Technical Problem

[0003]在钢跳板使用过程中,铁丝绑扎固定易出现钢跳板发生松动的问题,继而产生安全隐患,且钢丝绑扎操作相对麻烦,同时,使用完拆除也需要耗费一定的时间,从而降低了整体的施工效率

Benefits of technology

[0011]本实用新型提供的钢跳板固定结构及脚手架,方便对钢跳板进行固定,相对铁丝固定,稳定性好,固定方便,且整体的施工效率较高。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224902722U_ABST
    Figure CN224902722U_ABST
Patent Text Reader

Abstract

A steel jump plate fixing structure and a scaffold, the steel jump plate fixing structure comprising a pressing part, a locking rope and a clamping part, the clamping part being assembled on the pressing part, the locking rope being detachably locked on the clamping part to form a locking space with the pressing part to lock and fix the steel jump plate on the cross beam, the scaffold comprising the steel jump plate fixing structure and further comprising a plurality of steel jump plates and a plurality of cross beams, the steel jump plates being arranged on the cross beams, and the steel jump plates and the cross beams being located in the locking space. The steel jump plate fixing structure and the scaffold are convenient for fixing the steel jump plate, have good stability, are convenient to fix, and have high overall construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of scaffolding technology, and in particular to a steel plank fixing structure and scaffolding. Background Technology

[0002] Existing steel scaffolding planks are often secured using wire as a temporary fixation method.

[0003] During the use of steel scaffolding, the steel scaffolding is easily loosened when it is tied with wire, which can lead to safety hazards. In addition, the wire tying operation is relatively troublesome, and the dismantling after use also takes a certain amount of time, thus reducing the overall construction efficiency. Summary of the Invention

[0004] In view of this, the purpose of this utility model is to provide a steel plank fixing structure and scaffolding, which facilitates the fixing of steel planks. Compared with wire fixing, it has better stability, is easier to fix, and has higher overall construction efficiency.

[0005] This utility model provides a steel scaffold fixing structure, including a clamping component, a locking rope, and a clamp. The clamp is assembled on the clamping component, and the locking rope is detachably locked on the clamp to cooperate with the clamping component to form a locking space, thereby locking and fixing the steel scaffold onto the crossbeam.

[0006] In one embodiment, the locking element includes at least two rope clips, which are symmetrically mounted on the clamping member, and the two ends of the locking rope are detachably locked onto the corresponding rope clips.

[0007] In one embodiment, the rope clamp includes a stand, a U-bolt buckle, a rope clamp saddle, and a locking nut. The stand is mounted on the clamping member, the U-bolt buckle is mounted on the stand, the rope clamp saddle is movably sleeved on the U-bolt buckle, and the locking nut is threaded onto the U-bolt buckle to limit the position of the rope clamp saddle, so that the U-bolt buckle and the rope clamp saddle cooperate to lock the locking rope.

[0008] In one embodiment, the clamping member includes a plate and a fixing nail. The fixing nail is disposed on the plate and is used to pass through the through holes on the steel plank and the crossbeam. The clamp is assembled on the plate.

[0009] This utility model also provides a scaffold, including the steel plank fixing structure described above, and further including a plurality of steel planks and a plurality of crossbeams, wherein the steel planks are placed on the plurality of crossbeams, and the steel planks and crossbeams are located within the locking space.

[0010] In one embodiment, both the steel scaffolding and the crossbeam are provided with through holes, and the fixing nails are inserted into the through holes on the steel scaffolding and the crossbeam.

[0011] The steel plank fixing structure and scaffolding provided by this utility model facilitate the fixing of steel planks. Compared with wire fixing, it has better stability, is easier to fix, and has higher overall construction efficiency. Attached Figure Description

[0012] To more clearly illustrate the technical solutions of the embodiments of this utility model, the drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of this utility model and should not be regarded as a limitation on the scope. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.

[0013] Figure 1 This is a front view of the steel scaffolding fixing structure provided in Embodiment 1.

[0014] Figure 2 This is a top view of the steel scaffolding fixing structure provided in Embodiment 1.

