A rainwater harvesting tank
Patent Information
- Application Number
- CN202522209561.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-20
- Publication Date
- 2026-10-30
- Estimated Expiration
- 2035-10-20
AI Technical Summary
[0002]在通过水泥窑对废水进行水泥分离时,会使用到雨水收集池,通过雨水收集池对排入的废水进行水泥分离,但是现有的雨水收集池在使用时,水位不便于控制,因此提出一种雨水收集池
[0010]废水从入孔排入,通过收集池构成的污泥处置系统,进行水泥分离,收集池由钢筋混凝土结构制成,建筑层数为地下一层,建筑高度为3.5米,抗震设防烈度8度。
Smart Images

Figure CN224918576U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of rainwater harvesting technology, and in particular to a rainwater harvesting tank. Background Technology
[0002] When separating cement from wastewater in a cement kiln, a rainwater collection tank is used to separate cement from the discharged wastewater. However, the water level in existing rainwater collection tanks is not easy to control. Therefore, a new type of rainwater collection tank is proposed. Utility Model Content
[0003] To address at least one of the aforementioned technical shortcomings, this utility model provides a rainwater collection tank, comprising a bottom slab, a top slab, side walls, and several columns. The top slab has an access hole. The collection tank is made of reinforced concrete and has one underground floor, with a seismic fortification intensity of 8 degrees. Inside the initial rainwater tank, there are rainwater monitoring wells and rainwater interception wells arranged in parallel. Between the rainwater monitoring wells and the rainwater interception wells, there is a gate opening 2 for installing a gate. The rainwater interception wells have a gate opening 3 that penetrates the interior of the initial rainwater tank for installing a gate. The outer wall of the rainwater monitoring wells has a gate opening 4 for installing a gate.
[0004] Furthermore, the interior of the collection pool is divided into an initial rainwater pool and an emergency water pool by a partition made of side walls. The partition is provided with gate openings for installing gates. The bottom plates at both ends of the gate openings are recessed, and there are two access holes located at the top of the initial rainwater pool and the emergency water pool, respectively.
[0005] Furthermore, an ultrasonic level gauge is installed on the top plate, and the ultrasonic level gauge is equipped with an alarm level line.
[0006] Furthermore, a valve well 2 is provided on the side of the initial rainwater tank away from the rainwater interception well. Two flexible waterproof sleeves 2 are provided between the valve well 2 and the initial rainwater tank. A flexible waterproof sleeve 1 is provided on the outer wall of one side of the valve well 2.
[0007] Furthermore, the rainwater monitoring well is equipped with a rainwater ditch.
[0008] Furthermore, a valve well is located on the top plate directly above the gate opening.
[0009] Furthermore, the outer wall of the rainwater interception well is provided with a reserved hole. Beneficial effects
[0010] Wastewater is discharged through the manhole and undergoes cement separation through a sludge treatment system consisting of a collection tank. The collection tank is made of reinforced concrete and has one underground floor. The building is 3.5 meters high and has a seismic fortification intensity of 8 degrees.
[0011] Gates 914.05 and 914.06 at gate tunnels 3 and 2 are normally closed. As rainwater is collected, when the water level in the rainwater interception well rises to -1.30 meters, gate 914.05 at gate tunnel 3 opens, allowing rainwater to flow into the initial rainwater pool. After collecting initial rainwater for 15 minutes, gate 914.05 at gate tunnel 3 closes, and gate 914.06 at gate tunnel 2 opens, allowing initial rainwater to flow from the rainwater interception well into the rainwater monitoring well. When the water level in the rainwater monitoring well rises to -1.00 meters, gate 914.08 at gate tunnel 4 opens, allowing the initial rainwater in the rainwater monitoring well to flow into the rainwater ditch. Gate 914.08 at gate tunnel 4 automatically resets (closes) after 24 hours. An alarm is triggered when the water level in the rainwater monitoring well rises to -0.60 meters.
[0012] Ultrasonic level gauges are used to monitor water levels.
