A wall coating device for high-altitude operations
Patent Information
- Application Number
- CN202620195841.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2026-02-10
- Publication Date
- 2026-10-27
- Estimated Expiration
- 2036-02-10
AI Technical Summary
[0002]目前,高空建筑墙面的涂料涂抹作业主要依赖于人工完成,操作人员通常需站立于高空作业平台、升降机或脚手架上,手持滚筒或刷子进行施工;人工涂抹的效率低下,劳动强度大,尤其在大面积墙面上作业时耗时漫长;其次,作业质量高度依赖工人的经验与技术水平,难以保证涂层厚度的均匀性与表面的平整度;再者,高空环境本身具有危险性,人工长时间仰臂或探身作业,不仅容易疲劳,更增加了高空坠落的安全风险,同时涂料滴落也污染环境并带来安全隐患
1、在本实用新型中,将装置移动至高空作业平台或脚手架的合适位置,手动旋拧固定基座底部的旋转丝杠,通过丝杠螺母副驱动两夹紧块相向移动,利用夹紧槽及其内侧的弹性防滑垫,将装置牢固地夹持在平台栏杆或稳固结构上;
Smart Images

Figure CN224902680U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to a wall coating device for high-altitude operations, belonging to the field of construction equipment technology. Background Technology
[0002] Currently, painting work on high-altitude building walls mainly relies on manual labor. Operators typically need to stand on high-altitude work platforms, elevators, or scaffolding, using rollers or brushes to apply the paint. Manual painting is inefficient and labor-intensive, especially when working on large areas of walls, which is time-consuming. Secondly, the quality of the work is highly dependent on the experience and skill level of the workers, making it difficult to guarantee the uniformity of the coating thickness and the smoothness of the surface. Furthermore, the high-altitude environment itself is dangerous. Working with arms outstretched or body leaning for extended periods not only easily leads to fatigue but also increases the risk of falls from heights. In addition, paint drips pollute the environment and pose safety hazards. Summary of the Invention
[0003] The technical problem to be solved by this utility model is to overcome the defects of the prior art and provide a wall coating device for high-altitude operations, which can effectively improve the efficiency of high-altitude wall coating operations.
[0004] To solve the above-mentioned technical problems, the technical solution of this utility model is: a wall coating device for high-altitude operations, comprising: Fixed base; A movable bracket, which is mounted on the fixed base; The applicator includes two applicator brushes, a connecting seat, and two swing arms. The two applicator brushes are hinged to the connecting seat. The movable bracket has an elongated hole, and the connecting seat is slidably installed in the elongated hole. The two swing arms are installed on the top of the movable bracket, wherein one swing arm is hinged to any one of the applicator brushes, and the other swing arm is hinged to the other applicator brush. The sliding of the connecting seat along the elongated hole causes the two brushes to rotate around the hinge point between the brush and the connecting seat, thereby allowing the two brushes to swing towards or away from each other.
[0005] Furthermore, the brush includes an extension part and a fixing part. The fixing part has a first fixing hole at its top, the extension part has a hollow cavity, and the extension part has a plurality of evenly distributed second fixing holes. The extension portion is sleeved on the fixing portion through the hollow cavity, and the fixing portion is adapted to be hinged to the connecting seat. The first fixing hole and the second fixing hole have the same diameter.
[0006] Furthermore, a wall coating device for high-altitude operations also includes a fixing bolt, which is adapted to pass through the first fixing hole and any one of the second fixing holes simultaneously, so as to fix and lock the extension part and the fixing part at a selected length position.
[0007] Furthermore, a wall coating device for high-altitude operations also includes a movable drive component, the fixed end of which is mounted on the fixed base, and the movable end of which is connected to the connecting seat.
[0008] Furthermore, two clamping blocks are slidably installed at the bottom of the fixed base, the two clamping blocks are arranged opposite each other, and a clamping groove is provided between the two clamping blocks.
[0009] Furthermore, the clamping block is driven by at least one lead screw and nut pair, the lead screw and nut pair including a rotating lead screw rotatably mounted on the fixed base and a nut mounted on the clamping block, the rotating lead screw being connected to the nut; Turning the rotary screw is adapted to move the clamping block to adjust the size of the clamping groove.
[0010] Furthermore, an elastic anti-slip pad is provided on the opposite side of the two clamping blocks.
