Temporary fixing device for steel structure construction safety rope net

CN224918293UActive Publication Date: 2026-10-30MCC (SHANGHAI) STEEL STRUCTURE TECHNOLOGY CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522044271.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-09-23
Publication Date
2026-10-30
Estimated Expiration
2035-09-23

AI Technical Summary

Technical Problem

但是,因桥梁钢结构自身安全质量要求,不能在桥梁本体上焊接用于固定安全绳网的装置

Benefits of technology

[0014]从上面的描述可知,本实用新型提供的钢结构施工安全绳网临时固定装置,包括分别卡接在H型钢上翼缘板的两侧的翼缘夹板,两个翼缘夹板通过连接板的连接固定在上翼缘板上,连接稳定不会位移脱落,在连接板上部设置安全网夹板将安全网夹紧,安全网挂设牢固,安全绳挂在连接板一端的安全绳挂柱上,挂设方便牢固。本实用新型提出的钢结构施工安全绳网临时固定装置无需在钢结构本体上进行焊接作业,不损伤翼缘板,安装简单牢固,安全性高,可重复利用。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224918293U_ABST
    Figure CN224918293U_ABST
Patent Text Reader

Abstract

The utility model provides a kind of steel structure construction safety rope net temporary fixing device, including a pair of flange clamping plate, connecting plate, safety rope hanging column and safety net clamping plate, flange clamping plate includes upper plate, lower plate and connecting plate, middle threaded hole is provided in the middle part of upper plate, a pair of flange clamping plate is respectively clamped in the two side parts of H-shaped steel upper flange plate;Safety rope hanging column is fixed in the one end of connecting plate, two through holes are provided on connecting plate;Safety net clamping plate includes two pressing plates, two sockets are provided on pressing plate;Connecting plate is set in the upper portion of two upper plates, two pressing plates are sequentially set above connecting plate, safety net is clamped between two pressing plates, two pressing plates, connecting plate and two upper plates are fixed by middle hole bolt passing through corresponding socket, through hole and middle threaded hole.The utility model can be installed on the flange plate of steel structure, to solve the problem that safety rope net suspension device is not stable during bridge steel structure processing and installation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of safety construction device technology, and more specifically, to a temporary fixing device for safety rope netting in steel structure construction. Background Technology

[0002] During the fabrication and installation of bridge steel structures, the large cross-sections of the components and the high elevation often require workers to operate at heights, posing a risk of falls. However, due to the inherent safety and quality requirements of bridge steel structures, devices for securing safety ropes and nets cannot be welded onto the bridge body. Therefore, the current common practice is to use single clips or single bolts to directly fasten the safety net or rope to the protruding parts of the steel structure flanges. This type of fixing structure is highly susceptible to detachment after prolonged use and vibration. To address these issues, there is an urgent need for a temporary fixing device for safety ropes and nets during steel structure construction. Utility Model Content

[0003] In view of the above problems, the purpose of this utility model is to provide a temporary fixing device for safety rope netting in steel structure construction, which is installed on the flange plate of the steel structure to solve the problem of unstable suspension of safety rope netting during the processing and installation of bridge steel structure.

[0004] This utility model provides a temporary fixing device for safety rope netting in steel structure construction, comprising a pair of flange clamps, a connecting plate, a safety rope hanging post, and a safety net clamp. The flange clamping plate includes an upper plate, a lower plate, and a connecting plate connecting the edges of the upper plate and the lower plate. The upper plate and the lower plate are parallel and their center lines are aligned. A central threaded hole is provided in the middle of the upper plate. The pair of flange clamping plates are respectively snapped onto the two sides of the upper flange plate of the H-beam of the steel structure and are symmetrical about the center line of the upper flange plate. The safety rope hanging post is fixed to one end of the connecting plate, and the connecting plate is provided with through holes corresponding to the two threaded holes respectively; The safety net clamp includes two pressure plates, and two insertion slots with the same spacing as the two through holes are provided on the pressure plates; The connecting plate is disposed on the upper part of the two upper plates, and the two pressure plates are disposed above the connecting plate in sequence, with the sockets of the two pressure plates facing each other. A safety net is sandwiched between the two pressure plates. The two pressure plates, the connecting plate, and the two upper plates are fixed together by central hole bolts passing through corresponding sockets, through holes, and central threaded holes.