[0015] Figure 3 This is a diagram showing the positional relationship between the steel planks and crossbeams of the scaffolding provided in Example 2.

[0016] Figure 4 This is a top view of the scaffolding provided in Embodiment 2.

[0017] Figure 5 This is a front view of the scaffolding provided in Embodiment 2. Detailed Implementation

[0018] The specific embodiments of this utility model will now be described in detail with reference to the accompanying drawings. Obviously, the described embodiments are merely some, not all, of the embodiments of this utility model. Based on the description of this utility model, all other embodiments obtained by those skilled in the art without inventive effort are within the scope of protection of this utility model.

[0019] In the description of this utility model, unless otherwise explicitly specified and limited, the terms "set," "install," and "connect," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium. Those skilled in the art can understand the specific meaning of the above terms according to the specific circumstances.

[0020] The terms “upper,” “lower,” “left,” “right,” “front,” “back,” “top,” “bottom,” “inner,” and “outer,” etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship commonly used when the product is in use. They are used only for the convenience of description and simplification, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model.

[0021] The terms “first,” “second,” “third,” etc., are used merely to distinguish elements with similar properties, not to indicate or imply relative importance or a specific order.

[0022] The terms “include,” “comprising,” or any other variation thereof are intended to cover non-exclusive inclusion, which includes not only the elements listed but also other elements not expressly listed.

[0023] Example 1

[0024] Please see Figure 1 and Figure 2 The steel scaffold fixing structure provided by this utility model includes a clamping component 1, a locking rope 3, and a clamp 2. The clamp 2 is assembled on the clamping component 1, and the locking rope 3 is detachably locked on the clamp 2 to cooperate with the clamping component 1 to form a locking space, thereby locking and fixing the steel scaffold 4 to the crossbeam 5.

[0025] It is understood that the crossbeam 5 can be a fixed connection between two adjacent supports, and the fixing method can be bolt connection or welding, etc. The adjacent crossbeams 5 can be connected by steel planks 4. The steel planks 4 are placed on the adjacent crossbeams 5, and then the clamping member 1 is placed on the steel plank 4. In the initial state, one end of the locking rope 3 can be locked with the clamp 2, and the other end of the locking rope 3 is movably inserted into the clamp 2. Pulling this end makes the locking rope 3 and the clamping member 1 cooperate to form a locking space. This locking space can make the steel plank 4 and the crossbeam 5 fit tightly together. Finally, the movable end of the locking rope 3 is locked by the clamp 2 to keep the locking space stable. The locking rope 3 can be made of steel wire rope.

[0026] Please see Figure 1 In some embodiments, the locking member 2 includes at least two rope clips, which are symmetrically assembled on the clamping member 1, and the two ends of the locking rope 3 are detachably locked onto the corresponding rope clips.

[0027] It is known that by using a two-rope clamp, one end of the locking rope 3 can be locked while the other end is in a movable state during fixing, thus facilitating the locking and fixing of the steel plank 4 and the crossbeam 5.

[0028] Please see Figure 1 In some embodiments, the rope clamp includes a stand 201, a U-bolt buckle 203, a rope clamp slide saddle 202, and a locking nut 204. The stand 201 is mounted on the clamping member 1, the U-bolt buckle 203 is mounted on the stand 201, the rope clamp slide saddle 202 is movably sleeved on the U-bolt buckle 203, and the locking nut 204 is threadedly connected to the U-bolt buckle 203 to limit the position of the rope clamp slide saddle 202 so that the U-bolt buckle 203 and the rope clamp slide saddle 202 cooperate to lock the locking rope 3.

[0029] It is understandable that the upright 201 can be vertically welded to the clamping part 1, or it can be detachable in the form of bolt connection, etc. The end of the U-bolt buckle 203 is threaded. The rope clip saddle 202 can be plate-shaped and have an arc groove, which is adapted to the locking rope 3. The rope clip saddle 202 has an opening, and the U-bolt buckle 203 passes through the opening. The position of the rope clip saddle 202 can be adjusted so that the rope clip saddle 202 is in close contact with the locking rope 3. Then, the locking nut 204 is turned so that the locking nut 204 is in close contact with the rope clip saddle 202, thereby locking and fixing the locking rope 3.

