Cable installation adjusting frame for electric power engineering construction

CN224923290UActive Publication Date: 2026-10-30SHANDONG XINHAN CONSTRUCTION TECHNOLOGY CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202522559251.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-02
Publication Date
2026-10-30
Estimated Expiration
2035-12-02

AI Technical Summary

Technical Problem

[0004]但部分电缆安装会安装在井道和下水道的内部,电缆向井道的内部移动时电缆会与井道的内壁接触,造成摩擦会损伤电缆外层,该电力工程施工用电缆安装调节架在使用时仅能将电缆进行抬高,无法对向下方的电缆进行导向,降低了其实用性,为此,我们电力工程施工用电缆安装调节架

Benefits of technology

1、该电力工程施工用电缆安装调节架,通过第一伺服电机可以带动第一转动轴、主动齿轮和第二转动轴、从动齿轮运行,从而带动第一转动座转动,进而对横杆、安装杆和连接块、第四导向轮进行转动,从而根据需求调整连接块和第四导向轮的位置,在将电缆向高处安装时可以使调节杆升降调节的方向向上,在向井道的内部安装时,可以通过调节杆将连接块和第四导向轮下降于井道内部对电缆进行导向,从而避免或减少电缆与井道内壁的摩擦,减少对电缆外侧的磨损,提高了该电力工程施工用电缆安装调节架的实用性。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224923290U_ABST
    Figure CN224923290U_ABST
Patent Text Reader

Abstract

The utility model discloses a cable installation adjusting frame for electric power engineering construction relates to cable installation technical field, including base, the top fixed connection of base has the vertical rod, the outside of vertical rod is rotated and is connected with first rotating seat through the pivot, one side fixed connection of first rotating seat has the crosspiece, the utility model's beneficial effect is: through first servo motor can drive first rotating shaft, driving gear and second rotating shaft, driven gear operation, thereby drive first rotating seat rotation, and then to crosspiece, installation rod and connecting block, fourth guide pulley are rotated, thereby according to the position of demand adjustment connecting block and fourth guide pulley, when can make the direction of adjusting rod elevating adjustment upward when installing cable to high place, when installing to the inside of shaft, can through adjusting rod and connect block and fourth guide pulley inside the cable of shaft and guide to the cable in the inside of shaft, thereby avoid or reduce the friction of cable and shaft inner wall.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of cable installation technology, specifically to a cable installation adjustment frame for power engineering construction. Background Technology

[0002] A cable is a device for transmitting electrical energy or signals, typically consisting of several or groups of conductors. It is made of one or more mutually insulated conductors and an outer insulating protective layer, carrying electricity or information from one point to another. Cable installation often requires the use of cable mounting frames for installation.

[0003] Chinese patent application number 202320004645.7 discloses a cable installation adjustment frame for power engineering construction, including a support plate. Each of the four corners of the support plate is fixedly connected to a caster wheel. An adjustment mechanism is provided on the top of the support plate, and a positioning mechanism is provided on the top of the adjustment mechanism. Through the adjustment mechanism, under the elastic force of a first spring, two locking plates can be driven to move in opposite directions and engage with their respective corresponding slots, thus positioning the rectangular plate. This allows the height of the device to be adjusted according to the height of the cable, expanding the applicability of the device.

[0004] However, some cable installations are carried out inside shafts and sewers. When the cable moves into the shaft, it comes into contact with the inner wall of the shaft, causing friction that can damage the outer layer of the cable. The cable installation adjustment frame used in power engineering construction can only raise the cable and cannot guide the cable downwards, which reduces its practicality. Therefore, our cable installation adjustment frame for power engineering construction is designed to address this issue. Utility Model Content

[0005] To address the shortcomings of existing technologies, this utility model provides a cable installation adjustment frame for power engineering construction, which solves the problems mentioned in the background art.

