Connecting device of waste gas incinerator and flue gas treatment tower

By introducing a cooling and dust suppression device and a pull-out filter frame into the connection device between the waste gas incinerator and the flue gas treatment tower, the problems of uncooled high-temperature flue gas and incomplete particulate matter removal are solved, achieving efficient flue gas treatment and convenient operation and maintenance, and reducing operation and maintenance costs.

CN224990660UActive Publication Date: 2026-11-20SHANGHAI RUIDING ENVIRONMENTAL ENG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522726729.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-23
Publication Date
2026-11-20
Estimated Expiration
2035-12-23

AI Technical Summary

Technical Problem

The existing connection device between the waste gas incinerator and the flue gas treatment tower has problems such as insufficient cooling of high-temperature flue gas and incomplete removal of particulate matter. In addition, the filter components are fixed structures, and cleaning or replacement requires shutdown and disassembly, resulting in high operation and maintenance costs.

Method used

The device employs a cooling and dust suppression system, including a cooling box, a spray box, and a filter frame. Through a dual cooling structure of "pre-cooling in the cooling box + secondary cooling through atomization in the spray box," combined with a pull-out filter frame and a spray liquid circulation design, it achieves step-by-step cooling of high-temperature flue gas and dual removal of particulate matter. It is also equipped with a flame arrester and a sealed welding structure to ensure safety and sealing.

Benefits of technology

It achieves effective cooling of high-temperature flue gas, completely removes particulate matter, reduces operation and maintenance costs, improves the safety and resource utilization of the equipment, and reduces downtime and labor costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224990660U_ABST
    Figure CN224990660U_ABST
Patent Text Reader

Abstract

The utility model discloses the convergence device of waste gas incinerator and flue gas treatment tower, including device body, and device body includes cooling dust falling device, air inlet device and exhaust device, and air inlet device butt joint is in cooling dust falling device left end, and exhaust device installs in cooling dust falling device right -end, and cooling dust falling device includes heat sink, sprays the box and filter frame, and sprays the box and installs in heat sink top, and the front end of heat sink is provided with the insertion port, and the both ends of insertion port are provided with the sliding slot, and filter frame passes through insertion port and installs in heat sink, and sprays the top of box and is equipped with the connecting pipe. This kind of device has realized the step -by -step cooling of high temperature flue gas, the double depth removal of particulate matter, and through the design such as spraying liquid circulation, pull -out type filter structure, has considered resource utilization rate and operation convenience, and relies on fire -resistant, sealing and other structure, and the safety and sealing of device are strengthened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the technical field of waste gas incinerators and flue gas treatment towers, specifically to a connection device between a waste gas incinerator and a flue gas treatment tower. Background Technology

[0002] Waste gas incinerators are environmentally friendly devices that use auxiliary fuel combustion to heat harmful gases to the reaction temperature for oxidative decomposition. They are mainly used in the thermodynamics field within the energy and environment sectors. This equipment decomposes organic waste gas into harmless H2O and CO2 through a combustion chamber. Its treatment range covers waste gas purification from spraying and drying equipment, as well as industries such as petrochemicals and pharmaceuticals. It has a significant treatment effect on water-containing or viscous organic waste gas.

[0003] Existing connection devices between waste gas incinerators and flue gas treatment towers often suffer from problems such as insufficient cooling of high-temperature flue gas and incomplete removal of particulate matter (e.g., high-temperature flue gas can easily corrode downstream equipment and particulate matter can easily clog pipelines). In addition, most filter components are fixed structures, requiring shutdown and disassembly for cleaning / replacement, resulting in high operation and maintenance costs.

[0004] Therefore, a solution is needed. Utility Model Content

[0005] (a) Technical problems to be solved

[0006] In view of the shortcomings of the prior art, this utility model provides a connection device between the waste gas incinerator and the flue gas treatment tower to solve the problems mentioned in the background art.