[0005] One possible solution is that the distance between the upper plate and the lower plate is equal to the thickness of the upper flange plate.

[0006] One possible solution is that the width and length of the upper plate are greater than the width and length of the lower plate, respectively, and end threaded holes are provided at both ends of the upper plate. The upper plate is fixed to the upper flange plate by end bolts passing through the end threaded holes.

[0007] One option is that the width of the connecting plate is less than the distance between the two end threaded holes.

[0008] One option is that the width of the pressure plate is the same as the width of the connecting plate, and the socket includes a semi-circular hole disposed on the center line of the length direction of the pressure plate and an elongated hole opened from the semi-circular hole to the long edge of the pressure plate. The diameter of the circular hole and the width of the elongated hole are both equal to the diameter of the through hole.

[0009] One option is to tighten a first nut onto the bolt portion in the center hole between the safety net clamp and the connecting plate.

[0010] One option is to tighten a second nut onto the central bolt portion at the upper part of the safety net clamp.

[0011] One option is that the safety rope hanging post includes a steel pipe welded to the upper end of the connecting plate and closed, with two ear plates provided on the side wall of the steel pipe.

[0012] One option is to uniformly arrange the insertion ports on the pressure plate and uniformly arrange the through holes on the connecting plate.

[0013] One option is to install at least two temporary fixing devices for the steel structure construction safety rope net on the upper flange plate.

[0014] As described above, the temporary fixing device for safety rope netting in steel structure construction provided by this utility model includes flange clamps respectively clipped onto both sides of the upper flange plate of an H-beam. The two flange clamps are fixed to the upper flange plate through a connecting plate, ensuring a stable connection and preventing displacement or detachment. A safety net clamp is installed on the upper part of the connecting plate to clamp the safety net, ensuring a secure hanging of the safety net. The safety rope is hung on a safety rope post at one end of the connecting plate, making hanging convenient and secure. The temporary fixing device for safety rope netting in steel structure construction proposed by this utility model eliminates the need for welding operations on the steel structure body, does not damage the flange plates, is simple and secure to install, offers high safety, and is reusable.

[0015] To achieve the foregoing and related objectives, one or more aspects of the present invention include the features that will be described in detail below and specifically pointed out in the claims. The following description and accompanying drawings illustrate certain exemplary aspects of the present invention. However, these aspects indicate only a few of the various ways in which the principles of the present invention can be used. Furthermore, the present invention is intended to include all such aspects and their equivalents. Attached Figure Description

[0016] Other objects and results of this invention will become more apparent and readily understood upon referring to the following description taken in conjunction with the accompanying drawings, and with a more complete understanding of the invention. In the drawings: Figure 1 This is a structural schematic diagram of the temporary fixing device for steel structure construction safety rope net according to Embodiment 1 of this utility model; Figure 2 This is a top view of the connecting plate according to Embodiment 1 of the present invention; Figure 3 This is a schematic diagram of the flange clamp according to Embodiment 1 of the present invention; Figure 4 This is a schematic diagram of the pressure plate according to Embodiment 1 of the present invention; Figure 5 This is a schematic diagram of the connecting plate according to Embodiment 2 of the present invention; Figure 6 This is a schematic diagram of the pressure plate according to Embodiment 2 of the present invention; Among them, 1 is the flange clamping plate, 11 is the upper plate, 12 is the lower plate, 13 is the connecting plate, 14 is the middle threaded hole, 15 is the end threaded hole, 2 is the connecting plate, 21 is the through hole, 3 is the safety rope hanging post, 31 is the steel pipe, 32 is the ear plate, 33 is the U-shaped clamp, 4 is the safety net clamping plate, 41 is the pressure plate, 42 is the socket, 5 is the first nut, 6 is the second nut, 7 is the middle hole bolt, and 8 is the upper flange plate.

