Double-splitting mechanism and drilling and splitting integrated machine

CN224919254UActive Publication Date: 2026-10-30SHANDONG BAIWO CONSTR MASCH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522760766.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-26
Publication Date
2026-10-30
Estimated Expiration
2035-12-26

AI Technical Summary

Technical Problem

岩石裂缝相对小且分裂不彻底,导致后续破碎锤的工作耗时较长且破碎成本较高

Benefits of technology

[0014]本实用新型的有益效果是:双劈裂机构中的第一劈裂机具有较大的劈裂力,从而可实现岩石的初次劈裂,第二劈裂机具有较大的劈裂行程,可在第一劈裂机完成初次劈裂的基础上进行二次深度劈裂,故利用第一劈裂机与第二劈裂机的协同作业,可显著提升岩石分裂质量;岩石分裂质量高,则便于后续利用破碎锤实现岩石的高效破碎,继而可提高岩石的开采效率;钻孔机与双劈裂机构集成于同一机架上,形成钻劈一体化作业设备,实现钻孔与劈裂工序的连续高效完成,减少作业环节衔接时间,提升岩石劈裂效率。钻孔机、第一劈裂机和第二劈裂机的中心轴线分布于同一圆周上,利于钻孔、初次劈裂与二次劈裂工序的有序高效衔接,可减少设备的位置调整时间,进一步提升作业连贯性。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224919254U_ABST
    Figure CN224919254U_ABST
Patent Text Reader

Abstract

The utility model provides a kind of double splitting mechanism and drill split integrated machine, double splitting mechanism includes connecting frame, rotary system, rack, first splitting machine, second splitting machine, the rack is connected with the connecting frame by rotary system, rotary system can drive the rack free rotation, first splitting machine and second splitting machine are spaced apart on the rack, first splitting machine can be freely rotated, move up and down and position on the rack;Second splitting machine can be freely rotated, move up and down and position on the rack;Drill split integrated machine includes double splitting mechanism and drilling machine. Utilize the double splitting mechanism to realize the large stroke splitting of rock, in turn, it is convenient for subsequent utilization broken hammer to realize the efficient breaking of rock, to improve the whole breaking mining efficiency of rock.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of rock mining technology, specifically a double splitting mechanism and an integrated drilling and splitting machine. Background Technology

[0002] In the field of non-blasting construction in hard rock, integrated drilling and splitting machines are increasingly being used. Current integrated drilling and splitting machines primarily use a drilling rig to drill holes. After drilling, a hydraulic wedge assembly on the splitting machine is used to split the rock, creating cracks. Then, a hydraulic breaker is used to further split the rock. The main principle is that rock has much lower tensile strength than compressive strength, making it much easier to split from the inside than from the outside. The splitting machine, however, drills holes and then uses a hydraulic cylinder to press a wedge structure, generating a strong splitting force to split the rock from the inside. Because of its wedge structure, its splitting stroke is relatively small, resulting in smaller cracks. The relatively small rock cracks and incomplete splitting lead to longer working times and higher crushing costs for the subsequent hydraulic breaker operation. Utility Model Content

[0003] The purpose of this utility model is to provide a double splitting mechanism and an integrated drilling and splitting machine. The double splitting mechanism can achieve a large stroke splitting of the rock, which facilitates the subsequent use of a hydraulic breaker to achieve efficient rock crushing, thereby improving the overall rock crushing and mining efficiency.

[0004] The technical solution adopted by this utility model to solve its technical problem is: a double splitting mechanism, including a connecting frame, a rotating system, a frame, a first splitting machine, and a second splitting machine. The frame is connected to the connecting frame through the rotating system, which can drive the frame to rotate freely. The first splitting machine and the second splitting machine are arranged alternately on the frame. The first splitting machine can rotate freely, move up and down, and be positioned on the frame. The second splitting machine can rotate freely, move up and down, and be positioned on the frame.

[0005] Preferably, the first splitter and the second splitter are distributed at intervals along the circumferential direction of the rotary system, and the central axis of the first splitter and the central axis of the second splitter are both located on a circumference coaxial with the central axis of the rotary system.

