Quickly dismountable structure for supporting and protecting formwork of bridge pier of bridge construction

CN224918317UActive Publication Date: 2026-10-30THE FIRST CONSTR ENG COMPANY LTD OF CHINA CONSTR SECOND ENG BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522659517.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-16
Publication Date
2026-10-30
Estimated Expiration
2035-12-16

AI Technical Summary

Technical Problem

[0003]在桥墩施工过程中,通常会在桥墩模板的四周设置四个支撑梁,这些支撑梁通过与模板以及相互之间的牢固连接,形成一体式的结构,有效保证浇筑过程中的结构稳定性,然而,这种连接方式虽增强了刚度与安全性,但拆卸时工序复杂、耗时较长,影响施工效率,不利于模板及支撑体系的快速周转与重复利用

Benefits of technology

在桥墩支护作业中,工作人员首先安装模板本体,然后放置两个第一支撑梁和两组第二支撑梁于模板外侧,通过拆装组件连接第一支撑梁和第二支撑梁,并使用连接组件将模板本体固定在支撑梁上,完成模板本体搭建,拆装组件和连接组件的配合使用,形成组合式支撑结构,便于模板拆卸和安装作业。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224918317U_ABST
    Figure CN224918317U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of quick dismounting structure of bridge building pier supporting supporting formwork, belong to bridge building technical field, the utility model includes: formwork body;Two groups of first support beam and second support beam symmetrically arranged up and down, the first support beam with the second support beam is set in the formwork body outside;Dismounting assembly, the dismounting assembly is installed on the first support beam with the second support beam, for connecting the first support beam and the second support beam;Connecting assembly, the connecting assembly is installed on the first support beam with the second support beam, for the formwork body is installed to the first support beam and the second support beam, by dismounting assembly connection first support beam and second support beam, using connecting assembly to fix formwork body on support beam, complete formwork body erection, the cooperation of dismounting assembly and connecting assembly, form combined support structure, facilitate formwork dismounting and installation operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of bridge construction technology, and in particular relates to a quick assembly and disassembly structure for bridge pier support template. Background Technology

[0002] During the construction of bridge piers, support and formwork are required. Their main function is to ensure the stability and geometric shaping of the structure during concrete pouring. The formwork system bears the lateral pressure, self-weight, and construction loads of the newly poured concrete, preventing deformation or collapse. The support structure, through components such as columns, beams, tie rods, and diagonal braces, forms a stable force-bearing system, effectively transferring loads to the foundation and avoiding uneven settlement. Simultaneously, the support ensures the verticality, cross-sectional dimensions, and surface flatness of the piers, meeting design accuracy requirements. Furthermore, proper support can improve construction safety, reduce accident risks, and protect the safety of workers. The support system continues to function until the concrete reaches sufficient strength, ensuring the structural integrity and durability, making it a key technical aspect for the successful formation of bridge piers.

[0003] During the construction of bridge piers, four support beams are usually set around the pier formwork. These support beams form an integrated structure through a firm connection with the formwork and with each other, which effectively ensures the structural stability during the pouring process. However, although this connection method enhances rigidity and safety, the disassembly process is complicated and time-consuming, which affects the construction efficiency and is not conducive to the rapid turnover and reuse of the formwork and support system. Utility Model Content

[0004] To solve the above-mentioned technical problems, this utility model provides: a quick-assembly and disassembly structure for bridge pier support formwork, comprising: Template body; Two sets of first and second support beams are symmetrically arranged vertically, with the first and second support beams located on the outside of the template body. A disassembly and assembly assembly is installed on the first support beam and the second support beam, and is used to connect the first support beam and the second support beam; A connecting component is installed on the first support beam and the second support beam, and is used to install the template body onto the first support beam and the second support beam.

[0005] As a preferred embodiment of this utility model, the disassembly and assembly components include: A first mounting groove is formed on the first support beam and the second support beam, and a second mounting groove is formed on both sides of the template body, which are arranged symmetrically. A first connecting plate is inserted into the first mounting slot and the second mounting slot.

[0006] As a preferred embodiment of the present invention, two symmetrically arranged insert plates are fixedly connected to the first connecting plate, and brackets are sleeved on the first support beam and the second support beam. The bracket has a sleeve plate fixed inside for use with the insert plate.

