A high-altitude anticorrosion coating spraying robot
By designing a high-altitude anti-corrosion coating spraying robot, an anti-corrosion coating is formed on the surface of the reinforced concrete main tower of a cable-stayed bridge using an aircraft carrying a storage tank and a spraying drive. This solves the problem of high safety risks associated with manual spraying at high altitudes and achieves efficient and safe spraying results.
Patent Information
- Application Number
- CN202522214766.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-20
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-10-20
AI Technical Summary
In existing technologies, the reinforced concrete main towers of cable-stayed bridges are quite high, which leads to significant safety risks when manually spraying anti-corrosion coatings. Therefore, it is necessary to propose a high-altitude anti-corrosion coating spraying robot to reduce these safety risks.
Design a high-altitude anti-corrosion coating spraying robot that includes an aircraft, a storage tank, a spraying drive, and nozzles. The aircraft carries the storage tank and the spraying drive to spray the anti-corrosion coating material from the nozzles under high pressure to form an anti-corrosion coating. Workers control the spraying process from the ground.
This technology achieves high safety in high-altitude spraying of anti-corrosion coatings, reduces worker operational risks, and improves spraying efficiency and safety.
Smart Images

Figure CN224991301U_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of spraying technology, and in particular to a high-altitude anti-corrosion coating spraying robot. Background Technology
[0002] The GZSG-3 section of the new Zhuhai-Zhaoqing High-Speed Railway Gaoming-Zhaoqing East section's pre-station engineering project spans from DK25+565 to DK41+207.817, with a total length of 15.643km. The Xijiang Grand Bridge, located between Yong'an Town and Shapu Town in Zhaoqing City, Guangdong Province, crosses the main channel of the Xijiang River approximately 3.5km downstream of the existing Xijiang Grand Bridge on the Jiangzhao Expressway. It is a three-tower cable-stayed bridge with a span of (70+148+435+435+148+70) meters, currently the world's largest steel box girder composite railway cable-stayed bridge, and a key and challenging project along the entire line.
[0003] According to the "Code for Durability Design of Railway Concrete Structures" (TB10005-2010), the environment in which the bridge and main tower are located is a carbonization environment, with action levels of T2 and T3. To improve the aesthetics and durability of the concrete structure, in accordance with the requirements of "Technical Conditions for Surface Coating Corrosion Protection of Concrete Bridge Structures" (JT / T695-2007) and "Durability Repair and Protection of Railway Concrete Structures" (O / CR410-2020), the outer surfaces of the bridge piers and main tower columns (including crossbeams) will be coated with anti-corrosion coatings after the bridge is completed. According to the above design requirements, during the construction of the main bridge of the Xijiang Grand Bridge, it is necessary to spray an anti-corrosion coating on the reinforced concrete main tower of the cable-stayed bridge. The reinforced concrete main tower of the cable-stayed bridge is relatively tall, with the highest height reaching about 150 meters above the water surface.
[0004] In existing technologies, manual spraying is often used to apply anti-corrosion coatings to the reinforced concrete main towers of cable-stayed bridges. However, because the reinforced concrete main towers of cable-stayed bridges are quite tall, this poses a significant safety risk to workers.
[0005] Therefore, it is necessary to propose a high-altitude anti-corrosion coating spraying robot to reduce the safety risks of spraying operations, which has become an important technical problem that urgently needs to be solved. Utility Model Content
[0006] This application provides a high-altitude anti-corrosion coating spraying robot, which aims to solve the problem that the existing technology mostly uses manual spraying to spray anti-corrosion coatings on the reinforced concrete main towers of cable-stayed bridges, but because the reinforced concrete main towers of cable-stayed bridges are high, it leads to high safety risks for workers.
[0007] To achieve the above objectives, this application proposes a high-altitude anti-corrosion coating spraying robot, including an aircraft, and further comprising: a storage tank, which is mounted on the aircraft; a spraying drive, which is mounted on the aircraft and connected to the storage tank; and a nozzle, which is mounted on the aircraft and connected to the storage tank.