[0006] Furthermore, a first rock splitter rotary drive system and a first lifting mechanism are provided on the frame. The first rock splitter is mounted on the first rock splitter rotary drive system and the first rock splitter rotary drive system can drive the first rock splitter to rotate around its own axis. The first lifting mechanism is mounted on the frame and the first lifting mechanism can drive the first rock splitter rotary drive system and the first rock splitter as a whole to move up and down and be positioned.

[0007] Furthermore, the first lifting mechanism includes a first hydraulic cylinder and a first sliding support seat. The first sliding support seat is slidably mounted on the frame. The first hydraulic cylinder is mounted on the frame and its extension and retraction ends are connected to the first sliding support seat. The first splitter rotation drive system is mounted on the first sliding support seat.

[0008] Furthermore, a second rock splitter rotation drive system and a second lifting mechanism are also provided on the frame. The second rock splitter is mounted on the second rock splitter rotation drive system and the second rock splitter rotation drive system can drive the second rock splitter to rotate around its own axis. The second lifting mechanism is mounted on the frame and the second lifting mechanism can drive the second rock splitter rotation drive system and the second rock splitter to move up and down and be positioned as a whole.

[0009] Furthermore, the second lifting mechanism includes a second hydraulic cylinder and a second sliding support seat. The second sliding support seat is slidably mounted on the frame. The second hydraulic cylinder is mounted on the frame and its extension and retraction ends are connected to the second sliding support seat. The second splitter rotation drive system is mounted on the second sliding support seat.

[0010] A drilling and splitting machine includes the dual splitting mechanism described above. The drilling and splitting machine also includes a drilling machine, which is mounted on the frame and distributed at intervals with the first splitting machine and the second splitting machine. The central axis of the drilling machine is on the same circumference as the central axes of the first splitting machine and the second splitting machine. The drilling machine can move up and down and be positioned on the frame.

[0011] Furthermore, a third lifting mechanism is provided on the frame, which enables the drilling machine to move up and down and be positioned.

[0012] Further, the third lifting mechanism includes a third hydraulic cylinder, a middle guide sprocket assembly, an upper guide sprocket, a lower guide sprocket, an upper transmission chain, a lower transmission chain, and a third sliding support. The third sliding support is slidably mounted on the frame. The third hydraulic cylinder is vertically mounted on the frame, and its base is connected to the frame. The middle guide sprocket assembly includes a fixed frame, an upper middle guide sprocket, and a lower middle guide sprocket. The fixed frame is fixedly mounted on the telescopic end of the third hydraulic cylinder. The upper middle guide sprocket and the lower middle guide sprocket are rotatably mounted on the fixed frame. The guide sprocket is rotatably mounted on the upper part of the frame, and the lower guide sprocket is rotatably mounted on the lower part of the frame. One end of the upper drive chain is fixedly connected to the third sliding support. The other end of the upper drive chain passes through the upper guide sprocket and the upper-middle guide sprocket in sequence and is fixedly mounted near the upper guide sprocket. One end of the lower drive chain is fixedly mounted on the frame and adjacent to the cylinder of the third hydraulic cylinder. The other end of the lower drive chain passes through the lower-middle guide sprocket and the lower guide sprocket in sequence and is fixedly connected to the third sliding support. The drilling machine is mounted on the third sliding support.

[0013] Furthermore, a positioning shaft is provided at the bottom of the frame, and the central axis of the positioning shaft is coaxial with the central axis of the rotary system.

[0014] The beneficial effects of this invention are as follows: The first splitter in the double splitting mechanism has a large splitting force, thus enabling the initial splitting of the rock. The second splitter has a large splitting stroke, allowing for secondary deep splitting based on the initial splitting completed by the first splitter. Therefore, the coordinated operation of the first and second splitters significantly improves the quality of rock splitting. High rock splitting quality facilitates subsequent efficient rock crushing using a hydraulic breaker, thereby improving rock mining efficiency. The drilling machine and the double splitting mechanism are integrated on the same frame, forming an integrated drilling and splitting operation device, enabling continuous and efficient completion of drilling and splitting processes, reducing the connection time between operation links, and improving rock splitting efficiency. The central axes of the drilling machine, the first splitter, and the second splitter are distributed on the same circumference, which facilitates the orderly and efficient connection of drilling, initial splitting, and secondary splitting processes, reduces equipment position adjustment time, and further improves operational continuity. Attached Figure Description