[0006] To achieve the above objectives, this utility model provides the following technical solution: a cable installation adjustment frame for power engineering construction, comprising a base, a vertical pole fixedly connected to the top of the base, a first rotating seat rotatably connected to the outer side of the vertical pole via a rotating shaft, a horizontal bar fixedly connected to one side of the first rotating seat, an installation rod fixedly connected to one end of the horizontal bar, a transmission groove formed inside the vertical pole, a first rotating shaft rotatably connected inside the transmission groove via a bearing, a driving gear fixedly connected to the outer side of the first rotating shaft, a second rotating shaft rotatably connected inside the transmission groove via a bearing, a driven gear fixedly connected to the outer side of the second rotating shaft, the driving gear and the driven gear meshing with each other, and one end of the second rotating shaft fixedly connected to the first rotating seat.

[0007] Preferably, the mounting rod has an adjustment groove inside, and a threaded rod is rotatably connected inside the adjustment groove via a bearing. An adjustment rod is slidably connected inside the adjustment groove, and the threaded rod passes through the adjustment rod and cooperates with it. The threaded rod is driven to rotate by the second servo motor, thereby causing the adjustment rod to slide inside the adjustment groove, thereby adjusting the position of the connecting block and the fourth guide wheel.

[0008] Preferably, an electromechanical box is fixedly installed on the outside of the mounting rod, and a second servo motor is fixedly installed inside the electromechanical box. The output end of the second servo motor is fixedly connected to the threaded rod through a coupling.

[0009] Preferably, one end of the adjusting rod is fixedly connected to a connecting block, and the interior of the connecting block is rotatably connected to two corresponding fourth guide wheels via a rotating shaft. The outer side of the mounting rod is fixedly connected to a mounting arc block, and the interior of the mounting arc block is rotatably connected to two corresponding third guide wheels via a rotating shaft. The interior of the crossbar is provided with a second guide groove, and the interior of the second guide groove is rotatably connected to two corresponding second guide wheels via a rotating shaft. The interior of the upright is provided with a first internal groove, and the interior of the first internal groove is rotatably connected to four first guide wheels via a rotating shaft. The first guide wheels, second guide wheels, third guide wheels, and fourth guide wheels cooperate with each other, and the cable can be guided by the cooperation of multiple first guide wheels, second guide wheels, third guide wheels, and fourth guide wheels.

[0010] Preferably, an electromechanical box is fixedly installed on the outer side of the upright, and a first servo motor is fixedly installed inside the electromechanical box. The output end of the first servo motor is fixedly connected to the first rotating shaft through a coupling. The first servo motor can drive the first rotating shaft, the driving gear, the second rotating shaft, and the driven gear to run, thereby driving the first rotating seat to rotate, and then rotating the crossbar, the mounting rod, the connecting block, and the fourth guide wheel, thereby adjusting the position of the connecting block and the fourth guide wheel as needed.

[0011] Preferably, the base has a rotating insert rod rotatably connected inside via a rotating shaft, and an unwinding roller is sleeved on the outside of the rotating insert rod. The base has two corresponding insertion slots inside, and insertion blocks are inserted into the insertion slots. Side baffles are fixedly connected to the tops of the two insertion blocks, and the side baffles cooperate with the rotating insert rod and the unwinding roller.

[0012] Preferably, two corresponding guide rods are fixedly connected to the outside of the connecting block, the guide rods are slidably connected to the inside of the guide rod, a controller is provided on the top of the base, and a counterweight groove is provided inside the base.

[0013] This utility model provides a cable installation adjustment frame for power engineering construction, which has the following advantages: 1. This cable installation adjustment frame for power engineering construction uses a first servo motor to drive a first rotating shaft, a drive gear, a second rotating shaft, and a driven gear, thereby rotating a first rotating seat. This, in turn, rotates the crossbar, the mounting rod, the connecting block, and the fourth guide wheel. The position of the connecting block and the fourth guide wheel can be adjusted as needed. When installing cables at higher elevations, the adjustment rod can be raised upwards. When installing cables into the shaft, the adjustment rod can lower the connecting block and the fourth guide wheel into the shaft to guide the cable, thus avoiding or reducing friction between the cable and the shaft wall, reducing wear on the cable's outer surface, and improving the practicality of the cable installation adjustment frame for power engineering construction.

