Corridor water pipe reinforcing hanger

CN224904262UActive Publication Date: 2026-10-27CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522829411.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-31
Publication Date
2026-10-27
Estimated Expiration
2035-12-31

AI Technical Summary

Technical Problem

安装水管时,通常将水管放置在横杆上,再通过半圆环与螺栓配合进行固定,若半圆环与水管不匹配时,水管的外表面与半圆环之间将会出现空隙,进而影响水管安装,导致水管安装稳定性欠佳,当水管输送水流时,可能会产生轻微晃动,无法实现对水管的加固安装,此外,两个竖杆和一个横杆在组装过程中较为繁琐,不利于竖杆和横杆的快速组装

Benefits of technology

本实用新型提供一种走廊水管加固吊架,通过设置U形架可对应水管,将U形架插入横杆,翻转连接板,使定位杆与定位孔配合,完成连接板的安装,接着安装螺栓,让U形架产生向下的力,从而对水管进行加固安装,翻转横杆,使其与阻挡块接触对应,借助固定栓的作用,完成两个竖杆和横杆的组装固定。通过该结构的整体配合,便于对水管进行加固安装,安装后,水管外表面与U形架紧密贴合,提升了水管安装后的稳定性,同时,在安装水管前,吊架中的两个竖杆和横杆能够快速组装,整体结构操作简单便捷。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224904262U_ABST
    Figure CN224904262U_ABST
Patent Text Reader

Abstract

The utility model discloses a corridor water pipe reinforcing hanging bracket relates to water pipe hanging bracket technical field, including reinforcing component, reinforcing component is provided with two, two reinforcing component all includes the U -shaped frame, the right side of U -shaped frame vertical direction's front and back all are seted up with the installation slot no.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of water pipe hanger technology, specifically to a corridor water pipe reinforcement hanger. Background Technology

[0002] In various types of buildings, corridors, as important passage and functional areas, are usually equipped with a large number of water pipes to meet the needs of water supply, drainage, fire protection and other functions within the building. Most of these water pipes are suspended and fixed to the top of the corridor by hangers.

[0003] The existing technology has the following problems: In existing corridor water pipe hangers, the hanger is generally a U-shape composed of two vertical bars and one horizontal bar for water pipe installation. During installation, the water pipe is typically placed on the horizontal bar and then secured with a semi-circular ring and bolts. If the semi-circular ring does not match the water pipe, a gap will appear between the outer surface of the water pipe and the semi-circular ring, affecting the installation and resulting in poor stability. When water flows through the pipe, slight shaking may occur, making it impossible to achieve a secure installation. Furthermore, the assembly of the two vertical bars and one horizontal bar is cumbersome and not conducive to rapid assembly of the vertical and horizontal bars.

[0004] Therefore, we need a corridor water pipe reinforcement hanger to solve the above problems. Utility Model Content

[0005] This utility model provides a corridor water pipe reinforcement hanger to solve the problems mentioned in the background art.

[0006] To solve the above-mentioned technical problems, the technical solution adopted by this utility model is as follows: A corridor water pipe reinforcement hanger includes two reinforcement components. Each reinforcement component includes a U-shaped frame. The U-shaped frame has mounting grooves on the front and rear sides of its vertical right side. A connecting plate is movably connected inside the mounting groove. A bolt is threaded through the center of the surface of the connecting plate. Positioning holes are provided on the front and rear sides of the left side of the U-shaped frame. A horizontal bar is provided on the outer surface of both reinforcement components. Vertical bars are provided on both sides of the horizontal bar. The left side of the horizontal bar is movably connected to the surface of the vertical bar. The end face of the bolt is in tight contact with the lower surface of the horizontal bar.

[0007] A further improvement of this utility model is that: the front and rear sides of the connecting plate are provided with mounting grooves 2 on the left side; a spring is fixedly connected to the right side of the inside of the mounting groove 2; a positioning rod is fixedly connected to the left end of the spring; the outer surface of the positioning rod slides through the outside of the mounting groove 2; the outer surface of the positioning rod is inserted into the inside of the positioning hole; a handle block is fixedly connected to the right side of the outer surface of the positioning rod; and the outer surface of the handle block extends to the outside of the mounting groove 2.