[0015] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some preferred embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0016] Figure 1 This is a front view of the overall structure of one embodiment of the present utility model; Figure 2 This is a top view of one embodiment of the present utility model; Figure 3 This is a schematic diagram showing the distribution of the drilling machine on the frame. Figure 4 This is a schematic diagram showing the distribution of the first splitter on the frame; Figure 5 Here is a schematic diagram showing the distribution of the second splitter on the frame: In the diagram: 1 Connecting frame, 2 Rotary system, 21 First drive motor, 22 First slewing bearing, 3 Frame, 4 Drilling machine, 41 Drilling machine power head, 42 Drill rod, 43 Third hydraulic cylinder, 431 Fixed frame, 4311 Middle upper guide sprocket, 4312 Middle lower guide sprocket, 432 Upper guide sprocket, 433 Lower guide sprocket, 44 Drill bit, 45 Third sliding support seat, 5 First splitter, 51 First splitter rotary drive system, 52 First splitter cylinder, 53 First hydraulic cylinder, 54 Splitting block, 55 First sliding support seat, 6 Second splitter, 61 Second hydraulic cylinder, 62 Second splitter rotary drive system, 63 Second sliding support seat, 7 Positioning shaft, 101 Circumference. Detailed Implementation

[0017] The following will describe specific embodiments and appendices. Figure 1-5 The technical solutions in the embodiments of this utility model are clearly and completely described below. Obviously, the described embodiments are only some preferred embodiments of this utility model, and not all embodiments. Those skilled in the art can make similar modifications without departing from the spirit of this utility model. Therefore, this utility model is not limited to the specific embodiments disclosed below.

[0018] This utility model provides a double splitting mechanism (such as...) Figure 1As shown, the rock splitter includes a connecting frame 1, a slewing system 2, a frame 3, a first rock splitter 5, and a second rock splitter 6. In practical applications, the connecting frame 1 is used to connect the mechanism to external equipment, such as connecting it to the front end of the boom of an existing excavator, allowing the excavator to be used to adjust the position of the entire mechanism. The first rock splitter 5 is a well-known and mature wedge-type rock splitter in the field of rock mining technology; therefore, the specific structure of the first rock splitter 5 will not be described in detail here. The working principle of the first rock splitter 5 is to use the first rock splitter cylinder 52 to drive the splitting blocks 54 to expand outward, generating a huge thrust to make the rock move along a predetermined direction. The first rock splitter 5 has a large splitting force, but the width of the crack it creates is limited, making it suitable for creating initial fractures. The second rock splitter 6 can be a wedge-type rock splitter or a rock splitter with a relatively large splitting stroke, which are known and mature in the field of rock mining technology. Therefore, the specific structure of wedge-type rock splitters and rock splitters with a relatively large splitting stroke will not be described in detail here. In this specific embodiment, the second rock splitter 6 preferably uses a rock splitter with a relatively larger splitting stroke. The working principle of the rock splitter is to drive the rod body to extend and retract through hydraulic power, generating static pressure expansion force inside the rock, causing the rock mass to continuously split along the weak surface. Its splitting stroke is long and controllable, making it suitable for the gradual expansion and widening of cracks.

[0019] The frame 3 is connected to the connecting frame 1 via a rotary system 2. The rotary system 2 can drive the frame 3 to rotate freely. In this specific embodiment, the rotary system 2 can be a hydraulic rotary system commonly used in the field of existing engineering machinery. It mainly includes a first drive motor 21 and a first slewing bearing 22. The outer ring of the first slewing bearing 22 is fixedly mounted on the lower part of the connecting frame 1 by bolts. The first drive motor 21 is fixedly mounted on the connecting frame 1. A first drive wheel is mounted on the output shaft of the first drive motor 21. The first drive wheel meshes with the inner ring of the first slewing bearing 22. The upper part of the frame 3 is fixedly connected to the lower part of the inner ring of the first slewing bearing 22 by bolts. Therefore, the rotation of the first drive wheel can realize the rotation drive of the frame 3. The first splitter 5 and the second splitter 6 are spaced apart on the frame. In practical applications, the position of the first rock splitter 5 and the second rock splitter 6 can be adjusted by rotating the frame 3, thereby facilitating the orderly connection of the initial splitting operation and the secondary splitting operation, thus improving the efficiency of rock mining and splitting. The first rock splitter 5 can rotate freely, move up and down and be positioned on the frame 3. With the ability of the first rock splitter 5 to rotate freely, move up and down and be positioned on the frame 3, it is easy to adjust the working angle and position of the first rock splitter 5 so as to achieve directional splitting of the rock. The second rock splitter 6 can rotate freely, move up and down and be positioned on the frame 3. With the ability of the second rock splitter 6 to rotate freely, move up and down and be positioned on the frame 3, the depth and angle of the second rock splitter 6 inserted into the rock fissure can be precisely controlled to achieve continuous expansion and directional widening of the crack.