[0007] (II) Technical Solution

[0008] To achieve the above objectives, this utility model provides the following technical solution: a connection device between a waste gas incinerator and a flue gas treatment tower, comprising a device body, the device body including a cooling and dust suppression device, an air inlet device, and an exhaust device; the air inlet device is connected to the left end of the cooling and dust suppression device, and the exhaust device is installed at the right end of the cooling and dust suppression device; the cooling and dust suppression device includes a cooling box, a spray box, and a filter frame; the spray box is installed on top of the cooling box, and an insertion port is provided at the front end of the cooling box; sliding grooves are provided at both ends of the insertion port; the filter frame is installed inside the cooling box through the insertion port; a connecting pipe is provided at the top of the spray box; a sealing frame is provided on the outer side of the top of the spray box; several sets of spray pipes are provided at the bottom of the spray box; atomizing nozzles are installed at the bottom of the spray pipes; the cooling box has a rectangular structure; an air inlet is provided at the left end of the cooling box; an insertion channel is provided on the right side of the cooling box; and an exhaust pipe is provided at the bottom right side of the cooling box.

[0009] Preferably, a delivery pump is installed on the top of the spray box, and the output end of the delivery pump is connected to the discharge pipe through a pipe, and the output end of the delivery pump is connected to the connecting pipe through a pipe.

[0010] Preferably, the filter frame has a rectangular structure, with sliders at both ends, a filter screen installed inside, and a handle at the front end.

[0011] Preferably, the air intake device includes a first air pump, a flame arrester, a first delivery pipe, and a second delivery pipe. The input end of the first delivery pipe is connected to the flame arrester, the output end of the first delivery pipe is connected to the input end of the first air pump, the input end of the second delivery pipe is connected to the output end of the first air pump, and the output end of the second delivery pipe is connected to the air intake.

[0012] Preferably, the exhaust device includes a second air pump, an output pipe, and a tower body connecting pipe. The output pipe has an L-shaped structure and a downward sloping top. The output pipe passes through the insertion channel and is located inside the cooling box. The output pipe and the insertion channel are sealed by welding. The input end of the second air pump is connected to the output end of the output pipe. The tower body connecting pipe is installed at the output end of the second air pump.

[0013] (III) Beneficial Effects

[0014] This utility model provides a connection device between a waste gas incinerator and a flue gas treatment tower. It has the following beneficial effects:

[0015] In this solution, the connection device between the waste gas incinerator and the flue gas treatment tower utilizes a dual cooling structure of "pre-cooling in the cooling box + secondary cooling via atomization in the spray box" for high-temperature flue gas treatment. This structure gradually reduces the temperature of the high-temperature flue gas, preventing direct corrosion of downstream equipment. Simultaneously, the atomized spray liquid entrains particulate matter in the flue gas, which, combined with the filter screen in the cooling box, intercepts residual impurities, creating a dual impurity removal effect of "spray entrainment + filter interception." This completely solves the problem of particulate matter clogging the pipeline. Regarding ease of operation and maintenance, the filter frame adopts a pull-out design that adapts to the cooling box insertion port and sliding groove, requiring only a simple connection via the front... The filter frame can be quickly pulled out for cleaning or replacement by simply using the handle, without requiring the entire unit to be disassembled and shut down, significantly reducing equipment downtime and the manpower and time costs of maintenance. In terms of resource utilization, the spray liquid collected in the bottom discharge pipe of the cooling box is returned to the spray box via a transfer pump, achieving the recycling of the spray liquid and avoiding unnecessary waste of resources. Simultaneously, the air intake device is equipped with a flame arrester and an air pump, ensuring both the safety of the air intake and the stable delivery of flue gas. The sealed welding design of the L-shaped output pipe of the exhaust device and the tower body connection pipe also improves the sealing performance of the unit and the stability of flue gas delivery. In summary, this solution not only effectively solves the problems of insufficient cooling and incomplete particulate matter removal in existing devices, but also reduces maintenance costs and improves resource utilization through structural optimization, balancing practicality, economy, and stability. Attached Figure Description

[0016] Figure 1 This is a schematic diagram of the overall structure of this utility model;

[0017] Figure 2 This is a schematic diagram of the overall internal structure of this utility model;

[0018] Figure 3 This is a schematic diagram of the cooling and dust suppression device of this utility model.