[0008] A further improvement of this utility model is that the front and rear sides of the connecting plate are at the same horizontal level as the front and rear sides of the U-shaped frame.

[0009] A further improvement of this utility model is that: the upper surface of the crossbar is provided with four interconnected insertion ports, and the interior of the four insertion ports is respectively inserted into the outer surface of the U-shaped frame in the vertical direction.

[0010] A further improvement of this utility model is that: a groove is provided on the right side of the crossbar, and a fixing bolt is threaded through the inside of the groove; a blocking block is fixedly connected to the lower front and rear sides of one of the vertical bars; the outer surface of the fixing bolt is threaded through the inside of the vertical bar; and the right side of the upper surface of the crossbar corresponds to the lower surface of the blocking block.

[0011] Due to the adoption of the above technical solution, the technological progress achieved by this utility model compared to the prior art is as follows: This utility model provides a corridor water pipe reinforcement hanger. A U-shaped frame is used to align with the water pipe. The U-shaped frame is inserted into the horizontal bar, and the connecting plate is flipped to align the positioning rod with the positioning hole, completing the installation of the connecting plate. Then, bolts are installed, causing the U-shaped frame to exert a downward force, thereby reinforcing the water pipe. The horizontal bar is then flipped to align with the blocking block, and with the help of fixing bolts, the two vertical bars and the horizontal bar are assembled and fixed. This integrated structure facilitates the reinforcement and installation of water pipes. After installation, the outer surface of the water pipe fits tightly against the U-shaped frame, improving the stability of the installed water pipe. Furthermore, the two vertical bars and the horizontal bar in the hanger can be quickly assembled before installing the water pipe, making the overall structure simple and convenient to operate. Attached Figure Description

[0012] Figure 1 This is a schematic diagram of the structure of this utility model; Figure 2 This is a schematic diagram of the inner left side structure of the U-shaped frame in the reinforcement component of this utility model; Figure 3 This is a schematic diagram of the inner right side structure of the U-shaped frame in the reinforcement component of this utility model; Figure 4 This is a schematic diagram of the connecting plate structure in the reinforcement component of this utility model; Figure 5 This is a schematic diagram of the separation structure of the horizontal bar and one of the vertical bars of this utility model; Figure 6 This is a schematic diagram of the crossbar and reinforcing components of this utility model after installation on the water pipe; Figure 7 This is an enlarged structural diagram of point A of this utility model.

[0013] In the diagram: 1. Vertical rod; 11. Blocking block; 2. Horizontal rod; 21. Socket; 22. Groove; 23. Fixing bolt; 3. Reinforcing component; 31. U-shaped frame; 32. Mounting slot one; 33. Connecting plate; 331. Mounting slot two; 332. Spring; 333. Positioning rod; 334. Handle block; 34. Bolt; 35. Positioning hole. Detailed Implementation

[0014] To make the technical means, creative features, objectives and effects of this utility model easier to understand, the present utility model will be further described below in conjunction with specific embodiments.

[0015] Example 1: As Figures 1 to 7 As shown, this utility model provides a corridor water pipe reinforcement hanger, including a vertical rod 1 and a horizontal rod 2 as a basic support frame, and two reinforcement components 3 to achieve reinforcement installation of two water pipes.

[0016] Two vertical rods 1 serve as supporting components for the hanger. Mounting plates are fixedly connected to the upper ends of the two vertical rods 1. Bolt holes are provided at the corners of the mounting plates. The bolt holes cooperate with expansion bolts to install and fix the corridor ceiling. Blocks 11 are fixedly connected to the lower front and rear sides of one of the vertical rods 1. The left side of the horizontal rod 2 is movably connected to the surface of the vertical rod 1. The main function of the block 11 is to restrict the position of the horizontal rod 2 when it is flipped. During assembly, after the flipped horizontal rod 2 contacts the block 11, the flipped horizontal rod 2 is in a horizontal straight line state, which facilitates the installation of the fixing bolts 23 and realizes the rapid assembly of the horizontal rod 2 and the two vertical rods 1.