[0014] 2. The cable installation adjustment frame for power engineering construction uses a second servo motor to drive the threaded rod to rotate, thereby causing the adjustment rod to slide inside the adjustment groove, thus adjusting the position of the connecting block and the fourth guide wheel. Through the cooperation of multiple first guide wheels, second guide wheels, third guide wheels and fourth guide wheels, the cable can be guided, thereby ensuring the normal transmission of the cable and improving the practicality of the cable installation adjustment frame for power engineering construction. Attached Figure Description

[0015] Figure 1 This is a schematic diagram of the structure of this utility model; Figure 2 This is a schematic diagram of the internal structure of the upright of this utility model; Figure 3 This is a schematic diagram of the internal structure of the mounting rod of this utility model; Figure 4 This is a schematic diagram of the internal structure of the rotating insert of this utility model.

[0016] In the diagram: 1. Base; 2. Upright pole; 3. First internal groove; 4. First guide wheel; 5. First rotating seat; 6. Transmission groove; 7. First rotating shaft; 8. Drive gear; 9. Second rotating shaft; 10. Driven gear; 11. First servo motor; 12. Crossbar; 13. Second guide groove; 14. Second guide wheel; 15. Mounting rod; 16. Adjustment groove; 17. Threaded rod; 18. Adjustment rod; 19. Second servo motor; 20. Mounting arc block; 21. Third guide wheel; 22. Connecting block; 23. Fourth guide wheel; 24. Controller; 25. Guide rod; 26. Rotating insertion rod; 27. Unwinding roller; 28. Side baffle; 29. ​​Insertion block; 30. Insertion groove; 31. Counterweight groove. Detailed Implementation

[0017] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present utility model. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments.

[0018] Please see Figures 1 to 4 This utility model provides a technical solution: a cable installation adjustment frame for power engineering construction, including a base 1, a vertical rod 2 fixedly connected to the top of the base 1, a first rotating seat 5 rotatably connected to the outside of the vertical rod 2 via a rotating shaft, a crossbar 12 fixedly connected to one side of the first rotating seat 5, an installation rod 15 fixedly connected to one end of the crossbar 12, a transmission groove 6 opened inside the vertical rod 2, a first rotating shaft 7 rotatably connected inside the transmission groove 6 via a bearing, a driving gear 8 fixedly connected to the outside of the first rotating shaft 7, a second rotating shaft 9 rotatably connected inside the transmission groove 6 via a bearing, a driven gear 10 fixedly connected to the outside of the second rotating shaft 9, the driving gear 8 and the driven gear 10 meshing with each other, and one end of the second rotating shaft 9 fixedly connected to the first rotating seat 5; An adjustment groove 16 is provided inside the mounting rod 15. A threaded rod 17 is rotatably connected inside the adjustment groove 16 via a bearing. An adjustment rod 18 is slidably connected inside the adjustment groove 16. The threaded rod 17 passes through the adjustment rod 18 and cooperates with it. The threaded rod 17 is driven to rotate by the second servo motor 19, thereby causing the adjustment rod 18 to slide inside the adjustment groove 16, thereby adjusting the position of the connecting block 22 and the fourth guide wheel 23. An electromechanical box is fixedly installed on the outside of the mounting rod 15. A second servo motor 19 is fixedly installed inside the electromechanical box. The output end of the second servo motor 19 is fixedly connected to the threaded rod 17 through a coupling. One end of the adjusting rod 18 is fixedly connected to a connecting block 22. Inside the connecting block 22, two corresponding fourth guide wheels 23 are rotatably connected via a rotating shaft. The outer side of the mounting rod 15 is fixedly connected to a mounting arc block 20. Inside the mounting arc block 20, two corresponding third guide wheels 21 are rotatably connected via a rotating shaft. The inside of the crossbar 12 is provided with a second guide groove 13. Inside the second guide groove 13, two corresponding second guide wheels 14 are rotatably connected via a rotating shaft. Inside the upright rod 2 is provided with a first internal groove 3. Inside the first internal groove 3, four first guide wheels 4 are rotatably connected via a rotating shaft. The first guide wheels 4, second guide wheels 14, third guide wheels 21, and fourth guide wheels 23 cooperate with each other. Through the cooperation of multiple first guide wheels 4, second guide wheels 14, third guide wheels 21, and fourth guide wheels 23, the cable can be guided. An electromechanical box is fixedly installed on the outside of the upright 2. The first servo motor 11 is fixedly installed inside the electromechanical box. The output end of the first servo motor 11 is fixedly connected to the first rotating shaft 7 through a coupling. The first servo motor 11 can drive the first rotating shaft 7, the driving gear 8, the second rotating shaft 9, and the driven gear 10 to run, thereby driving the first rotating seat 5 to rotate, which in turn rotates the crossbar 12, the mounting rod 15, the connecting block 22, and the fourth guide wheel 23, thereby adjusting the position of the connecting block 22 and the fourth guide wheel 23 as needed. The base 1 has a rotating rod 26 rotatably connected inside via a rotating shaft. A unwinding roller 27 is sleeved on the outside of the rotating rod 26. The base 1 has two corresponding insertion slots 30. Insertion blocks 29 are inserted into the insertion slots 30. Side baffles 28 are fixedly connected to the top of the two insertion blocks 29. The side baffles 28 cooperate with the rotating rod 26 and the unwinding roller 27. Two corresponding guide rods 25 are fixedly connected to the outside of the connecting block 22. The guide rods 25 are slidably connected to the inside of the guide rods 25. A controller 24 is provided on the top of the base 1. A counterweight groove 31 is provided inside the base 1.