[0030] Please see Figure 1 In some embodiments, the clamping member 1 includes a plate 101 and a fixing nail 102. The fixing nail 102 is disposed on the plate 101 and is used to pass through the through holes 6 on the steel plank 4 and the crossbeam 5. The clamping member 2 is assembled on the plate 101.

[0031] It is understandable that the position of the fixing nail 102 can be corresponding to the through hole. The fixing nail 102 can be welded to the plate 101, or the fixing nail 102 and the plate 101 can be an integral structure. The fixing nail 102 passes through the through hole 6 on the steel scaffold 4 and the crossbeam 5, thereby improving the stability of the clamping component 1 in fixing the steel scaffold 4 and the crossbeam 5.

[0032] Example 2

[0033] Please see Figures 3 to 5 This embodiment provides a scaffold, including the above-mentioned steel plank fixing structure, and also includes a plurality of steel planks 4 and a plurality of crossbeams 5. The steel planks 4 are placed on the plurality of crossbeams 5, and the steel planks 4 and crossbeams 5 are located in the locking space.

[0034] It is understood that the method of fixing the crossbeam 5 and the steel plank 4, and the method of fixing the crossbeam 5 to the bracket, can be referred to the description of the above embodiment 1.

[0035] Please see Figure 5 In some embodiments, the steel plank 4 and the crossbeam 5 are provided with through holes 6, and the fixing nails 102 are inserted into the through holes 6 on the steel plank 4 and the crossbeam 5.

[0036] Understandably, the perforations can not only be used to engage with the fixing nails, but also allow bolts to pass through the perforations 6 on the crossbeam 5 to connect to the bracket when the crossbeam 5 needs to be connected randomly. The steel scaffold 4 and crossbeam 5 of this structure can easily engage with the fixing nails 102, thereby improving the stability of the connection between the steel scaffold 4 and crossbeam 5 and the clamping member 1.

[0037] As can be seen from the above description, the steel scaffolding fixing structure provided by this utility model makes it easy to fix the steel scaffolding 4. Compared with wire fixing, it has better stability, is easier to fix, and has higher overall construction efficiency.

[0038] The above description is merely a specific embodiment of this utility model, but the protection scope of this utility model is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in this utility model should be included within the protection scope of this utility model. Therefore, the protection scope of this utility model should be determined by the appended claims.

Claims

1. A steel scaffolding board fixing structure, characterized in that, It includes a clamping component, a locking rope, and a clamp. The clamp is assembled on the clamping component, and the locking rope is detachably locked on the clamp to cooperate with the clamping component to form a locking space, thereby locking and fixing the steel scaffolding to the crossbeam.

2. The steel scaffolding fixing structure as described in claim 1, characterized in that, The locking component includes at least two rope clips, which are symmetrically assembled on the clamping member. The two ends of the locking rope are detachably locked onto the corresponding rope clips.

3. The steel scaffolding fixing structure as described in claim 2, characterized in that, The rope clamp includes a stand, a U-bolt buckle, a rope clamp saddle, and a locking nut. The stand is mounted on the clamping member, the U-bolt buckle is mounted on the stand, the rope clamp saddle is movably sleeved on the U-bolt buckle, and the locking nut is threaded onto the U-bolt buckle to limit the position of the rope clamp saddle, so that the U-bolt buckle and the rope clamp saddle cooperate to lock the locking rope.

4. The steel scaffolding fixing structure as described in claim 1, characterized in that, The clamping component includes a plate and a fixing nail. The fixing nail is disposed on the plate and is used to pass through the holes on the steel plank and the crossbeam. The clamp is assembled on the plate.

5. A type of scaffolding, characterized in that, The steel scaffold fixing structure includes any one of claims 1 to 4, and further includes a plurality of steel scaffolds and a plurality of crossbeams, wherein the steel scaffolds are placed on the plurality of crossbeams and the steel scaffolds and crossbeams are located within the locking space.