[0008] In some embodiments, the device further includes: a connector, one end of which is connected to a nozzle; and a protective sleeve, the other end of which is connected to a protective sleeve.
[0009] In some embodiments, the device further includes: a first clamp disposed on the aircraft; and a second clamp connected to the first clamp by fasteners, wherein the first clamp and the second clamp form a limiting space for connecting the nozzle.
[0010] In some embodiments, it further includes: a limiting part disposed on the nozzle, the limiting part abutting against the first clamp and the second clamp.
[0011] In some embodiments, the nozzle further includes: a spray channel, wherein the spray channel is disposed within the nozzle; and a flared portion, wherein the end of the spray channel is provided with a flared portion.
[0012] In some embodiments, the nozzle further includes a connecting hole, which is formed in the nozzle and communicates with the spray channel, wherein the inner diameter of the connecting hole is larger than the inner diameter of the spray channel.
[0013] This application proposes a high-altitude anti-corrosion coating spraying robot, including an aircraft, a storage tank mounted on the aircraft, a spraying drive mounted on the aircraft and connected to the storage tank, and a nozzle mounted on the aircraft and connected to the storage tank. During the anti-corrosion coating spraying process on the reinforced concrete main tower of a cable-stayed bridge, especially for higher locations where workers cannot directly spray, the aircraft lifts the storage tank, spraying drive, and nozzle. The spraying drive then uses the high-pressure spraying of the anti-corrosion coating material stored in the storage tank from the nozzle. The material disperses into droplets during spraying and is ultimately sprayed onto the outer surface of the reinforced concrete main tower, forming an anti-corrosion coating that protects the tower. Workers only need to control the spraying process from the ground using a controller, ensuring high safety during the spraying operation. Attached Figure Description
[0014] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort, wherein: Figure 1This is a three-dimensional structural diagram of a high-altitude anti-corrosion coating spraying robot according to one embodiment of this application; Figure 2 for Figure 1 Enlarged view of part A in the middle; Figure 3 This is a three-dimensional structural diagram of the nozzle in one embodiment of this application; Figure 4 This is a cross-sectional view of a nozzle in one embodiment of this application.
[0015] In the diagram: 1. Aircraft; 2. Storage tank; 3. Spraying drive; 4. Protective sleeve; 5. First clamp; 6. Threaded connection hole; 7. Second clamp; 8. Nozzle; 10. Connector; 11. Limiting part; 12. Spraying channel; 13. Connection hole; 14. Flared part. Detailed Implementation
[0016] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of this application, and not all of the embodiments. Based on the embodiments of this application, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of this application.
[0017] See Figure 1 and Figure 2 As shown, this application proposes a high-altitude anti-corrosion coating spraying robot, including an aircraft 1, and further including: a storage tank 2, which is disposed on the aircraft 1; a spraying drive 3, which is disposed on the aircraft 1 and connected to the storage tank 2; and a nozzle 8, which is disposed on the aircraft 1 and connected to the storage tank 2.
[0018] The aircraft 1 is a complex system comprising a fuselage, a propulsion system, and an energy system. The propulsion system includes brushless motors, an electronic speed controller, and a control system. The control system includes a main controller, an inertial measurement unit, a magnetometer, a barometer, a BeiDou module, a vision and ultrasonic sensing system, a communication and link system, and a mission payload system. Aircraft 1 is also equipped with a gimbal camera to capture images of its surroundings and transmit these images back to the ground. The basic flight principle of aircraft 1 involves precisely controlling its attitude, altitude, and position by changing the rotational speeds of multiple motors (typically four). Workers on the ground control the aircraft 1's movements using the visual images transmitted from it and the controller. Since aircraft 1 and its controller represent mature existing technology, their specific structures will not be limited here.
[0019] In this embodiment, a counterweight is provided on the aircraft 1 to balance the influence of the loads such as the storage tank 2, the spray drive 3, and the nozzle 8 on the center of gravity of the aircraft 1.