[0017] In all the accompanying drawings, the same reference numerals indicate similar or corresponding features or functions. Detailed Implementation

[0018] In the following description, numerous specific details are set forth for illustrative purposes and to provide a thorough understanding of one or more embodiments. However, it will be apparent that these embodiments may also be implemented without these specific details. In other instances, well-known structures and devices are shown in block diagram form for ease of description of one or more embodiments.

[0019] This invention can be modified in various ways and has various embodiments, with specific embodiments illustrated in the accompanying drawings. However, this invention is not limited to this specific implementation and all modifications, equivalents, and substitutions falling within the spirit and technical scope of this invention are to be understood as included.

[0020] Ordinal terms such as "first," "second," etc., may be used to describe various constituent elements, but the constituent elements are not limited to these terms. The terms are used only to distinguish one constituent element from another. For example, without departing from the scope of the claims of this utility model, a second constituent element may be named a first constituent element, and similarly, a first constituent element may be named a second constituent element. Terms and / or include combinations of multiple associated items or one of multiple associated items.

[0021] It should be understood that when referring to a constituent element being "connected" or "in contact" with other constituent elements, this includes not only cases where it is directly connected or in contact with other constituent elements, but also cases where other constituent elements exist between them. Conversely, when referring to a constituent element being "directly connected" or "directly in contact" with other constituent elements, it should be understood that no other constituent elements exist between them.

[0022] In the description of the embodiments, when it is stated that a certain component is formed "on or under" other components, "on or under" includes both two components that are in direct contact with each other and at least one other component that is configured to be formed between the two components. Furthermore, when expressed as "on or under", based on a certain component, it refers not only to the upper direction but may also include the lower direction.

[0023] The terminology used in this application is for illustrative purposes only and is not intended to limit the scope of the invention. Unless the context clearly specifies otherwise, singular expressions include plural expressions. In this application, terms such as "comprising" or "having" are used to specify the presence of features, numbers, steps, operations, constituent elements, components, or combinations thereof described in the specification, and do not preclude the presence or additional possibilities of one or more other features, numbers, steps, operations, constituent elements, components, or combinations thereof.

[0024] Unless otherwise defined, including technical or scientific terms, all terms used herein have the same meaning as commonly understood by one of ordinary skill in the art. Terms as defined in commonly used dictionaries should be interpreted in a meaning consistent with their meaning in the context of the relevant art, and should not be construed as having an ideal or overly formal meaning unless explicitly defined in this application.

[0025] The specific embodiments of this utility model will be described in detail below with reference to the accompanying drawings.

[0026] Example 1 like Figures 1-4 As shown in the figure, the temporary fixing device for steel structure construction safety rope net proposed in this embodiment can be installed on the flange plate of the steel section of the steel structure for suspending safety ropes and safety nets, and can also be installed on both sides of other long strip plates for suspending nets or ropes.

[0027] The temporary fixing device for safety rope netting in steel structure construction proposed in this embodiment mainly includes a pair of flange clamping plates 1, a connecting plate 2, and a safety net clamping plate 4 arranged sequentially from bottom to top on the upper flange plate 8 of an H-beam or I-beam. A safety rope hanging post 3 is fixed to one end of the connecting plate 2. The pair of flange clamping plates 1 are used to clamp the two sides of the upper flange plate 8 along its length. The connecting plate 2 is used to pull and fix the pair of flange clamping plates 1 to the upper flange plate 8. The safety net clamping plate 4 is used to press and fix the safety net. The safety rope hanging post 3 is used to suspend the safety rope.

[0028] The flange clamp 1 includes an upper plate 11, a lower plate 12, and a connecting plate 13 connecting the edges of the upper plate 11 and the lower plate 12. The upper plate 11 and the lower plate 12 are parallel and their center lines are aligned. A central threaded hole 14 is provided in the middle of the upper plate 11. A pair of flange clamps 1 are respectively clamped on both sides of the upper flange plate 8 of the H-beam of the steel structure and are symmetrical about the center line of the upper flange plate 8.

