Adjustable disc buckle type scaffold wall connecting piece
Patent Information
- Application Number
- CN202522550154.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-01
- Publication Date
- 2026-10-30
- Estimated Expiration
- 2035-12-01
AI Technical Summary
然而,在实际施工过程中,由于主体结构施工误差、预埋件定位偏差及盘扣架体模数化步距限制等因素,预埋件中心与脚手架连接盘中心之间普遍存在一定的偏差,导致传统刚性连墙件无法水平安装,强行连接易产生上斜角度,违反规范要求;同时存在现场切割焊接质量难保证、长度无法微调周转率低、拆改困难影响施工效率等问题
[0017]1、本实用新型通过三段式结构配合双十字轴万向节,实现了连墙件在三维空间内的自由角度调节,有效解决了预埋件与脚手架连接盘高度偏差及角度偏离问题,确保连墙件能够严格按规范要求水平或下斜设置,杜绝了上斜连接的安全隐患。
Smart Images

Figure CN224918838U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the technical field of scaffolding wall ties, specifically an adjustable disc-lock scaffolding wall tie. Background Technology
[0002] With the increasing demands for scaffolding safety in the construction industry, socket-type disc-lock steel pipe scaffolding has become the mainstream scaffolding form for complex structures such as super high-rise buildings and large-span structures due to its advantages such as reliable node connections, high load-bearing capacity, and fast erection efficiency. As a key force-transferring component between the scaffolding and the main building structure, the rationality of its installation method directly determines the scaffolding's anti-overturning capacity and overall stability. According to the mandatory provisions of the "Safety Technical Standard for Socket-Type Disc-Lock Steel Pipe Scaffolding in Building Construction" (JGJ / T 231-2021), wall ties must be installed horizontally. When horizontal installation is not possible, they must be connected diagonally downwards to one end of the scaffolding; upward diagonal connections are strictly prohibited.
[0003] Existing disc-lock scaffolding wall ties mostly employ traditional rigid connection methods. This involves pre-embedding steel pipes, bolts, threaded sleeves, or installing post-installed bolts within the main building structure, followed by rigid connection of the scaffolding to the pre-embedded components using fixed-length steel pipes, couplers, or structural steel. However, in actual construction, due to factors such as construction errors in the main structure, positioning deviations of the pre-embedded components, and limitations of modular step distances in the disc-lock scaffolding, a certain deviation generally exists between the center of the pre-embedded components and the center of the scaffolding connection disc. This results in traditional rigid wall ties being unable to be installed horizontally, and forced connections easily creating an upward tilt angle, violating specifications. Furthermore, there are problems such as difficulty in ensuring the quality of on-site cutting and welding, low turnover rate due to the inability to fine-tune the length, and difficulties in dismantling and modification, affecting construction efficiency. The few existing adjustable solutions mostly use a single threaded sleeve for adjustment, which has drawbacks such as limited adjustment range, inability to adapt to multi-angle deviations, and low installation and dismantling efficiency, making it difficult to meet the standardized, tool-based, and efficient construction needs under complex on-site conditions.
[0004] Based on this, an adjustable disc-lock scaffolding wall tie is now provided, which can eliminate the drawbacks of existing devices. Utility Model Content
[0005] The purpose of this utility model is to provide an adjustable disc-lock scaffolding wall tie to solve the problems in the background art.
[0006] To achieve the above objectives, this utility model provides the following technical solution:
[0007] An adjustable disc-lock scaffolding wall tie includes a three-section wall tie disposed between the wall and the scaffolding. The three-section wall tie includes an expansion joint, a first connecting section connected to the wall, and a second connecting section connected to the scaffolding. The first and second connecting sections are connected to the expansion joint via a cross-shaped universal joint.
[0008] Based on the above technical solutions, this utility model also provides the following optional technical solutions:
[0009] In one alternative embodiment: the telescopic adjustment section includes a first rod connected to the first connecting section and a second rod connected to the second connecting section, a screw is provided between the first rod and the second rod, the screw is symmetrically provided with positive and negative threads at both ends, and a limiting block is also provided at both ends of the screw.
[0010] In one alternative: a fixing seat is provided at the middle position of the screw, and the fixing seat is provided with an adjustment hole.
[0011] In one alternative embodiment: a telescopic bellows is sleeved on the outside of the screw, one end of the telescopic bellows is fixedly connected to the first rod and the second rod, and the other end of the telescopic bellows is rotatably connected to the fixed seat.
[0012] In one alternative: the first connecting segment includes a connecting rod fixedly connected to a cross-shaped universal joint, and the other end of the connecting rod is provided with a connecting stud; the structure of the second connecting segment is the same as that of the first connecting segment.
[0013] In one alternative: the wall is provided with a pre-embedded sleeve that matches the connecting studs, and the scaffolding includes support rods and connecting plates fixed to the support rods.