[0020] The storage tank 2 is placed on the aircraft 1. The storage tank 2 contains anti-corrosion coating material, which can be one of polyurethane, acrylic, or fluorocarbon anti-corrosion coatings. The spraying drive 3 is a miniature high-pressure pump. The spraying drive 3 is connected to the storage tank 2 through a connecting pipe and to the nozzle 8 through a connecting pipe. The anti-corrosion coating material stored in the storage tank 2 is sprayed out from the nozzle 8 under high pressure under the action of the miniature high-pressure pump. During the spraying process, it is dispersed into droplets and finally sprayed onto the outer surface of the reinforced concrete main tower of the cable-stayed bridge, forming an anti-corrosion coating on the outer surface of the reinforced concrete main tower of the cable-stayed bridge.
[0021] In this embodiment, the storage tank 2 is positioned at the center of gravity of the aircraft 1 to prevent the weight reduction of the storage tank 2 from causing a shift in the center of gravity of the aircraft 1, thus contributing to the stable flight of the aircraft 1. Solenoid valves are installed on the connecting pipes between the miniature high-pressure pump and the storage tank 2, as well as on the connecting pipes between the miniature high-pressure pump and the nozzle 8, to control the opening and closing of these connecting pipes.
[0022] Specifically, during the anti-corrosion coating spraying process on the reinforced concrete main tower of the cable-stayed bridge, especially for higher positions where workers cannot directly spray, the aircraft 1 lifts the storage tank 2, spray drive 3, and nozzle 8. Then, the spray drive 3 sprays the anti-corrosion coating material stored in the storage tank 2 out of the nozzle 8 under high pressure. During the spraying process, the anti-corrosion coating material is dispersed into droplets and finally sprayed onto the outer surface of the reinforced concrete main tower of the cable-stayed bridge, forming an anti-corrosion coating on the outer surface of the reinforced concrete main tower of the cable-stayed bridge, thus protecting the reinforced concrete main tower of the cable-stayed bridge. Workers only need to control the spraying process through the controller on the ground, and the spraying operation is highly safe.
[0023] See Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, in some embodiments, the system further includes: a connector 10, one end of which is connected to the nozzle 8; the connector 10 is screwed onto the nozzle 8; and a protective sleeve 4, the other end of which is connected to the protective sleeve 4. The other end of the connector 10 is welded to the nozzle 8. During the lift-up or hovering of the aircraft 1, a large amount of wind is generated, which can affect the spraying of the anti-corrosion coating material. The protective sleeve 4 is used to reduce the impact of the wind on the spraying of the anti-corrosion coating material, and the orientation of the nozzle 8 between the two rotors also helps to reduce the impact of the wind on the spraying of the anti-corrosion coating material.
[0024] In this embodiment, the end of the nozzle 8 is tapered, and the end of the protective sleeve 4 facing the nozzle 8 is provided with a reverse tapered hole. The cooperation between the reverse tapered hole and the end of the nozzle 8 helps to improve the coaxiality of the protective sleeve 4 and the nozzle 8, reduce the probability of the anti-corrosion coating material hitting the inner wall surface of the protective sleeve 4, and thus reduce the loss of anti-corrosion coating material during the spraying process.
[0025] See Figure 1 and Figure 2 As shown, in some embodiments, the system further includes: a first clamp 5, which is disposed on the aircraft 1; a mounting screw is integrally formed on the first clamp 5 and screwed onto the fuselage of the aircraft 1, thereby connecting the first clamp 5 to the fuselage of the aircraft 1. A second clamp 7 is connected to the first clamp 5 by fasteners, and the first clamp 5 and the second clamp 7 form a limiting space for connecting the nozzle 8. Both the second clamp 7 and the first clamp 5 are provided with threaded connection holes 136, and the connection between the first clamp 5 and the second clamp 7 can be achieved by bolts and lock nuts, thus securing the nozzle 8 into the limiting space formed by the first clamp 5 and the second clamp 7.
