Steel structure bridge bridge inspection vehicle track installation device and bridge
Patent Information
- Application Number
- CN202522210256.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-20
- Publication Date
- 2026-10-30
- Estimated Expiration
- 2035-10-20
AI Technical Summary
1、钢结构梁体安装过程中难免出现偏位,直接影响轨道安装线性;另外梁体安装过程中可能损坏轨道
1、每段桥梁梁体上均设有由支撑架安装的滚轮结构,通过若干个滚轮结构构成位于桥梁梁底的滑道,利用滑道进行定位用于运送轨道标准节。通过将轨道标准节在施工平台上收尾焊接,并将焊接好的轨道标准节置于所述滑道上,再由位于桥梁另一端的钢丝绳牵引机构,牵引已焊接好的轨道标准节在所述滑道上滑动,从而将整个已焊接好的桥检车轨道由施工平台处输送至桥梁梁体的正下方。在已焊接好的桥检车轨道输送至桥梁梁体的正下方设计位置时,将桥检车轨道整体焊接在梁体上,即可完成桥检车轨道在轨道梁体上的精准安装。
Smart Images

Figure CN224918281U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of bridge construction technology, specifically to a track installation device for a steel structure bridge inspection vehicle and a bridge. Background Technology
[0002] The existing installation process for bridge inspection vehicle tracks on steel structure bridges is as follows: Generally, the inspection vehicle tracks are welded to the steel structure beams before the beams are installed; then, the inspection vehicle tracks are installed together with the steel structure beams. While welding the two sections of steel structure beams end to end, the inspection vehicle tracks on adjacent steel structure beams are also welded together.
[0003] However, the installation process of the aforementioned bridge inspection vehicle track has the following defects: 1. Misalignment is inevitable during the installation of steel structure beams, which directly affects the linearity of the track installation; in addition, the track may be damaged during the beam installation process.
[0004] 2. Large-span steel structure beams are generally divided into many segments, with each segment being relatively short and having a large number of track butt welds. Utility Model Content
[0005] To address the aforementioned shortcomings of existing technologies, a steel structure bridge inspection vehicle track installation device and a bridge are provided, which ensures the linearity of the bridge inspection vehicle track while reducing the number of welds on the track.
[0006] The technical solution adopted by this utility model to solve the above-mentioned technical problems is as follows: A steel structure bridge inspection vehicle track installation device, wherein the bridge inspection vehicle track is composed of several standard track sections connected end to end; characterized in that it includes: Support frames, with several sets of support frames arranged at intervals along the length of the bridge beam; The roller structure is fixedly installed on each set of support frames. All the roller structures are located on the same straight line and together form a slide. The clamp is fixedly connected to the end of the first standard section of the track; The wire rope traction mechanism has a construction platform at one end of the bridge for welding two adjacent standard track sections; and an installation platform at the other end of the bridge for installing the wire rope traction mechanism. The wire rope traction mechanism is connected to the clamps and pulls the welded standard track sections to move on the slide.
[0007] According to the above technical solution, the roller structure includes a rotating shaft fixed on a support frame and a roller rotatably connected to the rotating shaft; the roller can only be rotatably connected to the rotating shaft.
[0008] According to the above technical solution, the roller structure includes a rotating shaft fixed on a support frame, a roller rotatably connected to the rotating shaft, and rubber blocks for limiting position; the roller is sleeved on the rotating shaft and slides on the rotating shaft; the rubber blocks are sleeved on the rotating shaft and located on both sides of the roller; under certain action, the rubber blocks slide to adjust the position of the roller on the rotating shaft.
[0009] According to the above technical solution, the length of the rotating shaft is 10cm to 15cm longer than the length of the roller; the length of the rubber block is 1cm to 2cm.
[0010] According to the above technical solution, the roller has an annular groove around its circumference. The cross-section of the annular groove is divided into a bottom surface and two side surfaces. The width of the bottom surface is the same as the width of the standard section of the track.
[0011] According to the above technical solution, each set of support frames includes two support frames, which are respectively connected to the two ends of the rotating shaft.