[0019] In summary, when using this cable installation adjustment frame for power engineering construction, the operator places the unwinding roller 27 onto the outside of the rotating rod 26. The unwinding roller 27 and the rotating rod 26 have mating slots and pins inside. The insertion block 29 is then inserted into the insertion slot 30, causing the side baffle 28 to limit the rotation rod 26 and the unwinding roller 27 on one side. The insertion block 29 is then fixed with bolts. The handwheel connected to one end of the rotating rod 26 allows rotation of both the rotating rod 26 and the unwinding roller 27. The counterweight slot 31 facilitates the placement of counterweights, and multiple universal self-locking wheels at the bottom of the base 1 facilitate the pushing of the cable installation adjustment frame. Power is then supplied to each mechanism. According to usage requirements, the controller 24 starts the first servo motor 11, driving the first rotating shaft 7, the drive gear 8, the second rotating shaft 9, and the driven gear 10, thereby rotating the first rotating seat 5 and thus the crossbar 12. The mounting rod 15, connecting block 22, and fourth guide wheel 23 are rotated to adjust their positions. When the cable is installed into the shaft, the extension direction of the adjusting rod 18 is adjusted downwards; when the cable is installed at a higher position, the extension direction of the adjusting rod 18 is adjusted upwards. Then, the controller 24 starts the second servo motor 19 to drive the threaded rod 17 to rotate, thereby causing the adjusting rod 18 to slide inside the adjusting groove 16, thus adjusting the position of the connecting block 22 and fourth guide wheel 23. When installing into the shaft, the cable is passed between multiple first guide wheels 4, third guide wheels 21, and fourth guide wheels 23 to guide the cable. When installing at a higher position, the cable is passed between multiple first guide wheels 4, second guide wheels 14, third guide wheels 21, and fourth guide wheels 23 to guide the cable. Each mechanism is regularly inspected to ensure its normal operation. Existing heat dissipation facilities such as heat dissipation holes are provided in the electromechanical box.

[0020] All standard parts used in this application can be purchased from the market, and can be customized according to the description and drawings. The specific connection methods of each part adopt conventional methods such as bolts, rivets, and welding that are mature in the prior art. The machinery, parts and equipment all adopt conventional models in the prior art. The installation methods between equipment are also the same as conventional installation methods in the prior art. For example, the two ends of the shaft-shaped parts are connected by bearings, the connection position of the valve component is provided with anti-leakage rubber strips, the outside of the threaded rod or screw is provided with dust cover, and the equipment can be driven by either built-in battery or external power supply. The control method is automatic control by a controller. The control circuit of the controller can be implemented by simple programming by those skilled in the art and is common knowledge in the field. Since this utility model is mainly used to protect mechanical devices, this utility model will not explain the control method and circuit connection in detail. The external controller mentioned in the specification can play a control role for the electrical components mentioned in this article, and the external controller is a conventional known device.

