A tank assembly and combined dredging vehicle
By setting up an upper and lower connecting structure between the clean water tank and the sewage tank, the problems of complex manufacturing process and low corrosion resistance of the existing tank assembly are solved, which simplifies the assembly and makes the maintenance of the tank assembly more efficient, thereby improving the reliability and service life of the equipment.
Patent Information
- Application Number
- CN202522702153.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-19
- Publication Date
- 2026-11-06
- Estimated Expiration
- 2035-12-19
AI Technical Summary
Existing tank assemblies suffer from high manufacturing process requirements, low corrosion resistance, and difficulty in maintenance, which affect the reliability and service life of the equipment.
The clean water tank and the wastewater tank are connected and fixed by an upper connection structure and a lower connection structure, avoiding overall welding, enhancing corrosion resistance and simplifying the assembly process.
It improves the reliability and service life of the tank assembly, simplifies assembly and increases maintenance efficiency, and avoids dual corrosion from sewage and clean water.
Smart Images

Figure CN224943268U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of sanitation vehicle technology, and more specifically, to a tank assembly and a combined dredging vehicle. Background Technology
[0002] The combined dredging truck, also known as a sewer dredging truck, is a sanitation vehicle that integrates high-pressure cleaning and vacuum suction functions. It is widely used for dredging, cleaning, and sewage suction operations in urban sewers, rainwater wells, sedimentation wells, and ditches. This equipment typically consists of a chassis, tank assembly, high-pressure flushing system, vacuum suction system, hydraulic transmission system, and control system.
[0003] The tank assembly typically comprises a clean water tank and a wastewater tank, and is generally constructed using an integral welding process: two clean water tanks are symmetrically welded to both sides of the wastewater tank, with the outer wall of the wastewater tank simultaneously serving as the inner wall of the clean water tank. However, this structural design has the following technical drawbacks: First, it requires high precision in the welding process, making the tank anti-corrosion treatment difficult to implement; second, the wastewater tank wall must withstand the dual corrosion effects of internal wastewater and external clean water, significantly reducing the equipment's service life; furthermore, welding defects and leakage problems caused by long-term use are difficult to pinpoint accurately, affecting equipment maintenance efficiency.
[0004] In other words, existing tank assemblies suffer from high manufacturing process requirements, low corrosion resistance, and difficulty in maintenance, which seriously affect the reliability and service life of the tank assembly. Utility Model Content
[0005] The purpose of this utility model is to provide a tank assembly and a combined dredging vehicle, which is easy to maintain, simple to assemble, and not easily corroded, thereby improving the reliability and service life of the tank assembly.
[0006] The embodiments of this utility model are implemented as follows: In a first aspect, this utility model provides a tank assembly, comprising: A first clean water tank and a second clean water tank are provided, with the first clean water tank and the second clean water tank being arranged alternately. A wastewater tank, wherein the wastewater tank is disposed between the first clean water tank and the second clean water tank; Multiple upper connection structures are provided, wherein the upper part of the first clean water tank is connected to the upper part of the wastewater tank via at least one of the upper connection structures, and the upper part of the second clean water tank is connected to the upper part of the wastewater tank via at least one of the upper connection structures; and Multiple lower connection structures are provided, wherein the lower part of the first clean water tank is connected to the lower part of the sewage tank through at least one of the lower connection structures, and the lower part of the second clean water tank is connected to the lower part of the sewage tank through at least one of the lower connection structures.
[0007] In an optional embodiment, the upper connecting structure includes a first upper connecting frame, a second upper connecting frame, and a first fastener. The first upper connecting frame is disposed on the upper part of the first clean water tank or the second clean water tank, and the second upper connecting frame is disposed on the upper part of the wastewater tank. The first upper connecting frame is connected to the second upper connecting frame via the first fastener; and / or, The lower connection structure includes a first lower connection frame, a second lower connection frame, and a second fastener. The first lower connection frame is disposed at the lower part of the first clean water tank or the second clean water tank, and the second lower connection frame is disposed at the lower part of the sewage tank. The first lower connection frame is connected to the second lower connection frame through the second fastener.
[0008] In an optional embodiment, the upper connecting structure further includes a first reinforcing plate disposed on the upper part of the first water tank or the second water tank, and the first upper connecting frame disposed on the first reinforcing plate; and / or, The lower connecting structure further includes a second reinforcing plate, which is disposed at the lower part of the first water tank or the second water tank, and the first lower connecting frame is disposed on the second reinforcing plate.
[0009] In an optional embodiment, the first upper connecting frame overlaps the side of the second upper connecting frame away from the sewage tank; and / or, The first lower connecting frame overlaps the second lower connecting frame on the side near the sewage tank.
[0010] In an optional embodiment, the tank assembly further includes a constraint structure disposed circumferentially around the wastewater tank and at least partially surrounding the wastewater tank; both the upper connecting structure and the lower connecting structure are disposed on the constraint structure and are connected to the first clean water tank or the second clean water tank.
[0011] In an optional embodiment, the tank assembly further includes a connecting pipe, the two ends of which are respectively connected to the first clean water tank and the second clean water tank.
[0012] In an optional embodiment, the connecting pipe includes a first flexible hose, a second flexible hose, and a rigid pipe, wherein the first flexible hose, the rigid pipe, and the second flexible hose are connected in sequence, and the first flexible hose is connected to the first clean water tank, and the second flexible hose is connected to the second clean water tank.
