Conical hollow pier internal diameter adjustment lifting platform
By using a lifting platform with adjustable diameter inside a conical hollow pier, and employing a crane and positioning bolts to achieve platform lifting and width adjustment, the complex problem of constructing a platform under the inclined inner wall structure of the hollow pier was solved, improving construction efficiency and reducing costs.
Patent Information
- Application Number
- CN202522688264.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-18
- Publication Date
- 2026-11-06
- Estimated Expiration
- 2035-12-18
AI Technical Summary
The existing hollow pier has an inclined inner wall, which requires the construction of a scaffolding platform. The construction process is complicated, and the height adjustment requires repeated disassembly and reassembly, resulting in low construction efficiency and high cost.
A conical hollow pier internal diameter adjustment lifting platform is adopted, including a conical well and a crane. The conical well is equipped with a retractable platform. The lifting and width adjustment of the platform are realized by the crane and positioning bolts, avoiding repeated disassembly and reassembly.
It greatly saves time in erecting scaffolding, improves construction efficiency, and reduces construction and time costs.
Smart Images

Figure CN224943446U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of hollow pier construction, and in particular to an internal diameter adjustment lifting platform for conical hollow piers. Background Technology
[0002] The existing hollow piers have an inclined inner wall structure. Construction needs to be carried out inside the hollow piers with inclined inner walls, and a construction platform needs to be built inside the hollow piers for workers to carry out the work.
[0003] The existing construction method involves first erecting scaffolding inside the pier, and then using the scaffolding as a support to build work platforms for personnel. Due to the inclined inner wall of the hollow pier, the internal width varies at different heights, necessitating the construction of work platforms of varying widths to accommodate the corresponding inner wall space. This method of scaffolding erection is complex, requiring the assembly and fixing of each individual member, consuming significant manpower and time, and resulting in a long overall construction preparation period. Adjusting the construction height necessitates repeated disassembly and reassembly of the work platforms, further reducing construction efficiency. To match the width requirements at different heights, work boards need to be added or removed from both sides of the work platforms, increasing the complexity of the construction process and raising both construction and time costs. Utility Model Content
[0004] This utility model provides an internal diameter adjustment lifting platform for conical hollow piers, which solves the problems of the need to erect scaffolding for the inclined inner wall of hollow piers, the complicated scaffolding erection process, the time-consuming and labor-intensive overall construction process, the need to repeatedly disassemble and reassemble the work platform when the construction height needs to be adjusted, the low operation efficiency, and the need to add or remove work boards on both sides of the work platform to match the width requirements of different heights, which increases the complexity of the construction process.
[0005] To solve the above-mentioned technical problems, the technical solution adopted by this utility model is: a conical hollow pier internal diameter adjustment lifting platform, including a conical well and a crane. A retractable platform is provided inside the conical well. The retractable platform includes a middle platform and two side platforms. Multiple support side frames are provided on the side platforms. The middle platform and the two side platforms are slidably connected. The crane is connected to the middle platform through multiple steel cables. The support side frames are connected to the conical well.
[0006] In the preferred embodiment, the conical well has a rectangular cross-section, and the four sides of the inner wall of the conical well are inclined surfaces, with multiple reserved holes on the inclined surfaces of the conical well.
[0007] In the preferred embodiment, the intermediate platform includes a top plate, and multiple sliding beams are provided on both sides of the bottom of the top plate. One end of each sliding beam is provided with a limiting plate and a lifting lug, and the lifting lug is connected to the crane via a steel cable.
[0008] In the preferred embodiment, the side platform includes a flat plate with multiple mounting slots and multiple connecting beams, and the supporting side frame rests against the mounting slots.
[0009] In a preferred embodiment, the supporting side frame includes a horizontal frame, one end of which is provided with a vertical frame, and the bottom of the horizontal frame is provided with multiple supporting beams, which are connected to the connecting beams.
[0010] In the preferred embodiment, the crossbeam is provided with a cross groove, the bottom of the crossbeam abuts against the top of the mounting groove, and the sliding beam slides against the cross groove.
[0011] In the preferred embodiment, the top of the crossbeam is provided with a top roller, the bottom of the crossbeam is provided with multiple bottom rollers, and the slide beam is located between the top roller and the bottom roller.
[0012] In the preferred embodiment, a plurality of side rollers are provided on one side of the vertical frame, and the side rollers abut against the inner wall of the conical well.
[0013] In the preferred embodiment, a positioning bolt is provided at one end of the vertical frame, and the positioning bolt is connected to the conical well through a reserved hole.
[0014] The beneficial effects of this utility model are as follows: When construction is required inside a conical well, a crane is driven to lift the entire device to the bottom of the inner wall of the conical well. Workers at the bottom of the conical well pull apart the side platforms on both sides so that they abut against the inner wall of the well. Then, workers manually work on the retractable platform, using positioning bolts to connect the entire device to the conical well. When construction at this height is completed and the entire device needs to be moved upwards, multiple positioning bolts are removed manually. Workers stand on the middle platform, and the crane lifts the middle platform, causing the entire device to move upwards. Under the thrust of the inclined surface of the conical well, the side platforms on both sides move closer to the middle platform relative to the middle platform, allowing the overall structure to adapt to the width required at different heights. When the desired height is reached, the crane stops working, and the supporting side frames are reconnected to the conical well using the positioning bolts. This operation is repeated from top to bottom until construction is complete.
