Insulating fixing device for tower crane cable

CN224909044UActive Publication Date: 2026-10-27ZHEJIANG XINZHONGYUAN CONSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522442584.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-15
Publication Date
2026-10-27
Estimated Expiration
2035-11-15

AI Technical Summary

Technical Problem

针对上述中的相关技术,发明人认为上述电缆夹对不同规格塔吊的适应性有待提高

Benefits of technology

1.一种塔吊电缆线绝缘固定装置,包括安装基座、夹持主体以及锁定件;在将电缆线固定于塔吊时,操作人员先将电缆线安装于夹持主体,再将安装基座安装于塔身,使得第一锁定板和第二锁定板将塔身夹持,并将锁定件依次穿过第一锁定孔、第二锁定孔和第三锁定孔实现将安装基座与夹持主体固定,从而实现对电缆线于塔吊的固定;通过调节伸缩滑移结构能够实现对第一锁定板和第二锁定板的间距的调节,有助于提高电缆线固定装置对不同尺寸塔吊的适应性;

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224909044U_ABST
    Figure CN224909044U_ABST
Patent Text Reader

Abstract

The application relates to a tower crane cable insulation fixing device, which comprises a mounting base mounted on a tower body, a clamping body mounted on the mounting base and used for arranging a cable and a locking piece used for connecting the mounting base and the clamping body; the mounting base comprises oppositely arranged first and second locking plates and a telescopic sliding structure used for adjusting the spacing of the first and second locking plates; the first locking plate is provided with a first locking hole penetrating through the inner and outer surfaces and used for arranging the locking piece on the side away from the telescopic sliding structure, and the second locking plate is provided with a second locking hole penetrating through the inner and outer surfaces and used for arranging the locking piece opposite to the first locking hole; and the clamping body is provided with a locking part used for locking arrangement of the locking piece and is provided with a third locking hole at the locking part. The application has the effect that the cable fixing device is adaptable to tower cranes of different sizes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of cable fixing technology, and in particular to a tower crane cable insulation fixing device. Background Technology

[0002] Tower cranes, as important vertical transportation equipment, are widely used in various construction projects. Cables, as indispensable power transmission components during tower crane operation, are crucial for their safe and reliable arrangement. In related technologies, cable clamps are typically used to fix the cables along the tower body. A cable clamp includes a mounting base fixed to the tower body, a clamping body mounted on the mounting base for cable fixation, and a fastening mechanism for securing the clamping body to the mounting base. The mounting base is usually a fixed steel structure. By arranging the mounting base on the tower body and fixing it with the fastening mechanism, a fixed connection between the cable clamp and the tower crane can be achieved. Regarding the above-mentioned related technologies, the inventor believes that the adaptability of the cable clamp to tower cranes of different specifications needs to be improved. Utility Model Content

[0003] To improve the adaptability of cable fixing devices to tower cranes of different sizes, this application provides a tower crane cable insulation fixing device.

[0004] The technical solution for the tower crane cable insulation fixing device provided in this application is as follows: A tower crane cable insulation fixing device includes a mounting base installed on the tower body, a clamping body installed on the mounting base for arranging cables, and a locking member for connecting the mounting base and the clamping body. The mounting base includes a first locking plate and a second locking plate arranged opposite to each other, and a telescopic sliding structure for adjusting the distance between the first locking plate and the second locking plate. The first locking plate has a first locking hole on the side away from the telescopic sliding structure, penetrating its inner and outer surfaces, for arranging the locking member. The second locking plate has a second locking hole opposite to the first locking hole, penetrating its inner and outer surfaces, for arranging the locking member. The clamping body has a locking portion for locking the locking member and a third locking hole is provided in the locking portion.

[0005] By adopting the above technical solution, when fixing the cable to the tower crane, the operator first installs the cable onto the clamping body, and then installs the mounting base onto the tower body, so that the first locking plate and the second locking plate clamp the tower body. The locking element is then passed through the first locking hole, the second locking hole and the third locking hole in sequence to fix the mounting base to the clamping body, thereby fixing the cable to the tower crane. By adjusting the telescopic sliding structure, the distance between the first locking plate and the second locking plate can be adjusted, which helps to improve the adaptability of the cable fixing device to tower cranes of different sizes.

[0006] Optionally, there are two first locking holes arranged symmetrically on the first locking plate, and each of the two first locking holes is provided with a locking element; there are two second locking holes arranged directly opposite each of the two first locking holes.