[0019] In the diagram, 1. Device body; 2. Cooling and dust suppression device; 3. Air inlet device; 4. Exhaust device; 5. Cooling box; 6. Spray box; 7. Filter frame; 8. Insertion port; 9. Slide groove; 10. Sealing frame; 11. Connecting pipe; 12. Delivery pump; 13. Spray pipe; 14. Atomizing nozzle; 15. Air inlet; 16. Discharge pipe; 17. Insertion channel; 18. Slider; 19. Filter screen; 20. Handle; 21. First air pump; 22. Flame arrester; 23. First delivery pipe; 24. Second delivery pipe; 25. Second air pump; 26. Output pipe; 27. Tower body connecting pipe. Detailed Implementation

[0020] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0021] Please see Figure 1-3 This utility model provides a technical solution:

[0022] Example 1

[0023] Regarding the aforementioned problems: existing connection devices between waste gas incinerators and flue gas treatment towers often suffer from insufficient cooling of high-temperature flue gas and incomplete removal of particulate matter (e.g., high-temperature flue gas easily corrodes subsequent equipment, and particulate matter easily clogs pipelines). Furthermore, most filter components are fixed structures, requiring shutdown and disassembly for cleaning / replacement, resulting in high operation and maintenance costs.

[0024] The solution is as follows: A connection device between the waste gas incinerator and the flue gas treatment tower includes a device body 1. The device body 1 includes a cooling and dust suppression device 2, an air inlet device 3, and an exhaust device 4. The air inlet device 3 is connected to the left end of the cooling and dust suppression device 2, and the exhaust device 4 is installed at the right end of the cooling and dust suppression device 2. The cooling and dust suppression device 2 includes a heat dissipation box 5, a spray box 6, and a filter frame 7. The spray box 6 is installed on the top of the heat dissipation box 5. An insertion port 8 is opened at the front end of the heat dissipation box 5. The insertion port 8 is located on the left and right sides. Both ends are provided with sliding grooves 9. The filter frame 7 is installed in the cooling box 5 through the insertion port 8. The top of the spray box 6 is provided with a connecting pipe 11. The outer side of the top of the spray box 6 is provided with a sealing frame 10. The bottom of the spray box 6 is provided with several sets of spray pipes 13. The bottom of the spray pipes 13 is provided with atomizing nozzles 14. The cooling box 5 has a rectangular structure. The left end of the cooling box 5 is provided with an air inlet 15. The right side of the cooling box 5 is provided with an insertion channel 17. The bottom right side of the cooling box 5 is provided with an exhaust pipe 16.

[0025] The filter frame 7 has a rectangular structure, and sliders 18 are provided at both ends of the filter frame 7. A filter screen 19 is installed inside the filter frame 7, and a handle 20 is provided at the front end of the filter frame 7.

