A pipe laying device for electric power construction
Patent Information
- Application Number
- CN202522480547.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-24
- Publication Date
- 2026-10-30
- Estimated Expiration
- 2035-11-24
AI Technical Summary
[0005]本实用新型的目的在于提供一种电力施工用的管道铺设装置,能够解决现有技术中不方便调节方向和高度的技术问题
1、本实用新型通过安装有插栓,工作人员向上移动插栓,使两个插栓在外力的作用下能够移出其中两个圆孔的内侧,使两个插栓不再通过圆孔对圆盘进行固定,工作人员转动底座,使底座在外力的作用下能够带动圆盘和边块进行转动,使圆盘能够带动转块进行转动,同时,底座能够通过长壳带动加长杆进行转动,使工作人员能够将加长杆转动到合适角度,工作人员将两个插栓通过边块移进合适位置的两个圆孔的内侧对圆盘进行固定,工作人员拧动螺母,使螺母在螺杆的螺纹支撑下进行移动,使螺母能够移出螺杆的外侧,工作人员移动螺杆,使螺杆在外力的作用下能够移出长壳和其中一个通孔的内侧,使螺杆不再通过长壳和通孔对加长杆进行固定,工作人员向上移动加长杆到合适高度,将螺杆通过长壳插进合适位置的通孔的内侧对加长杆进行固定,将螺母拧紧在螺杆的外侧,工作人员在安装电力施工用的管道铺设装置时,该装置能够方便工作人员调节管道铺设装置的方向和角度,从而能够方便工作人员进行铺设工作。
Smart Images

Figure CN224919932U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the technical field of pipeline laying devices, specifically a pipeline laying device for power construction. Background Technology
[0002] Pipe laying devices are an essential part of power construction work. Workers use these devices to move sections of power pipes to suitable locations for laying. However, traditional devices are not perfect and lack convenient adjustment facilities, making them cumbersome. A new type of pipe laying device for power construction allows workers to easily adjust the direction and height of the pipe laying device.
[0003] Patent document: CN113690799B A pipeline laying auxiliary device for power construction, "including a moving mechanism, a support frame installed on the top of the moving mechanism, a lifting and tilting mechanism installed on the side of the support frame, a groove in the middle of the support frame, a support plate and a support mechanism installed inside the groove, one end of the support plate being rotatably mounted on the side wall of the groove, and the support mechanism being mounted on the bottom plate of the groove and cooperating with the other end of the support plate. The moving mechanism of this invention can drive the movement of the entire device, reducing the labor intensity of workers and improving work efficiency. The lifting and tilting mechanism can lift the pipeline from the ground and, with the cooperation of the support plate and the support mechanism, lay the pipeline into a pre-dug pit. This process can be completed by one person, greatly reducing the labor intensity of workers and improving work efficiency." The above-mentioned pipeline laying auxiliary device for power construction mainly considers the issue of greatly reducing the labor intensity of workers and improving work efficiency.
[0004] Existing pipeline laying equipment typically fixes the pipeline laying device to the ground at a suitable location, which makes it inconvenient for workers to adjust the pipeline laying device and reduces flexibility. Utility Model Content
[0005] The purpose of this utility model is to provide a pipeline laying device for power construction, which can solve the technical problem of inconvenience in adjusting direction and height in the prior art.
[0006] To achieve the above objectives, this utility model provides the following technical solution: a pipeline laying device for power construction, comprising a base plate, wherein a fixing plate is installed on the top of the base plate; The top of the fixed plate has ten circular holes. A rotating block is installed on the inner side of the fixed plate. A disc is installed on the top of the rotating block. A base is installed on the top of the disc. Side blocks are installed on both sides of the base. A long shell is installed on the top of the base. A screw is installed through the inside of the long shell. A nut is threaded on the outside of the screw and is located on one side of the long shell. An extension rod is installed on the inner side of the long shell.
[0007] Preferably, two long nails are installed through the interior of the base plate.