[0011] By adopting the above technical solution, this utility model has the following beneficial effects: 1. In this utility model, the device is moved to a suitable position on the high-altitude work platform or scaffolding, and the rotating screw at the bottom of the fixed base is manually screwed. The two clamping blocks are driven to move towards each other through the screw nut pair. The device is firmly clamped to the platform railing or stable structure by using the clamping groove and the elastic anti-slip pad on its inner side. Depending on the specific width of the wall to be coated, the second fixing holes at different positions on the extension part are inserted through the fixing bolts and aligned with the first fixing hole of the fixing part to lock, thereby changing the extension length of a single brush. The movable drive is activated, and the connecting seat slides in the long waist hole to adjust the unfolding angle of the two brushes so that their brush surfaces just cover the width of the target wall. The paint is then evenly applied to the two brushes. The movable drive is controlled so that the connecting seat drives the two brushes to maintain the set unfolding angle, so that the two brush surfaces are in close contact with the wall for coating. During operation, the angle of the brush can be finely adjusted in real time according to changes in the wall structure. After the application is completed, the movable drive component is controlled to move the connecting seat down, bringing the two brushes together to their minimum width. The clamping mechanism is then released, and the device can be transferred to the next work point.
[0012] 2. In this utility model, the synchronous opening and closing of two brushes can be achieved by a single drive control, which can quickly, continuously and accurately adjust the working width. It can adapt to complex structures such as walls, inside and outside corners, and windows of different widths without changing tools, which greatly reduces the auxiliary adjustment time, expands the coverage area of a single operation, and significantly improves construction efficiency. This device replaces the unstable and fatigue-prone reciprocating motion of a manual arm, ensuring a more uniform and stable contact pressure and movement trajectory between the brush and the wall during the coating process. This helps to achieve a consistent coating thickness and a smooth surface, improving project quality and reducing paint waste caused by uneven coating. Attached Figure Description
[0013] Figure 1 This is a perspective view of a wall coating device for high-altitude operations according to this utility model; Figure 2 This is a front view of a wall coating device for high-altitude operations according to this utility model; Figure 3 This is a schematic diagram of the structure of the applicator brush of this utility model. Detailed Implementation
[0014] To make the contents of this utility model easier to understand, the present utility model will be further described in detail below with reference to specific embodiments and accompanying drawings.
[0015] Specifically, such as Figure 1-3 As shown, a wall coating device for high-altitude operations includes: Fixed base 1; Movable bracket 2 is mounted on fixed base 1; The applicator includes two applicator brushes, a connecting seat 31, and two swing arms 32. The two applicator brushes are hinged to the connecting seat 31. The movable bracket 2 is provided with an elongated hole 21. The connecting seat 31 is slidably installed in the elongated hole 21. The two swing arms 32 are installed at the top of the movable bracket 2. One swing arm 32 is hinged to any one of the applicator brushes, and the other swing arm 32 is hinged to the other applicator brush. The sliding of the connecting seat 31 along the elongated hole 21 causes the two brushes to rotate around the hinge point between the connecting seat 31 and the brushes, so that the two brushes can swing towards or away from each other.
[0016] Specifically, such as Figure 1-3 As shown, the brush includes an extension part 33 and a fixing part 34. The top of the fixing part 34 is provided with a first fixing hole 341, the extension part 33 is provided with a hollow cavity 331, and the extension part 33 is provided with a plurality of evenly distributed second fixing holes 332. The extension portion 33 is sleeved on the fixing portion 34 through the hollow cavity 331. The fixing portion 34 is adapted to be hinged on the connecting seat 31. The first fixing hole 341 and the second fixing hole 332 have the same diameter.
[0017] Specifically, such as Figure 1-3 As shown, a wall coating device for high-altitude operations also includes a fixing bolt 4, which is adapted to pass through the first fixing hole 341 and any one of the second fixing holes 332 at the same time, so as to fix and lock the extension part 33 and the fixing part 34 at a selected length position.
[0018] Specifically, such as Figure 1-2 As shown, a wall coating device for high-altitude operations also includes a movable drive component 5. The fixed end of the movable drive component 5 is installed on the fixed base 1, and the movable end of the movable drive component 5 is connected to the connecting seat 31.
[0019] Specifically, such as Figure 1-2 As shown, two clamping blocks 11 are slidably installed at the bottom of the fixed base 1. The two clamping blocks 11 are arranged opposite to each other, and a clamping groove 12 is provided between the two clamping blocks 11.
[0020] Specifically, such as Figure 1-2 As shown, the clamping block 11 is driven by at least one lead screw and nut pair, which includes a rotating lead screw 13 rotatably mounted on the fixed base 1 and a nut 14 mounted on the clamping block 11, with the rotating lead screw 13 connected to the nut 14. Turning the lead screw 13 is suitable for moving the clamping block 11 to adjust the size of the clamping groove 12.