[0007] As a preferred embodiment of the present invention, each of the brackets is provided with a first slide rail; A first slider is slidably connected within the first slide rail; A fixing rod is fixedly connected to one side of the first slider, and one end of the fixing rod extends to the first support beam and the second support beam.

[0008] As a preferred embodiment of the present invention, a positioning groove is provided on the other side of the first slider; A first fixing block is inserted into the positioning groove, and a threaded rod is rotatably connected to one side of the first fixing block. A bearing plate is provided between the threaded rods. One side of the support plate is attached to the two brackets; The bearing plate is rotatably connected to a threaded sleeve that cooperates with the threaded rod. The bearing plate is connected by four symmetrically arranged bolts, one end of each bolt extending into the bracket.

[0009] As a preferred embodiment of this utility model, the connecting component includes: A second slide rail is provided on the template body and the first support beam and the second support beam, and a first positioning block and a second positioning block are slidably connected in the second slide rail.

[0010] As a preferred embodiment of this invention, one end of the first positioning block having an adjusting screw connected by a thread extends into the second positioning block.

[0011] Compared with the prior art, the beneficial effects of this utility model are as follows: In the pier support operation, the workers first install the formwork body, then place two first support beams and two sets of second support beams on the outside of the formwork. The first and second support beams are connected by disassembly and assembly components, and the formwork body is fixed to the support beams using connecting components to complete the formwork body construction. The combined use of disassembly and assembly components and connecting components forms a combined support structure, which facilitates the disassembly and installation of the formwork. Attached Figure Description

[0012] Figure 1 This is a schematic diagram of the overall structure of the quick-assembly and disassembly structure of the bridge pier support template provided in this embodiment of the utility model; Figure 2This utility model provides a quick-assembly and disassembly structure for bridge pier support formwork. Figure 1 A magnified three-dimensional structural diagram of part A in the middle section; Figure 3 This utility model provides a quick-assembly and disassembly structure for bridge pier support formwork. Figure 1 A magnified three-dimensional structural diagram of part B in the middle section; Figure 4 This is a schematic diagram of the unfolded structure of some disassembly and assembly components of the quick disassembly and assembly structure for bridge pier support template provided in this embodiment of the utility model; Figure 5 This utility model provides a quick-assembly and disassembly structure for bridge pier support formwork. Figure 4 A magnified three-dimensional structural diagram of part C in the middle.

[0013] In the diagram: 1. Template body; 2. First support beam; 3. Second support beam; 4. First mounting groove; 5. Second mounting groove; 6. First connecting plate; 7. Insert plate; 8. Bracket; 9. Sleeve plate; 10. First slide rail; 11. First slider; 12. Fixing rod; 13. Positioning groove; 14. First fixing block; 15. Threaded rod; 16. Bearing plate; 17. Threaded sleeve; 18. Bolt; 19. First positioning block; 20. Second positioning block; 21. Second slide rail; 22. Adjusting screw. Detailed Implementation

[0014] To further understand the invention content, features and effects of this utility model, the following embodiments are provided, and detailed descriptions are given in conjunction with the accompanying drawings.

[0015] The structure of this utility model will now be described in detail with reference to the accompanying drawings.

[0016] Please see Figures 1 to 5 This utility model provides a quick-assembly and disassembly structure for bridge pier support formwork, comprising: a formwork body 1; two sets of first support beams 2 and second support beams 3 symmetrically arranged vertically, the first support beams 2 and second support beams 3 being disposed on the outside of the formwork body 1; a disassembly and assembly assembly, which is installed on the first support beams 2 and second support beams 3 for connecting the first support beams 2 and second support beams 3; and a connecting assembly, which is installed on the first support beams 2 and second support beams 3 for installing the formwork body 1 onto the first support beams 2 and second support beams 3.

[0017] The above scheme is adopted as follows: In the pier support operation, the workers first install the template body 1, and then place two first support beams 2 and two second support beams 3 on the outside of the template body 1. The first support beams 2 and the second support beams 3 are connected to each other by the disassembly and assembly components, and the template body 1 is fixed to the first support beams 2 and the second support beams 3 by the connecting components, thereby completing the construction of the template body 1. The combined use of the disassembly and assembly components and the connecting components forms a combined support structure, which facilitates the disassembly and installation of the template.