[0008] Preferably, the side block is internally fitted with a plug, and two plugs are located inside two of the circular holes.
[0009] Preferably, the extension rod has a set of through holes through its interior, and the screw is located inside one of the through holes.
[0010] Preferably, a round rod is installed through the interior of the two extension rods, the top of the round rod has an elongated groove, two limiting pieces are installed on the outer side of the round rod and the limiting pieces are located on one side of the extension rod, and a threaded sleeve is threaded on the outer side of the round rod and the threaded sleeve is located on the other side of the extension rod.
[0011] Preferably, two annular shells are installed on the outer side of the round rod, and the two annular shells are located between two limiting plates. Two support frames are installed on the inner side of the top wall of the annular shells, and short bolts are installed on the inner side of the support frames. Rollers are installed on the outer side of the short bolts, and the rollers are located on the inner side of the support frames. The support frames, short bolts, and rollers are located on the inner side of the long groove. A support plate is installed on one side of the annular shell, and a long rod is installed at the bottom of the support plate. A fixing block is installed at the bottom of the long rod, and a support shell is installed on one side of the fixing block.
[0012] Preferably, a side shell is installed on the top of the support plate on the left side, and a fastening bolt is threaded through the top of the side shell. A movable plate is installed on the inner side of the side shell, and the movable plate is located on the top of the support plate on the right side. A set of top grooves is opened on the top of the movable plate, and the fastening bolt is located on the inner side of one of the top grooves.
[0013] Compared with the prior art, the beneficial effects of this utility model are as follows: 1. This utility model utilizes a system with inserts. The operator moves the inserts upwards, causing them to move out of the inner sides of two circular holes under external force. This removes the inserts from securing the disc through the holes. The operator then rotates the base, causing the disc and side blocks to rotate under external force. Simultaneously, the base, through a long shell, drives an extension rod to rotate. The operator can then rotate the extension rod to a suitable angle, move the two inserts through the side blocks into the inner sides of the two circular holes at appropriate positions to secure the disc, and finally tighten the nuts. The screw is moved under the threaded support of the screw rod, allowing the nut to move out of the outside of the screw rod. The worker moves the screw rod so that it can move out of the inside of the long shell and one of the through holes under the action of external force, so that the screw rod is no longer fixed to the extension rod through the long shell and the through hole. The worker moves the extension rod upward to a suitable height, inserts the screw rod through the long shell into the inside of the appropriate position of the through hole to fix the extension rod, and tightens the nut on the outside of the screw rod. When the worker is installing the pipeline laying device for power construction, this device can make it easy for the worker to adjust the direction and angle of the pipeline laying device, thereby facilitating the worker to carry out the laying work.
[0014] 2. This utility model features a long rod. When a worker moves the long rod, it causes a ring shell to move along the rod via a support plate under external force. The ring shell, through a support frame and short bolts, moves rollers, causing them to roll due to friction against the inner side of the long groove under external force. Simultaneously, the long rod, under external force, can move a support shell via a fixed block, allowing the worker to easily move one support shell to a suitable position. Furthermore, under external force, the support plate, through a side shell, fastening bolts, and a movable plate, moves another support plate, allowing it to move under external force. The device moves its associated components, and the worker tightens the fastening bolt, causing it to move upward under the threaded support of the side shell, moving the fastening bolt out of the inner side of a top groove. The worker then moves another support shell to the appropriate position by moving the movable plate, and tightens the fastening bolt into the inner side of the top groove in the appropriate position to fix the movable plate. The worker moves the electrical conduit to the top of the support shell, and moves the electrical conduit to the appropriate position by moving the long rod. The worker then moves the electrical conduit to the appropriate position for laying. When installing the conduit laying device for power construction, this device can facilitate the worker to move the electrical conduit, reduce the worker's physical labor, and thus provide convenience for the worker. Attached Figure Description
[0015] Figure 1 This is a three-dimensional structural diagram of the present invention; Figure 2 This is a schematic diagram of the fixed disk structure of this utility model; Figure 3 This is a schematic diagram of the elongated shell structure of this utility model; Figure 4 This is a schematic diagram of the annular shell structure of this utility model; Figure 5 This is a schematic diagram of the movable plate structure of this utility model.