[0013] Secondly, this utility model provides a combined dredging vehicle, including a chassis and a tank assembly as described in any of the foregoing embodiments, wherein the sewage tank is disposed on the chassis; The combined dredging vehicle also includes a high-pressure dredging reel system, a suction boom system, a high-pressure water system, a primary overflow prevention system, a secondary overflow prevention system, a vacuum suction system, and a centrifugal pump. The centrifugal pump is connected to the sewage tank and is used to discharge the sewage in the sewage tank. It can also operate simultaneously with the vacuum suction system.
[0014] In an optional embodiment, the combined dredging vehicle further includes a first toolbox, which is disposed on the chassis and located on the side of the first clean water tank near the sewage tank; and / or, The combined dredging vehicle also includes a second toolbox, which is mounted on the chassis and located on the side of the second clean water tank closer to the sewage tank; and / or, The combined dredging vehicle also includes a third toolbox, which is mounted on the chassis and located at the front end of the sewage tank; and / or, The combined dredging vehicle also includes an electrical control box, which is located at the rear end of the sewage tank.
[0015] In an optional embodiment, the third toolbox includes a third housing, a third tool door, and a third maintenance door, all of which are hinged to the third housing. The third housing includes a first movable frame, a second movable frame, and a fixed frame. The first movable frame and the second movable frame are movably connected to opposite sides of the fixed frame, and both the first movable frame and the second movable frame are connected to the tank assembly. The first movable frame and the second movable frame extend toward the first clean water tank and the second clean water tank, respectively, and a maintenance compartment is formed between the first movable frame, the second movable frame, the fixed frame, and the tank assembly.
[0016] In an optional embodiment, the combined dredging vehicle further includes a rear guardrail and a foot pedal, the rear guardrail being disposed at the rear end of the chassis and the foot pedal being disposed at the rear guardrail.
[0017] The beneficial effects of this utility model embodiment include: The tank assembly provided in this embodiment is connected and fixed by upper and lower connecting structures between the first clean water tank and the wastewater tank, and also between the second clean water tank and the wastewater tank. In other words, the first clean water tank, the second clean water tank, and the wastewater tank of this tank assembly are all independent tanks, without being integrally welded together, making overall assembly convenient and the installation process simple. Furthermore, the clean water tank and the wastewater tank do not share a wall panel, avoiding dual corrosion from wastewater and clean water, thus exhibiting strong corrosion resistance. Simultaneously, it facilitates the implementation of tank anti-corrosion treatment processes, resulting in high maintenance efficiency, thereby improving the reliability and service life of the tank assembly.
[0018] The combined dredging vehicle includes a tank assembly, which has all the beneficial effects of that tank assembly. Attached Figure Description
[0019] To more clearly illustrate the technical solutions of the embodiments of this utility model, the drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of this utility model and should not be regarded as a limitation on the scope. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.
[0020] Figure 1 A first-view structural schematic diagram of the combined dredging vehicle provided in an embodiment of this utility model; Figure 2 A second-view structural schematic diagram of the combined dredging vehicle provided in an embodiment of this utility model; Figure 3 A first-view structural schematic diagram of the tank assembly provided in an embodiment of this utility model; Figure 4 A second-view structural schematic diagram of the tank assembly provided in an embodiment of this utility model; Figure 5 A third-view structural schematic diagram of the tank assembly provided in an embodiment of this utility model; Figure 6 A fourth-view structural schematic diagram of the tank assembly provided in an embodiment of this utility model; Figure 7 A schematic diagram showing the connection between the first clean water tank, the upper connecting structure, and the sewage tank provided in this embodiment of the utility model; Figure 8 A schematic diagram showing the connection between the second clean water tank, the lower connecting structure, and the sewage tank provided in this embodiment of the utility model; Figure 9 Schematic diagrams of the first toolbox and the second toolbox provided in the embodiments of this utility model; Figure 10Cross-sectional views of the first toolbox and the second toolbox provided for embodiments of this utility model; Figure 11 A first-view structural schematic diagram of the third toolbox provided in an embodiment of this utility model; Figure 12 A second-view structural schematic diagram of the third toolbox provided in an embodiment of this utility model; Figure 13 A structural schematic diagram of the third toolbox provided in an embodiment of this utility model from a third perspective; Figure 14 A third-view structural schematic diagram of the combined dredging vehicle provided in an embodiment of this utility model; Figure 15 This is a schematic diagram of the taillight protection structure provided in an embodiment of the present utility model.
