Multifunctional leak stoppage simulation training device

CN224907461UActive Publication Date: 2026-10-27PEOPLES POLICE UNIV OF CHINA (INT LAW ENFORCEMENT COOP INST OF THE MINISTRY OF PUBLIC SECURITY CHINA PEACEKEEPING POLICE TRAINING CENT)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522401185.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Priority Date
2025-09-05
Filing Date
2025-11-12
Publication Date
2026-10-27
Estimated Expiration
2035-11-12

AI Technical Summary

Technical Problem

为了弥补以上堵漏模拟训练装置的不足,实现化工装置等固定源和危化品槽罐车等移动源泄漏场景的集成,突破泄漏点固定、形状单一、泄漏介质气液不可控的局限,优化堵漏效果评价系统,设计一种多功能堵漏模拟训练装置是十分重要和必要的

Benefits of technology

本实用新型提供一种多功能堵漏模拟训练装置,使作为模拟泄漏物质的液体或气体通过管道输送至漏点位置,液体和气体不需在模拟泄漏装置内充盈就能准确模拟泄漏效果,同一模拟泄漏装置上漏点位置可以调整、更换,模拟泄漏装置可循环使用。液体和气体切换使用,方便省时。所需液体由供液装置生产供给、所需气体由供气装置生产供给,可良好地控制模拟泄漏物质的压力和流量。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224907461U_ABST
    Figure CN224907461U_ABST
Patent Text Reader

Abstract

The utility model discloses a multifunctional leaking stoppage simulation training device relates to dangerous goods accident handling simulation training field, including the simulation leakage device of setting with leakage point, liquid supply device and gas supply device, and the feed end of liquid supply device and the feed end of gas supply device are connected the feed end of simulation leakage device through pipeline, and the inside pipeline for connecting leakage point is arranged in simulation leakage device, and the feed end of inside pipeline is connected with the feed end of simulation leakage device, and the discharge branch pipe of inside pipeline and leakage point intercommunication. Multifunctional leaking stoppage simulation training device provided by the utility model makes liquid or gas as simulation leakage material through pipeline delivery to leakage point position, and liquid and gas can accurately simulate leakage effect without filling in simulation leakage device, and leakage point position can be adjusted and replaced on the same simulation leakage device, and simulation leakage device can be recycled. Liquid and gas switch use, and it is convenient and time -saving.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of hazardous chemical accident handling simulation training, and in particular to a multifunctional leak-stopping simulation training device. Background Technology

[0002] With the rapid development of my country's economy, the country's chemical industry has also achieved significant progress. The amount of hazardous chemicals used in production, operation, storage, and transportation is constantly increasing. Due to the flammable, explosive, toxic, and corrosive properties of hazardous chemicals, as well as the special characteristics of the environments they are in, such as high temperatures and high pressures, accidents involving hazardous chemicals are highly likely and extremely dangerous. Once a leak occurs, it not only causes significant loss of life and property but also easily leads to severe environmental pollution and damage.

[0003] In the handling of hazardous chemical spills, plugging and sealing the leak is a crucial measure and method for eliminating the hazard. Choosing appropriate plugging tools and methods can achieve twice the result with half the effort. However, plugging operations are difficult, dangerous, and technically demanding, and professional rescue forces lack practical experience. Therefore, there is an urgent need to utilize simulation training devices to conduct systematic practical training to improve the ability to handle hazardous chemical accidents.

[0004] Currently, overseas leak sealing simulation training mainly relies on chemical plant simulation facilities or abandoned tank trucks to conduct targeted training. Rescue personnel can quickly familiarize themselves with chemical production processes and the internal structure of tank trucks, but the simulated scenarios are limited, and the types of leaked media are few, making it insufficient to handle most leak accident scenarios.