[0029] In other words, the upper plate 11, the lower plate 12, and the connecting plate 13 constitute a U-shaped flange clamp 1. Each flange clamp 1 can be inserted into the edge of the upper flange plate 8. The upper plate 11 and the lower plate 12 respectively fit against the upper and lower sides of the upper flange plate 8, and the connecting plate 13 is close to the edge of the upper flange plate 8. The two flange clamps 1 are symmetrically clamped onto both sides of the upper flange plate 8 of the H-beam and locked in place. The threaded holes 14 on the two upper plates 11 are used by the connecting plate 2 to connect the two flange clamps 1, so that the two flange clamps 1 are pulled together relative to each other to clamp onto the upper flange plate 8.

[0030] The connecting plate 2 can be a rectangular steel plate with a length slightly larger than the width of the upper flange plate 8. The connecting plate 2 not only connects the two flange clamps 1 but also supports the safety rope hanging post 3. The safety rope hanging post 3 is fixed to one end of the connecting plate 2. The connecting plate 2 has through holes 21 corresponding to the two central threaded holes 14, for connecting the two flange clamps 1. The diameter of the through holes can be about 2mm larger than the diameter of the central threaded holes.

[0031] The safety net clamp 4 may include two pressure plates 41, and each pressure plate 41 has two insertion slots 42 spaced at the same distance as the two through holes 21. The safety net is clamped between the two pressure plates 41, increasing the fixing area of ​​the safety net, making the safety net firmly fixed, and preventing it from being pulled and damaged during use.

[0032] During installation, the connecting plate 2 is placed on the upper part of the two upper plates 11, and the two pressure plates 41 are placed above the connecting plate 2 in sequence. The sockets 42 of the two pressure plates 41 are arranged opposite each other. A safety net is sandwiched between the two pressure plates 41. The two pressure plates 41, the connecting plate 2 and the two upper plates 11 are fixed together by the central bolts 7 that pass through the corresponding sockets 42, through holes 21 and central threaded holes 14.

[0033] The connecting plate 2 is horizontally placed on the top surface of the upper plate 11 of the pair of flange clamping plates 1. The through hole 21 of the connecting plate 2 is aligned with the corresponding threaded hole 14. At this point, a safety net can be placed on the connecting plate 2. The center bolt 7 is screwed into the through hole 21 and the threaded hole 14 to initially connect the pair of flange clamping plates 1 and the connecting plate 2. One pressure plate 41 is placed on the upper part of the connecting plate 2, and the corresponding center bolt 7 is inserted into the socket 42. The other pressure plate 41 is placed on the upper part of the safety net, and the corresponding center bolt 7 is inserted into the socket 42. The sockets 42 of the two pressure plates 41 are opposite each other, and the two pressure plates 41 clamp the safety net in the middle. After tightening the center bolt 7, the two pressure plates 41, the safety net, the connecting plate 2, and the flange clamping plates 1 are fastened together as a whole and firmly installed on the upper flange plate 8. The center bolt 7 can also be slightly screwed into the upper flange plate 8 for further stable installation. The length of the center bolt 7 is equal to or slightly longer than the sum of the thicknesses of the upper plate 11, the connecting plate 13, and the two pressure plates 41.

[0034] In one specific embodiment of this utility model, the distance between the upper plate 11 and the lower plate 12 is equal to the thickness of the upper flange plate 8, ensuring that the flange clamping plate 1 can be stably fixed on the upper flange plate 8.

[0035] In one specific embodiment of this utility model, the width and length of the upper plate 11 are greater than those of the lower plate 12, respectively. Threaded holes 15 are provided at both ends of the upper plate 11, and the upper plate 11 is fixed to the upper flange plate 8 by end bolts passing through the threaded holes 15. The fixing of the upper plate 11 to the upper flange plate 8 by the end bolts on both sides further prevents the entire device from shaking or shifting.