[0021] Icons: 1000 - Combined dredging vehicle; 100 - Tank assembly; 11 - First clean water tank; 12 - Second clean water tank; 20 - Sewage tank; 21 - Tank cover; 30 - Upper connecting structure; 31 - First upper connecting frame; 32 - Second upper connecting frame; 33 - First fastener; 34 - First reinforcing plate; 40 - Lower connecting structure; 41 - First lower connecting frame; 42 - Second lower connecting frame; 43 - Second fastener; 44 - Second reinforcing plate; 50 - Restraint structure; 60 - Connecting pipe; 61 - First flexible hose; 62 - Second flexible hose; 63 - Rigid pipe; 64 - Mounting bracket; 200 - Chassis; 301 - First toolbox; 3011 - First partition; 3012 - First compartment; 3013 - First tool door; 302 - Second toolbox; 3021 - Second partition; 3022 - Second compartment; 3023 - Second tool door; 303-Third Toolbox; 3031-Maintenance Compartment; 3032-Third Compartment; 3033-Third Tool Door; 3034-Maintenance Door; 3035-First Movable Shelf; 3036-Second Movable Shelf; 3037-Fixed Shelf; 304-Electrical Control Box; 401-Rear Guardrail; 402-Foot Pedal; 403-Taillight Protective Structure; 4031-Taillight Bracket; 4032-Taillight Protective Cover; 501- Arrow lights; 502-Tail lights; 503-Working flashing lights; 504-Working lights; 505-Long row of warning lights; 600-High-pressure sludge removal reel system; 601-Sludge removal reel; 602-Reel bracket; 700-Cabin; 801-Sludge suction boom system; 802-High-pressure water system; 803-Primary overflow prevention system; 804-Secondary overflow prevention system; 805-Vacuum sludge suction system; 806-Centrifugal pump. Detailed Implementation
[0022] To make the objectives, technical solutions, and advantages of the embodiments of this utility model clearer, the technical solutions of the embodiments of this utility model will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this utility model, and not all embodiments. The components of the embodiments of this utility model described and shown in the accompanying drawings can generally be arranged and designed in various different configurations.
[0023] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely to illustrate selected embodiments of the invention. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without inventive effort are within the scope of protection of the present invention.
[0024] It should be noted that similar labels and letters in the following figures indicate similar items. Therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures.
[0025] In the description of this utility model, it should be noted that the terms "center," "upper," "lower," "left," "right," "vertical," "horizontal," "inner," and "outer," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship commonly used when the product of this utility model is in use. They are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model. In addition, the terms "first," "second," and "third," etc., are only used to distinguish descriptions and should not be construed as indicating or implying relative importance.
[0026] Furthermore, terms such as "horizontal" and "vertical" do not imply that components must be absolutely horizontal or suspended, but rather that they can be slightly tilted. For example, "horizontal" simply means that its direction is more horizontal than "vertical," and does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0027] In the description of this utility model, it should also be noted that, unless otherwise explicitly specified and limited, the terms "set," "install," "connect," and "link" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances.
[0028] As described in the background section, existing tank assemblies suffer from high manufacturing process requirements, low corrosion resistance, and difficulty in maintenance, severely impacting their reliability and service life. Specifically, the clean water and wastewater tanks in these assemblies are typically manufactured using an integral welding process, where two clean water tanks are symmetrically welded to both sides of the wastewater tank, with the outer wall of the wastewater tank simultaneously serving as the inner wall of the clean water tank. However, this method demands high precision in the welding process, making anti-corrosion treatment difficult. Secondly, the wastewater tank wall must withstand the dual corrosion from both internal wastewater and external clean water, significantly reducing the equipment's lifespan. Furthermore, welding defects and leaks caused by long-term use are difficult to pinpoint accurately, affecting equipment maintenance efficiency.
[0029] Based on this, please refer to Figures 1-15 The present invention provides a tank assembly 100 and a combined dredging vehicle 1000, which can effectively improve the aforementioned technical problems. Specifically, it is easy to maintain, simple to assemble, and not easily corroded, thus improving the reliability and service life of the tank assembly 100. The tank assembly 100 and the combined dredging vehicle 1000 will be described in detail below.
[0030] Please refer to Figure 1 and Figure 2 , Figure 1 This is a first-view structural schematic diagram of the combined dredging vehicle 1000 provided in this embodiment. Figure 2 This is a second-view structural schematic diagram of the combined dredging vehicle 1000 provided in this embodiment. (Combined with...) Figure 1 and Figure 2 The combined dredging vehicle 1000 includes a tank assembly 100 and a chassis 200, with the tank assembly 100 mounted on the chassis 200.
[0031] For details, please refer to Figure 3 and Figure 4 , Figure 3 This is a first-view structural schematic diagram of the tank assembly 100 provided in this embodiment. Figure 4 This is a second-view structural schematic diagram of the tank assembly 100 provided in this embodiment. (Combined with...) Figure 3 and Figure 4The tank assembly 100 includes a first clean water tank 11, a second clean water tank 12, a wastewater tank 20, multiple upper connecting structures 30, and multiple lower connecting structures 40. The first clean water tank 11 and the second clean water tank 12 are spaced apart, and the wastewater tank 20 is disposed between the first clean water tank 11 and the second clean water tank 12. The upper part of the first clean water tank 11 is connected to the upper part of the wastewater tank 20 through at least one upper connecting structure 30, and the upper part of the second clean water tank 12 is connected to the upper part of the wastewater tank 20 through at least one upper connecting structure 30. The lower part of the first clean water tank 11 is connected to the lower part of the wastewater tank 20 through at least one lower connecting structure 40, and the lower part of the second clean water tank 12 is connected to the lower part of the wastewater tank 20 through at least one lower connecting structure 40.