[0014] In one alternative: a clamp is detachably connected to one end of the second connecting section, the clamp being matched with a support rod, and one end of the clamp being threadedly connected to the second connecting section via a first connecting sleeve.
[0015] In one alternative: a plug is detachably connected to one end of the second connecting segment, the plug including a connector that matches the connecting plate, the connector having a pin, and one end of the connector being threadedly connected to the second connecting segment via a second connecting sleeve.
[0016] Compared with the prior art, the beneficial effects of this utility model are as follows:
[0017] 1. This utility model, through a three-section structure and double cross-shaft universal joint, realizes the free angle adjustment of the wall tie in three-dimensional space, effectively solves the problems of height deviation and angle deviation between the embedded parts and the scaffolding connection plate, ensures that the wall tie can be set horizontally or downwardly according to the specifications, and eliminates the safety hazards of upward inclined connection.
[0018] 2. This utility model achieves stepless adjustment of the length of the wall tie by symmetrically arranged positive and negative threads at both ends of the screw. The screw is fully enclosed by a telescopic corrugated pipe, which effectively prevents cement slurry, rainwater and other substances from entering the threaded pair, avoiding corrosion and pollution, ensuring the long-term flexibility and reliability of the adjustment mechanism, and significantly improving the product's turnover service life.
[0019] 3. This utility model features a dual-mode connection structure with a quick-switchable clamp and plug joint in the second connecting section. It can be plugged into the disc fastener or connected to the clamp of the support rod, thus improving the applicability of the wall tie. Attached Figure Description
[0020] Figure 1 This is a structural schematic diagram of the first connection state of this utility model.
[0021] Figure 2 This is a structural schematic diagram of the second connection state of this utility model.
[0022] Figure 3 This is a structural schematic diagram of the three-section wall tie in this utility model.
[0023] Figure reference numerals: 100, Three-section wall tie; 200, Telescopic adjustment section; 201, First rod; 202, Second rod; 203, Screw; 204, Limiting block; 205, Fixing seat; 206, Adjustment hole; 207, Telescopic corrugated pipe; 300, First connecting section; 301, Connecting rod; 302, Connecting stud; 400, Second connecting section; 500, Universal joint; 600, Wall; 601, Embedded sleeve; 700, Scaffolding; 701, Support rod; 702, Connecting plate; 800, Clamp; 801, First connecting sleeve; 900, Plug; 901, Connector; 902, Pin; 903, Second connecting sleeve. Detailed Implementation
[0024] To make the objectives, technical solutions, and advantages of this utility model clearer, the present utility model will be further described in detail below with reference to the accompanying drawings and embodiments.
[0025] In one embodiment, such as Figure 1 and Figure 2As shown, an adjustable disc-lock scaffolding wall tie includes a three-section wall tie 100 disposed between the wall 600 and the scaffolding 700. The three-section wall tie 100 includes a telescopic adjustment section 200, a first connecting section 300 connected to the wall 600, and a second connecting section 400 connected to the scaffolding 700. The first connecting section 300 and the second connecting section 400 are connected to the telescopic adjustment section 200 via a cross-shaft universal joint 500. During installation, the first connecting section 300 is connected to the wall 600, and the second connecting section 400 is connected to the scaffolding 700. Then, the length of the wall tie is adjusted through the telescopic adjustment section 200 to make the wall tie taut.
[0026] In one embodiment, such as Figure 3 As shown, the telescopic adjustment section 200 includes a first rod 201 connected to the first connecting section 300 and a second rod 202 connected to the second connecting section 400. A screw 203 is provided between the first rod 201 and the second rod 202. The screw 203 has symmetrical positive and negative threads at both ends. Limiting blocks 204 are also provided at both ends of the screw 203. A fixing seat 205 is provided in the middle of the screw 203. An adjustment hole 206 is provided on the fixing seat 205. A telescopic corrugated tube 2 is sleeved on the outside of the screw 203. 07. One end of the telescopic corrugated pipe 207 is fixedly connected to the first rod 201 and the second rod 202, and the other end of the telescopic corrugated pipe 207 is rotatably connected to the fixed base 205. In use, the special adjusting rod is inserted into the adjusting hole 206, and the screw 203 is rotated to make the first rod 201 and the second rod 202 move simultaneously along the screw 203, thereby realizing the adjustment of the length of the wall tie. At the same time, the telescopic corrugated pipe 207 provides a protective effect for the screw 203, improving the service life of the wall tie.
[0027] In one embodiment, such as Figure 1 As shown, the first connecting section 300 includes a connecting rod 301 fixedly connected to the cross shaft universal joint 500, and a connecting stud 302 is provided at the other end of the connecting rod 301. The structure of the second connecting section 400 is the same as that of the first connecting section 300. The wall 600 is provided with a pre-embedded sleeve 601 that matches the connecting stud 302. The scaffolding 700 includes a support member 701 and a connecting plate 702 fixed on the support member 701. During installation, the connection between the wall connector and the wall 600 is achieved by threading the connecting stud 302 to the pre-embedded sleeve 601 in the wall 600.