[0026] See Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, in some embodiments, a limiting part 11 is further included, which is disposed on the nozzle 8 and abuts against the first clamp 5 and the second clamp 7. The limiting part 11 is used to limit the installation position of the first clamp 5 and the second clamp 7. Furthermore, during the spraying process, the nozzle 8 is subjected to a recoil force, which is overcome by the contact force between the limiting part 11 and the first clamp 5 and the second clamp 7, thereby improving the stability of the nozzle 8.
[0027] See Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, in some embodiments, the nozzle 8 is further included with: a spray channel 12, wherein the nozzle 8 is provided with a spray channel 12; and a flared portion 14, wherein the end of the spray channel 12 is provided with a flared portion 14. The anti-corrosion coating material flows through the spray channel 12 and is sprayed out from the flared portion 14. The inner diameter of the flared portion 14 gradually increases. The flared portion 14 is provided to increase the spray coverage of the nozzle 8, improve work efficiency, and facilitate the dispersion of the anti-corrosion coating material into droplets.
[0028] See Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, in some embodiments, it further includes a connecting hole 13, which is formed in the nozzle 8 and communicates with the spray channel 12. The inner diameter of the connecting hole 13 is larger than the inner diameter of the spray channel 12. The connecting hole 13 is used to form a connection with the connecting pipe.
[0029] Understandably, one end of the double-ended connector is screwed into the connecting hole 13, and the other end is connected to the connecting pipe between the spray drive 3 and the nozzle 8 by means of snap-fit or clamping. A stepped surface is formed at the connection between the connecting hole 13 and the spray flow channel 12, and a sealing gasket is provided between the stepped surface and the double-ended connector.
[0030] Understandably, the high-altitude anti-corrosion coating spraying device can not only be used to spray anti-corrosion coatings, but also to spray cooling water after replacing the anti-corrosion coating raw materials in storage tank 2 with cooling water to cure high-altitude reinforced concrete.
[0031] The above description is only a part or preferred embodiment of this application. Neither the text nor the drawings should limit the scope of protection of this application. All equivalent structural transformations made using the content of this application's specification and drawings under the overall concept of this application, or direct / indirect applications in other related technical fields, are included within the scope of protection of this application.
Claims
1. A high-altitude anti-corrosion coating spraying robot, comprising an aircraft (1), characterized in that, Also includes: Storage tank (2), the storage tank (2) is installed on the aircraft (1); Spraying drive (3), the spraying drive (3) is mounted on the aircraft (1), and the spraying drive (3) is connected to the storage tank (2); Nozzle (8), which is disposed on the aircraft (1) and is connected to the storage tank (2).
2. The high-altitude anti-corrosion coating spraying robot according to claim 1, characterized in that, Also includes: Connector (10), one end of which is connected to nozzle (8); The other end of the connecting piece (10) is connected to the protective sleeve (4).
3. The high-altitude anti-corrosion coating spraying robot according to claim 1, characterized in that, Also includes: The first clamp (5) is mounted on the aircraft (1); The second clamp (7) is connected to the first clamp (5) by fasteners. The first clamp (5) and the second clamp (7) form a limiting space for connecting the nozzle (8).
4. The high-altitude anti-corrosion coating spraying robot according to claim 3, characterized in that, Also includes: A limiting part (11) is provided on the nozzle (8) and the limiting part (11) abuts against the first clamp (5) and the second clamp (7).
5. The high-altitude anti-corrosion coating spraying robot according to claim 1, characterized in that, Also includes: Spraying channel (12), the spraying channel (12) is provided inside the nozzle (8); The flared section (14) is provided at the end of the spray channel (12).
6. The high-altitude anti-corrosion coating spraying robot according to claim 5, characterized in that, Also includes: A connecting hole (13) is provided in the nozzle (8) and is connected to the spray channel (12). The inner diameter of the connecting hole (13) is larger than the inner diameter of the spray channel (12).