[0032] As is easily understood, the first clean water tank 11 and the sewage tank 20 are connected and fixed together by an upper connecting structure 30 and a lower connecting structure 40, and the second clean water tank 12 and the sewage tank 20 are also connected and fixed together by an upper connecting structure 30 and a lower connecting structure 40. In other words, the first clean water tank 11, the second clean water tank 12, and the sewage tank 20 of the tank assembly 100 are all independent tanks, without being integrally welded together, making overall assembly convenient and the installation process simple. Furthermore, the clean water tank and the sewage tank 20 do not share a wall panel, thus avoiding dual corrosion from sewage and clean water, resulting in strong corrosion resistance. At the same time, it also facilitates the implementation of tank anti-corrosion treatment processes, leading to high maintenance efficiency, thereby improving the reliability and service life of the tank assembly 100.
[0033] Combination Figures 1-4 Furthermore, the combined dredging vehicle 1000 also includes a high-pressure dredging reel system 600, a suction boom system 801, a high-pressure water system 802, a primary overflow prevention system 803, a secondary overflow prevention system 804, a vacuum suction system 805, and a centrifugal pump 806. The centrifugal pump 806 is connected to the sewage tank 20 and is used to discharge the sewage in the sewage tank 20. It can also operate simultaneously with the vacuum suction system 805.
[0034] Understandably, in this embodiment, the suction boom system 801, the high-pressure water system 802, the primary overflow prevention system 803, the secondary overflow prevention system 804, and the vacuum suction system 805 are all connected to the tank assembly 100.
[0035] It should be noted that, in order to improve the connection stability between the first clean water tank 11 and the second clean water tank 12 and the sewage tank 20, the number of upper connection structures 30 and lower connection structures 40 between the first clean water tank 11 and the sewage tank 20 can be multiple, and the number of upper connection structures 30 and lower connection structures 40 between the second clean water tank 12 and the sewage tank 20 can also be multiple.
[0036] For example, please refer to Figure 5 and Figure 6 , Figure 5 This is a third-view structural schematic diagram of the tank assembly 100 provided in this embodiment. Figure 6 This is a fourth-view structural schematic diagram of the tank assembly 100 provided in this embodiment. (Combined with...) Figure 5 and Figure 6 In this embodiment, there are six upper connecting structures 30 and six lower connecting structures 40. Furthermore, there are three upper connecting structures 30 and three lower connecting structures 40 between the first clean water tank 11 and the sewage tank 20, and three upper connecting structures 30 and three lower connecting structures 40 between the second clean water tank 12 and the sewage tank 20. This symmetrical arrangement ensures that the installation forces on the first clean water tank 11 and the second clean water tank 12 on opposite sides of the sewage tank 20 are balanced, thereby improving the stability of the combined dredging vehicle 1000 during travel and operation.
[0037] Of course, in other embodiments, the number of upper connecting structures 30 and lower connecting structures 40 between the first clean water tank 11 and the sewage tank 20 can also be one, two, or four, etc.; similarly, the number of upper connecting structures 30 and lower connecting structures 40 between the second clean water tank 12 and the sewage tank 20 can also be one, two, or four, etc.
[0038] Furthermore, in order to improve the overall structural strength of the sewage tank 20, the tank assembly 100 also includes a constraint structure 50, which is disposed around the sewage tank 20 and at least partially surrounds the sewage tank 20; the upper connecting structure 30 and the lower connecting structure 40 are both disposed on the constraint structure 50 and are both connected to the first clean water tank 11 or the second clean water tank 12.
[0039] As is easily understood, the constraint structure 50 can also provide installation points for the upper connecting structure 30 and the lower connecting structure 40, which facilitates the installation and fixing of the two, and to a certain extent improves the installation stability of the upper connecting structure 30 and the lower connecting structure 40, while also improving assembly efficiency.
[0040] It should be noted that in this embodiment, the constraint structure 50 is specifically a U-shaped clamp structure with the opening facing upwards. That is, the constraint structure 50 is set around the circumference of the sewage tank 20, extending from the lower part of the sewage tank 20 to the upper part, and the two ends of the constraint structure 50 are not connected at the upper part of the sewage tank 20. The purpose of this setting is that, firstly, according to actual operation, the water in the tank will not be full, so there is no need to reinforce the top; secondly, the negative pressure of the entire hollow tank is mainly concentrated in the middle position, so it is sufficient to reinforce the lower middle part of the tank; thirdly, the top of the sewage tank 20 is usually equipped with an overflow valve and other structures. If the constraint structure 50 is extended to the top of the tank, it will occupy the top space and easily interfere with other components; in addition, this U-shaped clamp structure can also improve the overall aesthetics of the tank assembly 100.
[0041] Combination Figure 5 and Figure 6 It should also be noted that, specifically in this embodiment, the number of constraint structures 50 is three, and each constraint structure 50 is provided with two upper connecting structures 30 and two lower connecting structures 40. Of course, in other embodiments, the number of constraint structures 50 can also be one, two, or four, etc.
[0042] Combination Figures 3-6 The tank assembly 100 also includes a connecting pipe 60, with its two ends connected to the first clean water tank 11 and the second clean water tank 12, respectively. By connecting the first clean water tank 11 and the second clean water tank 12, the clean water inside both tanks can flow between them. During operation, the combined cleaning truck 1000 ensures that the water levels in the first clean water tank 11 and the second clean water tank 12 remain consistent, thus maintaining equal weight on both sides of the vehicle and improving stability and safety. Furthermore, the connecting pipe 60 balances the air pressure inside the first clean water tank 11 and the second clean water tank 12, resulting in smoother water flow and improving cleaning efficiency to some extent.