[0007] By adopting the above technical solution, two symmetrically arranged first locking holes are respectively equipped with locking components, and two second locking holes are directly opposite the first locking holes, making the connection between the mounting base and the clamping body more stable and helping to improve the overall stability of the fixing device.

[0008] Optionally, the clamping body is installed on the side of the second locking plate away from the first locking plate; the clamping body includes a first clamping block and a second clamping block slidably arranged on the first clamping block; the locking parts are symmetrically arranged on both sides of the first clamping block.

[0009] By adopting the above technical solution, the specific structure of the clamping body is disclosed. By using the first clamping block and the second clamping block that is slidably arranged on the first clamping block, the clamping space can be flexibly adjusted to adapt to cables of different sizes. The locking parts are symmetrically arranged on both sides of the first clamping block, which can make the locking more stable and enhance the fixing effect on the cable.

[0010] Optionally, the first clamping block is provided with a U-shaped groove on the side facing the second locking plate for sliding arrangement of the cable, and the U-shaped groove is provided with guide grooves on both side walls along the axial direction parallel to the third locking hole for sliding arrangement of the second clamping block; the second clamping block has a sliding protrusion that cooperates with the guide groove.

[0011] By adopting the above technical solution, the U-shaped groove provides space for the cable to slide and arrange, which facilitates the installation and adjustment of the cable; the cooperation between the guide groove and the sliding protrusion enables the second clamping block to slide stably on the first clamping block, which helps to ensure that the cable is accurately and securely clamped.

[0012] Optionally, the second clamping block has an arcuate groove opposite the U-shaped groove for accommodating the cable.

[0013] By adopting the above technical solution, an arc-shaped groove that matches the U-shaped groove is set in the second clamping block, which makes the cable more stably attached and arranged in the U-shaped groove, helps to reduce the risk of the cable swaying left and right, and improves the reliability of the cable fixing.

[0014] Optionally, the mounting base further includes a first side plate connected to the upper edge of the first locking plate and extending toward the side closer to the second locking plate, and a second side plate connected to the upper edge of the second locking plate and extending toward the side closer to the first locking plate; the first side plate and the second side plate are slidably arranged relative to each other, and the telescopic sliding structure is arranged on the first side plate and the second side plate.

[0015] By adopting the above technical solution, a first side plate and a second side plate that slide relative to each other are provided on the upper edge of the first locking plate and the second locking plate, and a telescopic sliding structure is provided between the first side plate and the second side plate. This allows for a more stable adjustment of the distance between the first locking plate and the second locking plate, which helps to improve the compatibility of the mounting base with the fixing of tower cranes of different sizes.

[0016] Optionally, the telescopic sliding structure includes a first slide groove formed on the surface of the first side plate for sliding arrangement of the second side plate, and a first slider arranged on the second side plate and sliding in cooperation with the first slide groove; the bottom of the first slider is provided with an arrangement hole and a ball spring plunger is installed in the arrangement hole, and the bottom of the first slide groove has a snap-fit ​​hole for the plunger ball of the ball spring plunger to snap into.

[0017] By adopting the above technical solution, the sliding of the second side plate relative to the first side plate can be realized by the cooperation of the first slider and the first sliding groove, which facilitates the adjustment of the distance between the first locking plate and the second locking plate; the plunger ball of the ball spring plunger engages with the locking hole, which can effectively position the ball when it is adjusted to the appropriate position, ensuring the stability and accuracy of the distance adjustment.

[0018] Optionally, the number of snap-fit ​​holes is not less than four and they are evenly spaced along the length of the first slide groove.

[0019] By adopting the above technical solution, the snap-fit ​​holes, which are not less than four and evenly spaced along the length of the first slide groove, can stably fix the first locking plate and the second locking plate in multiple positions, realize multi-level adjustment of the spacing, and help to further improve the installation adaptability to tower cranes of different sizes.

[0020] Optionally, the telescopic sliding structure includes a plug groove formed at the end of the first side plate and extending along the length direction, a plug part arranged on the first side plate and cooperating with the plug groove, and a positioning bolt installed on the first side plate for pressing the plug part against the inner wall of the plug groove; a positioning hole is formed at the top of the first side plate, communicating with the plug groove and for installing the positioning bolt; the plug part has an abutting surface on the side away from the positioning hole that abuts against the inner wall of the plug groove.

[0021] By adopting the above technical solution, the telescopic sliding structure uses a combination of a plug-in groove, a plug-in part, and positioning bolts. The positioning bolts press the plug-in part against the inner wall of the plug-in groove, which can easily adjust the distance between the first locking plate and the second locking plate. At the same time, the abutting surface abuts against the inner wall of the plug-in groove, which can ensure the stability of the structure of the mounting base after the distance is adjusted.