[0012] According to the above technical solution, the support frame is spaced 2m to 4m apart along the direction of the bridge beam.
[0013] According to the above technical solution, the wire rope traction mechanism includes a first wire rope and a traction drum structure, with the two ends of the first wire rope connected between the clamp and the traction drum structure, respectively. It also includes the installation of hanging baskets, which are then connected to the bridge.
[0014] According to the above technical solution, it also includes fixed pulleys and reciprocating steel wire ropes. Several fixed pulleys are provided and are respectively fixed on the bridge beam, construction platform, or installation platform. The reciprocating steel wire ropes are connected to the fixed pulleys and the traction drum structure to form a ring structure, and the traction drum structure pulls the reciprocating steel wire ropes to rotate. The clamp is connected to a reciprocating wire rope, which carries the clamp and the first wire rope connected to the clamp from the installation platform to the construction platform.
[0015] A bridge, on which a steel structure bridge inspection vehicle track mounting device as described in any of the above descriptions is installed.
[0016] This utility model has the following beneficial effects: 1. Each bridge girder section is equipped with a roller structure mounted on a support frame. Several roller structures form a slide rail located at the bottom of the bridge girder, which is used for positioning and transporting standard track sections. The standard track sections are finished by welding on a construction platform, and then placed on the slide rail. A wire rope traction mechanism located at the other end of the bridge pulls the welded standard track section along the slide rail, thus transporting the entire welded bridge inspection vehicle track from the construction platform to directly beneath the bridge girder. Once the welded bridge inspection vehicle track is transported to the designed position directly beneath the bridge girder, the entire track is welded to the girder, completing the precise installation of the bridge inspection vehicle track on the track beam.
[0017] Based on the above structure, firstly, it solves the problem of inconvenient transportation of track components when installing the bridge inspection vehicle track for cross-river and cross-line steel structure bridges; secondly, the standard track sections do not need to be hoisted along with individual bridge beam sections, removing the limitation on the size of the standard track sections, increasing the length of the standard track sections, reducing the number of track butt welds, and improving installation efficiency and quality; thirdly, it improves the linearity of the bridge inspection vehicle track installation, enhances the installation quality of the bridge inspection vehicle track, and avoids the problem of slippage and jamming of the bridge inspection vehicle.
[0018] 2. Rubber blocks are installed inside the roller structure to adjust the position of the roller on the rotating shaft, thereby adjusting the slide and ensuring its linearity, thus improving the installation quality of the bridge inspection vehicle.
[0019] 3. A reciprocating wire rope is installed within the wire rope traction mechanism. This reciprocating wire rope drives the clamp from the installation platform to the construction platform. The above description is merely an overview of the technical solution of this utility model. In order to better understand the technical means of this utility model and to implement it according to the contents of the specification, the preferred embodiments of this utility model are described in detail below with reference to the accompanying drawings. The specific implementation methods of this utility model are given in detail in the following embodiments and their accompanying drawings. Attached Figure Description
[0020] The accompanying drawings, which are included to provide a further understanding of the present invention and form part of this application, illustrate exemplary embodiments of the present invention and are used to explain the present invention, but do not constitute an undue limitation of the present invention.
[0021] Figure 1 This is a front view of an embodiment provided by this utility model; Figure 2 This is a partial view of the support frame and roller structure provided in an embodiment of the present invention; Figure 3 This is a side view of an embodiment provided by this utility model; In the diagram, 1. Standard track section; 2. Support frame; 3. Bridge beam; 4. Roller structure; 4-1. Rotating shaft; 4-2. Roller; 4-3. Rubber block; 4-4. Annular groove; 5. Clamp; 6. Wire rope traction mechanism; 6-1. First wire rope; 6-2. Traction drum structure; 6-3. Fixed pulley; 6-4. Reciprocating wire rope; 7. Construction platform; 8. Installation platform; 9. Hanging basket. Detailed Implementation
[0022] The following is in conjunction with the appendix Figure 1-3 The principles and features of this utility model are described below. The examples given are for illustrative purposes only and are not intended to limit the scope of this utility model. The utility model is described more specifically in the following paragraphs by way of example with reference to the accompanying drawings. The advantages and features of this utility model will become clearer from the following description and claims. It should be noted that the drawings are in a very simplified form and use non-precise proportions, and are only used to facilitate and clarify the illustration of the embodiments of this utility model.