[0043] It should be noted that, in this embodiment, the connecting pipe 60 is specifically located below the sewage tank 20 and near the front end of the sewage tank 20. This avoids interference between the connecting pipe 60 and other components above the tank assembly 100, and also avoids interference between the connecting pipe 60 and components located at the rear end of the tank assembly 100, saving installation space and facilitating the installation and subsequent maintenance and replacement of the connecting pipe 60.
[0044] Please continue to combine Figure 3Specifically, the connecting pipe 60 includes a first flexible hose 61, a second flexible hose 62, and a rigid pipe 63. The first flexible hose 61, the rigid pipe 63, and the second flexible hose 62 are connected in sequence, and the first flexible hose 61 is connected to the first clean water tank 11, and the second flexible hose 62 is connected to the second clean water tank 12.
[0045] Understandably, the first hose 61 and the second hose 62 are flexible and adaptable, facilitating easy installation and connection with the first water tank 11 and the second water tank 12, thus improving assembly efficiency. Furthermore, the rigid pipe 63 ensures the overall structural strength of the connecting pipe 60, preventing it from swaying during vehicle operation or work.
[0046] Furthermore, in order to improve the installation stability of the rigid pipe 63, in this embodiment, the connecting pipe 60 also includes a mounting bracket 64, which is disposed on the sewage tank 20 and fixedly connected to the rigid pipe 63.
[0047] It should be noted that there can be multiple mounting brackets 64, which are spaced apart. For example, in this embodiment, there are two mounting brackets 64. Of course, in other embodiments, there can be one, three, or four mounting brackets 64, etc.
[0048] Please refer to Figure 7 , Figure 7 This is a schematic diagram showing the connection between the first clean water tank 11, the upper connecting structure 30, and the sewage tank 20 provided in this embodiment, in conjunction with... Figure 3 and Figure 7 Specifically, the upper connecting structure 30 includes a first upper connecting frame 31, a second upper connecting frame 32, and a first fastener 33. The first upper connecting frame 31 is disposed on the upper part of the first clean water tank 11 or the second clean water tank 12, and the second upper connecting frame 32 is disposed on the upper part of the sewage tank 20. The first upper connecting frame 31 is connected to the second upper connecting frame 32 through the first fastener 33.
[0049] In other words, during the actual assembly process, the first upper connecting frame 31 can be welded to the upper part of the first clean water tank 11 or the second clean water tank 12, and the second upper connecting frame 32 can be welded to the upper part of the sewage tank 20. Then, the first upper connecting frame 31 and the second upper connecting frame 32 can be overlapped and locked and fixed using the first fastener 33, making the assembly convenient and quick.
[0050] Please refer to Figure 8 , Figure 8 This is a schematic diagram showing the connection between the second clean water tank 12, the lower connecting structure 40, and the sewage tank 20 provided in this embodiment, in conjunction with... Figure 3 and Figure 8Specifically, the lower connecting structure 40 includes a first lower connecting frame 41, a second lower connecting frame 42, and a second fastener 43. The first lower connecting frame 41 is disposed at the lower part of the first clean water tank 11 or the second clean water tank 12, and the second lower connecting frame 42 is disposed at the lower part of the sewage tank 20. The first lower connecting frame 41 is connected to the second lower connecting frame 42 by the second fastener 43. Through the cooperation of the first lower connecting frame 41, the second lower connecting frame 42, and the second fastener 43, the assembly efficiency between the clean water tank and the sewage tank 20 can also be improved.
[0051] Combination Figure 7 and Figure 8 It should be noted that, specifically in this embodiment, both the second upper connecting frame 32 and the second lower connecting frame 42 are disposed on the constraint structure 50.
[0052] Furthermore, in order to improve the installation stability of the first upper connecting frame 31, the upper connecting structure 30 also includes a first reinforcing plate 34, which is disposed on the upper part of the first clean water tank 11 or the second clean water tank 12, and the first upper connecting frame 31 is disposed on the first reinforcing plate 34.
[0053] Similarly, in order to improve the installation stability of the first lower connecting frame 41, the lower connecting structure 40 also includes a second reinforcing plate 44, which is disposed at the lower part of the first clean water tank 11 or the second clean water tank 12, and the first lower connecting frame 41 is disposed on the second reinforcing plate 44.
[0054] It should be noted that, in this embodiment, the first reinforcing plate 34 and the second reinforcing plate 44 are connected and fixed to the first clean water tank 11 or the second clean water tank 12 by welding, and both the first reinforcing plate 34 and the second reinforcing plate 44 are L-shaped reinforcing plates, which can increase the welding area and further improve the connection strength between the first clean water tank 11 or the second clean water tank 12 and the sewage tank 20.
[0055] To facilitate assembly and improve the installation stability between the clean water tank and the sewage tank 20, in this embodiment, the first upper connecting frame 31 overlaps the side of the second upper connecting frame 32 away from the sewage tank 20, and the first lower connecting frame 41 overlaps the side of the second lower connecting frame 42 close to the sewage tank 20.