[0005] Domestic leak-sealing simulation training devices typically combine miniature chemical equipment to simply simulate common leak locations in leak accidents. However, these devices differ significantly in size from the targets in real leak accidents, failing to meet the requirements of realistic training. Researchers at the Shanghai Fire and Rescue Research Institute designed modular, multi-functional pressurized leak-sealing simulation training devices using actual hazardous chemical tank trucks as carriers. These devices offer advantages such as centralized on-site automatic control and wireless remote automatic control, achieving the requirements of realistic and standardized leak-sealing training. However, the leaking medium cannot reach a high-temperature state, which is inconsistent with reality. Other scholars have improved and innovated leak-sealing simulation training devices, designing controllable leak outlets to increase the randomness and controllability of leak-sealing training; designing leak-sealing training scoring systems to evaluate leak-sealing effectiveness and reduce errors in evaluation based on direct observation or experience; some training devices use water as the leaking medium, which cannot simulate gas leaks; some use pressurized gas cylinders or steam to simulate pressurized leak-sealing processes, but the gas cylinders or steam cannot maintain a stable leak pressure. The characteristics and ideas of these leak-sealing simulation training device designs provide reference and ideas for the design of multifunctional leak-sealing simulation training devices. To overcome the shortcomings of the above-mentioned leak-sealing simulation training devices, integrate leak scenarios from fixed sources such as chemical plants and mobile sources such as hazardous chemical tank trucks, break through the limitations of fixed leak points, single shapes, and uncontrollable gas and liquid leak media, and optimize the leak-sealing effect evaluation system, it is very important and necessary to design a multifunctional leak-sealing simulation training device. Utility Model Content

[0006] The purpose of this invention is to provide a multifunctional leak-stopping simulation training device to solve the problems existing in the prior art. It allows liquids or gases, serving as the simulated leak substance, to be transported to the leak location via pipelines. The liquids and gases do not need to be filled into the simulation device to accurately simulate the leak effect. The leak location on the same simulation device can be adjusted and replaced, and the simulation device can be reused. Switching between liquids and gases is convenient and time-saving.

[0007] To achieve the above objectives, this utility model provides the following solution: This utility model provides a multifunctional leak-stopping simulation training device, including a simulated leak device with a leak point, a liquid supply device for supplying simulated leaking liquid to the simulated leak device, and a gas supply device for supplying simulated leaking gas to the simulated leak device. The outlet end of the liquid supply device is connected to the inlet end of the simulated leak device through a pipe, and the outlet end of the gas supply device is connected to the inlet end of the simulated leak device through a pipe. The simulated leak device is provided with an internal pipeline for connecting the leak point. The inlet end of the internal pipeline is connected to the inlet end of the simulated leak device, and the outlet branch of the internal pipeline is connected to the leak point.

[0008] In one embodiment, each of the discharge branch pipes is provided with a flow control valve for controlling the flow rate of the discharge branch pipe.

[0009] In one embodiment, the simulated leak device includes a tank and at least one mounting pipe connected to the tank. At least one cylindrical body communicating with the interior of the tank and a pipe interface for connecting the mounting pipe are disposed on the outer side of the tank. The inlet end of the tank serves as the inlet end of the simulated leak device. The mounting pipe includes a first straight pipe section, a bent section, and a second straight pipe section connected in sequence. The first end of the mounting pipe is connected to the pipe interface via a flange. A shut-off valve is installed on the mounting pipe. Both the inlet and processing ends of the shut-off valve are connected to the mounting pipe via flanges. The shut-off valve is located in the first straight pipe section. Alternatively, on the second straight pipe section, the second end of the installation pipe is sealed; the first tank leakage point is located on the bottom surface of the tank, the second tank leakage point is located on the side surface of the tank, the third tank leakage point is located at the junction of the tank and the cylinder, the first pipeline leakage point is located on the flange between the shut-off valve and the installation pipe, the second pipeline leakage point is located on the first straight pipe section or the second straight pipe section, the third pipeline leakage point is located on the stuffing box of the shut-off valve, the fourth pipeline leakage point is located on the bend section, the internal pipeline is located inside the tank, and the discharge branch pipe connects the leakage point on the tank and the pipeline interface.

[0010] In one embodiment, the number of installation pipes is four, and each pipe includes at least one of a first pipe leak, a second pipe leak, a third pipe leak, or a fourth pipe leak. All leaks on the four installation pipes simultaneously include the first pipe leak, the second pipe leak, the third pipe leak, and the fourth pipe leak.

[0011] In one embodiment, a quick-release connector is provided at the first end of the mounting tube.

[0012] In one embodiment, the number of cylinders is two, and at least one third tank leakage point is provided at the joint position of each cylinder and the tank.