[0017] The horizontal bar 2 serves as the core connecting component between the vertical bar 1 and the reinforcing component 3. The upper surface of the horizontal bar 2 has four interconnected slots 21. The inside of the slots 21 is inserted into the outer surface of the two U-shaped frames 31 in the vertical direction, so as to realize the installation of the reinforcing component 3 on the horizontal bar 2. The size of the slots 21 is adapted to the U-shaped frames 31 to ensure that the U-shaped frames 31 will not wobble after being inserted.

[0018] A groove 22 is provided on the right side of the horizontal bar 2. The groove 22 provides installation space for the connection between the vertical bar 1 and the horizontal bar 2. A fixing bolt 23 is threaded through the inside of the groove 22. The outer surface of the fixing bolt 23 is threaded through the inside of the vertical bar 1. The horizontal bar 2 and the vertical bar 1 are firmly connected by the threaded locking action of the fixing bolt 23. The right side of the upper surface of the horizontal bar 2 corresponds to the lower surface of the blocking block 11.

[0019] Example 2: Figures 1 to 7 As shown, the two reinforcing components 3 are the core structure for clamping and reinforcing the two water pipes. Each reinforcing component 3 includes a U-shaped frame 31, whose U-shaped structure is adapted to the outer surface of the water pipe, so that the upper inner side and the left and right inner sides of the U-shaped frame 31 respectively contact the outer surface of the water pipe. This can prevent gaps from appearing after the water pipe is installed in the hanger and avoid the water pipe from shaking due to the rapid flow of water during use. The U-shaped frame 31 has a mounting groove 32 on the front and back of the right side in the vertical direction. The mounting groove 32 provides space for the installation and movement of the connecting plate 33.

[0020] A connecting plate 33 is movably connected inside the mounting slot 32. The right side of the connecting plate 33 has an opening, which facilitates the alignment between the two mounting slots 32. A fixing rod is fixedly connected to the right side of the inner wall of the opening. The outer surface of the fixing rod passes through the interior of the U-shaped frame 31. This structure allows the connecting plate 33 to be rotated. A bolt 34 is threaded through the center of the surface of the connecting plate 33. When the water pipe is placed in the crossbar 2 and is limited by the U-shaped frame 31, the bolt 34 is rotated so that the end face of the bolt 34 is in tight contact with the lower surface of the crossbar 2. The thread of the bolt 34 drives the connecting plate 33 and the U-shaped frame 31 to move downward, thereby clamping the water pipe. The front and rear sides of the connecting plate 33 are at the same horizontal level as the front and rear sides of the U-shaped frame 31, which facilitates the insertion of the U-shaped frame 31 into the crossbar 2.

[0021] Mounting slots 331 are provided on the left side of both the front and rear sides of the connecting plate 33. Mounting slots 331 provide a carrier for the installation of spring 332 and positioning rod 333, forming a positioning and fixing structure for the connecting plate 33. Spring 332 is fixedly connected to the right side of the interior of mounting slot 331. Spring 332 provides a clamping force for positioning rod 333, so that positioning rod 333 will not move easily. Positioning rod 333 is fixedly connected to the left end of spring 332. The outer surface of positioning rod 333 slides through the outside of mounting slot 331. Positioning holes 35 are provided on the front and rear sides of the left side of the vertical direction of U-shaped frame 31. The outer surface of positioning rod 333 is inserted into the interior of positioning hole 35 to fix the position of connecting plate 33 and facilitate the installation and use of bolt 34.

[0022] A handle block 334 is fixedly connected to the right side of the outer surface of the positioning rod 333. The outer surface of the handle block 334 extends to the outside of the mounting groove 331, providing a convenient point of force application for the operator.