[0056] In other words, the installation positions of the first upper connecting frame 31 and the second upper connecting frame 32 between the first clean water tank 11 and the sewage tank 20, or between the second clean water tank 12 and the sewage tank 20, are actually misaligned with the installation positions of the first lower connecting frame 41 and the second lower connecting frame 42. When assembling the first clean water tank 11 or the second clean water tank 12 with the sewage tank 20, the first upper connecting frame 31 can overlap the second upper connecting frame 32, and the first lower connecting frame 41 can also overlap the second lower connecting frame 42, thereby ensuring that the first clean water tank 11 or the second clean water tank 12 can be stably aligned with the sewage tank 20 first, and then connected and fixed by the first fastener 33 or the second fastener 43.
[0057] Please continue to combine Figure 1 In order to facilitate the storage of working tools, the combined dredging vehicle 1000 also includes a first toolbox 301, which is located on the chassis 200 and on the side of the first clean water tank 11 near the sewage tank 20.
[0058] Combination Figure 2 Similarly, the combined dredging vehicle 1000 also includes a second toolbox 302, which is located on the chassis 200 and on the side of the second clean water tank 12 near the sewage tank 20.
[0059] That is, in this embodiment, toolboxes are provided on both sides of the sewage tank 20, and the first toolbox 301 and the second toolbox 302 can also be understood as left and right toolboxes.
[0060] It should be noted that the first toolbox 301 and the second toolbox 302 are located below the first water tank 11 and the second water tank 12, respectively, and are flush with the outer sides of the first toolbox 301 and the second toolbox 302, thereby ensuring the overall coordination and aesthetics of the vehicle.
[0061] For details, please refer to Figure 9 and Figure 10 , Figure 9 This is a schematic diagram of the structure of the first toolbox 301 and the second toolbox 302 provided in this embodiment. Figure 10 Cross-sectional views of the first toolbox 301 and the second toolbox 302 provided in this embodiment. (In conjunction with...) Figure 9 and Figure 10 The first toolbox 301 includes a first box body and a first tool door 3013, the first tool door 3013 being hinged to the first box body; the second toolbox 302 includes a second box body and a second tool door 3023, the second tool door 3023 being hinged to the second box body.
[0062] It should be noted that, in this embodiment, since both the first toolbox 301 and the second toolbox 302 are long and narrow toolboxes, in order to facilitate opening and closing the tool doors, both the first tool door 3013 and the second tool door 3023 are flip-top tool doors, that is, they are opened by flipping up and closed by flipping down.
[0063] Combination Figure 10 Furthermore, the first toolbox 301 also includes a first partition 3011, which is disposed within the first box body and is used to divide the internal space of the first box body into multiple first compartments 3012 for convenient storage of different types of tools. Similarly, the second toolbox 302 also includes a second partition 3021, which is disposed within the second box body and is used to divide the internal space of the second box body into multiple second compartments 3022.
[0064] Please continue to combine Figure 1 and Figure 2 The combined dredging vehicle 1000 also includes a third toolbox 303, which is located on the chassis 200 and at the front end of the sewage tank 20.
[0065] In this embodiment, the combined dredging vehicle 1000 also includes a driver's cab 700, which is disposed on the chassis 200 and spaced apart from the sewage tank 20. The third toolbox 303 is located between the sewage tank 20 and the driver's cab 700. That is to say, the third toolbox 303 can be understood as the front toolbox.
[0066] For details, please refer to Figures 11-13 , Figure 11 This is a first-view structural diagram of the third toolbox 303 provided in this embodiment. Figure 12 This is a structural schematic diagram of the third toolbox 303 provided in this embodiment from a second perspective. Figure 13 This is a structural schematic diagram of the third toolbox 303 provided in this embodiment from a third-view perspective.
[0067] Combination Figures 11-13 The third toolbox 303 includes a third box body, a third tool door 3033, and a third maintenance door 3034, both of which are hinged to the third box body. Specifically, the third box body has a third compartment 3032 and a maintenance compartment 3031. The third compartment 3032 can be understood as a tool compartment, the third tool door 3033 is located in the third compartment 3032, and the maintenance door 3034 is located in the maintenance compartment 3031. By providing the maintenance compartment 3031 and the tool compartment, tools can be conveniently stored, and workers can easily enter the maintenance compartment 3031 through the maintenance door 3034 to perform maintenance work.
[0068] Combination Figure 1 , Figure 12and Figure 13 It should be noted that the maintenance compartment 3031 is located close to the tank assembly 100, which facilitates the placement of relevant components in the combined dredging vehicle 1000 that are connected to the tank assembly 100, such as the hydraulic valve assembly and the anti-overflow valve assembly, inside the maintenance compartment 3031. This not only protects the components but also facilitates future maintenance work through the maintenance door 3034, thereby improving maintenance efficiency.
[0069] Specifically, the third box of the third toolbox 303 includes a first movable frame 3035, a second movable frame 3036, and a fixed frame 3037. The first movable frame 3035 and the second movable frame 3036 are movably connected to opposite sides of the fixed frame 3037, and both the first movable frame 3035 and the second movable frame 3036 are connected to the tank assembly 100. The first movable frame 3035 and the second movable frame 3036 extend toward the first clean water tank 11 and the second clean water tank 12, respectively, and a maintenance compartment 3031 is formed between the first movable frame 3035, the second movable frame 3036, the fixed frame 3037, and the tank assembly 100.