[0026] Analysis of the above: After the high-temperature flue gas enters the cooling box 5, it first undergoes initial natural cooling inside the box (the rectangular structure of the cooling box 5 provides a buffer space); simultaneously, the spray box 6 is connected to liquid through the connecting pipe 11, and transported to the atomizing nozzle 14 through the spray pipe 13, atomizing the liquid and spraying it into the cooling box 5, providing secondary cooling of the flue gas and entraining particulate matter; finally, the flue gas passes through the filter screen 19 of the filter frame 7, intercepting residual impurities, completing the cooling and dust suppression; the sprayed liquid collects at the bottom of the cooling box 5, is discharged through the discharge pipe 16, and then transported back to the connecting pipe 11 by the transfer pump 12, realizing the circulation of the spray liquid; when the filter screen 19 is clogged / dirty: hold the handle 20 of the filter frame 7. Pull out the filter frame 7 (slider 18 adapts to slide groove 9) along the slide groove 9 of insertion port 8, clean / replace filter screen 19, and then insert it back in; when the spray liquid is insufficient: replenish the liquid through connecting pipe 11; if the spray liquid is seriously contaminated, turn off the delivery pump 12, drain the waste liquid through discharge pipe 16, and replace with new liquid; the cooling box 5 + atomizing nozzle 14 achieve "double cooling" to avoid high-temperature flue gas corrosion of subsequent equipment; atomizing spray + filter screen 19 achieve "double impurity removal" to thoroughly remove particulate matter and prevent pipeline blockage; the pull-out structure of filter frame 7 does not require shutdown and disassembly, making operation and maintenance convenient; delivery pump 12 + discharge pipe 16 + connecting pipe 11 achieve spray liquid circulation, saving resources.

[0027] Example 2:

[0028] Please see Figure 1-3Based on Embodiment 1, this utility model provides a technical solution: a delivery pump 12 is installed on the top of the spray box 6, the output end of the delivery pump 12 is connected to the discharge pipe 16 through a pipe, and the output end of the delivery pump 12 is connected to the connecting pipe 11 through a pipe.

[0029] Analysis of the above: Connecting pipe 11 receives liquid from delivery pump 12 and distributes it to each group of atomizing nozzles 14 through spray pipe 13, atomizing the liquid into fine droplets and spraying them evenly into the cooling box 5, ensuring full contact with the flue gas; sealing frame 10 enhances the sealing of the top of spray box 6 to prevent liquid / flue gas leakage; when atomizing nozzle 14 is blocked: open spray box 6 (operating in conjunction with the sealing structure of sealing frame 10), disassemble spray pipe 13 to clean nozzle 14; when the spray volume needs to be adjusted: control the power of delivery pump 12 to adjust the liquid delivery speed; the atomization effect of atomizing nozzle 14 increases the liquid-gas contact area, resulting in higher efficiency in cooling and entraining particulate matter; sealing frame 10 ensures the sealing of the device, preventing leakage; the design of multiple spray pipes 13 + nozzles 14 covers the entire area of ​​cooling box 5, resulting in more uniform treatment.

[0030] Example 3:

[0031] Please see Figure 1-3 This utility model provides a technical solution based on Embodiment 1: The air intake device 3 includes a first air pump 21, a flame arrester 22, a first delivery pipe 23, and a second delivery pipe 24. The input end of the first delivery pipe 23 is connected to the flame arrester 22, the output end of the first delivery pipe 23 is connected to the input end of the first air pump 21, the input end of the second delivery pipe 24 is connected to the output end of the first air pump 21, and the output end of the second delivery pipe 24 is connected to the air intake port 15.

[0032] Analysis of the above: The flue gas from the waste gas incinerator first passes through the flame arrester 22 (preventing flame backlash), then enters the first air pump 21 through the first delivery pipe 23. Powered by the air pump 21, the gas is delivered to the air inlet 15 of the cooling box 5 through the second delivery pipe 24. When the flue gas flow is insufficient, the power of the first air pump 21 is increased to increase the delivery volume. When the flame arrester 22 fails, the air intake device is shut off, the flame arrester 22 is replaced, and then restarted. The flame arrester 22 prevents flame backlash in the incinerator, improving the safety of the air intake. The first air pump 21 ensures the stable delivery of flue gas and prevents flue gas from stagnating in the pipeline.

