AI Technical Summary

Technical Problem

[0005]本实用新型的目的是为了解决常规插入式振捣器包括高频插入式振捣棒的振动头清理比较麻烦的问题,而提出的一种用于大体积混凝土的二次振捣辅助设备

Benefits of technology

1、当插入式振捣器振动头放入目标混凝土内使用后,解开弹扣,向下拉动环形刮,再向上复原环形刮,通过环形刮清理插入式振捣器振动头外表残留混凝土,避免大量混凝土凝固在插入式振捣器振动头外,方便快速清理插入式振捣器振动头外残留混凝土。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224918879U_ABST
    Figure CN224918879U_ABST
Patent Text Reader

Abstract

A secondary vibration auxiliary equipment for mass concrete, including cable, plug-in vibrator vibration head, the cable is connected on the upper end of plug-in vibrator vibration head, the outer surface of plug-in vibrator vibration head is slidably installed with annular scraper, the upper end of plug-in vibrator vibration head is fixedly connected with elastic buckle, the upper part of elastic buckle is buckled with the upper part of plug-in vibrator vibration head.The plug-in vibrator vibration head includes shell, the upper part of shell is fixedly connected with buckling ring.Unbuckle the elastic buckle, pull down the annular scraper, and then restore the annular scraper, clean the residual concrete on the outer surface of plug-in vibrator vibration head through the annular scraper, avoid a large amount of concrete solidifying on the outer surface of plug-in vibrator vibration head, and facilitate quick cleaning of residual concrete on the outer surface of plug-in vibrator vibration head.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the technical field of concrete vibration equipment, and in particular relates to an auxiliary device for secondary vibration of large-volume concrete. Background Technology

[0002] Immersion vibrators include high-frequency immersion vibrators, which vibrate by inserting into the concrete. They are suitable for deep and large-area pouring, effectively remove air bubbles and compact the structure, and can be used to assist in the secondary vibration of large-volume concrete.

[0003] After use, the vibrating head of a conventional immersion vibrator, including a high-frequency immersion vibrator, will have a small amount of concrete residue adhering to its surface. If it is not cleaned in time, it will be difficult to remove after the concrete on the surface has hardened. Cleaning with external tools is also quite troublesome. This makes cleaning the vibrating head of a conventional immersion vibrator, including a high-frequency immersion vibrator, quite troublesome.

[0004] To address this issue, we propose a secondary vibration auxiliary device for large-volume concrete to solve the aforementioned problems. Utility Model Content

[0005] The purpose of this invention is to solve the problem of the cumbersome cleaning of the vibrating head of conventional immersion vibrators, including high-frequency immersion vibrators, and to propose a secondary vibration auxiliary device for large-volume concrete.

[0006] To achieve the above objectives, the present invention adopts the following technical solution: A secondary vibration auxiliary device for large-volume concrete includes a cable and an immersion vibrator head. The cable is connected to the upper end of the immersion vibrator head. A ring-shaped scraper is slidably mounted on the outside of the immersion vibrator head. A spring clip is fixedly connected to the upper end of the immersion vibrator head, and the upper part of the spring clip engages with the upper part of the immersion vibrator head. After the immersion vibrator head is placed in the target concrete, the spring clip is released, the ring scraper is pulled down, and then the ring scraper is pushed back up. The ring scraper cleans the residual concrete on the surface of the immersion vibrator head, preventing a large amount of concrete from solidifying outside the immersion vibrator head and facilitating quick and easy cleaning of residual concrete outside the immersion vibrator head.

[0007] Preferably, the vibrating head of the insert vibrator includes a housing, and a fastening ring is fixedly connected to the upper part of the housing. A spring-loaded buckle engages with the fastening ring, and the spring-loaded buckle acts on the annular scraper, keeping the annular scraper on the vibrating head of the insert vibrator, thus facilitating the maintenance of the annular scraper's position.

[0008] Preferably, the annular scraper includes a movable ring, with annular shovels fixedly connected to both the upper and lower parts of the movable ring. The movable ring and annular shovels are movably fitted onto the outer casing. Pulling the movable ring downwards or pushing it upwards causes the annular shovels to act on residual concrete outside the vibrating head of the immersion vibrator, facilitating quick and easy cleaning of residual concrete.