[0070] By engaging the first movable frame 3035 and the second movable frame 3036 with the fixed frame 3037, the installation positions of the first movable frame 3035 and the second movable frame 3036 relative to the fixed frame 3037 can be adjusted during the assembly of the third toolbox 303. This can also be understood as adjusting the width of the overall frame to ensure that the first movable frame 3035 and the second movable frame 3036 are flush with the outer sides of the first water tank 11 and the second water tank 12, respectively, thereby ensuring the overall aesthetics of the vehicle.
[0071] Please continue to combine Figure 1 The combined dredging vehicle 1000 also includes a rear guardrail 401 and a foot pedal 402. The rear guardrail 401 is located at the rear end of the chassis 200, and the foot pedal 402 is located on the rear guardrail 401. By placing the foot pedal 402 on the rear guardrail 401, it is convenient for workers to get on and off the vehicle when performing vehicle maintenance, thus improving maintenance convenience.
[0072] Please refer to Figure 14 , Figure 14 This is a third-view structural diagram of the combined dredging vehicle 1000 provided in this embodiment. Figure 3 and combination Figure 14 The combined dredging vehicle 1000 also includes an electrical control box 304, which is located at the rear of the sewage tank 20. In other words, the electrical control box 304 is specifically located at the rear of the vehicle and can cooperate with the foot pedal 402 and the rear guardrail 401 to facilitate the operation of the electrical control box 304 to control the tank assembly 100, hydraulic system, flushing system, or suction system, etc., for corresponding sanitation operations.
[0073] Specifically, in this embodiment, a tank cover 21 is provided at the rear end of the sewage tank 20, and the high-pressure unblocking reel system 600 also includes a reel bracket 602. The reel bracket 602 is located on the tank cover 21, and the electrical control box 304 is located below the reel bracket 602, which facilitates the installation and fixing of the electrical control box 304 and also makes it easier for staff to operate.
[0074] Please continue to combine Figure 14 In order to provide safety warnings during vehicle operation, in this embodiment, the combined dredging vehicle 1000 also includes arrow lights 501. Arrow lights 501 are provided at the rear ends of the first toolbox 301 and the second toolbox 302, and the arrows of the two arrow lights 501 are in opposite directions.
[0075] Furthermore, the high-pressure unclogging reel system 600 also includes an unclogging reel 601, and the combined unclogging vehicle 1000 also includes a working flashing light 503 and a working light 504. The unclogging reel 601 is mounted on the tank cover 21, and the working flashing light 503 and the working light 504 are spaced apart on the unclogging reel 601.
[0076] Combination Figure 1 and Figure 2 The joint dredging vehicle 1000 also includes a long row of warning lights 505, which are mounted on the driver's cab 700.
[0077] In addition, combined Figure 14 The combined dredging vehicle 1000 also includes a taillight 502, which is located at the rear end of the chassis 200. To protect the taillight 502, the combined dredging vehicle 1000 also includes a taillight protection structure 403, which is fixed to the rear end of the chassis 200 and covers the taillight 502.
[0078] For details, please refer to Figure 15 , Figure 15 This is a schematic diagram of the taillight protection structure 403 provided in this embodiment, combined with... Figure 14 and Figure 15 The taillight protection structure 403 includes a taillight bracket 4031 and a taillight protective cover 4032. The taillight bracket 4031 is located at the rear end of the chassis 200, and the taillight protective cover 4032 is located on the taillight bracket 4031 and covers the taillight 502.
[0079] In summary, the embodiments of this utility model provide a tank assembly 100 and a combined dredging vehicle 1000. The tank assembly 100 includes a first clean water tank 11, a second clean water tank 12, a sewage tank 20, a plurality of upper connecting structures 30, and a plurality of lower connecting structures 40. The first clean water tank 11 and the second clean water tank 12 are spaced apart, and the sewage tank 20 is disposed between the first clean water tank 11 and the second clean water tank 12. The upper part of the first clean water tank 11 is connected to the upper part of the sewage tank 20 through at least one upper connecting structure 30, and the upper part of the second clean water tank 12 is connected to the upper part of the sewage tank 20 through at least one upper connecting structure 30. The lower part of the first clean water tank 11 is connected to the lower part of the sewage tank 20 through at least one lower connecting structure 40, and the lower part of the second clean water tank 12 is connected to the lower part of the sewage tank 20 through at least one lower connecting structure 40. In other words, the first clean water tank 11, the second clean water tank 12, and the sewage tank 20 of the tank assembly 100 are all independent tanks, and they are not welded together. Instead, they are connected and fixed by the upper connecting structure 30 and the lower connecting structure 40, which makes the overall assembly convenient and the installation process simple. Furthermore, the clean water tank and the sewage tank 20 do not share a wall plate, so they are not subject to dual corrosion from sewage and clean water, and have strong corrosion resistance. At the same time, it is also convenient to carry out anti-corrosion treatment of the tank, resulting in high maintenance efficiency, thereby improving the reliability and service life of the tank assembly 100.
[0080] The combined dredging vehicle 1000 includes a tank assembly 100, which has all the functions and benefits of the tank assembly 100.
[0081] The above description is merely a specific embodiment of this utility model and is not intended to limit the utility model. Various modifications and variations can be made to this utility model by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this utility model should be included within the protection scope of this utility model.