[0018] Furthermore, the assembly and disassembly assembly includes: a first mounting groove 4 formed on the first support beam 2 and the second support beam 3; and second mounting grooves 5 formed on both sides of the template body 1, arranged symmetrically at the top and bottom; and a first connecting plate 6 inserted into the first mounting groove 4 and the second mounting groove 5.

[0019] Furthermore, two symmetrically arranged insert plates 7 are fixedly connected to the first connecting plate 6, and brackets 8 are sleeved on the first support beam 2 and the second support beam 3; a sleeve plate 9 that cooperates with the insert plates 7 is fixed inside the bracket 8.

[0020] Furthermore, each of the brackets 8 is provided with a first slide rail 10; a first slider 11 is slidably connected in the first slide rail 10; a fixing rod 12 is fixedly connected to one side of the first slider 11, and one end of the fixing rod 12 extends to the first support beam 2 and the second support beam 3.

[0021] Furthermore, a positioning groove 13 is provided on the other side of the first slider 11; a first fixing block 14 is inserted into the positioning groove 13, and a threaded rod 15 is rotatably connected to one side of the first fixing block 14, and a bearing plate 16 is provided between the threaded rods 15; one side of the bearing plate 16 is attached to the two brackets 8; a threaded sleeve 17 that cooperates with the threaded rod 15 is rotatably connected to the bearing plate 16, and four symmetrically arranged bolts 18 are threadedly connected to the bearing plate 16, and one end of each bolt 18 extends into the bracket 8.

[0022] Using the above scheme: In use, the first connecting plate 6 is inserted into the first mounting groove 4 in the first support beam 2 and the second support beam 3. At this time, one side of the first connecting plate 6 will be inserted into the second mounting groove 5 of the template body 1. Then, the bracket 8 is sleeved on the first support beam 2 and the second support beam 3. At this time, the sleeve plate 9 on the bracket 8 will be inserted into the insert plate 7 of the first connecting plate 6. The bracket 8 is used to connect the four corners formed by the first support beam 2, the second support beam 3 and the first connecting plate 6. After the bracket 8 is installed, the first positioning block 19 is inserted into the positioning groove of the first slider 11. In step 13, one side of the bearing plate 16 will be attached to the two symmetrical brackets 8, and the bolts 18 will be screwed into the bearing plate 16 and the brackets 8 to fix the brackets 8 in the current position. Then, the threaded sleeve 17 will be rotated so that the two threaded rods 15 will drive the first positioning blocks 19 on them to move away from each other. The first positioning blocks 19 will drive the first slider 11 on them to move in the first slide rail 10. After the first slider 11 moves to the preset position, the fixing rod 12 on it will be inserted into the first connecting plate 6 to fix the first connecting plate 6, thus forming an integral combination structure.

[0023] It should be noted that: First, if dismantling is required, the above principle can be reversed. Second, the number of bearing plates 16 and bolts 18 can be increased according to actual needs, thereby increasing the stability of the connection between the two brackets 8.

[0024] Furthermore, the connecting component includes: a second slide rail 21 formed on the template body 1 and the first support beam 2 and the second support beam 3, wherein a first positioning block 19 and a second positioning block 20 are slidably connected in the second slide rail 21.

[0025] Furthermore, one end of the first positioning block 19, which is threadedly connected to the adjusting screw 22, extends into the second positioning block 20.

[0026] Using the above scheme: In use, the first positioning block 19 and the second positioning block 20 are moved in the second slide rail 21 by the staff. After the first positioning block 19 and the second positioning block 20 are moved to the preset position, they will be aligned with each other. Then, by inserting the adjusting screw 22 into the first positioning block 19 and the second positioning block 20, the connection and fixation of the first positioning block 19 and the second positioning block 20 are realized. This process indirectly installs the template body 1 onto the first support beam 2 and the second support beam 3, forming a secondary connection and fixation.