[0015] When the retractable platform is raised or lowered, the middle platform slides relative to the side platforms, thus accommodating conical wells of varying cross-sectional widths. This avoids the cumbersome, time-consuming, and labor-intensive process of erecting scaffolding, as well as the need for repeated disassembly and reassembly of the work platform. It also eliminates the need to add or remove working boards on both sides of the platform to meet different height and width requirements. This significantly saves time on scaffolding erection and reduces the time spent on repeated disassembly and reassembly of the work platform, thereby improving construction efficiency. Attached Figure Description
[0016] The present invention will be further described below with reference to the accompanying drawings and embodiments; Figure 1 This is a sectional view of the overall structure of this utility model; Figure 2This is an axonometric view of the retraction platform of this utility model; Figure 3 This is an axonometric view of the support side frame of this utility model; Figure 4 This is an axonometric view of the support side frame of this utility model; Figure 5 This is a side view of the support side frame of this utility model; Figure 6 This is an axonometric view of the intermediate platform of this utility model; Figure 7 This is an axonometric view of the side platform of this utility model; In the diagram: 1. Conical well; 101. Inclined surface; 102. Reserved hole; 2. Shrinkage platform; 3. Side platform; 301. Flat plate; 302. Mounting groove; 303. Connecting beam; 4. Intermediate platform; 401. Top plate; 402. Sliding beam; 403. Limiting plate; 404. Lifting lug; 5. Supporting side frame; 501. Horizontal frame; 501. Horizontal groove; 502. Vertical frame; 503. Supporting beam; 504. Top roller; 505. Bottom roller; 506. Side roller; 6. Positioning bolt; 7. Steel cable. Detailed Implementation
[0017] Example 1: like Figure 1-7 In the conical hollow pier, the diameter adjustment lifting platform includes a conical well 1 and a crane. The conical well 1 is equipped with a retractable platform 2, which includes a middle platform 4 and two side platforms 3. Multiple support side frames 5 are provided on the side platforms 3. The middle platform 4 and the two side platforms 3 are slidably connected. The crane is connected to the middle platform 4 through multiple steel cables 7, and the support side frames 5 are connected to the conical well 1. With this structure, when construction is required inside the conical well 1, the crane is driven to lift the entire assembly to the bottom of the inner wall of the conical well 1. Workers at the bottom of the conical well 1 pull apart the two side platforms 3, so that the two side platforms 3 abut against the inner wall of the conical well 1. Then, workers work on the retractable platform 2, connecting the entire assembly to the conical well 1 using positioning bolts 6. When construction at this height is completed and the entire assembly needs to be moved upwards, multiple positioning bolts 6 are removed manually. Workers stand on the middle platform 4, and the crane lifts the middle platform 4, moving the entire assembly upwards. Under the thrust of the inclined surface 101 of the conical well 1, the two side platforms 3 move closer to the middle platform 4 relative to the middle platform 4, allowing the overall structure to adapt to the width required at different heights. When the desired height is reached, the crane stops working, and the supporting side frame 5 is reconnected to the conical well 1 using the positioning bolts 6. This operation is repeated from top to bottom until construction is complete.
[0018] When the retractable platform 2 is raised or lowered, the middle platform 4 slides relative to the side platforms 3, thus accommodating conical wells 1 with different cross-sectional widths. This avoids the cumbersome, time-consuming, and labor-intensive process of erecting scaffolding, as well as the need for repeated disassembly and reassembly of the work platform. It also avoids the need to add or remove work boards on both sides of the work platform according to different height and width requirements. This significantly saves time on scaffolding erection and reduces the time spent on repeated disassembly and reassembly of the work platform, thereby improving construction efficiency.
[0019] In the preferred embodiment, the conical well 1 has a rectangular cross-section, and the four sides of the inner wall of the conical well 1 are inclined surfaces 101. Multiple pre-drilled holes 102 are provided on the inclined surfaces 101 of the conical well 1. With this structure, the positioning bolts 6 pass through the pre-drilled holes 102 and the crossbeam 501 of the supporting side frame 5, so that the supporting side frame 5 is connected to the conical well 1, thereby connecting the overall structure to the conical well 1.
[0020] In the preferred embodiment, the intermediate platform 4 includes a top plate 401, with multiple sliding beams 402 on both sides of the bottom of the top plate 401. One end of each sliding beam 402 is equipped with a limiting plate 403 and a lifting lug 404, which is connected to the crane via a steel cable 7. With this structure, when the overall structural height remains fixed, the crane stops working, and the entire structure is connected to the conical well 1. When the overall structural height needs to be changed, the crane is driven to raise or lower the intermediate platform 4, allowing the side platforms 3 to slide relative to the intermediate platform 4.