[0023] It should be noted that when a component is described as "fixed to" another component, it can be directly on the other component or may have a component in between. When a component is considered "connected to" another component, it can be directly connected to the other component or may have a component in between. When a component is considered "set on" another component, it can be directly set on the other component or may have a component in between. The terms "vertical," "horizontal," "left," "right," and similar expressions used in this document are for illustrative purposes only.
[0024] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains. The terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. The term "and / or" as used herein includes any and all combinations of one or more of the associated listed items.
[0025] Reference Figures 1-3 As shown, this utility model provides a track installation device for a steel structure bridge inspection vehicle.
[0026] Example 1 The bridge inspection vehicle track is composed of several standard track sections connected end to end; including Support frame 2, several sets of support frames are arranged at intervals along the length of bridge beam 3; Roller structure 4: Roller structures are fixedly installed on each set of support frames. All roller structures are located on the same straight line and together form a slide. Clamp 5, the clamp is fixedly connected to the end of the first standard section of track; The wire rope traction mechanism 6 has a construction platform 7 at one end of the bridge for welding two adjacent standard track sections; and an installation platform 8 at the other end of the bridge for installing the wire rope traction mechanism. The wire rope traction mechanism is connected to the clamp and pulls the welded standard track sections to move on the slide.
[0027] In this invention, each bridge beam segment is equipped with a roller structure mounted on a support frame. Several roller structures form a slide rail located at the bottom of the bridge beam, which is used for positioning and transporting standard track sections. The standard track sections are finished by welding on a construction platform and then placed on the slide rail. A wire rope traction mechanism located at the other end of the bridge pulls the welded standard track section along the slide rail, thereby transporting the entire welded bridge inspection vehicle track from the construction platform to directly beneath the bridge beam. Once the welded bridge inspection vehicle track is transported to the designed position directly beneath the bridge beam, it is welded integrally onto the beam, thus completing the precise installation of the bridge inspection vehicle track on the track beam.
[0028] Based on the above structure, firstly, it solves the problem of inconvenient transportation of track components when installing the bridge inspection vehicle track for cross-river and cross-line steel structure bridges; secondly, the standard track sections do not need to be hoisted along with individual bridge beam sections, removing the limitation on the size of the standard track sections, increasing the length of the standard track sections, reducing the number of track butt welds, and improving installation efficiency and quality; thirdly, it improves the linearity of the bridge inspection vehicle track installation, enhances the installation quality of the bridge inspection vehicle track, and avoids the problem of slippage and jamming of the bridge inspection vehicle.
[0029] Example 2 Based on Example 1, two preferred roller structures are presented.
[0030] The first type of roller structure includes a rotating shaft fixed to a support frame and a roller rotatably connected to the rotating shaft; the roller can only be rotatably connected to the rotating shaft, such as by a bearing. The advantage of this roller structure is its simplicity.
[0031] The second method, in order to improve the installation accuracy of the bridge inspection vehicle track and reduce the installation difficulty of the support frame on the bridge beam, includes a rotating shaft 4-1 fixed on the support frame, a roller 4-2 rotatably connected to the rotating shaft, and rubber blocks 4-3 for limiting the position; the roller is sleeved on the rotating shaft and slides on the rotating shaft; the rubber blocks are sleeved on the rotating shaft and located on both sides of the roller; under certain action, the rubber blocks slide to adjust the position of the roller on the rotating shaft.
[0032] Due to welding errors between bridge beams and between standard track sections, these errors can cause the support frame to deviate from its designed position, resulting in the roller structure falling off the straight line where the slide is designed to be. Damped rubber blocks restrict the rollers' position on the rotating shaft; operators then drive the rubber blocks to slide axially on the shaft, adjusting the rollers' positions to ensure all rollers are on the straight line where the slide is designed to be.