[0013] In one embodiment, the liquid supply device includes a storage tank, a centrifugal pump, a pressure monitor, and a pressurization tank. The discharge end of the storage tank is connected to the inlet end of the centrifugal pump via a pipeline, and the discharge end of the centrifugal pump is connected to the inlet end of the pressurization tank via a pipeline. The discharge end of the pressurization tank is connected to the inlet end of the simulated leakage device. The pressure monitor is installed on the pipeline between the centrifugal pump and the pressurization tank. The device also includes a frequency converter control cabinet for controlling the operating intensity of the centrifugal pump.

[0014] In one embodiment, the gas supply device includes a steam boiler, which is equipped with a feed valve, a main gas valve, a drain valve, and a safety valve. The steam boiler is also equipped with a level controller and a pressure controller. The main gas valve is connected to the feed end of the simulated leakage device through a pipeline.

[0015] In one embodiment, the outlet of the pressurized tank, the main air valve, and the inlet of the simulated leakage device are respectively connected to a three-way switching valve via pipelines. The outlet of the pressurized tank is connected to the first inlet of the three-way switching valve, the main air valve is connected to the second inlet of the three-way switching valve, and the inlet of the simulated leakage device is connected to the outlet of the three-way switching valve.

[0016] In one embodiment, an automatic detection and control system is also included, which comprises a control system, a control terminal, and an automatic evaluation system for leak sealing effectiveness.

[0017] The present invention achieves the following technical advantages over the prior art: This invention provides a multifunctional leak-stopping simulation training device. Liquid or gas, acting as the simulated leak substance, is transported to the leak location via pipeline. The liquid or gas does not need to be filled into the simulation device to accurately simulate the leak effect. The leak location on the same simulation device can be adjusted and replaced, and the device can be reused. Switching between liquid and gas is convenient and time-saving. The required liquid is produced and supplied by a liquid supply device, and the required gas is produced and supplied by a gas supply device, allowing for effective control of the pressure and flow rate of the simulated leak substance. Attached Figure Description

[0018] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0019] Figure 1 This is a schematic diagram of a working structure in an embodiment of the present utility model; Figure 2 This is a schematic diagram of the main structure of the simulated leakage device in an embodiment of this utility model; Figure 3 This is a schematic diagram of the left side of the simulated leakage device in an embodiment of this utility model; Figure 4 This is a top view of the simulated leakage device in an embodiment of the present invention; Figure 5 This is a schematic diagram of the internal pipeline structure in an embodiment of the present invention; Figure 6 This is a schematic diagram showing the location of the leak point in the first tank in this embodiment of the present invention; Figure 7 This is a schematic diagram showing the location of the leak point in the second tank in an embodiment of this utility model; Figure 8 This is a schematic diagram showing the location of the leak point in the third tank in this embodiment of the present invention; Figure 9 This is a schematic diagram showing the location of the first pipeline leak point in an embodiment of this utility model; Figure 10 This is a schematic diagram showing the location of the second pipe leak point in an embodiment of this utility model; Figure 11 This is a schematic diagram showing the location of the third pipe leak point in an embodiment of this utility model; Figure 12 This is a schematic diagram showing the location of the fourth pipeline leak point in an embodiment of this utility model; Figure 13 This is a structural diagram of the Internet of Things control terminal system in an embodiment of this utility model; Figure 14 This is the display interface of the IoT control terminal in this embodiment of the utility model.

[0020] Among them, 1. Simulated leakage device; 101. Tank body; 102. Installation pipe; 103. Cylinder body; 104. Shut-off valve; 2. Liquid supply device; 201. Liquid storage tank; 202. Centrifugal pump; 203. Pressure monitor; 204. Pressurization tank; 205. Variable frequency control cabinet; 3. Gas supply device; 301. Steam boiler; 302. Feed valve; 303. Main gas valve; 304. Drain valve; 305. Safety valve; 306. Liquid level controller; 307. Pressure control; 308. Control box; 4. Discharge branch pipe; 5. Flow control valve; 6. Three-way switching valve. Detailed Implementation

[0021] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings. Those skilled in the art can easily understand other advantages and effects of the present utility model from the content disclosed in this specification. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of the present utility model.