[0021] In a preferred embodiment, the side platform 3 includes a flat plate 301 with multiple mounting slots 302 and multiple connecting beams 303. The supporting side frame 5 abuts against the mounting slots 302. With this structure, the supporting side frame 5 is installed in the mounting slots 302, and the connecting beams 303 are connected to the supporting beams 503 of the supporting side frame 5.
[0022] In a preferred embodiment, the supporting side frame 5 includes a horizontal frame 501, with a vertical frame 502 at one end of the horizontal frame 501. Multiple supporting beams 503 are located at the bottom of the horizontal frame 501, and the supporting beams 503 are connected to the connecting beams 303. With this structure, In a preferred embodiment, the crossbeam 501 is provided with a transverse groove 5011, the bottom of the crossbeam 501 abuts against the top of the mounting groove 302, and the sliding beam 402 slides against the transverse groove 5011. With this structure, the sliding beam 402 slides against the transverse groove 5011, so that when the intermediate platform 4 is raised or lowered, the intermediate platform 4 slides relative to the supporting side frame 5, so that the intermediate platform 4 slides relative to the side platforms 3, and so that the two side platforms 3 open and close relative to the intermediate platform 4.
[0023] In a preferred embodiment, the top of the crossbeam 501 is provided with a top roller 504, and the bottom of the crossbeam 501 is provided with multiple bottom rollers 505. The slide beam 402 is located between the top roller 504 and the bottom rollers 505. With this structure, the top roller 504 and the bottom rollers 505 serve to limit the slide beam 402 and at the same time reduce the friction between them.
[0024] In a preferred embodiment, a plurality of side rollers 506 are provided on one side of the vertical frame 502, and the side rollers 506 abut against the inner wall of the conical well 1. With this structure, the side rollers 506 reduce the friction between the conical well 1 and the supporting side frame 5.
[0025] In the preferred embodiment, one end of the vertical frame 502 is provided with a positioning bolt 6, which is connected to the conical well 1 through a reserved hole 102.
[0026] The above embodiments are merely preferred technical solutions of this utility model and should not be considered as limitations on this utility model. The protection scope of this utility model should be the technical solution described in the claims, including equivalent substitutions of the technical features described in the claims. That is, equivalent substitutions and improvements within this scope are also within the protection scope of this utility model.
Claims
1. A conical hollow pier internal diameter adjustment lifting platform, characterized by: It includes a conical well (1) and a crane. The conical well (1) is equipped with a retractable platform (2). The retractable platform (2) includes a middle platform (4) and two side platforms (3). Multiple support side frames (5) are provided on the side platforms (3). The middle platform (4) and the two side platforms (3) are slidably connected. The crane is connected to the middle platform (4) through multiple steel cables (7). The support side frames (5) are connected to the conical well (1).
2. The tapered hollow pier inner-diameter-adjustable lifting platform according to claim 1, characterized in that: The conical well (1) has a rectangular cross-section. The four sides of the inner wall of the conical well (1) are inclined surfaces (101). Multiple reserved holes (102) are provided on the inclined surfaces (101) of the conical well (1).
3. The tapered hollow pier under-regulating lifting platform according to claim 1, characterized in that: The intermediate platform (4) includes a top plate (401). Multiple sliding beams (402) are provided on both sides of the bottom of the top plate (401). A limiting plate (403) and a lifting lug (404) are provided at one end of the sliding beam (402). The lifting lug (404) is connected to the crane through a steel cable (7).
4. The tapered hollow pier under-river diameter-adjustable lifting platform according to claim 1, characterized in that: The side platform (3) includes a flat plate (301), which has multiple mounting slots (302) and multiple connecting beams (303) on the flat plate (301). The supporting side frame (5) rests against the mounting slots (302).
5. The tapered hollow pier under-river diameter-adjustable lifting platform according to claim 1, characterized in that: The supporting side frame (5) includes a horizontal frame (501), a vertical frame (502) is provided at one end of the horizontal frame (501), and multiple supporting beams (503) are provided at the bottom of the horizontal frame (501). The supporting beams (503) are connected to the connecting beams (303).
6. The conical hollow pier internal diameter adjustment lifting platform according to claim 5, characterized in that: A horizontal groove (5011) is provided on the horizontal frame (501), the bottom of the horizontal frame (501) abuts against the top of the mounting groove (302), and the sliding beam (402) slides against the horizontal groove (5011).
7. The tapered hollow pier under-regulating lifting platform according to claim 6, characterized in that: The top of the cross frame (501) is provided with a top roller (504), and the bottom of the cross frame (501) is provided with multiple bottom rollers (505). The slide beam (402) is located between the top roller (504) and the bottom rollers (505).
8. The tapered hollow pier under-regulating lifting platform according to claim 5, characterized in that: The vertical frame (502) has multiple side rollers (506) on one side, and the side rollers (506) abut against the inner wall of the conical well (1).
9. The tapered hollow pier under-river diameter-adjustable lifting platform according to claim 5, characterized in that: The vertical frame (502) is provided with a positioning bolt (6) at one end, and the positioning bolt (6) is connected to the conical well (1) through the reserved hole (102).