[0021] The above description is only a preferred embodiment of the present utility model, but the protection scope of the present utility model is not limited thereto. Any equivalent substitutions or changes made by those skilled in the art within the technical scope disclosed in the present utility model, based on the technical solution and the inventive concept of the present utility model, should be included within the protection scope of the present utility model.

Claims

1. A cable installation adjustment frame for power engineering construction, comprising a base (1), characterized in that: A vertical rod (2) is fixedly connected to the top of the base (1). A first rotating seat (5) is rotatably connected to the outside of the vertical rod (2) via a rotating shaft. A horizontal bar (12) is fixedly connected to one side of the first rotating seat (5). An installation rod (15) is fixedly connected to one end of the horizontal bar (12). A transmission groove (6) is opened inside the vertical rod (2). A first rotating shaft (7) is rotatably connected to the inside of the transmission groove (6) via a bearing. A drive gear (8) is fixedly connected to the outside of the first rotating shaft (7). A second rotating shaft (9) is rotatably connected to the inside of the transmission groove (6) via a bearing. A driven gear (10) is fixedly connected to the outside of the second rotating shaft (9). The drive gear (8) and the driven gear (10) mesh with each other. One end of the second rotating shaft (9) is fixedly connected to the first rotating seat (5).

2. The cable installation adjustment frame for power engineering construction according to claim 1, characterized in that: The mounting rod (15) has an adjustment groove (16) inside. A threaded rod (17) is rotatably connected inside the adjustment groove (16) via a bearing. An adjustment rod (18) is slidably connected inside the adjustment groove (16). The threaded rod (17) passes through the adjustment rod (18) and cooperates with it.

3. The cable installation adjustment frame for power engineering construction according to claim 1, characterized in that: An electromechanical box is fixedly installed on the outside of the mounting rod (15), and a second servo motor (19) is fixedly installed inside the electromechanical box. The output end of the second servo motor (19) is fixedly connected to the threaded rod (17) through a coupling.

4. A cable installation adjustment frame for power engineering construction according to claim 2, characterized in that: One end of the adjusting rod (18) is fixedly connected to a connecting block (22). The interior of the connecting block (22) is rotatably connected to two corresponding fourth guide wheels (23) via a rotating shaft. The outer side of the mounting rod (15) is fixedly connected to an mounting arc block (20). The interior of the mounting arc block (20) is rotatably connected to two corresponding third guide wheels (21) via a rotating shaft. The interior of the crossbar (12) is provided with a second guide groove (13). The interior of the second guide groove (13) is rotatably connected to two corresponding second guide wheels (14) via a rotating shaft. The interior of the upright rod (2) is provided with a first internal groove (3). The interior of the first internal groove (3) is rotatably connected to four first guide wheels (4) via a rotating shaft. The first guide wheels (4), second guide wheels (14), third guide wheels (21), and fourth guide wheels (23) cooperate with each other.

5. A cable installation adjustment frame for power engineering construction according to claim 1, characterized in that: An electromechanical box is fixedly installed on the outside of the pole (2), and a first servo motor (11) is fixedly installed inside the electromechanical box. The output end of the first servo motor (11) is fixedly connected to the first rotating shaft (7) through a coupling.

6. A cable installation adjustment frame for power engineering construction according to claim 1, characterized in that: The base (1) is rotatably connected to a rotating rod (26) via a rotating shaft. A unwinding roller (27) is sleeved on the outside of the rotating rod (26). The base (1) has two corresponding insertion slots (30). Insertion blocks (29) are inserted into the insertion slots (30). Side baffles (28) are fixedly connected to the top of the two insertion blocks (29). The side baffles (28) cooperate with the rotating rod (26) and the unwinding roller (27).

7. A cable installation adjustment frame for power engineering construction according to claim 4, characterized in that: Two corresponding guide rods (25) are fixedly connected to the outside of the connecting block (22). The guide rods (25) are slidably connected to the inside of the guide rods (25). A controller (24) is provided on the top of the base (1). A counterweight groove (31) is provided inside the base (1).

Citation Information

Patent Citations

  • Cable installation adjusting frame for electric power engineering construction

    CN219268319U