[0022] Optionally, the second side plate has a damping layer on the abutment surface.

[0023] By adopting the above technical solution, setting a damping layer on the contact surface can increase the friction between the second side plate and the inner wall of the insertion groove, making the positioning of the telescopic sliding structure more stable after adjusting the spacing, thereby ensuring that the installation base and tower crane are more firmly fixed.

[0024] In summary, this application includes at least one of the following beneficial technical effects: 1. A tower crane cable insulation fixing device, comprising a mounting base, a clamping body, and a locking component; when fixing the cable to the tower crane, the operator first installs the cable onto the clamping body, then installs the mounting base onto the tower body, so that a first locking plate and a second locking plate clamp the tower body, and the locking component passes through a first locking hole, a second locking hole, and a third locking hole in sequence to fix the mounting base to the clamping body, thereby fixing the cable to the tower crane; by adjusting the telescopic sliding structure, the distance between the first locking plate and the second locking plate can be adjusted, which helps to improve the adaptability of the cable fixing device to tower cranes of different sizes; 2. By cooperating with the first slider and the first groove, and by engaging the ball head of the ball spring plunger with the locking hole, the second side plate can slide relative to the first side plate. This helps to adjust the distance between the first locking plate and the second locking plate, so that the second side plate can be effectively positioned when adjusted to the appropriate position, thereby improving the stability and accuracy of the distance adjustment between the first locking plate and the second locking plate. 3. By using the combination of the insertion slot, insertion part and positioning bolt, the positioning bolt presses the insertion part against the inner wall of the insertion slot, which helps to adjust the distance between the first locking plate and the second locking plate. At the same time, the abutting surface abuts against the inner wall of the insertion slot, which improves the stability of the mounting base structure after the distance is adjusted. Attached Figure Description

[0025] Figure 1 This is a schematic diagram of the tower crane cable insulation fixing device in Example 1.

[0026] Figure 2 This is a cross-sectional view along the length of the tower crane cable insulation fixing device in Example 1.

[0027] Figure 3 This is a schematic diagram of the fit between the first side plate and the second side plate in Embodiment 1.

[0028] Figure 4 yes Figure 3 A schematic diagram of the engagement of the ball-head spring plunger at point A with the engagement hole.

[0029] Figure 5 yes Figure 2 A schematic diagram of the fit between the guide groove and the sliding protrusion at point B.

[0030] Figure 6 This is a schematic diagram of the fit between the first side plate and the second side plate in Embodiment 2.

[0031] Explanation of reference numerals in the attached drawings: 1. Mounting base; 11. First locking plate; 111. First locking hole; 12. Second locking plate; 121. Second locking hole; 13. First side plate; 131. First sliding groove; 132. Snap-fit ​​hole; 133. Insertion groove; 134. Positioning hole; 14. Second side plate; 141. First slider; 1411. Arrangement hole; 142. Insertion part; 1421. Abutment surface; 1422. Damping layer; 15. Ball-head spring plunger; 151. Plunger housing; 152. Plunger spring; 153. Plunger ball head; 16. Positioning bolt; 2. Clamping body; 21. First clamping block; 211. U-shaped groove; 212. Guide groove; 213. Locking part; 2131. Third locking hole; 22. Second clamping block; 221. Arc groove; 222. Sliding protrusion; 3. Locking element; 31. Locking bolt; 32. Locking nut. Detailed Implementation

[0032] The following is in conjunction with the appendix Figure 1-6 This application will be described in further detail.

[0033] Example 1 This application discloses an insulation fixing device for tower crane cables. (Refer to...) Figure 1 The tower crane cable insulation fixing device includes a mounting base 1 installed on the tower body, a clamping body 2 installed on the mounting base 1 for cable arrangement, and a locking member 3 for connecting the mounting base 1 and the clamping body 2.

[0034] Reference Figure 1 and Figure 2The mounting base 1 includes a first locking plate 11, a second locking plate 12 arranged parallel to the first locking plate 11, a first side plate 13 connected to the upper edge of the first locking plate 11 and extending towards the side closer to the second locking plate 12, and a second side plate 14 connected to the upper edge of the second locking plate 12 and extending towards the side closer to the first locking plate 11. A telescopic sliding structure is provided between the first side plate 13 and the second side plate 14 for relative sliding arrangement. The first locking plate 11 has a first locking hole 111 penetrating through its inner and outer surfaces and used for arranging the locking member 3 on the side away from the telescopic sliding structure. The second locking plate 12 has a second locking hole 121 penetrating through its inner and outer surfaces and used for arranging the locking member 3, directly opposite the first locking hole 111. There are two first locking holes 111, symmetrically arranged on the first locking plate 11. There are two second locking holes 121, each directly opposite one of the two first locking holes 111.