[0036] In one specific embodiment of this utility model, the width of the connecting plate 2 is less than the distance between the two end threaded holes 15. The connecting plate 2 covers the upper part of the upper plate 11 of the two flange clamping plates 1 and is located between the two end threaded holes 15, without affecting the fastening installation of the end threaded holes 15.

[0037] In one specific embodiment of this utility model, the width of the pressure plate 41 is the same as the width of the connecting plate 2. The insertion port 42 includes a semi-circular hole disposed on the center line of the length direction of the pressure plate 41 and an elongated hole extending from the semi-circular hole to the long edge of the pressure plate 41. The diameter of the circular hole and the width of the elongated hole are both equal to the diameter of the through hole 21. The width and length of the insertion port 42 not only facilitate the insertion with the central bolt 7 but also ensure a stable insertion that will not fall off. After the two pressure plates 41 are inserted, an elongated hole is formed around the central bolt 7, clamping the safety net in the middle and preventing it from falling off.

[0038] In one specific embodiment of this utility model, a first nut 5 is screwed onto the central hole bolt 7 between the safety net clamping plate 4 and the connecting plate 2. After the connecting plate 2 covers the two upper plates 11, the central hole bolt 7 can be passed through the mesh of the safety net and the first nut 5, and screwed onto the corresponding through hole 21 and central threaded hole 14. Then, the first nut 5 is tightened to secure the connecting plate 2 to the pair of flange clamping plates 1, ensuring that the pair of flange clamping plates 1 can be firmly fixed on the upper flange plate 8 before the safety net clamping plate 4 is installed, facilitating the installation of the two pressure plates 41. The central hole bolt 7 is a fully threaded fine-pitch bolt, and its length is greater than the sum of the thicknesses of the upper plate 11, the connecting plate 13, and the two pressure plates 41.

[0039] In one specific embodiment of this utility model, a second nut 6 is screwed onto the upper central bolt 7 portion of the safety net clamping plate 4. The second nut 6 can be tightened after the two pressure plates 41 are inserted to secure the clamping of the two pressure plates 41. Through the tightening of the second nut 6 and the first nut 5, the two pressure plates 41, the safety net, the connecting plate 2, and the pair of flange clamping plates 1 are fixed as a whole.

[0040] In one specific embodiment of this utility model, the safety rope hanging post 3 includes a steel pipe 31 with its upper end closed and welded to the connecting plate 2. Two ear plates 32 are provided on the side wall of the steel pipe 31, with a certain distance between them. The distance is set according to the needs of the safety rope hanging. The ear plates 32 are perpendicular to the edge of the upper flange plate 8 and face the upper flange plate 8. The central hole of the two ear plates 32 is used to thread the safety rope. The portion of the safety rope located on both sides of the ear plates 32 is clamped using U-shaped clamps 33 that match the thickness of the safety rope. The outer circumference of the U-shaped clamps 33 is larger than the central hole of the ear plates 32, which can prevent the safety rope from shifting left and right and causing danger.

[0041] In one specific embodiment of this utility model, at least two temporary fixing devices for the steel structure construction safety rope net are installed on the upper flange plate 8 according to the width of the safety net and construction needs. Several temporary fixing devices for the steel structure construction safety rope net are equally spaced on the upper flange plate 8 of an H-beam to fix the entire safety net. Several temporary fixing devices for the steel structure construction safety rope net can also be installed on adjacent H-beams to stably fix larger safety nets.

[0042] Example 2 Figure 5 This is a schematic diagram of the structure of the connecting plate 2 according to Embodiment 2 of this utility model; Figure 6 This is a schematic diagram of the structure of the pressure plate 41 according to Embodiment 2 of the present invention; like Figure 5 and Figure 6 As shown in the figure, the temporary fixing device for steel structure construction safety rope net provided in this embodiment, based on embodiment 1, has evenly arranged insertion slots 42 on the pressure plate 41 and evenly arranged through holes 21 on the connecting plate 2 in order to adapt to upper flange plates 8 of different widths.