[0020] Based on the above embodiments, to facilitate efficient coordination between the first rock splitter 5 and the second rock splitter 6 during operation, the first rock splitter 5 and the second rock splitter 6 are spaced apart along the circumferential direction of the rotary system 2, and the central axes of the first rock splitter 5 and the second rock splitter 6 are both located on a circumference 101 coaxial with the central axis of the rotary system 2. Utilizing the above-mentioned positional distribution of the first rock splitter 5 and the second rock splitter 6, when adjusting their working positions, only the frame 3 needs to be rotated without requiring further movement or adjustment. When the frame 3 rotates under the drive of the rotary system 2, the first rock splitter 5 and the second rock splitter 6 can be sequentially aligned with the same working surface, achieving continuous and efficient operation with the first rock splitter 5 splitting and the second rock splitter 6 widening the crack.

[0021] Based on the above embodiments, the specific implementation method for the first rock splitter 5 to achieve free rotation, vertical movement, and positioning on the frame 3 is as follows: A first rock splitter rotation drive system 51 and a first lifting mechanism are provided on the frame 3. The first rock splitter 5 is mounted on the first rock splitter rotation drive system 51, and the first rock splitter rotation drive system 51 can drive the first rock splitter 5 to rotate around its own axis. The first lifting mechanism is mounted on the frame 3, and the first lifting mechanism can drive the first rock splitter rotation drive system 51 and the first rock splitter 5 as a whole to move vertically and position vertically. Specifically, the first lifting mechanism includes a first hydraulic cylinder 53 and a first sliding support seat 55. The first sliding support seat 55 is slidably mounted on the frame 3. The first hydraulic cylinder 53 is mounted on the frame 3, and the extension end of the first hydraulic cylinder 53 is connected to the first sliding support seat. The first rock splitter rotation drive system 51 is mounted on the first sliding support seat 55, utilizing... The reciprocating movement of the first hydraulic cylinder 53 enables the reciprocating up-and-down movement of the first sliding support 55. The first rock splitter rotary drive system 51 can be a hydraulic drive rotary system commonly used in the field of existing engineering machinery. It includes a second drive motor and a second slewing bearing. The outer ring of the second slewing bearing is fixedly connected to the support frame of the first rock splitter rotary drive system 51 by bolts. The lower part of the inner ring of the second slewing bearing is fixedly connected to the upper part of the first rock splitter cylinder 52. The second drive motor is fixedly mounted on the support frame of the first rock splitter rotary drive system 51. The second drive wheel on the output shaft of the second drive motor meshes with the inner ring teeth of the second slewing bearing. Therefore, the second drive motor can be used to realize the free rotation drive of the first rock splitter 5. The upper part of the support frame of the first rock splitter rotary drive system 51 is connected to the first sliding support 55. Therefore, by using the reciprocating up-and-down sliding and positioning of the first sliding support 55, the first rock splitter 5 can be realized to slide up and down and be positioned on the frame 3.