[0021] Specifically, the two clamping blocks 11 are provided with elastic anti-slip pads on opposite sides.
[0022] In this embodiment, the device is moved to a suitable position on the aerial work platform or scaffold, and the rotating screw 13 at the bottom of the fixed base 1 is manually screwed. The two clamping blocks 11 are driven to move towards each other through the screw nut 14 pair. The device is firmly clamped to the platform railing or stable structure by using the clamping groove 12 and the elastic anti-slip pad on its inner side. According to the specific width of the wall to be coated, the second fixing holes 332 at different positions on the extension part 33 are inserted by the fixing bolt 4 and aligned with the first fixing hole 341 of the fixing part 34 to lock, thereby changing the extension length of a single brush. The movable drive 5 is activated, and the connecting seat 31 is driven to slide in the long waist hole 21 to adjust the unfolding angle of the two brushes so that the brush surface just covers the width of the target wall. The paint is evenly applied to the two brushes. The movable drive 5 is controlled so that the connecting seat 31 drives the two brushes to maintain the set unfolding angle, so that the two brush surfaces are in close contact with the wall for coating construction. During operation, the angle of the brush can be finely adjusted in real time according to changes in the wall structure. After the brushing operation is completed, the movable drive component 5 is controlled to move the connecting seat 31 down, and the two brushes are brought together to the minimum width state. The clamping mechanism is then released, and the device can be transferred to the next operation point.
[0023] The above specific embodiments further illustrate the technical problems solved by this utility model, the technical solutions, and the beneficial effects. It should be understood that the above are only specific embodiments of this utility model and are not intended to limit this utility model. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this utility model should be included within the protection scope of this utility model.
Claims
1. A wall coating device for high-altitude operations, characterized in that, include: Fixed base (1); Movable bracket (2), which is mounted on the fixed base (1); The applicator includes two applicator brushes, a connecting seat (31), and two swing arms (32). The two applicator brushes are hinged to the connecting seat (31). The movable bracket (2) is provided with an elongated hole (21). The connecting seat (31) is slidably installed in the elongated hole (21). The two swing arms (32) are installed at the top of the movable bracket (2). One of the swing arms (32) is hinged to any one of the applicator brushes, and the other swing arm (32) is hinged to the other applicator brush. The sliding of the connecting seat (31) along the elongated hole (21) causes the two brushes to rotate around the hinge point between the brush and the connecting seat (31), so that the two brushes can swing towards or away from each other.
2. The wall coating device for high-altitude operations according to claim 1, characterized in that: The brush includes an extension part (33) and a fixing part (34). The fixing part (34) has a first fixing hole (341) at the top, the extension part (33) has a hollow cavity (331), and the extension part (33) has a plurality of evenly distributed second fixing holes (332). The extension portion (33) is sleeved on the fixing portion (34) through the hollow cavity (331). The fixing portion (34) is adapted to be hinged on the connecting seat (31). The first fixing hole (341) and the second fixing hole (332) have the same diameter.
3. The wall coating device for high-altitude operations according to claim 2, characterized in that: It also includes a fixing bolt (4), which is adapted to pass through the first fixing hole (341) and any one of the second fixing holes (332) at the same time to fix and lock the extension (33) and the fixing part (34) at a selected length position.
4. The wall coating device for high-altitude operations according to claim 1, characterized in that: It also includes a movable drive component (5), the fixed end of which is mounted on the fixed base (1), and the movable end of which is connected to the connecting seat (31).
5. A wall coating device for high-altitude operations according to claim 1, characterized in that: Two clamping blocks (11) are slidably installed at the bottom of the fixed base (1), the two clamping blocks (11) are arranged opposite to each other, and a clamping groove (12) is provided between the two clamping blocks (11).
6. A wall coating device for high-altitude operations according to claim 5, characterized in that: The clamping block (11) is driven by at least one lead screw and nut pair, which includes a rotating lead screw (13) rotatably mounted on the fixed base (1) and a nut (14) mounted on the clamping block (11), wherein the rotating lead screw (13) is connected to the nut (14); Twisting the rotary screw (13) is adapted to move the clamping block (11) to adjust the size of the clamping groove (12).
7. A wall coating device for high-altitude operations according to claim 5, characterized in that: The two clamping blocks (11) are provided with elastic anti-slip pads on opposite sides.