[0009] Preferably, the annular scraper further includes a handle, which is fixedly connected to the outside of the movable ring and to the inner end of the handle. Pulling the handle actuates the movable ring, which in turn acts on the annular scraper, causing the scraper to remove residual concrete along the outer shell.

[0010] Preferably, the spring clip includes a spring piece, the upper end of which is fixedly connected to a clip block, and the lower end of which is fixedly connected to a ring shovel. The spring piece's elasticity holds the clip block on the fastening ring, and the spring piece acts on the ring shovel, keeping the ring scraper on the vibrating head of the insert vibrator, thus facilitating the maintenance of the ring scraper's position.

[0011] Preferably, the snap-on mechanism further includes a pull button, which is fixedly connected to the upper part of the snap spring. Squeezing the pull button applies force to the upper part of the snap spring, pulling it outward to disengage the snap block from the fastening ring, thus facilitating the unlocking of the snap-on mechanism.

[0012] In summary, the technical effects and advantages of this utility model are as follows: 1. After the vibrating head of the immersion vibrator is placed into the target concrete, release the spring clip, pull down the ring scraper, and then push the ring scraper back up. Use the ring scraper to clean the residual concrete on the outside of the vibrating head of the immersion vibrator, so as to avoid a large amount of concrete solidifying on the outside of the vibrating head of the immersion vibrator and facilitate quick cleaning of the residual concrete on the outside of the vibrating head of the immersion vibrator.

[0013] 2. The spring clips and fastening rings are used to fasten the ring scraper. The spring clips act on the ring scraper to keep the ring scraper on the vibrating head of the insert vibrator, making it easy to maintain the position of the ring scraper.

[0014] 3. Pull down or push up the movable ring to apply the ring shovel to the residual concrete outside the vibrating head of the immersion vibrator, making it easy and quick to clean up the residual concrete.

[0015] 4. The elasticity of the spring clip keeps the buckle block on the buckling ring. The spring clip acts on the ring scraper, keeping the ring scraper on the vibrating head of the insert vibrator, making it easy to maintain the position of the ring scraper. Attached Figure Description

[0016] Figure 1 This is a schematic diagram of the overall structure of this utility model; Figure 2 This is a schematic diagram of the vibrating head structure of the insertion-type vibrator of this utility model; Figure 3This is a schematic diagram of the annular scraper structure of this utility model; Figure 4 This is a schematic diagram of the spring-loaded buckle structure of this utility model.

[0017] In the diagram: 1. Cable; 2. Vibrating head of immersion vibrator; 3. Circular scraper; 4. Spring clip; 21. Housing; 22. Fastening ring; 31. Movable ring; 32. Circular shovel; 33. Handle; 41. Spring piece; 42. Fastening block; 43. Pull button. Detailed Implementation

[0018] The technical solutions of the utility model embodiments will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the utility model, and not all embodiments.

[0019] like Figure 1 and 2 As shown, a secondary vibration auxiliary device for large-volume concrete includes a cable 1 and an immersion vibrator head 2. The cable 1 is connected to the upper end of the immersion vibrator head 2. An annular scraper 3 is slidably installed on the outside of the immersion vibrator head 2. A spring clip 4 is fixedly connected to the upper end of the immersion vibrator head 2, and the upper part of the spring clip 4 is engaged with the upper part of the immersion vibrator head 2. After the immersion vibrator head 2 is inserted into the target concrete, the spring clip 4 is released, the annular scraper 3 is pulled down, and then the annular scraper 3 is pushed back up to clean the residual concrete on the surface of the immersion vibrator head 2.

[0020] like Figure 1 and 2 As shown, the vibrating head 2 of the immersion vibrator includes a housing 21, and a fastening ring 22 is fixedly connected to the upper part of the housing 21. The fastening ring 22 is fastened by a spring buckle 4, and the spring buckle 4 acts on the annular scraper 3 to keep the annular scraper 3 on the vibrating head 2 of the immersion vibrator.