[0013] The second section of the flexible waterproof sleeve is 1.8 meters below ground level. The sludge from the wastewater treatment system is discharged into the kiln for incineration from one section of the flexible waterproof sleeve.
[0014] The purpose, features, and advantages of this utility model will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Attached Figure Description
[0015] Figure 1 This is a bottom view of the entire utility model.
[0016] Figure 2 This is a top view of the entire utility model.
[0017] Figure 3 For the present utility model Figure 1 A sectional view of AA.
[0018] Figure 4 For the present utility model Figure 1 A cross-sectional view of BB.
[0019] Figure 5 For the present utility model Figure 1 A cross-sectional view of CC.
[0020] Figure 6 For the present utility model Figure 1 A sectional view of DD.
[0021] Figure 7 For the present utility model Figure 1 A sectional view of the EE.
[0022] exist Figures 1 to 7The correspondence between component names or lines and attached drawing numbers is as follows: Base plate 1, Top plate 2, Column 3, Side wall 4, Rainwater monitoring well 5, Rainwater interception well 6, Ultrasonic level gauge 7, Alarm level line 71, Gate opening 1 8, Gate opening 2 81, Gate opening 3 82, Gate opening 4 83, Valve well 1 9, Valve well 2 91, Flexible waterproof sleeve 1 92, Flexible waterproof sleeve 2 93, Reserved hole 10, Rainwater ditch 11, Collection pool 12, Initial rainwater pool 121, Emergency water pool 122, Manhole 123. Detailed Implementation
[0023] Please refer to Figures 1 to 7 ; This embodiment provides a rainwater collection tank, which consists of a bottom plate 1, a top plate 2, side walls 4 and several columns 3. The top plate 2 is provided with an access hole 123. The collection tank is made of reinforced concrete structure, has one underground floor, a building height of 3.5 meters, and a seismic fortification intensity of 8 degrees.
[0024] In practice, wastewater is discharged through manhole 123 and undergoes cement separation through a sludge treatment system consisting of collection tank 12. The collection tank is made of reinforced concrete and has one underground floor. The building is 3.5 meters high and has a seismic fortification intensity of 8 degrees.
[0025] Furthermore, the initial rainwater pool 121 is equipped with rainwater monitoring wells 5 and rainwater interception wells 6 arranged in parallel. Between the rainwater monitoring wells 5 and the rainwater interception wells 6, there is a gate opening 2 81 for installing a gate. The rainwater interception well 6 is equipped with a gate opening 3 82 that penetrates the interior of the initial rainwater pool 121 for installing a gate. The outer wall of the rainwater monitoring well 5 is equipped with a gate opening 4 83 for installing a gate. The bottom elevation of gate opening 2 81 and gate opening 3 82 is -4.1 meters, and the bottom elevation of gate opening 4 83 is -1 meter.
[0026] In practice, gates 914.05, 914.06, and 914.08 are respectively installed in gate tunnel 2, 81 (gate 914.06 is installed in gate tunnel 2); 82 (gate 3) (gate 914.05 is installed in gate tunnel 3); and 83 (gate 4) (gate 914.08 is installed in gate tunnel 4). Import from manhole 123 Rainwater interception well 6 Controlled objects: Gates 914.05, 914.06, and 914.08 Control Logic Both gates 914.05 and 914.06 are normally closed; B. When the water level in the rainwater switching forebay (interception well) rises to -1.30 meters, 914.05 will be opened; C. After the initial rainwater pool collects initial rainwater for 15 minutes, 914.05 is closed, and 914.06 is opened at the same time; D. When the water level in the rainwater monitoring well rises to -1.00, open 914.08; E. The gate will automatically reset (close) 24 hours after it is opened; F. An alarm will be triggered when the water level rises to -0.60 meters.
[0027] The control and alarm technologies utilize existing technologies.