[0022] It should be understood that the structures, proportions, sizes, etc., depicted in the accompanying drawings are merely for illustrative purposes to aid those skilled in the art and to facilitate understanding. They are not intended to limit the implementation of this utility model and therefore have no substantial technical significance. Any modifications to the structure, changes in proportions, or adjustments to size, without affecting the effectiveness and purpose of this utility model, should still fall within the scope of the technical content disclosed herein. In the description of this utility model, it should be understood that the terms "longitudinal," "lateral," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," and "outer," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings. They are merely for the convenience of describing this utility model and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model. Furthermore, the terms "first," "second," and "third," etc., are used for descriptive purposes only and should not be construed as indicating or implying relative importance. Therefore, features specified with "first," "second," etc., may explicitly or implicitly include one or more of those features. In the description of this utility model, unless otherwise stated, "multiple" means two or more.

[0023] It should also be noted that in the embodiments of this application, the same reference numerals are used to denote the same component or the same part.

[0024] The purpose of this invention is to provide a multifunctional leak-stopping simulation training device to solve the problems existing in the prior art. It allows liquids or gases, serving as the simulated leak substance, to be transported to the leak location through pipelines. The liquids and gases do not need to be filled into the simulation device to accurately simulate the leak effect. The leak location on the same simulation device can be adjusted and replaced, and the simulation device can be reused. Switching between liquids and gases is convenient and time-saving.

[0025] To make the above-mentioned objectives, features and advantages of this utility model more apparent and understandable, the utility model will be further described in detail below with reference to the accompanying drawings and specific embodiments.

[0026] Example like Figures 1 to 14As shown, this utility model provides a multifunctional leak-stopping simulation training device, including a simulated leak device 1 with a leak point, a liquid supply device 2 for supplying simulated leaking liquid to the simulated leak device 1, and a gas supply device 3 for supplying simulated leaking gas to the simulated leak device 1. The outlet end of the liquid supply device 2 is connected to the inlet end of the simulated leak device 1 via a pipe, and the outlet end of the gas supply device 3 is connected to the inlet end of the simulated leak device 1 via a pipe. The simulated leak device 1 has an internal pipeline for connecting to the leak point. The inlet end of the internal pipeline is connected to the inlet end of the simulated leak device 1, and the outlet branch pipe 4 of the internal pipeline is connected to the leak point.

[0027] Working principle: Liquid supply device 2 generates and supplies liquid at a certain pressure to simulated leak device 1, while gas supply device 3 generates and supplies gas at a certain pressure to simulated leak device 1. The liquid or gas is transported within internal pipelines until it reaches the leak point through outlet branch pipe 4, creating a simulated leak effect. Liquid and gas supplies are switched separately as needed.

[0028] In one embodiment, each discharge branch pipe 4 is equipped with a flow control valve 5 for controlling the flow rate of the discharge branch pipe 4. The flow control valve 5 can individually adjust the flow rate of a specific discharge branch pipe 4, thereby achieving different leakage effects at different leakage locations.

[0029] In one embodiment, the simulated leak device 1 includes a tank 101 and at least one installation pipe 102 connected to the tank 101. At least one cylindrical body 103 communicating with the interior of the tank 101 and a pipe interface for connecting the installation pipe 102 are provided on the outer side of the tank 101. The inlet end of the tank 101 is the inlet end of the simulated leak device 1. The installation pipe 102 includes a first straight pipe section, a bent section, and a second straight pipe section connected in sequence. The first end of the installation pipe 102 is connected to the pipe interface via a flange. A shut-off valve 104 is provided on the installation pipe 102. Both the inlet end and the processing end of the shut-off valve 104 are connected to the installation pipe 102 via flanges. The shut-off valve 104 is located on either the first or second straight pipe section. The second end of the installation pipe 102 is sealed. The first tank leak point is located on the bottom surface of tank 101, the second tank leak point is located on the side of tank 101, and the third tank leak point is located at the junction of tank 101 and cylinder 103. The first pipeline leak point is located on the flange between shut-off valve 104 and installation pipe 102, the second pipeline leak point is located on the first or second straight pipe section, the third pipeline leak point is located on shut-off valve 104, and the fourth pipeline leak point is located on the bend. The internal pipeline is located inside tank 101, and the discharge branch pipe 4 connects the leak points on tank 101 to the pipeline interface. Table 1 is a comparison table of common leak locations, leak outlet shapes, and leak causes. This utility model determines the leak point locations based on the table below.