[0028] In one embodiment, such as Figure 1As shown, a clamp 800 is detachably connected to one end of the second connecting section 400. The clamp 800 matches the support rod 701. One end of the clamp 800 is threadedly connected to the second connecting section 400 through the first connecting sleeve 801. In use, the clamp 800 is threadedly connected to one end of the second connecting section 400 through the first connecting sleeve 801. During installation, the clamp 800 is fixedly installed on the support rod 701, thereby realizing the connection between the wall tie and the scaffolding 700.
[0029] In one embodiment, such as Figure 2 As shown, a plug connector 900 is detachably connected to one end of the second connecting section 400. The plug connector 900 includes a connector head 901 that matches the connecting plate 702. The connector head 901 is provided with a pin 902. One end of the connector head 901 is threadedly connected to the second connecting section 400 through a second connecting sleeve 903. In use, the plug connector 900 is threadedly connected to one end of the second connecting section 400 through the second connecting sleeve 903. In installation, the connector head 901 is connected to the connecting plate 702 through the pin 902, thereby realizing the connection between the wall tie and the scaffolding 700.
[0030] The above embodiment discloses an adjustable disc-lock scaffolding wall tie. In use, based on the positional relationship between the pre-embedded sleeve 601 and the connecting disc 702, and on the premise that the installation of the connector meets the specifications, a clamp 800 or a plug connector 900 is selected and threadedly connected to one end of the second connecting section 400. During installation, the connection between the wall tie and the wall 600 is achieved by first threading the connecting stud 302 to the pre-embedded sleeve 601 in the wall 600. Then, the connection between the wall tie and the scaffolding 700 is achieved by using the clamp 800 or the plug connector 900. Next, the special adjusting rod is inserted into the adjusting hole 206, and the screw 203 is rotated to make the first rod 201 and the second rod 202 move simultaneously along the screw 203, thereby adjusting the length of the wall tie and making the wall tie tensioned.
[0031] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.
Claims
1. An adjustable disc-lock scaffolding wall tie, characterized in that, The wall tie (100) includes a three-section wall tie (100) installed between the wall (600) and the scaffold (700). The three-section wall tie (100) includes an expansion and adjustment section (200), a first connecting section (300) connected to the wall (600), and a second connecting section (400) connected to the scaffold (700). The first connecting section (300) and the second connecting section (400) are connected to the expansion and adjustment section (200) via a cross-shaped universal joint (500).
2. The adjustable disc-lock scaffolding wall tie according to claim 1, characterized in that, The telescopic adjustment section (200) includes a first rod (201) connected to the first connecting section (300) and a second rod (202) connected to the second connecting section (400). A screw (203) is provided between the first rod (201) and the second rod (202). The screw (203) has symmetrical positive and negative threads at both ends. Limiting blocks (204) are also provided at both ends of the screw (203).
3. The adjustable disc-lock scaffolding wall tie according to claim 2, characterized in that, The screw (203) is provided with a fixing seat (205) at the middle position, and the fixing seat (205) is provided with an adjustment hole (206).
4. The adjustable disc-lock scaffolding wall tie according to claim 3, characterized in that, The screw (203) is fitted with a telescopic corrugated tube (207) on its outer side. One end of the telescopic corrugated tube (207) is fixedly connected to the first rod (201) and the second rod (202), and the other end of the telescopic corrugated tube (207) is rotatably connected to the fixed seat (205).
5. An adjustable disc-lock scaffolding wall tie according to claim 1, characterized in that, The first connecting section (300) includes a connecting rod (301) fixedly connected to the cross shaft universal joint (500), and the other end of the connecting rod (301) is provided with a connecting stud (302). The structure of the second connecting section (400) is the same as that of the first connecting section (300).
6. The adjustable disc-lock scaffolding wall tie according to claim 1, characterized in that, The wall (600) is provided with a pre-embedded sleeve (601) that matches the connecting stud (302), and the scaffold (700) includes a support rod (701) and a connecting plate (702) fixed on the support rod (701).
7. An adjustable disc-lock scaffolding wall tie according to claim 1, characterized in that, The second connecting section (400) is detachably connected to a clamp (800) at one end. The clamp (800) matches the support rod (701). One end of the clamp (800) is threadedly connected to the second connecting section (400) through a first connecting sleeve (801).
8. An adjustable disc-lock scaffolding wall tie according to claim 1, characterized in that, The second connecting segment (400) is detachably connected to a connector (900) at one end. The connector (900) includes a connector (901) that matches the connecting plate (702). The connector (901) is provided with a pin (902). One end of the connector (901) is threadedly connected to the second connecting segment (400) through a second connecting sleeve (903).