[0028] Gates 914.05 and 914.06 at gate tunnel 3 (82) and gate tunnel 2 (81) are normally closed. As rainwater is collected, when the water level in the rainwater interception well 6 rises to -1.30 meters, gate 914.05 at gate tunnel 3 (82) opens, allowing rainwater to flow into the initial rainwater pool 121. After collecting initial rainwater for 15 minutes, gate 914.05 at gate tunnel 3 (82) closes, and simultaneously gate 914.06 at gate tunnel 2 (81) opens, allowing initial rainwater to flow from the rainwater interception well 6 into the rainwater monitoring well 5. The water level in the rainwater monitoring well 5 then rises to -1.00 meters. When the water level in the rainwater monitoring well 5 reaches 0.60 meters, the gate 914.08 at gate 83 of gate 4 is opened to allow the initial rainwater in the rainwater monitoring well 5 to drain into the rainwater ditch. The gate 914.08 at gate 83 of gate 4 will automatically reset (close) after 24 hours. An alarm will be triggered when the water level in the rainwater monitoring well 5 rises to -0.60 meters.
[0029] Initial rainwater pool Controlled object: Initial rainwater booster pump (external device, used to pump water in) Control Logic According to the operation mode of the sludge treatment system, one submersible pump (an external device that pumps water in) is started remotely or manually from the central control room or on-site. When the water level is greater than -1.30m, the pump will maintain its current operating status and issue an alarm signal. C. Stop pumping when water level is below -4.90m; D. Two water pumps operate in rotation, with the standby pump switched on periodically. The liquid level signal is transmitted to the central control system.
[0030] Furthermore, the interior of the collection pool is divided into an initial rainwater pool 121 and an emergency water pool 122 by a partition made of side wall 4. The partition is provided with a gate hole 8 for installing a gate. The lowest elevation of the gate hole 8 is -4.9 meters. The bottom plates 1 at both ends of the gate hole 8 are sunken, sinking to -5.5 meters. There are two access holes 123 located at the top of the initial rainwater pool 121 and the emergency water pool 122 respectively.
[0031] In practice, the effective volume of the initial rainwater pool 121 is 300 cubic meters, the effective volume of the emergency pool 122 is 540 cubic meters, and the gate opening 8 is equipped with a gate 914.07. When an emergency occurs, the gate 914.07 at the gate opening 8 is opened, so that the rainwater inside the initial rainwater pool 121 can be discharged into the interior of the emergency pool 122. Emergency accident pool control object: gate 914.07; Control Logic A. Gate 914.07 is normally closed; B. Gate 914.07 can be remotely opened and closed manually from the central control room or manually operated on-site; D. The gate will automatically reset (close) 24 hours after it is opened.
[0032] Furthermore, an ultrasonic level gauge 7 is installed on the top plate 2, and the elevation of the alarm level line 7 of the ultrasonic level gauge 7 is -1.3 meters.
[0033] In practice, the ultrasonic level gauge 7 is used to monitor the water level.
[0034] Furthermore, a valve well 2 91 is provided on the side of the initial rainwater pool 121 away from the rainwater interception well 6. Two flexible waterproof sleeves 2 93 are provided between the valve well 2 91 and the initial rainwater pool 121. A flexible waterproof sleeve 1 92 is provided on the outer wall of one side of the valve well 2 91.
[0035] In practice, the flexible waterproof sleeve 2 is at an elevation of -1.8 meters at elevation 93. The sludge from the wastewater treatment system is discharged into the kiln for incineration from the flexible waterproof sleeve 1 at elevation 92.
[0036] Furthermore, the rainwater monitoring well 5 is equipped with a rainwater ditch 11, and the bottom elevation of the rainwater ditch 11 is -0.85 meters.
[0037] In practice, it is used to drain rainwater from gate 914.08 at gate 83 of gate tunnel 4.
[0038] Furthermore, a valve well 9 is provided on the top plate 2 directly above the gate opening 8.
[0039] Furthermore, a reserved hole 10 with an elevation of -0.85 meters is provided on the outer wall of the rainwater interception well 6.
[0040] In practice, when the water level inside the rainwater interception well 6 reaches -0.85 meters, it is automatically discharged into the rainwater ditch 11 through the reserved hole 10.