[0016] In the diagram: 1. Base plate; 2. Long nail; 3. Fixing plate; 4. Round hole; 5. Rotating block; 6. Disc; 7. Base; 8. Side block; 9. Bolt; 10. Long shell; 11. Screw; 12. Nut; 13. Extension rod; 14. Through hole; 15. Round rod; 16. Long groove; 17. Limiting piece; 18. Screw sleeve; 19. Ring shell; 20. Support frame; 21. Short bolt; 22. Roller; 23. Support plate; 24. Long rod; 25. Fixing block; 26. Support shell; 27. Side shell; 28. Fastening bolt; 29. Movable plate; 30. Top groove. Detailed Implementation
[0017] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present utility model.
[0018] In the description of this utility model, it should be noted that the terms "upper," "lower," "inner," "outer," "front end," "rear end," "both ends," "one end," and "the other end," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model. In addition, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.
[0019] In the description of this utility model, it should be noted that, unless otherwise explicitly specified and limited, the terms "installed," "equipped with," and "connected," etc., should be interpreted broadly. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be a connection within two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances.
[0020] Please see Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 A pipeline laying device for power construction; The system includes a base plate 1, with two long nails 2 driven through its interior. Workers drive the nails 2 into the ground through the base plate 1, securing it to the ground and providing support for associated components. A fixing plate 3 is mounted on the top of the base plate 1, with a rotating block 5 installed inside. The fixing plate 3, supported by the base plate 1, provides space for the circular hole 4. The rotating block 5 supports the rotation of the circular disc 6 under external force. A long shell 10 is mounted on the top of the base 7, providing support for associated components. Two extension rods 13 have round rods 15 driven through their interiors. The top of each round rod 15 has a long groove 16, and two limiting plates 17 are mounted on the outer side of each round rod 15, located on one side of the extension rod 13. A threaded sleeve is threaded onto the outer side of each round rod 15. 18, and the threaded sleeve 18 is located on the other side of the extension rod 13. The round rod 15 can provide support for its associated components. The long groove 16 can provide guidance for the movement of the support frame 20, the short bolt 21 and the roller 22. The limiting piece 17 can limit the round rod 15 under the fixed support of the round rod 15 through the extension rod 13. The threaded sleeve 18 can fix the round rod 15 by pressing the limiting piece 17 under the support of the extension rod 13. Two ring shells 19 are installed on the outer side of the round rod 15, and the two ring shells 19 are located between the two limiting pieces 17. The ring shells 19 can provide fixed support for the support plate 23 and the support frame 20. The top of the support plate 23 on the left side is equipped with a side shell 27. The side shell 27 can provide guidance for the movement of the movable plate 29 under the fixed support of the support plate 23 on the left side.