[0022] Based on the above embodiments, the specific implementation method for the second rock splitter 6 to achieve free rotation, vertical movement, and positioning on the frame 3 is as follows: A second rock splitter rotary drive system 62 and a second lifting mechanism are also provided on the frame 3. The second rock splitter 6 is mounted on the second rock splitter rotary drive system 62, and the second rock splitter rotary drive system 62 can drive the second rock splitter 6 to rotate around its own axis. The second lifting mechanism is mounted on the frame 3, and the second lifting mechanism can drive the second rock splitter rotary drive system 62 and the second rock splitter 6 to move vertically and position as a whole. Specifically, the second lifting mechanism includes a second hydraulic cylinder 61 and a second sliding support seat 63. The second sliding support seat 63 is slidably mounted on the frame 3. The second hydraulic cylinder 61 is mounted on the frame 3, and the extension and retraction end of the second hydraulic cylinder 61 is connected to the second sliding support seat 63. The reciprocating motion of the second hydraulic cylinder 61 enables the second sliding support... The second rock splitter 63 reciprocates up and down; the second rock splitter rotary drive system 62 is mounted on the second sliding support 63. The second rock splitter rotary drive system 62 can be a hydraulic drive rotary system commonly used in the field of existing engineering machinery. It includes a third drive motor and a third slewing bearing. The inner ring of the third slewing bearing is fixedly connected to the support frame of the second rock splitter rotary drive system 62 by bolts. The lower part of the outer ring of the third slewing bearing is fixedly connected to the upper part of the second rock splitter. The third drive motor is fixedly mounted on the support frame of the second rock splitter rotary drive system 62. The third drive wheel mounted on the output shaft of the third drive motor meshes with the outer ring teeth of the third slewing bearing. Therefore, the free rotation drive of the second rock splitter 6 can be achieved by using the third drive motor. The upper part of the support frame of the second rock splitter rotary drive system 62 is connected to the second sliding support 63. Therefore, by using the reciprocating up and down sliding and positioning of the second sliding support 63, the up and down sliding and positioning of the second rock splitter 6 on the frame 3 can be achieved.

[0023] This utility model also provides a drilling and splitting integrated machine, including the double splitting mechanism described in the above embodiment. The drilling and splitting integrated machine also includes a drilling machine 4, which is a commonly used rock drilling device known in existing drilling and splitting integrated machines. Therefore, the specific working principle of the drilling machine 4 will not be described in detail here. The drilling machine 4 is mounted on the frame 3 and is distributed at intervals with the first splitting machine 5 and the second splitting machine 6. The central axis of the drilling machine 4 is on the same circumference 101 as the central axes of the first splitting machine 5 and the second splitting machine 6. Utilizing the above spatial distribution relationship of the drilling machine 4, the first splitting machine 5, and the second splitting machine 6, the rotation of the frame 3 can be used to achieve precise and rapid adjustment of the three relative to the working position, thereby effectively improving work efficiency and positioning accuracy. The drilling machine 4 can move up and down and be positioned on the frame 3. The vertical movement capability of the drilling machine 4 on the frame 3 facilitates the control of the drilling depth.

[0024] Based on the above embodiments, the specific implementation method for the drilling machine 4 to achieve up-and-down reciprocating movement and positioning on the frame 3 is as follows: a third lifting mechanism is provided on the frame 3. The third lifting mechanism can realize the up-and-down movement and positioning of the drilling machine 4. The third lifting mechanism includes a third hydraulic cylinder 43, a middle guide sprocket group, an upper guide sprocket 432, a lower guide sprocket 433, an upper transmission chain, a lower transmission chain, and a third sliding support 45. The third sliding support 45 is slidably mounted on the frame 3, and the third hydraulic cylinder 43 is vertically mounted on the frame 3. The base of the upper third hydraulic cylinder 43 is connected to the frame 3. The middle guide sprocket assembly includes a fixed frame 431, an upper middle guide sprocket 4311, and a lower middle guide sprocket 4312. The fixed frame 431 is fixedly mounted on the telescopic end of the third hydraulic cylinder 43. The upper middle guide sprocket 4311 and the lower middle guide sprocket 4312 are rotatably mounted on the fixed frame 431. The upper guide sprocket 432 is rotatably mounted on the upper part of the frame 3, and the lower guide sprocket 431 is rotatably mounted on the lower part of the frame 3. One end of the upper transmission chain is connected to the third sliding... The moving support 45 is fixedly connected. The other end of the upper transmission chain passes sequentially around the upper guide sprocket 432 and the upper-middle guide sprocket 4311 and is fixedly mounted near the upper guide sprocket 432. One end of the lower transmission chain is fixedly mounted on the frame 3 and adjacent to the cylinder of the third hydraulic cylinder 43. The other end of the lower transmission chain passes sequentially around the lower-middle guide sprocket 4312 and the lower guide sprocket 433 and is fixedly connected to the third sliding support 45. The drilling machine 4 is mounted on the third sliding support 45. Specifically, the drilling motion of the drilling machine 4... The power head 41 is fixedly mounted on the third sliding support 45. The output end of the power head 41 of the drilling machine is connected to the drill rod 42, and the front end of the drill rod 42 is connected to the drill bit 44. In actual application, when the extension end of the third hydraulic cylinder 43 moves upward continuously, the transmission action of the lower transmission chain causes the third sliding support 45 to move downward continuously, thereby realizing the downward movement of the drilling machine 4 and enabling the drilling machine 4 to continuously drill holes. When the extension end of the third hydraulic cylinder 43 moves downward continuously, the transmission action of the upper transmission chain causes the third sliding support 45 to move upward continuously, thereby resetting the drilling machine 4.