[0033] Example 5:

[0034] Please see Figure 1-3This utility model provides a technical solution based on Embodiment 1: The exhaust device 4 includes a second air pump 25, an output pipe 26, and a tower body connecting pipe 27. The output pipe 26 has an L-shaped structure and a downward sloping top. The output pipe 26 passes through the insertion channel 17 and is located inside the cooling box 5. The output pipe 26 and the insertion channel 17 are sealed by welding. The input end of the second air pump 25 is connected to the output end of the output pipe 26. The tower body connecting pipe 27 is installed at the output end of the second air pump 25.

[0035] Analysis of the above: The treated flue gas in the cooling box 5 enters the L-shaped output pipe 26 (tilted downwards at the top to prevent liquid backflow), powered by the second air pump 25, and is transported to the flue gas treatment tower through the tower body connecting pipe 27; the output pipe 26 is welded and sealed to the insertion channel 17 to prevent flue gas leakage; when the pressure of the flue gas treatment tower is too high: the power of the second air pump 25 is reduced to lower the delivery pressure; when the interface of the tower body connecting pipe 27 is loose: the welding / sealing parts are reinforced to ensure the sealing performance; the inclined design of the L-shaped output pipe 26 prevents the spray liquid from backflowing into the exhaust pipe; the welded and sealed insertion channel 17 + tower body connecting pipe 27 improves the sealing performance of the device; the second air pump 25 ensures the stable delivery of the treated flue gas and makes the connection to the flue gas treatment tower smoother.

[0036] Working principle: During operation, the high-temperature dust-laden flue gas generated by the waste gas incinerator first enters the flame arrester 22 of the air intake device 3. This component can effectively prevent the flame in the incinerator from spreading back along the pipeline to the connecting device (technical effect: avoids the safety hazard of the flame causing the flammable medium in the device to explode from the source, and greatly improves the safety protection level of the air intake process); then the flue gas enters the first air pump 21 through the first conveying pipe 23. The first air pump 21 provides stable power and then accurately delivers it to the air inlet 15 of the cooling box 5 of the cooling and dust suppression device 2 through the second conveying pipe 24 (technical effect: avoids the flue gas from stagnating and accumulating in the pipeline due to insufficient natural flow power, ensures the continuity and stability of flue gas delivery, and provides a stable flue gas flow basis for the subsequent cooling and dust suppression process).

[0037] After entering the rectangular cooling box 5, the high-temperature flue gas undergoes preliminary natural cooling in the buffer space within the box, which reduces the flue gas temperature and slows down the corrosion of subsequent spraying and filtration components (technical effect: pre-treatment of high-temperature flue gas extends the service life of subsequent core processing components); simultaneously, the connecting pipe 11 at the top of the spray box 6 receives liquid delivered by the transfer pump 12. One end of the transfer pump 12 is connected to the discharge pipe 16 at the bottom of the cooling box 5, which can re-pump the liquid collected at the bottom of the cooling box after spraying back to the connecting pipe 11 (technical effect: realizes the recycling of spray liquid, reduces the amount of new spray liquid replenishment, and significantly reduces water consumption). (It reduces waste liquid treatment costs, combining economy and environmental protection); after the liquid is evenly distributed by multiple sets of spray pipes 13 in the spray box 6, it is atomized into fine droplets by the atomizing nozzles 14 and evenly sprayed into the cooling box 5. The atomized droplets come into full contact with the high-temperature flue gas, which on the one hand can perform secondary deep cooling of the flue gas, reducing the flue gas temperature to a safe range that subsequent equipment can withstand (technical effect: completely solves the problem of high-temperature flue gas corroding subsequent pipelines and treatment tower equipment, and extends the equipment life of the entire waste gas treatment system), on the other hand, can efficiently entrain suspended particulate matter in the flue gas, achieving preliminary impurity removal (technical effect: separates most of the particulate matter in advance, reducing the workload of subsequent filter components).

