view of the structure of this utility model; Figure 3 This is a three-dimensional structural diagram of the present invention (including the frame and concrete layer). Figure 4 This is a three-dimensional structural diagram of the mounting frame in this utility model; Figure 5 This is a schematic diagram of the connection between the anti-pull-out beam and the mounting support in this utility model.

[0015] The names corresponding to each mark in the diagram: 1. Support pile; 101. First mounting seat; 102. Support beam; 2. Tension pile; 201. Second mounting seat; 202. Tension beam; 203. Reinforcing bar; 3. Mounting frame; 301. Fixed support; 302. Mounting support; 303. Crossbeam; 4. Base plate; 401. Precast slab; 5. Frame; 6. Concrete layer; 7. Reinforcing layer; 701. Reinforcing bar. Detailed Implementation

[0016] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present utility model are within the protection scope of the present utility model.

[0017] A synergistic anti-buoyancy structure based on double-row piles and anti-tension piles includes several support piles 1, which are arranged in two rows to form a double-row pile structure. Typically, the double-row piles are built on the ground. It should be noted that the piles in the front row are called the front row piles, and vice versa. Several tension piles 2 are set in front of the double-row piles (that is, several support piles 1); under normal circumstances, tension piles 2 are used to build the interior of the river channel; In detail: the support pile 1 includes a first mounting base 101 buried in the ground, and a support beam 102 is vertically fixed to the top of the first mounting base 101, and the top of the support beam 102 is set through the ground. In detail: The anti-tension pile 2 includes a second mounting base 201 installed below the river channel, and the second mounting base 201 is buried in the silt below the river channel. The top of the second mounting base 201 is vertically fixed with an anti-tension beam 202. Under normal circumstances, the height of the anti-tension beam 202 is lower than that of the support beam 102.

[0018] The top of several support beams 102 and several tension beams 202 are equipped with the same mounting frame 3. The mounting frame 3 serves to fix the several support beams 102 and several tension beams 202. The top of the mounting frame 3 is equipped with a base plate 4. In detail: The mounting frame 3 includes several fixed supports 301 and several mounting supports 302. The fixed supports 301 are fixed to the top of the support beam 102. The mounting supports 302 are installed on the top of the anti-tension beam 202. Crossbeams 303 are fixed between adjacent fixed supports 301, between adjacent mounting supports 302, and between adjacent fixed supports 301 and mounting supports 302. The arrangement of the crossbeams 303 serves to fix the fixed supports 301 and the mounting supports 302. In more detail: the mounting support 302 is a hollow structure; the top of the anti-tension beam 202 is fixed with an insert shaft 203 so that the bottom end of the mounting support 302 can be inserted into the insert shaft 203 to prevent the mounting support 302 from tilting during use; the top of the insert shaft 203 is fixed with several reinforcing ribs 204 extending into the mounting support 302. After concrete is poured into the interior of the mounting support 302, the concrete can solidify on the inner wall of the mounting support 302 and the several reinforcing ribs 204, thereby reinforcing the mounting support 302 and preventing the mounting support 302 from moving during use, thus having strong stability.

[0019] It should be noted that the base plate 4 consists of several precast slabs 401, with each precast slab 401 having its two ends placed on the crossbeams 303 to provide support.

[0020] Furthermore, a surrounding plate 5 is fixed to the top of the base plate 4. The surrounding plate 5 serves to shield and prevent concrete from leaking from the edge of the base plate 4. It should be noted that the surrounding plate 5 and the base plate 4 form a pouring trough, and a concrete layer 6 is poured inside the pouring trough. The front part of the concrete layer 6 can apply downward pressure to several tension piles 2 to prevent several tension piles 2 from becoming suspended.

[0021] It should be noted that the concrete layer 6 has an internal reinforcing layer 7. The reinforcing layer 7 serves to strengthen the concrete layer 6 and prevent it from cracking over time.

[0022] In detail: The reinforcement layer 7 includes several steel bars 701, which are placed horizontally and vertically. The connection between every two steel bars 701 can be tied with wire or welded to achieve the reinforcement effect and prevent the steel bars 701 from loosening during use.

Claims

1. A synergistic anti-buoyancy structure based on double-row piles and tension piles, comprising a plurality of support piles (1), wherein the plurality of support piles (1) are arranged in two rows to form a double-row pile; and a plurality of tension piles (2) are provided on the front side of the double-row piles, characterized in that: The top of several support piles (1) and several tension piles (2) are equipped with the same mounting frame (3). The mounting frame (3) is used to fix several support piles (1) and several tension piles (2). The top of the mounting frame (3) is provided with a base plate (4). A frame (5) is fixed at the edge of the base plate (4). The frame (5) and the base plate (4) form a pouring groove. A concrete layer (6) is poured inside the pouring groove. The front part of the concrete layer (6) is used to apply downward pressure to several tension piles (2).

2. The anti-buoyancy structure based on double-row piles and tension piles according to claim 1, characterized in that: The support pile (1) includes a first mounting base (101) buried in the ground, and a support beam (102) is vertically fixed to the top of the first mounting base (101), and the top of the support beam (102) is set through the ground.

3. The anti-buoyancy structure based on double-row piles and tension piles according to claim 2, characterized in that: The anti-uplift pile (2) includes a second mounting base (201) buried in the silt below the river channel. The top of the second mounting base (201) is vertically fixed with an anti-uplift beam (202), and the height of the anti-uplift beam (202) is lower than that of the support beam (102).

4. The anti-buoyancy structure based on double-row piles and tension piles according to claim 3, characterized in that: The mounting frame (3) includes several fixed supports (301) and several mounting supports (302); several fixed supports (301) are respectively fixed to the top of the support beam (102), and several mounting supports (302) are respectively fixed to the top of the pull-out beam (202); crossbeams (303) are respectively fixed between adjacent fixed supports (301), between adjacent mounting supports (302), and between adjacent fixed supports (301) and mounting supports (302).

5. The anti-buoyancy structure based on double-row piles and tension piles according to claim 4, characterized in that: The center of the mounting support (302) is a hollow structure. The top of the anti-tension beam (202) is fixed with several reinforcing bars (204) extending into the mounting support (302), and the interior of the anti-tension beam (202) is filled with concrete that has solidified with the several reinforcing bars (204).

6. The anti-buoyancy structure based on double-row piles and tension piles according to claim 4, characterized in that: The base plate (4) includes a number of precast slabs (401), and the number of precast slabs (401) are respectively built on two opposite crossbeams (303).

7. The anti-buoyancy structure based on double-row piles and tension piles according to claim 1, characterized in that: The interior of the casting trough is also provided with a reinforcing layer (7) solidified in the concrete layer (6), which is used to reinforce the concrete layer (6).

8. The anti-buoyancy structure based on double-row piles and tension piles according to claim 7, characterized in that: The reinforcement layer (7) includes several steel bars (701), and the steel bars (701) are placed horizontally and vertically, and the intersection of every two steel bars (701) is tied with wire or welded.