[0041] Rainwater ditch 11 is an external ditch.
[0042] The initial rainwater tank and emergency water tank level signals are transmitted to the central control room.
[0043] Unless otherwise specified, all cover plates used in this project are made of galvanized steel grating.
[0044] Outdoor inspection well covers should have anti-theft and anti-fall measures, and inspection well and valve well covers should have attribute markings. Inspection wells and valve wells located in roadways should use manhole covers and frames with sufficient load-bearing capacity and good stability.
[0045] For details on the corrosion protection design of the water tank, please refer to the general structural design description.
[0046] The water tank primarily receives surface flushing water from the plant's hazardous waste disposal system. Details regarding hazardous waste types are provided in the process specifications.
[0047] All pressure drainage pipelines in this project are made of seamless steel pipes and are welded. Flange connections are used for the connection with valves and equipment. Enhanced anti-corrosion measures must be taken for the seamless pipelines.
[0048] Safety precautions for the project: Before construction begins, the technical personnel responsible for project management at the construction unit shall provide a detailed explanation of the relevant technical requirements for safe construction to the construction work teams and workers, and both parties shall sign to confirm the explanation.
[0049] Construction units shall install conspicuous safety warning signs at dangerous locations such as construction site entrances, construction lifting machinery, temporary power facilities, scaffolding, access passages, stairwells, elevator shafts, openings, bridge entrances, tunnel entrances, excavation pit edges, and storage areas for explosives and hazardous gases and liquids. Safety warning signs must comply with national standards.
[0050] Construction units shall provide workers with safety protection equipment and clothing, and inform them in writing of the operating procedures for hazardous positions and the dangers of violating regulations.
Claims
1. A rainwater collection tank, comprising a bottom plate (1), a top plate (2), side walls (4), and several columns (3) forming a collection tank (12), wherein the top plate (2) is provided with an inlet (123), characterized in that: The collection pool is made of reinforced concrete structure, with one underground floor and a building height of 3.5 meters. The seismic fortification intensity is 8 degrees. The initial rainwater pool (121) is equipped with rainwater monitoring wells (5) and rainwater interception wells (6) arranged in parallel. There is a gate hole two (81) for installing gates between the rainwater monitoring wells (5) and the rainwater interception wells (6). There is a gate hole three (82) for installing gates on the rainwater interception wells (6) that penetrates the interior of the initial rainwater pool (121). There is a gate hole four (83) for installing gates on the outer wall of the rainwater monitoring wells (5).
2. The rainwater harvesting tank according to claim 1, characterized in that: The interior of the collection pool is divided into an initial rainwater pool (121) and an emergency water pool (122) by a partition made of side wall (4). The partition is provided with a gate hole (8) for installing a gate. The bottom plate (1) at both ends of the gate hole (8) is sunken. There are two access holes (123) located at the top of the initial rainwater pool (121) and the emergency water pool (122) respectively.
3. A rainwater harvesting tank according to claim 2, characterized in that: An ultrasonic level gauge (7) is installed on the top plate (2), and the ultrasonic level gauge (7) is equipped with an alarm level line (71).
4. A rainwater harvesting tank according to claim 3, characterized in that: A valve well (91) is provided on the side of the initial rainwater pool (121) away from the rainwater interception well (6). Two flexible waterproof sleeves (93) are provided between the valve well (91) and the initial rainwater pool (121). A flexible waterproof sleeve (92) is provided on the outer wall of one side of the valve well (91).
5. A rainwater harvesting tank according to claim 4, characterized in that: The rainwater monitoring well (5) is equipped with a rainwater ditch (11), and the bottom elevation of the rainwater ditch (11) is -0.85 meters.
6. A rainwater harvesting tank according to claim 5, characterized in that: A valve well (9) is located on the top plate (2) directly above the gate opening (8).
7. A rainwater harvesting tank according to claim 6, characterized in that: A reserved hole (10) is provided on the outer wall of the rainwater interception well (6).