A water conservancy construction channel side wall supporting device

CN224918477UActive Publication Date: 2026-10-30闫兴武
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522687628.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-18
Publication Date
2026-10-30
Estimated Expiration
2035-12-18

AI Technical Summary

Technical Problem

施工人员需要花费额外的时间和精力来绕过这些连接机构,甚至可能需要对连接机构进行临时拆除和重新安装,这不仅增加了施工难度,还延长了施工周期,提高了施工成本

Benefits of technology

[0013]本实用新型两侧支撑杆之间除底部加固板外,上部无额外支撑结构。相较于传统多数设有复杂连接机构、占据大量空间的支撑结构,此设计为渠道内部作业如铺设管道、浇筑混凝土等腾出了更多操作空间,极大降低了对施工人员操作和施工设备运行的阻碍。施工人员无需再花费额外时间精力绕过复杂连接机构,也无需对其进行临时拆除和重新安装,有效提高了施工效率,缩短了施工周期,降低了施工成本。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224918477U_ABST
    Figure CN224918477U_ABST
Patent Text Reader

Abstract

The utility model relates to channel support technical field, and disclose a water conservancy project construction channel side wall support device, including support plate, still include: fixed installation on support plate's fixed link, install two upper and lower arrangement's installation components on the fixed link, install the support link of support plate support fixed treatment on the installation component of upper portion, the utility model two side support link between except bottom reinforcing plate, upper portion has no additional support structure. Compared with the support structure that most of traditional complex connecting mechanism, occupies a lot of space, this design is for channel internal operation such as laying pipeline, pours concrete and so on to vacate more operating space, greatly reduced the hindrance to construction personnel operation and construction equipment operation. Construction personnel need not to spend additional time and energy again to bypass complex connecting mechanism, also need not to carry out temporary dismantling and reinstallation to it, effectively improved construction efficiency, shortened construction period, reduced construction cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of channel support technology, specifically a channel sidewall support device for water conservancy engineering construction. Background Technology

[0002] Water conservancy projects are a general term encompassing projects such as flood control, drainage, power generation, and water resource management and protection. The implementation and construction of water conservancy projects can make significant contributions to social development and the protection of natural resources. Currently, water conservancy projects mainly transport water by excavating ditches. However, when the ditches are first excavated, the soil is loose, so support devices are used to support the side walls of the ditches to prevent them from collapsing.

[0003] Currently, most channels have connecting mechanisms between their supporting structures. While these mechanisms enhance the overall stability of the supporting structures to some extent, they also cause numerous inconveniences during actual construction. For example, when carrying out other work inside the channel, such as laying pipes or pouring concrete, these connecting mechanisms occupy space, hindering the operation of construction workers and the normal functioning of construction equipment. Construction workers need to spend extra time and effort to bypass these connecting mechanisms, and may even need to temporarily dismantle and reinstall them. This not only increases the difficulty of construction but also prolongs the construction period and raises construction costs. Utility Model Content

[0004] The purpose of this utility model is to provide a support device for the sidewall of a water conservancy project channel to solve the problems mentioned in the background art.

[0005] To achieve the above objectives, this utility model provides the following technical solution: a sidewall support device for a water conservancy engineering construction channel, comprising a support plate, and further comprising:

[0006] A fixing rod is fixedly installed on a support plate. Two mounting components are installed on the fixing rod, arranged vertically. The upper mounting component is equipped with a support rod for supporting and fixing the support plate. A crossbar is installed between the lower mounting component and the support rod. A fixing component is installed at the bottom of the support rod, and a reinforcing plate is installed on the fixing component.

[0007] Preferably, the mounting assembly includes a collar sleeved on the outside of the fixing rod, a limit ring rotatably mounted on the collar, and a mounting rod fixedly mounted on the other side of the collar.

[0008] Preferably, the fixing component includes a fixing plate, a connecting rod, and a through hole. The connecting rod is fixedly installed on the top of the fixing plate, the support rod is rotatably installed on the connecting rod, and the through hole is formed on the fixing plate.