[0030] Table 1

[0031] In one embodiment, there are four installation pipes 102, each pipe including at least one of a first pipe leak point, a second pipe leak point, a third pipe leak point, or a fourth pipe leak point. All leak points on the four installation pipes 102 simultaneously include the first pipe leak point, the second pipe leak point, the third pipe leak point, and the fourth pipe leak point. During leak-sealing simulation training, multiple sets of training can be conducted simultaneously using leak points at the same location or leak points at different locations.

[0032] In one embodiment, a quick-release connector is provided at the first end of the mounting tube 102. The quick-release connector allows for the replacement and expansion of new functional modules; new functional modules can be replaced using the same mounting tube 102 for repeated operational training. It also allows for changes to the leak location, leak outlet shape, and size to meet the needs of different leak scenarios.

[0033] In one embodiment, there are two cylinders 103, and at least one third tank leakage point is provided at the joint position of each cylinder 103 and the tank 101. During leakage plugging simulation training, multiple sets of training can be conducted simultaneously using leakage points at the same location or leakage points at different locations.

[0034] In one embodiment, the liquid supply device 2 includes a storage tank 201, a centrifugal pump 202, a pressure monitor 203, and a pressurization tank 204. The outlet of the storage tank 201 is connected to the inlet of the centrifugal pump 202 via a pipeline, and the outlet of the centrifugal pump 202 is connected to the inlet of the pressurization tank 204 via a pipeline. The outlet of the pressurization tank 204 is connected to the inlet of the simulated leak device 1. The pressure monitor 203 is installed on the pipeline between the centrifugal pump 202 and the pressurization tank 204. The liquid supply device 2 also includes a frequency converter control cabinet 205 for controlling the operating intensity of the centrifugal pump 202. To make the pressure of the leaked liquid (e.g., water) adjustable and controllable, the frequency converter control cabinet 205 is used to change the speed of the centrifugal pump 202, thereby achieving water supply and primary pressurization. The pressurization tank 204 is used for secondary pressurization, reducing the start-stop frequency of the centrifugal pump 202, so that the liquid pressure can be smoothly regulated. The pressure monitor 203 can monitor the pressure value of the first pressurization in real time, thereby determining the pressure value that the pressurizing tank 204 should apply. During operation, the storage tank 201 is switched to the discharge state, and the frequency converter control cabinet 205 is set to automatic operation of the centrifugal pump 202. The centrifugal pump 202 begins pumping water and providing system pressure, while the pressurizing tank 204 performs secondary pressurization. After the pressure reaches the preset value, the frequency converter control cabinet 205 controls the pressure to stabilize, and the pressurized medium flows out from the leakage point. When the pressure does not meet the set pressure, the centrifugal pump 202 and the pressurizing tank 204 continue to operate to maintain pressure stability. The storage tank 201 has a capacity of 1000L, and the pressure tank is a diaphragm type.

[0035] In one embodiment, the gas supply device 3 includes a steam boiler 301, which is equipped with a feed valve 302, a main gas valve 303, a drain valve 304, and a safety valve 305. The steam boiler 301 also includes a level controller 306 and a pressure controller 307. The main gas valve 303 is connected to the feed end of the simulated leak device 1 via a pipeline. The steam boiler 301 heats the internal liquid (e.g., water), causing it to evaporate and form a high-pressure gaseous leak substance. This gaseous leak substance is discharged from the main gas valve 303 and enters the internal piping network, ultimately forming a leak at the leak location. The safety valve 305 prevents overpressure explosions and accidents. The drain valve 304 is used to discharge waste when cleaning the steam boiler 301 and its interior. The drain valve 304 and the feed valve 302 are separate to prevent blockage and obstruction of the feed. The level controller 306 can automatically replenish the liquid in the steam boiler 301 to prevent dry burning, and the pressure controller 307 can promptly provide feedback on the pressure information inside the steam boiler 301; it will also promptly issue an alarm when the pressure is abnormal. Both the level controller 306 and the pressure controller 307 are controlled by a control terminal located in the control box 308.