[0027] The working principle of this utility model: In the pier support operation, the workers first install the formwork body 1. Then, two first support beams 2 and two second support beams 3 are placed on the outside of the formwork body 1. The first connecting plate 6 is inserted into the first mounting groove 4 in the first support beams 2 and 3. At this time, one side of the first connecting plate 6 is inserted into the second mounting groove 5 of the formwork body 1. Next, the bracket 8 is fitted onto the first support beams 2 and 3. At this time, the sleeve plate 9 on the bracket 8 is inserted into the insert plate 7 of the first connecting plate 6. The bracket 8 is used to connect the four corners formed by the first support beams 2, 3, and the first connecting plate 6. After the bracket 8 is installed, the first positioning block 19 is inserted into the positioning groove 13 of the first slider 11. At this time, one side of the bearing plate 16 will fit against the two symmetrical brackets 8. The bolts 18 are screwed into the bearing plate 16 and the brackets 8 to fix the brackets 8 in the current position. Next, rotate the threaded sleeve 17 to move the two threaded rods 15 away from each other, and the first positioning block 19 on the first positioning block 19 will move the first slider 11 on it within the first slide rail 10. After the first slider 11 moves to the preset position, the fixing rod 12 on it will be inserted into the first connecting plate 6 to fix the first connecting plate 6, thus forming an integral combination structure. The worker pushes the first positioning block 19 and the second positioning block 20 to move in the second slide rail 21. After the first positioning block 19 and the second positioning block 20 move to the preset position, they will be aligned with each other. Then, by inserting the adjusting screw 22 into the first positioning block 19 and the second positioning block 20, the connection and fixation of the first positioning block 19 and the second positioning block 20 are realized. This process indirectly installs the template body 1 onto the first support beam 2 and the second support beam 3, forming a secondary connection and fixation.

[0028] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.

[0029] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A quick-assembly and disassembly structure for bridge pier support formwork, characterized in that, include: Template body (1); Two sets of first support beams (2) and second support beams (3) are symmetrically arranged vertically, with the first support beams (2) and the second support beams (3) located on the outside of the template body (1); The disassembly and assembly assembly is installed on the first support beam (2) and the second support beam (3) to connect the first support beam (2) and the second support beam (3); A connecting component is installed on the first support beam (2) and the second support beam (3) for installing the template body (1) onto the first support beam (2) and the second support beam (3).

2. The quick-assembly and disassembly structure for bridge pier support formwork as described in claim 1, characterized in that: The disassembly / assembly components include: A first mounting groove (4) is opened on the first support beam (2) and the second support beam (3), and a second mounting groove (5) is opened on both sides of the template body (1) and arranged symmetrically. A first connecting plate (6) is inserted into the first mounting slot (4) and the second mounting slot (5).

3. The quick-assembly and disassembly structure for bridge pier support formwork as described in claim 2, characterized in that: Two symmetrically arranged insert plates (7) are fixedly connected to the first connecting plate (6), and brackets (8) are sleeved on the first support beam (2) and the second support beam (3); The bracket (8) has a sleeve (9) fixed inside for use with the insert plate (7).

4. The quick-assembly and disassembly structure for bridge pier support formwork as described in claim 3, characterized in that: Each of the brackets (8) is provided with a first slide rail (10); A first slider (11) is slidably connected inside the first slide rail (10); A fixing rod (12) is fixedly connected to one side of the first slider (11), and one end of the fixing rod (12) extends to the first support beam (2) and the second support beam (3).

5. The quick-assembly and disassembly structure for bridge pier support formwork as described in claim 4, characterized in that: A positioning groove (13) is provided on the other side of the first slider (11); A first fixing block (14) is inserted into the positioning groove (13), and a threaded rod (15) is rotatably connected to one side of the first fixing block (14), and a bearing plate (16) is provided between the threaded rods (15). One side of the bearing plate (16) is attached to the two brackets (8); A threaded sleeve (17) that works with the threaded rod (15) is rotatably connected to the bearing plate (16). Four symmetrically arranged bolts (18) are threadedly connected to the bearing plate (16), and one end of each bolt (18) extends into the bracket (8).

6. The quick-assembly and disassembly structure for bridge pier support formwork as described in claim 1, characterized in that: The connection component includes: A second slide rail (21) is provided on the template body (1), the first support beam (2), and the second support beam (3). A first positioning block (19) and a second positioning block (20) are slidably connected in the second slide rail (21).

7. The quick-assembly and disassembly structure for bridge pier support formwork as described in claim 6, characterized in that: One end of the first positioning block (19) is connected by an adjusting screw (22) to extend into the second positioning block (20).