[0043] The connecting plate 2 has multiple through holes 21, allowing for flexible selection of two suitable through holes 21 for connection based on the spacing of the threaded holes 14 on the two flange clamps 1. The pressure plate 41 has multiple sockets 42, allowing for flexible selection of two suitable sockets 42 for insertion based on the spacing of the two central bolts 7. This design offers flexible installation and a wide range of applications.

[0044] The temporary fixing device for safety rope netting in steel structure construction according to the present invention is described above by way of example with reference to the accompanying drawings. However, those skilled in the art should understand that various modifications can be made to the temporary fixing device for safety rope netting in steel structure construction proposed by the present invention without departing from the scope of the present invention. Therefore, the scope of protection of the present invention should be determined by the contents of the appended claims.

Claims

1. A temporary fixing device for safety rope netting in steel structure construction, characterized in that, Includes a pair of flange clamps, a connecting plate, a safety rope post, and a safety net clamp, among which, The flange clamping plate includes an upper plate, a lower plate, and a connecting plate connecting the edges of the upper plate and the lower plate. The upper plate and the lower plate are parallel and their center lines are aligned. A central threaded hole is provided in the middle of the upper plate. The pair of flange clamping plates are respectively snapped onto the two sides of the upper flange plate of the H-beam of the steel structure and are symmetrical about the center line of the upper flange plate. The safety rope hanging post is fixed to one end of the connecting plate, and the connecting plate is provided with through holes corresponding to the two threaded holes respectively; The safety net clamp includes two pressure plates, and two insertion slots with the same spacing as the two through holes are provided on the pressure plates; The connecting plate is disposed on the upper part of the two upper plates, and the two pressure plates are disposed above the connecting plate in sequence, with the sockets of the two pressure plates facing each other. A safety net is sandwiched between the two pressure plates. The two pressure plates, the connecting plate, and the two upper plates are fixed together by central hole bolts passing through corresponding sockets, through holes, and central threaded holes.

2. The temporary fixing device for steel structure construction safety rope net as described in claim 1, characterized in that, The distance between the upper plate and the lower plate is equal to the thickness of the upper flange plate.

3. The temporary fixing device for steel structure construction safety rope net as described in claim 1, characterized in that, The width and length of the upper plate are greater than the width and length of the lower plate, respectively. Threaded holes are provided at both ends of the upper plate, and the upper plate is fixed to the upper flange plate by bolts passing through the threaded holes.

4. The temporary fixing device for steel structure construction safety rope net as described in claim 3, characterized in that, The width of the connecting plate is less than the distance between the two end threaded holes.

5. The temporary fixing device for steel structure construction safety rope net as described in claim 1, characterized in that, The width of the pressure plate is the same as the width of the connecting plate. The socket includes a semi-circular hole disposed on the center line of the length direction of the pressure plate and an elongated hole opened from the semi-circular hole to the long edge of the pressure plate. The diameter of the circular hole and the width of the elongated hole are both equal to the diameter of the through hole.

6. The temporary fixing device for steel structure construction safety rope net as described in claim 1, characterized in that, A first nut is screwed onto the central bolt portion between the safety net clamp and the connecting plate.

7. The temporary fixing device for steel structure construction safety rope net as described in claim 1, characterized in that, A second nut is screwed onto the central bolt portion at the upper part of the safety net clamp.

8. The temporary fixing device for steel structure construction safety rope net as described in claim 1, characterized in that, The safety rope hanging post includes a steel pipe welded to the connecting plate with its upper end closed, and two ear plates are provided on the side wall of the steel pipe.

9. The temporary fixing device for steel structure construction safety rope net as described in claim 1, characterized in that, The insertion slots are evenly arranged on the pressure plate, and the through holes are evenly arranged on the connecting plate.

10. The temporary fixing device for steel structure construction safety rope net as described in claim 1, characterized in that, At least two temporary fixing devices for the steel structure construction safety rope net are installed on the upper flange plate.