[0036] In one embodiment, the discharge end of the pressurization tank 204, the main air valve 303, and the inlet end of the simulated leakage device 1 are respectively connected to a three-way switching valve 6 via pipelines. The discharge end of the pressurization tank 204 is connected to the first inlet of the three-way switching valve 6, the main air valve 303 is connected to the second inlet of the three-way switching valve 6, and the inlet end of the simulated leakage device 1 is connected to the outlet of the three-way switching valve 6. The on / off states of the first and second inlets of the three-way switching valve 6 are opposite: when the first inlet is connected to the outlet, the second inlet is disconnected from the outlet; when the second inlet is connected to the outlet, the first inlet is disconnected.

[0037] In one embodiment, an automatic detection and control system is also included. This system comprises a control system, a control terminal, and an automatic leak-stopping effect evaluation system. The control system controls the on / off state of the flow control valve 5 to control the opening and closing of the leaking part. In this invention, the flow control valve 5 is a PLC-guided pneumatic solenoid valve. This system has a short response time, is simple to operate, and has a wide range of applications. A pressure sensor is also installed at the discharge branch pipe 4. The flow control valve 5 and the pressure sensor are connected to the PLC to control the opening and closing of the leaking part and to store and process pressure data. The control terminal is implemented by connecting an IoT gateway and a remote control to the PLC control system. The IoT control system connects the PLC to the IoT gateway and, using wireless transmission methods such as wireless networks and WIFI, uploads pressure sensor data and solenoid valve control switch data to a remote computer or portable device. This enables remote PLC programming, remote data monitoring, pressure data acquisition and display, and data application.

[0038] The handheld remote control terminal can serve as a backup control terminal when the wireless transmission path of the IoT control terminal is affected. It controls the opening and closing of the solenoid valve by adding an industrial remote controller. The remote controller has strong anti-interference capabilities and rapid response, and is used for emergency opening and closing of leaking parts, preventing the IoT control terminal from being unable to control the opening and closing of leaking parts due to network fluctuations.

[0039] To better reflect the effectiveness of leak sealing, this device employs an automated evaluation system based on Internet of Things (IoT) technology to objectively assess the sealing results. The system uses a programmed PLC to have pressure sensors detect initial and final pressure values, pressure changes, effective initial pressure, and pressure comparison values, uploading these data to the PLC's memory. An IoT gateway then provides real-time feedback of the leak pressure to a portable display device, which displays these pressure values ​​on a screen via cloud configuration. Once the leak is sealed, the pressure continues to rise to its maximum value. At this point, the leak sealing is considered complete, and the test timing ends. A delay timer records the pressure maintained for a fixed period; if there is no significant pressure drop, the leak sealing is successful. A significant pressure drop indicates the leak has not been completely sealed. The evaluation system analyzes the detected data to derive various detection values ​​and automatically evaluates the sealing effect based on the recorded data. This eliminates the need for manual verification of sealing success, avoiding the influence of human factors during training, assessments, or competitions, and ensuring fair and impartial results.

[0040] It should be noted that, for those skilled in the art, it is obvious that this utility model is not limited to the details of the above exemplary embodiments, and that it can be implemented in other specific forms without departing from the spirit or essential characteristics of this utility model. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of this utility model is defined by the appended claims rather than the foregoing description. Therefore, all variations falling within the meaning and scope of equivalents of the claims are intended to be included within this utility model, and no reference numerals in the claims should be construed as limiting the scope of the claims.

[0041] This utility model uses specific examples to illustrate its principles and implementation methods. The above description of the embodiments is only for the purpose of helping to understand the method and core idea of ​​this utility model. At the same time, for those skilled in the art, there will be changes in the specific implementation methods and application scope based on the idea of ​​this utility model. In summary, the content of this specification should not be construed as a limitation of this utility model.

Claims

1. A multifunctional leak-sealing simulation training device, characterized in that: It includes a simulated leak device (1) with a leak point, a liquid supply device (2) for supplying simulated leak liquid to the simulated leak device (1), and a gas supply device (3) for supplying simulated leak gas to the simulated leak device (1). The outlet of the liquid supply device (2) is connected to the inlet of the simulated leak device (1) through a pipe, and the outlet of the gas supply device (3) is connected to the inlet of the simulated leak device (1) through a pipe. The simulated leakage device (1) is equipped with an internal pipeline for connecting the leakage point. The inlet end of the internal pipeline is connected to the inlet end of the simulated leakage device (1), and the outlet branch pipe (4) of the internal pipeline is connected to the leakage point.