[0023] Working principle: After the hanger is installed and fixed to the corridor ceiling, the operator flips the horizontal bar 2 so that it contacts the blocking block 11. At this time, the horizontal bar 2 is in a horizontal state. Then, the operator uses the fixing bolt 23 to install and fix it. Next, the operator places the water pipe on the upper surface of the horizontal bar 2. Then, the operator opens the connecting plate 33 in the U-shaped frame 31 so that the connecting plate 33 is in a vertical state. Then, the connecting plate 33 and the U-shaped frame 31 are inserted into the socket 21. At this time, the bolt 34 is in an uninstalled state. When the connecting plate 33 and the U-shaped frame 31 are inserted into the appropriate position, the connecting plate 33 is in a horizontal state. The lower surface of the crossbar 2 is positioned. Then, the operator flips the connecting plate 33. After flipping it to the appropriate position, the operator releases the handle block 334. Under the elastic action of the contracted spring 332, the positioning rod 333 is pushed into the positioning hole 35 to fix the connecting plate 33. Then, the operator aligns the bolt 34 with the threaded hole in the connecting plate 33 and rotates it. When the bolt 34 is rotated to the appropriate position, the end face of the bolt 34 contacts the lower surface of the crossbar 2. The bolt 34 is rotated again to move the U-shaped bracket 31 down, thereby clamping and fixing the water pipe and reinforcing the installation of the water pipe and the hanger.

[0024] The present invention has been described in detail above. However, modifications or improvements can be made to it, which will be obvious to those skilled in the art. Therefore, any modifications or improvements that do not depart from the spirit of the present invention are within the protection scope of the present invention.

Claims

1. A corridor water pipe reinforcement hanger, comprising a reinforcement component (3), characterized in that: Two reinforcement components (3) are provided. Both reinforcement components (3) include a U-shaped frame (31). The U-shaped frame (31) has a mounting groove (32) on the front and back of the right side in the vertical direction. A connecting plate (33) is movably connected inside the mounting groove (32). A bolt (34) is threaded through the middle of the surface of the connecting plate (33). A positioning hole (35) is provided on the front and back of the left side in the vertical direction of the U-shaped frame (31). A crossbar (2) is provided on the outer surface of the two reinforcement components (3). A vertical bar (1) is provided on both the left and right sides of the crossbar (2). The left side of the crossbar (2) is movably connected to the surface of the vertical bar (1). The end face of the bolt (34) is in tight contact with the lower surface of the crossbar (2).

2. The corridor water pipe reinforcement hanger according to claim 1, characterized in that: The connecting plate (33) has a second mounting groove (331) on the left side of both the front and rear sides. A spring (332) is fixedly connected to the right side of the inside of the second mounting groove (331). A positioning rod (333) is fixedly connected to the left end of the spring (332). The outer surface of the positioning rod (333) slides through the outside of the second mounting groove (331). The outer surface of the positioning rod (333) is inserted into the inside of the positioning hole (35). A handle block (334) is fixedly connected to the right side of the outer surface of the positioning rod (333). The outer surface of the handle block (334) extends to the outside of the second mounting groove (331).

3. The corridor water pipe reinforcement hanger according to claim 1, characterized in that: The front and rear sides of the connecting plate (33) are at the same horizontal level as the front and rear sides of the U-shaped frame (31).

4. The corridor water pipe reinforcement hanger according to claim 1, characterized in that: The upper surface of the crossbar (2) is provided with four interconnected insertion ports (21), and the interior of the four insertion ports (21) is respectively inserted into the outer surface of the U-shaped frame (31) in the vertical direction.

5. The corridor water pipe reinforcement hanger according to claim 1, characterized in that: The right side of the crossbar (2) is provided with a groove (22), and a fixing bolt (23) is threaded through the inside of the groove (22). A blocking block (11) is fixedly connected to the lower front and rear sides of one of the vertical bars (1). The outer surface of the fixing bolt (23) is threaded through the inside of the vertical bar (1). The right side of the upper surface of the crossbar (2) corresponds to the lower surface of the blocking block (11).