[0021] Please see Figure 1 , Figure 2 and Figure 3 A pipeline laying device for power construction; The system includes a fixed plate 3 with ten round holes 4 on its top; a rotating block 5 with a disc 6 on its top; a base 7 on its top; side blocks 8 on both sides of the base 7; and two plugs 9 inserted through the interior of each side block 8, with the two plugs 9 located inside two of the round holes 4. A screw 11 is inserted through the interior of a long shell 10, with a nut 12 threaded onto the outer side of the screw 11, located on one side of the long shell 10. An extension rod 13 is installed inside the long shell 10. A set of through holes 14 are provided inside the 13, and the screw 11 is located inside one of the through holes 14. The operator moves the plug 9 upward, so that the two plugs 9 can be moved out of the inside of the two round holes 4 under the action of external force, so that the two plugs 9 are no longer fixed to the disc 6 through the round holes 4. The operator rotates the base 7, so that the base 7 can drive the disc 6 and the side block 8 to rotate under the action of external force, so that the disc 6 can drive the rotating block 5 to rotate. At the same time, the base 7 can pass through the long shell 10. The extension rod 13 is rotated, allowing the worker to rotate it to a suitable angle. The worker then moves the two plugs 9 through the side block 8 into the inner side of the two round holes 4 at the appropriate position to fix the disc 6. The worker then tightens the nut 12, allowing it to move under the threaded support of the screw rod 11, so that the nut 12 can move out of the outer side of the screw rod 11. The worker then moves the screw rod 11, allowing it to move out of the inner side of the long shell 10 and one of the through holes 14 under the action of external force, so that the screw rod 11 is no longer fixed to the extension rod 13 through the long shell 10 and the through hole 14. The worker then moves the extension rod 13 upward to a suitable height, inserts the screw rod 11 through the long shell 10 into the inner side of the through hole 14 at the appropriate position to fix the extension rod 13, and tightens the nut 12 on the outer side of the screw rod 11. When installing the pipeline laying device for power construction, this device allows the worker to easily adjust the direction and angle of the pipeline laying device, thereby facilitating the laying work.
[0022] Please see Figure 1 , Figure 4 and Figure 5 A pipeline laying device for power construction; The system includes an annular shell 19. Two support frames 20 are installed on the inner side of the top wall of the annular shell 19. Short bolts 21 are installed on the inner side of the support frames 20, and rollers 22 are installed on the outer side of the short bolts 21, with the rollers 22 located inside the support frames 20. The support frames 20, short bolts 21, and rollers 22 are located inside the long groove 16. A support plate 23 is installed on one side of the annular shell 19. A long rod 24 is installed at the bottom of the support plate 23, and a fixing block 25 is installed at the bottom of the long rod 24. A support shell 26 is installed on one side of the fixing block 25. A fastening bolt 28 is threaded through the top of the side shell 27. A fastening bolt 28 is installed on the inner side of the side shell 27. A movable plate 29 is located on top of the right-side support plate 23. A set of top grooves 30 are formed on the top of the movable plate 29, and a fastening bolt 28 is located inside one of the top grooves 30. An operator moves a long rod 24, causing it to move a ring shell 19 along the round rod 15 via the support plate 23 under external force. The ring shell 19 then moves a roller 22 via the support frame 20 and short bolt 21. Under external force, the roller 22 rolls against the inner side of the long groove 16, allowing it to move along the inner side of the long groove 16. Simultaneously, a long rod 24, under the action of external force, can move a support shell 26 via a fixed block 25, allowing the operator to easily move the support shell 26 to a suitable position. At the same time, under the action of external force, a support plate 23, through a side shell 27, a fastening bolt 28, and a movable plate 29, moves another support plate 23, causing the other support plate 23 to move its associated components under the action of external force. The operator tightens the fastening bolt 28, causing it to move upwards under the threaded support of the side shell 27, dislodging the fastening bolt 28 from a top groove 3. Inside the 0, the worker moves another support shell 26 to a suitable position by moving the movable plate 29, and screws the fastening bolt 28 into the inside of the top groove 30 in the suitable position to fix the movable plate 29. The worker moves the electrical conduit to the top of the support shell 26, moves the electrical conduit to a suitable position by moving the long rod 24, and moves the electrical conduit to a suitable position for laying. When the worker is installing the conduit laying device for power construction, the device can facilitate the worker to move the electrical conduit, reduce the worker's physical labor, and thus provide the worker with convenient access.