[0021] like Figure 1 , 2 As shown in Figure 3, the annular scraper 3 includes a movable ring 31, with annular shovels 32 fixedly connected to both the upper and lower parts of the movable ring 31. The movable ring 31 and the annular shovels 32 are movably fitted onto the outer casing 21. Pulling down or pushing up the movable ring 31 causes the annular shovels 32 to act on the residual concrete outside the vibrating head 2 of the immersion vibrator.

[0022] like Figure 1 , 2 As shown in Figure 3, the annular scraper 3 also includes a handle 33, which is fixedly connected to the outside of the movable ring 31 and to the inner end of the handle 33. When the hand grips the handle 33 and pulls, it acts on the movable ring 31, which in turn acts on the annular shovel 32, causing the annular shovel 32 to remove residual concrete along the outside of the outer casing 21.

[0023] like Figure 1 , 2 As shown in Figures 3 and 4, the spring clip 4 includes a spring piece 41, with a clip block 42 fixedly connected to the upper end of the spring piece 41 and a ring shovel 32 fixedly connected to the lower end of the spring piece 41. The spring force of the spring piece 41 is used to hold the clip block 42 on the fastening ring 22, and the spring piece 41 acts on the ring shovel 32 to hold the ring scraper 3 on the vibrating head 2 of the insert vibrator.

[0024] like Figure 1 , 2 As shown in Figure 4, the snap fastener 4 also includes a pull button 43, which is fixedly connected to the upper part of the spring piece 41. Squeezing the pull button 43 acts on the upper part of the spring piece 41, pulling the upper part of the spring piece 41 outward, causing the buckle block 42 to disengage from the buckle ring 22.

[0025] Working principle: After the vibrating head 2 of the immersion vibrator is placed into the target concrete, the spring clip 4 is released, the annular scraper 3 is pulled down, and then the annular scraper 3 is restored to its original position. The annular scraper 3 cleans the residual concrete on the surface of the vibrating head 2 of the immersion vibrator.

[0026] The above description is only a preferred embodiment of the utility model, but the protection scope of the utility model is not limited thereto. Any equivalent substitutions or changes made by those skilled in the art within the technical scope disclosed by the utility model, based on the technical solution and the utility model concept, should be included within the protection scope of the utility model.

[0027] The description briefly mentions the application direction of the utility model in relation to existing technologies known to those skilled in the art without modification, and combines them with the utility model to form a complete technology; it avoids excessive popularization of technologies known to those skilled in the art, in order to help those skilled in the art quickly understand the main content of the utility model.

Claims

1. A secondary vibration auxiliary device for large-volume concrete, comprising a cable (1) and an immersion vibrator head (2), wherein the cable (1) is connected to the upper end of the immersion vibrator head (2), characterized in that: An annular scraper (3) is slidably installed on the outside of the vibrating head (2) of the insert vibrator. A spring buckle (4) is fixedly connected to the upper end of the vibrating head (2). The upper part of the spring buckle (4) is fastened and matched with the upper part of the vibrating head (2) of the insert vibrator.

2. The auxiliary equipment for secondary vibration of large-volume concrete according to claim 1, characterized in that: The vibrating head (2) of the insert vibrator includes a housing (21), and a fastening ring (22) is fixedly connected to the upper part of the housing (21).

3. The auxiliary equipment for secondary vibration of large-volume concrete according to claim 2, characterized in that: The annular scraper (3) includes a movable ring (31), and an annular shovel (32) is fixedly connected to both the upper and lower parts of the movable ring (31). The movable ring (31) and the annular shovel (32) are movably fitted onto the outer shell (21).

4. The auxiliary equipment for secondary vibration of large-volume concrete according to claim 3, characterized in that: The annular scraper (3) also includes a handle (33), which is fixedly connected to the outside of the movable ring (31) and fixedly connected to the inside of the handle (33).

5. The auxiliary equipment for secondary vibration of large-volume concrete according to claim 3, characterized in that: The spring clip (4) includes a spring piece (41), the upper end of which is fixedly connected to a clip block (42), and the lower end of which is fixedly connected to a ring shovel (32).

6. The auxiliary equipment for secondary vibration of large-volume concrete according to claim 5, characterized in that: The spring clip (4) also includes a pull button (43), which is fixedly connected to the upper part of the spring piece (41).