[0035] Reference Figure 3 and Figure 4 The telescopic sliding structure includes a first slide groove 131 formed on the surface of the first side plate 13 for sliding arrangement of the second side plate 14, and a first slider 141 arranged on the second side plate 14 and sliding in cooperation with the first slide groove 131. The bottom of the first slider 141 is provided with an arrangement hole 1411, and a ball-head spring plunger 15 is installed in the arrangement hole 1411. The ball-head spring plunger includes a plunger housing 151, a plunger spring 152, and a plunger ball head 153. One end of the plunger spring 152 abuts against the bottom of the inner cavity of the plunger housing 151, and the other end abuts against the plunger ball head 153, so that the plunger ball head 153 always tends to abut against the opening of the plunger housing 151. The bottom of the first slide groove 131 has a locking hole 132 for the plunger ball head 153 of the ball-head spring plunger 15 to engage. The number of locking holes 132 is six, and they are evenly spaced along the length of the first slide groove 131. In this embodiment, the first slider 141 is a slider with a T-shaped cross-section perpendicular to the length direction, and the first groove 131 is a T-shaped groove adapted to the first slider 141.

[0036] Reference Figure 2 and Figure 5The clamping body 2 is installed on the side of the second locking plate 12 away from the first locking plate 11. The clamping body 2 includes a first clamping block 21 and a second clamping block 22 slidably arranged on the first clamping block 21. The first clamping block 21 has a U-shaped groove 211 on the side facing the second locking plate 12 for sliding arrangement of the cable. The second clamping block 22 has an arc-shaped groove 221 opposite the U-shaped groove 211 for close arrangement of the cable. The U-shaped groove 211 has guide grooves 212 on both side walls along the axis parallel to the third locking hole 2131 for sliding arrangement of the second clamping block 22. The second clamping block 22 has sliding protrusions 222 on both sides that cooperate with the guide grooves 212. In this embodiment, both the first clamping block 21 and the second clamping block 22 are made of plastic with good insulation properties.

[0037] Reference Figure 2 The first clamping block 21 has a locking portion 213 for locking the locking member 3, and a third locking hole 2131 is formed in the locking portion 213. There are two locking portions 213, symmetrically arranged on both sides of the first clamping block 21. Each locking portion 213 has a third locking hole 2131 directly opposite the two second locking holes 121. The locking member 3 includes a locking bolt 31 that passes sequentially through the first locking hole 111, the second locking hole 121, and the third locking hole 2131, and a locking nut 32 installed on the outside of the third locking hole 2131 and engaging with the locking bolt 31.

[0038] The implementation principle of the tower crane cable insulation fixing device according to the embodiment of this application is as follows: the operator first installs the cable on the first clamping block 21, and then slides the second clamping block 22 onto the first clamping block 21, thereby fixing the cable to the clamping body 2; then the mounting base 1 is installed on the tower body, so that the first locking plate 11 and the second locking plate 12 clamp the tower body, and the locking member 3 passes through the first locking hole 111, the second locking hole 121 and the third locking hole 2131 in sequence to fix the mounting base 1 to the clamping body 2, thereby fixing the cable to the tower crane; by adjusting the telescopic sliding structure, the distance between the first locking plate 11 and the second locking plate 12 can be adjusted, which helps to improve the adaptability of the cable fixing device to tower cranes of different sizes.

[0039] Example 2 The tower crane cable insulation fixing device in this application is identical to that in Embodiment 1 except for the telescopic sliding structure.

[0040] Reference Figure 6The telescopic sliding structure includes a insertion groove 133 formed at the end of the first side plate 13 and extending along its length, an insertion part 142 arranged on the second side plate 14 and cooperating with the insertion groove 133, and a positioning bolt 16 installed on the first side plate 13 for pressing the insertion part 142 against the inner wall of the insertion groove 133. The top of the first side plate 13 has a positioning hole 134 communicating with the insertion groove 133 and used for arranging the positioning bolt 16. The insertion part 142 has an abutment surface 1421 on the side away from the positioning hole 134 that abuts against the inner wall of the insertion groove 133. A damping layer 1422 is provided on the surface of the abutment surface 1421. In this embodiment, the damping layer 1422 can be a rubber pad.