[0025] Based on the above embodiments, in order to facilitate the stable positioning of the frame 3 during the entire operation, a positioning shaft 7 is provided at the bottom of the frame 3, and the central axis of the positioning shaft 7 is coaxial with the central axis of the rotary system 2.

[0026] In practical application, the operation process of using the above-mentioned integrated drilling and splitting machine to perform rock drilling and splitting operations is as follows: The first splitting machine 5 is placed in the designated working area and positioned using the positioning shaft 7. The rotary system 2 is activated, and the rotary motor 21 drives the rotary bearing 22 to rotate, thereby rotating the frame 3. The drill bit 44 of the drilling machine is placed at the desired drilling position. At this time, the power head 41 of the drilling machine is activated, and the drill bit 44 is driven by the drill rod 42 to perform drilling. After drilling is completed, the drilling machine 4 is lifted. After the drilling machine is lifted into position, the rotary system 2 is activated again, driving the frame 3 to rotate. The center of the splitting block 54 at the bottom of the first splitting machine 5 is aligned vertically with the center of the drilled hole. The rotary drive system 51 of the first splitting machine is activated, and a suitable rock splitting direction is selected according to the rock. After the rock splitting direction is selected, the first hydraulic cylinder 53 is activated, causing the first splitting... Machine 5 moves downwards within the borehole. Once in position, it begins splitting. At this point, the first splitter's hydraulic cylinder 52 pushes the splitting block 54 to split the rock. After splitting, cracks appear in the rock. The first splitter 5 is then lifted back to its initial position, and the rotary system 2 restarts, driving the frame 3 to rotate. The center of the second splitter 6 is aligned vertically with the center of the drilled borehole. Based on the direction of the rock cracks, the rotary drive system 62 of the second splitter is activated, ensuring that the splitting direction of the second splitter 6 matches the previously formed crack direction. The second hydraulic cylinder 61 is then activated. After the second splitter 6 reaches the splitting position, it begins splitting the rock. The large stroke of the second splitter 6 further expands the existing rock cracks. After splitting, the second splitter 6 is lifted back to its initial position. Through these steps, a double splitting operation can be completed. Compared to existing single-splitting equipment, this integrated drilling and splitting machine can significantly enlarge existing rock cracks and is easy to operate, requiring no additional adjustments to the frame 3.

[0027] In this utility model, "left" and "right" are relative positions used for the convenience of describing positional relationships, and therefore cannot be understood as absolute positions as a limitation on the scope of protection.

[0028] Except for the technical features described in the specification, all other technologies are known to those skilled in the art.

[0029] The preferred embodiments and examples of the present invention have been described in detail above with reference to the accompanying drawings. However, the present invention is not limited to the above embodiments and examples. For those skilled in the art, several improvements and modifications can be made without departing from the concept of the present invention, and these improvements and modifications should also be considered within the protection scope of the present invention.

Claims

1. A double-splitting mechanism, characterized in that, The device includes a connecting frame, a rotating system, a frame, a first splitter, and a second splitter. The frame is connected to the connecting frame via the rotating system, which drives the frame to rotate freely. The first splitter and the second splitter are spaced apart on the frame. The first splitter can rotate freely, move up and down, and be positioned on the frame. The second splitter can also rotate freely, move up and down, and be positioned on the frame.