[0009] Preferably, a protrusion is welded to the bottom of the fixing plate, the protrusion is snapped onto the reinforcing plate, and the reinforcing plate has mounting holes.

[0010] Preferably, the reinforcing plate has a through groove in the middle, and the protrusion slides in the through groove.

[0011] Preferably, a plug is fixedly installed on one side of the support plate, and a slot is provided on the other side of the support plate.

[0012] Compared with the prior art, the beneficial effects of this utility model are as follows:

[0013] This utility model has no additional support structure at the top between the two support rods, except for the bottom reinforcing plate. Compared with traditional support structures that mostly have complex connecting mechanisms and occupy a lot of space, this design frees up more operating space for channel operations such as laying pipes and pouring concrete, greatly reducing obstacles to the operation of construction personnel and equipment. Construction personnel no longer need to spend extra time and effort to bypass complex connecting mechanisms, nor do they need to temporarily dismantle and reinstall them, effectively improving construction efficiency, shortening the construction cycle, and reducing construction costs. Attached Figure Description

[0014] Figure 1 A schematic diagram of the main structure of the water conservancy engineering construction channel sidewall support device provided by this utility model;

[0015] Figure 2 A schematic diagram of the connection structure between the support plate and the support rod provided by this utility model;

[0016] Figure 3 A schematic diagram of the installation component structure provided by this utility model;

[0017] Figure 4 A schematic diagram of the fixing component structure provided by this utility model;

[0018] Figure 5 This is a partial structural diagram of the reinforcing plate provided by this utility model.

[0019] In the diagram: 1. Support plate; 2. Fixing rod; 3. Mounting assembly; 31. Collar; 32. Limiting ring; 33. Mounting rod; 4. Support rod; 5. Fixing assembly; 51. Fixing plate; 52. Connecting rod; 53. Through hole; 6. Reinforcing plate; 7. Insert block; 8. Slot; 9. Crossbar; 10. Protrusion; 11. Mounting hole. Detailed Implementation

[0020] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0021] Please see Figure 1-5 As shown, a channel sidewall support device for water conservancy engineering construction includes a support plate 1 and a fixing rod 2 fixedly installed on the support plate 1. Two installation components 3 are arranged vertically on the fixing rod 2. The upper installation component 3 is equipped with a support rod 4 for supporting and fixing the support plate 1. A crossbar 9 is installed between the lower installation component 3 and the support rod 4. A fixing component 5 is installed at the bottom of the support rod 4. A reinforcing plate 6 is installed on the fixing component 5.

[0022] It should be noted that: the support rod 4 and the crossbar 9 are connected to the fixed rod 2 through the installation component 3. The support plate 1 is supported and fixed to the side wall of the channel through the support rod 4 and the crossbar 9. Both sets of support rods 4 on the side wall of the channel are installed and fixed to the ground by the fixed component 5. The support effect on the side wall of the channel is improved by the reinforcement plate 6.

[0023] Based on the above implementation scheme, the installation component 3 includes a collar 31 sleeved on the outside of the fixed rod 2, a limiting ring 32 rotatably installed on the collar 31, and an installation rod 33 fixedly installed on the other side of the collar 31; the collar 31 is square on one side and semi-circular on the other side, and the limiting ring 32 is a semi-circular ring with the same size as the collar 31, one end of the limiting ring 32 is rotatably installed on the collar 31, and the other end is fixedly connected to the collar 31 by bolts.

[0024] When fixing the support plate 1, open the limiting ring 32 on the collar 31, pass the collar 31 through the fixing rod 2, and then close the limiting ring 32 and the collar 31 together with bolts, thereby fixing the collar 31 to the fixing rod 2. The upper and lower collars 31 are installed in the same way. The upper end of the support rod 4 is rotatably installed on the mounting rod 33 on the upper collar 31. One end of the crossbar 9 is rotatably installed on the lower mounting rod 33, and the other end is rotatably installed on the lower part of the support rod 4. The support rod 4 and the crossbar 9 are rotatably connected to the fixing rod 2, and the support rod 4 and the crossbar 9 are also rotatably connected, which can change the support angle of the support plate 1. Apart from the bottom reinforcing plate 6, there is no support between the support rods 4 on both sides, which can reduce the obstruction to construction.