[0033] In the above embodiments, preferably, the length of the rotating shaft is 10cm to 15cm longer than the length of the roller; and the length of the rubber block is 1cm to 2cm.
[0034] Example 3 Based on Example 2, in order to prevent the track standard section from shifting during the movement of the roller structure, the roller is provided with an annular groove 4-4 around its perimeter. The cross-section of the annular groove is divided into a bottom surface and two side surfaces, and the width of the bottom surface is the same as the width of the track standard section.
[0035] In embodiments 2 and 3, each set of support frames includes two support frames, which are respectively connected to the two ends of the rotating shaft.
[0036] In embodiments 1-3, the preferred interval of the support frame along the direction of the bridge beam is 2m to 4m.
[0037] Example 4 Based on embodiments 1-3, the wire rope traction mechanism includes a first wire rope 6-1 and a traction drum structure 6-2, with the two ends of the first wire rope connected between the clamp and the traction drum structure, respectively.
[0038] After the clamp holds the standard section of the track in the first section, the first steel wire rope is pulled by the traction drum structure, driving the standard section of the track to slide on the slide.
[0039] To facilitate the connection of the first wire rope and clamp to the first standard section of the track, a fixed pulley 6-3 and a reciprocating wire rope 6-4 are also included. Several fixed pulleys are provided and are fixed to the bridge beam, construction platform, or installation platform respectively. The reciprocating wire rope is connected to the fixed pulley and the traction drum structure to form a ring structure, and the traction drum structure pulls the reciprocating wire rope to rotate. The clamp is connected to a reciprocating wire rope, which carries the clamp and the first wire rope connected to the clamp from the installation platform to the construction platform.
[0040] In this implementation, when pulling the first standard track section, the clamp and the first wire rope located at the installation platform are connected to a node of the reciprocating wire rope via a reciprocating wire rope. Subsequently, the rotation of the traction drum structure drives the reciprocating wire rope to carry the clamp and the first wire rope from the installation platform to the construction platform.
[0041] In embodiments 1-4, a hanging basket 9 is also included, which is connected to the bridge.
[0042] This utility model also provides a bridge, on which a steel structure bridge inspection vehicle track installation device as described in any of the above is provided.
[0043] Construction steps of this utility model: S1: Before installing the bridge beam, determine the installation position of the bridge inspection vehicle track in advance, and install the support frame on the bridge beam accordingly. The installation position of the support frame on the bridge beam along the transverse direction of the bridge can be determined according to the adjustment requirements of the bridge inspection vehicle track on the bridge connector along the transverse direction of the bridge. The spacing of the support frames along the length of the bridge can be determined according to the length of the standard track section, generally with a spacing of 3m.
[0044] S2: After the bridge beam is installed, a winch is installed on the installation platform at one end of the bridge beam as a wire rope traction mechanism, forming a reciprocating traction system together with the reciprocating wire rope and several fixed pulleys. Under the action of the reciprocating traction system, the clamp and the first wire rope pass through the installation position of the bridge inspection vehicle track. The first standard section of the track is connected to the reciprocating traction system through the clamp, and then the reciprocating traction system pulls the bridge inspection vehicle track to the installation position.
[0045] S3: Accurately measure the installation position of the bridge inspection vehicle track as designed, and adjust the actual position of the slide rail using the rubber blocks on the rotating shaft to ensure that the designed installation position of the bridge inspection vehicle track coincides with the actual position of the slide rail. Specifically, the gap between the support frames should be greater than the length of the rollers, generally 10-15cm wide is appropriate. Adjustment method for the transverse bridge track beam position: The rotating shaft is fixed, and the rollers can roll around the rotating shaft or swing laterally along it; the rubber blocks are generally 1-2cm long and are used to restrict the axial movement of the rollers on the rotating shaft, preventing hard contact between the rollers and the support frames, and adjusting the position of the rubber blocks on the rotating shaft. Adjust the position of the rubber blocks on the rotating shaft as needed, so that the rollers located between the rubber blocks are on the straight line of the set position of the slide rail, thus ensuring that the bridge inspection vehicle track on the slide rail is in the designed installation position.