2. The double-splitting mechanism according to claim 1, characterized in that, The first splitter and the second splitter are distributed at intervals along the circumferential direction of the rotary system, and the central axis of the first splitter and the central axis of the second splitter are both located on a circumference coaxial with the central axis of the rotary system.

3. The double-splitting mechanism according to claim 2, characterized in that, in The frame is equipped with a first rock splitter rotary drive system and a first lifting mechanism. The first rock splitter is mounted on the first rock splitter rotary drive system and the first rock splitter rotary drive system can drive the first rock splitter to rotate around its own axis. The first lifting mechanism is mounted on the frame and the first lifting mechanism can drive the first rock splitter rotary drive system and the first rock splitter as a whole to move up and down and be positioned.

4. The double-splitting mechanism according to claim 3, characterized in that, The first lifting mechanism includes a first hydraulic cylinder and a first sliding support seat. The first sliding support seat is slidably mounted on the frame. The first hydraulic cylinder is mounted on the frame and its extension and retraction ends are connected to the first sliding support seat. The first splitter rotation drive system is mounted on the first sliding support seat.

5. The double-splitting mechanism according to claim 3 or 4, characterized in that, in The frame is also equipped with a second rock splitter rotary drive system and a second lifting mechanism. The second rock splitter is mounted on the second rock splitter rotary drive system and the second rock splitter rotary drive system can drive the second rock splitter to rotate around its own axis. The second lifting mechanism is mounted on the frame and the second lifting mechanism can drive the second rock splitter rotary drive system and the second rock splitter to move up and down and be positioned as a whole.

6. The double-splitting mechanism according to claim 5, characterized in that, The second lifting mechanism includes a second hydraulic cylinder and a second sliding support. The second sliding support is slidably mounted on the frame. The second hydraulic cylinder is mounted on the frame and its extension and retraction ends are connected to the second sliding support. The second splitter rotation drive system is mounted on the second sliding support.

7. A drilling and splitting integrated machine, characterized in that, Including the double splitting mechanism according to claim 6, the drilling and splitting integrated machine also includes a drilling machine, which is disposed on the frame and distributed at intervals with the first splitting machine and the second splitting machine. The central axis of the drilling machine is on the same circumference as the central axis of the first splitting machine and the second splitting machine. The drilling machine can move up and down and be positioned on the frame.

8. The drilling and splitting integrated machine according to claim 7, characterized in that, in A third lifting mechanism is provided on the frame, which enables the drilling machine to move up and down and be positioned.

9. The drilling and splitting integrated machine according to claim 8, characterized in that, The third lifting mechanism includes a third hydraulic cylinder, a middle guide sprocket assembly, an upper guide sprocket, a lower guide sprocket, an upper transmission chain, a lower transmission chain, and a third sliding support. The third sliding support is slidably mounted on the frame. The third hydraulic cylinder is vertically mounted on the frame, and its base is connected to the frame. The middle guide sprocket assembly includes a fixed frame, an upper middle guide sprocket, and a lower middle guide sprocket. The fixed frame is fixedly mounted on the telescopic end of the third hydraulic cylinder. The upper middle guide sprocket and the lower middle guide sprocket are rotatably mounted on the fixed frame. The sprocket is rotatably mounted on the upper part of the frame, and the lower guide sprocket is rotatably mounted on the lower part of the frame. One end of the upper drive chain is fixedly connected to the third sliding support. The other end of the upper drive chain passes through the upper guide sprocket and the upper middle guide sprocket in sequence and is fixedly mounted near the upper guide sprocket. One end of the lower drive chain is fixedly mounted on the frame and adjacent to the cylinder of the third hydraulic cylinder. The other end of the lower drive chain passes through the lower middle guide sprocket and the lower guide sprocket in sequence and is fixedly connected to the third sliding support. The drilling machine is mounted on the third sliding support.

10. The drilling and splitting integrated machine according to claim 9, characterized in that, A positioning shaft is provided at the bottom of the frame, and the central axis of the positioning shaft is coaxial with the central axis of the rotary system.