[0023] Working principle: Before using the device, check for any issues that might affect its use. When the device is ready, move the two pipe laying devices to the appropriate position, drive the long nail 2 into the ground, move the plug 9 to rotate the base 7 and the extension rod 13 to the appropriate direction, move the plug 9 into the inner side of the round hole 4 in the appropriate position, insert the round rod 15 into the inner side of the two extension rods 13, screw on the nut 18, unscrew the nut 12 and pull out the screw 11, move the extension rod 13 to the appropriate height, insert the screw 11 through the long shell 10 into the inner side of the through hole 14 in the appropriate position, tighten the nut 12, turn the fastening bolt 28 to move the movable plate 29 to the appropriate position, screw the fastening bolt 28 into the inner side of the top groove 30 in the appropriate position, move the electrical conduit to the top of the support shell 26, move the electrical conduit to the appropriate position by moving the long rod 24, and then move the electrical conduit out of the support shell 26.
[0024] It will be apparent to those skilled in the art that this invention is not limited to the details of the exemplary embodiments described above, and that it can be implemented in other specific forms without departing from the spirit or essential characteristics of this invention. Therefore, the embodiments should be considered illustrative and non-limiting in all respects, and the scope of this invention is defined by the appended claims rather than the foregoing description. Thus, it is intended that all variations falling within the meaning and scope of equivalents of the claims be included within this invention. No reference numerals in the claims should be construed as limiting the scope of the claims.
Claims
1. A pipeline laying device for power construction, comprising a base plate (1), characterized in that: A fixing plate (3) is installed on the top of the base plate (1); The top of the fixed plate (3) has ten round holes (4). A rotating block (5) is installed on the inner side of the fixed plate (3). A disc (6) is installed on the top of the rotating block (5). A base (7) is installed on the top of the disc (6). Side blocks (8) are installed on both sides of the base (7). A long shell (10) is installed on the top of the base (7). A screw (11) is installed through the inside of the long shell (10). A nut (12) is installed on the outer thread of the screw (11), and the nut (12) is located on one side of the long shell (10). An extension rod (13) is installed on the inner side of the long shell (10).
2. The pipeline laying device for power construction according to claim 1, characterized in that: Two long nails (2) are installed through the interior of the base plate (1).
3. The pipeline laying device for power construction according to claim 1, characterized in that: The inside of the side block (8) is fitted with a plug (9), and the two plugs (9) are located inside the two round holes (4).
4. A pipeline laying device for power construction according to claim 1, characterized in that: The extension rod (13) has a set of through holes (14) inside, and the screw (11) is located inside one of the through holes (14).
5. A pipeline laying device for power construction according to claim 4, characterized in that: A round rod (15) is installed through the interior of the two extended rods (13). A long groove (16) is opened at the top of the round rod (15). Two limiting pieces (17) are installed on the outside of the round rod (15), and the limiting pieces (17) are located on one side of the extended rod (13). A threaded sleeve (18) is installed on the outside of the round rod (15), and the threaded sleeve (18) is located on the other side of the extended rod (13).
6. A pipeline laying device for power construction according to claim 5, characterized in that: Two annular shells (19) are installed on the outer side of the round rod (15), and the two annular shells (19) are located between two limiting plates (17). Two support frames (20) are installed on the inner side of the top wall of the annular shell (19), and short bolts (21) are installed on the inner side of the support frames (20). Rollers (22) are installed on the outer side of the short bolts (21), and the rollers (22) are located on the inner side of the support frames (20). The support frames (20), short bolts (21) and rollers (22) are located on the inner side of the long groove (16). A support plate (23) is installed on one side of the annular shell (19), and a long rod (24) is installed at the bottom of the support plate (23). A fixing block (25) is installed at the bottom of the long rod (24), and a support shell (26) is installed on one side of the fixing block (25).
7. A pipeline laying device for power construction according to claim 6, characterized in that: A side shell (27) is installed on the top of the support plate (23) on the left side. A fastening bolt (28) is threaded through the top of the side shell (27). A movable plate (29) is installed on the inner side of the side shell (27). The movable plate (29) is located on the top of the support plate (23) on the right side. A set of top grooves (30) are opened on the top of the movable plate (29), and the fastening bolt (28) is located on the inner side of one of the top grooves (30).