[0038] The flue gas that has undergone spray treatment will continue to flow through the filter frame 7 installed in the cooling box 5. The filter frame 7 is installed by fitting the slide groove 9 of the cooling box insertion port 8 with the sliders 18 at both ends. The filter screen 19 inside can accurately intercept the fine particles remaining in the flue gas (technical effect: completes the secondary deep filtration of particles, thoroughly removes impurities in the flue gas, fundamentally solves the problem of particles clogging subsequent pipelines, and ensures the smooth operation of the entire system); and the filter frame 7 is equipped with a front handle 20, which can be pulled out and installed, and can be cleaned or replaced without stopping the machine to disassemble the entire device (technical effect: greatly shortens the operation and maintenance time of filter components, reduces production losses caused by downtime, reduces manpower and disassembly costs, and improves the convenience of operation and maintenance of the device).

[0039] The clean, low-temperature flue gas, after being cooled and dust-suppressed, enters the L-shaped output pipe 26 of the exhaust device 4. The top of the output pipe 26 has a downward-sloping structure, which can effectively prevent the spray liquid in the cooling box 5 from flowing back into the exhaust system (technical effect: preventing the spray liquid from entering the second air pump 25 and the flue gas treatment tower, and preventing the liquid from corroding the exhaust power components and the core structure of the treatment tower and causing functional interference); at the same time, the connection between the output pipe 26 and the insertion channel 17 on the right side of the cooling box 5 adopts a welding sealing process, which can prevent flue gas from leaking from the connection gap. (Technical effect: Ensures the overall sealing of the device, prevents untreated flue gas from escaping to the outside world and causing environmental pollution, and also prevents external impurities from entering the device and affecting the treatment effect); Subsequently, the second air pump 25 provides the power to transport the clean flue gas, which is then smoothly transported to the flue gas treatment tower through the tower body connecting pipe 27, realizing the efficient connection between the waste gas incinerator and the flue gas treatment tower (Technical effect: Ensures the stable transport of the treated flue gas, ensures the seamless connection between the two waste gas treatment processes, and improves the continuity and treatment efficiency of the entire waste gas treatment process).

[0040] Overall, through the coordinated operation of multiple components, the device achieves both step-by-step cooling of high-temperature flue gas and deep removal of particulate matter. It also balances resource utilization and ease of operation and maintenance through designs such as spray liquid circulation and pull-out filter structure. Furthermore, it enhances the safety and sealing of the device by relying on flame-retardant and sealing structures, thus comprehensively solving the core pain points of existing connection devices.

[0041] The present invention comprises: 1. Device body; 2. Cooling and dust suppression device; 3. Air inlet device; 4. Exhaust device; 5. Cooling box; 6. Spray box; 7. Filter frame; 8. Insertion port; 9. Slide groove; 10. Sealing frame; 11. Connecting pipe; 12. Delivery pump; 13. Spray pipe; 14. Atomizing nozzle; 15. Air inlet; 16. Discharge pipe; 17. Insertion channel; 18. Slider; 19. Filter screen; 20. Handle; 21. First air pump; 22. Flame arrester; 23. First delivery pipe; 24. Second delivery pipe; 25. Second air pump; 26. Output pipe; 27. Tower body connecting pipe. All components are general standard parts or parts known to those skilled in the art, and their structure and principles are based on the present invention. As can be learned by personnel through technical manuals or conventional experimental methods, the problem solved by this utility model is that the connection device between the existing waste gas incinerator and the flue gas treatment tower often suffers from insufficient cooling of high-temperature flue gas and incomplete removal of particulate matter (such as high-temperature flue gas easily corroding downstream equipment and particulate matter easily clogging pipelines). In addition, the filter components are mostly fixed structures, which require shutdown and disassembly for cleaning / replacement, resulting in high operation and maintenance costs. This utility model achieves both stepped cooling of high-temperature flue gas and dual deep removal of particulate matter through the combination of the above-mentioned components. It also takes into account resource utilization and operation and maintenance convenience through designs such as spray liquid circulation and pull-out filter structure. At the same time, it strengthens the safety and sealing of the device by relying on flame-retardant and sealing structures.