Claims
1. A tank assembly, characterized in that, include: A first clean water tank (11) and a second clean water tank (12) are provided at intervals; Wastewater tank (20), wherein the wastewater tank (20) is disposed between the first clean water tank (11) and the second clean water tank (12); Multiple upper connecting structures (30), the upper part of the first clean water tank (11) is connected to the upper part of the sewage tank (20) through at least one of the upper connecting structures (30), and the upper part of the second clean water tank (12) is connected to the upper part of the sewage tank (20) through at least one of the upper connecting structures (30); and Multiple lower connecting structures (40) are provided, wherein the lower part of the first clean water tank (11) is connected to the lower part of the sewage tank (20) through at least one of the lower connecting structures (40), and the lower part of the second clean water tank (12) is connected to the lower part of the sewage tank (20) through at least one of the lower connecting structures (40).
2. The tank assembly according to claim 1, characterized in that, The upper connecting structure (30) includes a first upper connecting frame (31), a second upper connecting frame (32), and a first fastener (33). The first upper connecting frame (31) is disposed on the upper part of the first clean water tank (11) or the second clean water tank (12), and the second upper connecting frame (32) is disposed on the upper part of the sewage tank (20). The first upper connecting frame (31) is connected to the second upper connecting frame (32) through the first fastener (33); and / or, The lower connecting structure (40) includes a first lower connecting frame (41), a second lower connecting frame (42), and a second fastener (43). The first lower connecting frame (41) is disposed at the lower part of the first clean water tank (11) or the second clean water tank (12), and the second lower connecting frame (42) is disposed at the lower part of the sewage tank (20). The first lower connecting frame (41) is connected to the second lower connecting frame (42) through the second fastener (43).
3. The tank assembly according to claim 2, characterized in that, The upper connecting structure (30) further includes a first reinforcing plate (34), which is disposed on the upper part of the first clean water tank (11) or the second clean water tank (12), and the first upper connecting frame (31) is disposed on the first reinforcing plate (34); and / or, The lower connecting structure (40) further includes a second reinforcing plate (44), which is disposed at the lower part of the first water tank (11) or the second water tank (12), and the first lower connecting frame (41) is disposed on the second reinforcing plate (44).
4. The tank assembly according to claim 1, characterized in that, The tank assembly (100) further includes a constraint structure (50) disposed around the circumference of the sewage tank (20) and the constraint structure (50) at least partially surrounds the sewage tank (20); the upper connecting structure (30) and the lower connecting structure (40) are both disposed on the constraint structure (50) and are both connected to the first clean water tank (11) or the second clean water tank (12).
5. The tank assembly according to claim 1, characterized in that, The tank assembly (100) also includes a connecting pipe (60), the two ends of which are connected to the first clean water tank (11) and the second clean water tank (12), respectively.
6. The tank assembly according to claim 5, characterized in that, The connecting pipe (60) includes a first flexible hose (61), a second flexible hose (62), and a rigid pipe (63). The first flexible hose (61), the rigid pipe (63), and the second flexible hose (62) are connected in sequence. The first flexible hose (61) is connected to the first clean water tank (11), and the second flexible hose (62) is connected to the second clean water tank (12).
7. A combined dredging vehicle, characterized in that, Includes a chassis (200) and a tank assembly (100) as described in any one of claims 1-6, wherein the sewage tank (20) is disposed on the chassis (200). The combined dredging vehicle (1000) also includes a high-pressure dredging reel system (600), a suction boom system (801), a high-pressure water system (802), a primary overflow prevention system (803), a secondary overflow prevention system (804), a vacuum suction system (805), and a centrifugal pump (806). The centrifugal pump (806) is connected to the sewage tank (20) and is used to discharge sewage from the sewage tank (20). It can also operate simultaneously with the vacuum suction system (805).
8. The combined dredging vehicle according to claim 7, characterized in that, The combined dredging vehicle (1000) further includes a first toolbox (301), which is disposed on the chassis (200) and located on the side of the first clean water tank (11) near the sewage tank (20); and / or, The combined dredging vehicle (1000) also includes a second toolbox (302), which is disposed on the chassis (200) and located on the side of the second clean water tank (12) near the sewage tank (20); and / or, The combined dredging vehicle (1000) also includes a third toolbox (303), which is disposed on the chassis (200) and located at the front end of the sewage tank (20); and / or, The combined dredging vehicle (1000) also includes an electrical control box (304), which is located at the rear end of the sewage tank (20).
9. The combined dredging vehicle according to claim 8, characterized in that, The third toolbox (303) includes a third box body, a third tool door (3033) and a third maintenance door (3034), wherein the third tool door (3033) and the third maintenance door (3034) are both hinged to the third box body; The third housing includes a first movable frame (3035), a second movable frame (3036), and a fixed frame (3037). The first movable frame (3035) and the second movable frame (3036) are movably connected to opposite sides of the fixed frame (3037), and both the first movable frame (3035) and the second movable frame (3036) are connected to the tank assembly (100). The first movable frame (3035) and the second movable frame (3036) extend toward the first clean water tank (11) and the second clean water tank (12), respectively, and a maintenance compartment (3031) is formed between the first movable frame (3035), the second movable frame (3036), the fixed frame (3037), and the tank assembly (100).
10. The combined dredging vehicle according to claim 7, characterized in that, The combined dredging vehicle (1000) also includes a rear guardrail (401) and a foot pedal (402). The rear guardrail (401) is located at the rear end of the chassis (200), and the foot pedal (402) is located at the rear guardrail (401).