[0041] The above are all preferred embodiments of this application, and are not intended to limit the scope of protection of this application. Therefore, all equivalent changes made in accordance with the structure, shape and principle of this application should be covered within the scope of protection of this application.

Claims

1. A tower crane cable insulation fixing device, characterized in that, The system includes a mounting base (1) installed on the tower body, a clamping body (2) installed on the mounting base (1) for cable arrangement, and a locking member (3) for connecting the mounting base (1) and the clamping body (2); the mounting base (1) includes a first locking plate (11) and a second locking plate (12) arranged opposite to each other, and a telescopic sliding structure for adjusting the distance between the first locking plate (11) and the second locking plate (12); the first locking plate (11) has a first locking hole (111) on the side away from the telescopic sliding structure that penetrates the inner and outer surfaces and is used for the arrangement of the locking member (3); the second locking plate (12) has a second locking hole (121) opposite to the first locking hole (111) that penetrates the inner and outer surfaces and is used for the arrangement of the locking member (3); the clamping body (2) has a locking part (213) for locking the arrangement of the locking member (3) and a third locking hole (2131) is provided in the locking part (213).

2. The tower crane cable insulation fixing device according to claim 1, characterized in that, The number of the first locking holes (111) is two and they are symmetrically arranged on the first locking plate (11), and the two first locking holes (111) are respectively provided with the locking member (3); the number of the second locking holes (121) is two and they are arranged opposite to the two first locking holes (111).

3. The tower crane cable insulation fixing device according to claim 1, characterized in that, The clamping body (2) is installed on the side of the second locking plate (12) away from the first locking plate (11); the clamping body (2) includes a first clamping block (21) and a second clamping block (22) slidably arranged on the first clamping block (21); the locking part (213) is symmetrically arranged on both sides of the first clamping block (21).

4. The tower crane cable insulation fixing device according to claim 3, characterized in that, The first clamping block (21) is provided with a U-shaped groove (211) for sliding arrangement of the cable on the side facing the second locking plate (12). The U-shaped groove (211) is provided with guide grooves (212) on both sides along the axis parallel to the third locking hole (2131) for sliding arrangement of the second clamping block (22). The second clamping block (22) has a sliding protrusion (222) that cooperates with the guide groove (212).

5. A tower crane cable insulation fixing device according to claim 4, characterized in that, The second clamping block (22) has an arc-shaped groove (221) opposite the U-shaped groove (211) for the cable to be attached and arranged.

6. The tower crane cable insulation fixing device according to claim 1, characterized in that, The mounting base (1) further includes a first side plate (13) connected to the upper edge of the first locking plate (11) and extending toward the side closer to the second locking plate (12), and a second side plate (14) connected to the upper edge of the second locking plate (12) and extending toward the side closer to the first locking plate (11); the first side plate (13) and the second side plate (14) are slidably arranged relative to each other, and the telescopic sliding structure is arranged on the first side plate (13) and the second side plate (14).

7. A tower crane cable insulation fixing device according to claim 6, characterized in that, The telescopic sliding structure includes a first slide groove (131) formed on the surface of the first side plate (13) for the second side plate (14) to slide and be arranged, and a first slider (141) arranged on the second side plate (14) and sliding in cooperation with the first slide groove (131); the bottom of the first slider (141) is provided with an arrangement hole (1411) and a ball spring plunger (15) is installed in the arrangement hole (1411); the bottom of the first slide groove (131) has a snap-fit ​​hole (132) for the plunger ball head (153) of the ball spring plunger (15) to snap into.

8. A tower crane cable insulation fixing device according to claim 7, characterized in that, The number of the snap-fit ​​holes (132) is not less than four and they are evenly spaced along the length of the first slide groove (131).

9. A tower crane cable insulation fixing device according to claim 6, characterized in that, The telescopic sliding structure includes a plug groove (133) opened at the end of the first side plate (13) and extending along the length direction, a plug part (142) arranged in the first side plate (13) and cooperating with the plug groove (133), and a positioning bolt (16) installed on the first side plate (13) for pressing the plug part (142) against the inner wall of the plug groove (133); the top of the first side plate (13) is provided with a positioning hole (134) communicating with the plug groove (133) and for installing the positioning bolt (16); the plug part (142) has an abutting surface (1421) on the side away from the positioning hole (134) that abuts against the inner wall of the plug groove (133).

10. A tower crane cable insulation fixing device according to claim 9, characterized in that, The second side plate (14) has a damping layer (1422) on the surface of the abutment surface (1421).