[0046] After the roller position is adjusted to be correct, the bridge inspection vehicle track is connected to the bottom of the bridge beam to complete the installation of the track beam (during the fine-tuning stage, personnel use a hanging basket to reach the designated position).
[0047] S4: Remove the rolling structure and support frame.
[0048] If multiple bridge inspection vehicle tracks are installed on the bridge, then multiple sets of the aforementioned steel structure bridge inspection vehicle track installation devices shall be installed.
[0049] The above description is merely a preferred embodiment of this utility model and is not intended to limit the utility model in any way. Those skilled in the art can readily implement this utility model based on the accompanying drawings and the above description. However, any modifications, alterations, or variations made by those skilled in the art without departing from the scope of the utility model's technical solution, utilizing the disclosed technical content, are equivalent embodiments of this utility model. Furthermore, any equivalent changes, alterations, or variations made to the above embodiments based on the essential technology of this utility model are still within the protection scope of this utility model's technical solution.
Claims
1. A rail installation device for a steel structure bridge inspection vehicle, wherein the bridge inspection vehicle rail is composed of several standard rail sections connected end to end; characterized in that: include Support frames, with several sets of support frames arranged at intervals along the length of the bridge beam; The roller structure is fixedly installed on each set of support frames. All the roller structures are located on the same straight line and together form a slide. The clamp is fixedly connected to the end of the first standard section of the track; The wire rope traction mechanism has a construction platform at one end of the bridge for welding two adjacent standard track sections; and an installation platform at the other end of the bridge for installing the wire rope traction mechanism. The wire rope traction mechanism is connected to the clamps and pulls the welded standard track sections to move on the slide.
2. The steel structure bridge inspection vehicle track installation device according to claim 1, characterized in that: The roller structure includes a rotating shaft fixed on a support frame and a roller rotatably connected to the rotating shaft; the roller can only be rotatably connected to the rotating shaft.
3. The steel structure bridge inspection vehicle track installation device according to claim 1, characterized in that: The roller structure includes a rotating shaft fixed on a support frame, a roller rotatably connected to the rotating shaft, and rubber blocks for limiting position; the roller is sleeved on the rotating shaft and slides on the rotating shaft; the rubber blocks are sleeved on the rotating shaft and located on both sides of the roller; under certain action, the rubber blocks slide to adjust the position of the roller on the rotating shaft.
4. The steel structure bridge inspection vehicle track installation device according to claim 3, characterized in that: The length of the rotating shaft is 10cm to 15cm longer than the length of the roller; the length of the rubber block is 1cm to 2cm.
5. The steel structure bridge inspection vehicle track installation device according to any one of claims 2-4, characterized in that: The roller has an annular groove around its circumference. The cross-section of the annular groove is divided into a bottom surface and two side surfaces. The width of the bottom surface is the same as the width of the standard section of the track.
6. The steel structure bridge inspection vehicle track installation device according to claim 5, characterized in that: Each set of support frames includes two support frames, which are respectively connected to the two ends of the rotating shaft.
7. The steel structure bridge inspection vehicle track installation device according to claim 1, characterized in that: The support frame is spaced 2m to 4m apart along the direction of the bridge beam.
8. The steel structure bridge inspection vehicle track installation device according to claim 1, characterized in that: The wire rope traction mechanism includes a first wire rope and a traction drum structure, with the two ends of the first wire rope connected between the clamp and the traction drum structure, respectively. It also includes the installation of hanging baskets, which are then connected to the bridge.
9. The steel structure bridge inspection vehicle track installation device according to claim 8, characterized in that: It also includes fixed pulleys and reciprocating wire ropes. Several fixed pulleys are provided and are fixed to the bridge beam, construction platform, or installation platform respectively. The reciprocating wire ropes are connected to the fixed pulleys and the traction drum structure to form a ring structure, and the traction drum structure pulls the reciprocating wire ropes to rotate. The clamp is connected to a reciprocating wire rope, which carries the clamp and the first wire rope connected to the clamp from the installation platform to the construction platform.
10. A bridge, characterized in that: The bridge is equipped with a steel structure bridge inspection vehicle track installation device as described in any one of claims 1-9.