[0025] Based on the above implementation scheme, the fixing component 5 includes a fixing plate 51, a connecting rod 52 and a through hole 53. The connecting rod 52 is fixedly installed on the top of the fixing plate 51, the support rod 4 is rotatably installed on the connecting rod 52, and the through hole 53 is opened on the fixing plate 51. The bottom of the support rod 4 is rotatably installed on the connecting rod 52. By passing the fixing cone rod through the through hole 53, the fixing plate 51 can be installed and fixed on the ground.

[0026] The support rod 4 is rotatably mounted on the top of the fixed plate 51, and the fixed angle can be adjusted so that the fixed plate 51 is always horizontally mounted on the ground.

[0027] Based on the above implementation scheme, a protrusion 10 is welded to the bottom of the fixed plate 51, the protrusion 10 is snapped onto the reinforcing plate 6, and the reinforcing plate 6 has an installation hole 11; a through groove is provided in the middle of the reinforcing plate 6, and the protrusion 10 slides in the through groove; the fixed plate 51 moves in the reinforcing plate 6 by being limited by the protrusion 10, and the installation hole 11 and the through hole 53 have the same size.

[0028] Before installing the fixing plate 51, the protrusion 10 is snapped into the reinforcing plate 6. After the position of the fixing plate 51 is determined, the fixing cone rod is passed through the through hole 53 and the mounting hole 11 on the fixing plate 51 and fixed to the ground. The reinforcing plate 6 transmits the lateral support and fixing force between the two fixing plates 51, thereby improving the support and fixing effect of the support rod 4 on the support plate 1.

[0029] Based on the above implementation scheme, a plug 7 is fixedly installed on one side of the support plate 1, and a slot 8 is opened on the other side of the support plate 1; the size of the plug 7 is compatible with the slot 8, and the plug 7 can be inserted into the slot 8.

[0030] By inserting the end blocks 7 and slots 8 of adjacent support plates 1 into each other, multiple sets of support plates 1 can be spliced ​​together to form a suitable support area.

[0031] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.

[0032] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A sidewall support device for a water conservancy engineering construction channel, comprising a support plate (1), characterized in that, Also includes: A fixing rod (2) is fixedly installed on a support plate (1). Two mounting components (3) are installed on the fixing rod (2) arranged vertically. A support rod (4) for supporting and fixing the support plate (1) is installed on the upper mounting component (3). A crossbar (9) is installed between the lower mounting component (3) and the support rod (4). A fixing component (5) is installed at the bottom of the support rod (4). A reinforcing plate (6) is installed on the fixing component (5).

2. The water conservancy project channel sidewall support device according to claim 1, characterized in that: The mounting assembly (3) includes a collar (31) sleeved on the outside of the fixing rod (2), a limit ring (32) is rotatably mounted on the collar (31), and a mounting rod (33) is fixedly mounted on the other side of the collar (31).

3. The channel sidewall support device for water conservancy engineering construction according to claim 1, characterized in that: The fixing component (5) includes a fixing plate (51), a connecting rod (52) and a through hole (53). The connecting rod (52) is fixedly installed on the top of the fixing plate (51), the support rod (4) is rotatably installed on the connecting rod (52), and the through hole (53) is opened on the fixing plate (51).

4. The water conservancy project channel sidewall support device according to claim 3, characterized in that: The bottom of the fixed plate (51) is welded with a protrusion (10), which is snapped onto the reinforcing plate (6). The reinforcing plate (6) has mounting holes (11).

5. A channel sidewall support device for water conservancy engineering construction according to claim 4, characterized in that: The reinforcing plate (6) has a through groove in the middle, and the protrusion (10) slides in the through groove.

6. The water conservancy project channel sidewall support device according to claim 1, characterized in that: A plug (7) is fixedly installed on one side of the support plate (1), and a slot (8) is provided on the other side of the support plate (1).