[0042] The foregoing has shown and described the basic principles, main features, and advantages of this utility model. It will be apparent to those skilled in the art that this utility model is not limited to the details of the exemplary embodiments described above, and that it can be implemented in other specific forms without departing from the spirit or basic characteristics of this utility model. Therefore, the embodiments should be considered exemplary and non-limiting in all respects. The scope of this utility model is defined by the appended claims rather than the foregoing description, and thus all variations falling within the meaning and scope of equivalents of the claims are intended to be included within this utility model. No reference numerals in the claims should be construed as limiting the scope of the claims.

[0043] Furthermore, it should be understood that although this specification describes embodiments, not every embodiment contains only one independent technical solution. This narrative style is merely for clarity. Those skilled in the art should consider the specification as a whole, and the technical solutions in each embodiment can also be appropriately combined to form other embodiments that can be understood by those skilled in the art.

Claims

1. A connection device between a waste gas incinerator and a flue gas treatment tower, characterized in that: The device includes a main body (1), which includes a cooling and dust suppression device (2), an air intake device (3) and an exhaust device (4). The air intake device (3) is connected to the left end of the cooling and dust suppression device (2), and the exhaust device (4) is installed at the right end of the cooling and dust suppression device (2). The cooling and dust suppression device (2) includes a cooling box (5), a spray box (6), and a filter frame (7). The spray box (6) is installed on the top of the cooling box (5). An insertion port (8) is provided at the front end of the cooling box (5). Sliding grooves (9) are provided at both ends of the insertion port (8). The filter frame (7) is installed in the cooling box (5) through the insertion port (8). A connecting pipe (11) is provided at the top of the spray box (6). A sealing frame (10) is provided on the outer side of the top of the spray box (6). Several sets of spray pipes (13) are provided at the bottom of the spray box (6). Atomizing nozzles (14) are installed at the bottom of the spray pipes (13). The cooling box (5) has a rectangular structure. An air inlet (15) is provided at the left end of the cooling box (5). An insertion channel (17) is provided on the right side of the cooling box (5). An exhaust pipe (16) is provided at the bottom right side of the cooling box (5).

2. The connection device between the waste gas incinerator and the flue gas treatment tower according to claim 1, characterized in that: The top of the spray box (6) is equipped with a delivery pump (12), the output end of the delivery pump (12) is connected to the discharge pipe (16) through a pipe, and the output end of the delivery pump (12) is connected to the connecting pipe (11) through a pipe.

3. The connection device between the waste gas incinerator and the flue gas treatment tower according to claim 1, characterized in that: The filter frame (7) has a rectangular structure. The filter frame (7) has sliders (18) at both ends. The filter frame (7) has a filter screen (19) installed inside. The filter frame (7) has a handle (20) at the front end.

4. The connection device between the waste gas incinerator and the flue gas treatment tower according to claim 1, characterized in that: The air intake device (3) includes a first air pump (21), a flame arrester (22), a first delivery pipe (23), and a second delivery pipe (24). The input end of the first delivery pipe (23) is connected to the flame arrester (22), the output end of the first delivery pipe (23) is connected to the input end of the first air pump (21), the input end of the second delivery pipe (24) is connected to the output end of the first air pump (21), and the output end of the second delivery pipe (24) is connected to the air inlet (15).

5. The connection device between the waste gas incinerator and the flue gas treatment tower according to claim 1, characterized in that: The exhaust device (4) includes a second air pump (25), an output pipe (26), and a tower body connecting pipe (27). The output pipe (26) has an L-shaped structure and a downward sloping top. The output pipe (26) passes through the insertion channel (17) and is located inside the cooling box (5). The output pipe (26) and the insertion channel (17) are sealed by welding. The input end of the second air pump (25) is connected to the output end of the output pipe (26). The tower body connecting pipe (27) is installed at the output end of the second air pump (25).