2. The multifunctional leak-stopping simulation training device according to claim 1, characterized in that: Each of the discharge branch pipes (4) is provided with a flow control valve (5) for controlling the flow rate of the discharge branch pipe (4).

3. The multifunctional leak-stopping simulation training device according to claim 1 or 2, characterized in that: The simulated leakage device (1) includes a tank (101) and at least one mounting pipe (102) connected to the tank (101). At least one cylindrical body (103) communicating with the inside of the tank (101) and a pipe interface for connecting the mounting pipe (102) are provided on the outside of the side of the tank (101). The feed end of the tank (101) is the feed end of the simulated leakage device (1). The installation pipe (102) includes a first straight pipe section, a bent section, and a second straight pipe section connected in sequence. The first end of the installation pipe (102) is connected to the pipe interface via a flange. A shut-off valve (104) is installed on the installation pipe (102). The inlet and processing ends of the shut-off valve (104) are both connected to the installation pipe (102) via flanges. The shut-off valve (104) is installed on either the first or the second straight pipe section. The second end of the installation pipe (102) is sealed. A first tank leakage point is located on the bottom surface of the tank (101), and a second tank leakage point is located on the bottom surface of the tank (101). The side of the tank (101) and the third tank leak point are located at the junction of the tank (101) and the cylinder (103). The first pipeline leak point is located on the flange between the shut-off valve (104) and the installation pipe (102). The second pipeline leak point is located on the first straight pipe section or the second straight pipe section. The third pipeline leak point is located on the stuffing box of the shut-off valve (104). The fourth pipeline leak point is located on the bend section. The internal pipeline is located inside the tank (101). The discharge branch pipe (4) connects the leak point on the tank (101) and the pipeline interface.

4. The multifunctional leak-stopping simulation training device according to claim 3, characterized in that: The number of installation pipes (102) is four, and each pipe includes at least one of the following: a first pipe leak, a second pipe leak, a third pipe leak, or a fourth pipe leak. All leaks on the four installation pipes (102) simultaneously include the first pipe leak, the second pipe leak, the third pipe leak, and the fourth pipe leak.

5. The multifunctional leak-stopping simulation training device according to claim 3, characterized in that: A quick-release connector is provided at the first end of the installation tube (102).

6. The multifunctional leak-sealing simulation training device according to claim 3, characterized in that: The number of cylinders (103) is two, and at least one third tank leakage point is provided at the joint position of each cylinder (103) and the tank (101).

7. The multifunctional leak-stopping simulation training device according to claim 1 or 2, characterized in that: The liquid supply device (2) includes a storage tank (201), a centrifugal pump (202), a pressure monitor (203), and a pressurization tank (204). The discharge end of the storage tank (201) is connected to the inlet end of the centrifugal pump (202) via a pipeline. The discharge end of the centrifugal pump (202) is connected to the inlet end of the pressurization tank (204) via a pipeline. The discharge end of the pressurization tank (204) is connected to the inlet end of the simulated leakage device (1). The pressure monitor (203) is installed on the pipeline between the centrifugal pump (202) and the pressurization tank (204). It also includes a frequency converter control cabinet (205) for controlling the operating intensity of the centrifugal pump (202).

8. The multifunctional leak-stopping simulation training device according to claim 7, characterized in that: The gas supply device (3) includes a steam boiler (301), which is equipped with a feed valve (302), a main gas valve (303), a drain valve (304), and a safety valve (305). The steam boiler (301) is also equipped with a level controller (306) and a pressure controller (307). The main gas valve (303) is connected to the feed end of the simulated leakage device (1) through a pipeline.

9. The multifunctional leak-stopping simulation training device according to claim 8, characterized in that: The discharge end of the pressurizing tank (204), the main air valve (303) and the feed end of the simulated leakage device (1) are respectively connected to the three-way switching valve (6) through pipelines. The discharge end of the pressurizing tank (204) is connected to the first inlet of the three-way switching valve (6), the main air valve (303) is connected to the second inlet of the three-way switching valve (6), and the feed end of the simulated leakage device (1) is connected to the outlet of the three-way switching valve (6).

10. The multifunctional leak-stopping simulation training device according to claim 1, characterized in that: It also includes an automatic detection and control system, which comprises a control system, a control terminal, and an automatic evaluation system for leak sealing effectiveness.