A boring device for a round tube and sleeve welding production line
By combining a boring machine and a centering assembly, the problem of low manual alignment accuracy in welding round tubes and bushings was solved, achieving high precision and high efficiency in round tube processing and improving welding quality.
Patent Information
- Application Number
- CN202522552061.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-01
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-12-01
AI Technical Summary
In the existing technology, the manual alignment accuracy before welding the round tube and the bushing is low, which leads to positional offset, insufficient coaxiality or dimensional error when processing the bevel of the round tube, affecting the welding quality.
The combination of a boring machine and a centering assembly is used. The clamping seat is moved by a synchronous gear and a hydraulic cylinder to ensure that the round tube is always in the same position inside the boring machine. Combined with the baffle and clamping assembly, precise positioning is achieved, improving processing accuracy and efficiency.
This method achieves high precision and efficiency in welding round tubes and bushings, reduces positional offset and dimensional errors, and improves welding quality.
Smart Images

Figure CN224992344U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of round tube and bushing welding technology, specifically a boring device for a round tube and bushing welding production line. Background Technology
[0002] Welding of round tubes and bushings is a common connection method in mechanical manufacturing and engineering. Welding of round tubes and bushings can transmit large torques or axial forces and withstand complex loads. Before welding round tubes and bushings, the round tubes need to be beveled. The main purpose is to ensure that the root of the weld is fully penetrated, enhance the strength of the weld joint, control welding deformation and stress, save welding materials, and optimize the weld formation.
[0003] Currently, when round tubes of the same diameter are placed into a boring machine to bevel, the position of the tube changes each time it is placed into the boring machine and then fixed. The boring machine's cutting tool needs to be reset to the machining path. Manual alignment of the round tube and the boring machine has low accuracy and efficiency, and the tube may shift when it is fixed. This can lead to positional deviation, insufficient coaxiality, or dimensional errors when beveling the round tube, affecting the subsequent welding of the round tube to the bushing. Utility Model Content
[0004] In order to solve the problems in related technologies, this utility model provides a boring device for a round tube and bushing welding production line. This device solves the problem that the low precision of manual alignment of the round tube and boring machine leads to positional deviation of the bevel of the round tube, which affects the welding of the round tube and bushing.
[0005] To solve the above problems, the following technical solutions are provided: This utility model discloses a boring device for a round tube and bushing welding production line, comprising: Boring machine; A centering assembly for clamping a round tube is provided on the output end of the boring machine. The centering assembly includes two symmetrically arranged clamps, one end of which is connected to a hydraulic cylinder. The other end of each of the two clamps is connected to a synchronous rack, and a rotating centering gear is provided between the two synchronous racks. The two synchronous racks mesh with the two sides of the centering gear respectively, and the hydraulic cylinder drives the clamps and the synchronous racks to move in the horizontal direction.
[0006] The above solution, through the setup of a boring machine and a centering assembly, allows manual transport of the round tube to the centering assembly via a feeding mechanism. Two hydraulic cylinders simultaneously push the clamps towards the drill bit, and two synchronous racks move synchronously in the same direction along with the clamps. Since both synchronous racks mesh with the centering gear, and are located on opposite sides of the gear, their displacements are always the same. When one clamp contacts the round tube, its movement speed is slower than the other clamp due to the tube's obstruction. However, under the action of the centering gear, the movement of the other synchronous rack drives the centering gear to rotate, thus moving the first rack and providing the clamp with the force to push the tube. This ensures that the displacements of the two clamps remain the same, guaranteeing that the round tube in the production line is always in the same position. This eliminates the need to reset the boring machine's processing path, improving the accuracy of round tube boring and consequently the welding accuracy between the round tube and the bushing, while also increasing the efficiency of beveling.
[0007] Furthermore, the centering assembly also includes a base frame, the clamp is slidably connected to the base frame, and the centering gear and the synchronizing rack are both disposed within the base frame; A gear cylinder and a baffle are connected to the side wall of the base frame near the drill bit of the boring machine. The output shaft of the gear cylinder is connected to the baffle, and the gear cylinder drives the baffle to move horizontally on the base frame.
[0008] The above solution uses a baffle. The baffle is moved by a cylinder. When the baffle moves to the middle position of the two clamps, the baffle blocks the round tube from moving further when the feeding mechanism drives the round tube to be transported, which makes it easier for the centering component to center the round tube.
[0009] Furthermore, it also includes a base, on which the base frame is mounted; The top of the base is provided with a slide, and the slide contains a motor and a lead screw. The output shaft of the motor is connected to the lead screw.
[0010] The above solution uses a sliding block to drive the lead screw to rotate, which in turn moves the boring machine horizontally to bore the round tube.
[0011] Furthermore, the boring machine is slidably connected to the slide block via a slide table, the bottom end of the housing of the boring machine is connected to the top end of the slide table, the bottom end of the slide table is sleeved on the lead screw, and the boring machine moves in a direction close to or away from the centering assembly.
[0012] The above solution uses a sliding block to drive the lead screw to rotate. The slide table and boring machine move horizontally along the lead screw, thus getting closer to the centering component, and the drill bit boring the round tube.
[0013] Furthermore, a vertical frame and a feeding cylinder are sequentially connected to the top of the base. The output shaft of the feeding cylinder is connected to a clamping assembly. The feeding cylinder drives the clamping assembly to move in a direction close to or away from the centering assembly. The clamping assembly is located at the end of the centering assembly away from the boring machine.
[0014] The above solution uses a clamping component to hold the round tube. The feeding cylinder drives the clamping component, which in turn moves the round tube, allowing it to move closer to the boring machine for boring or move further away from the boring machine after boring, thus realizing the loading and unloading of the round tube.
[0015] Furthermore, the clamping assembly includes a mounting plate connected to the output shaft of the feeding cylinder, two symmetrically arranged grippers, and a clamping cylinder disposed on the mounting plate.
[0016] The above solution uses a combination of grippers and a clamping cylinder. The clamping cylinder is used to push the grippers to move. The two grippers come together to hold the round tube, and the feeding cylinder drives the round tube to move, thus realizing the loading and unloading of the round tube.
[0017] Furthermore, both grippers are connected to the mounting plate via sliders, and the output shaft of the clamping cylinder is connected to one of the sliders. The clamping cylinder drives the slider and the grippers to move horizontally on the mounting plate.
[0018] The above solution uses a slider to hold a cylindrical cylinder that pushes the slider to move the gripper, thereby clamping the round tube and loading / unloading it for boring.
[0019] Furthermore, a clamping gear is rotatably mounted on the mounting plate, and a drive rack is mounted on each of the two sliders, with the two drive racks meshing with the two sides of the clamping gear respectively.
[0020] The above solution uses a clamping gear and a drive rack. The clamping cylinder pushes a slider, which in turn causes the drive rack on it to slide on the clamping gear. The drive rack drives the clamping gear to rotate, which in turn causes another drive rack, slider, and jaws to slide. The two jaws move in opposite directions to clamp the round tube.
[0021] Furthermore, a chip removal hole is provided at the top of the base, and the chip removal hole is located between the boring machine and the centering assembly.
[0022] The above solution uses a chip removal hole to allow the boring machine to bore the round tube. The chips generated during boring fall into the chip removal hole for centralized treatment, preventing the chips from flying onto the round tube or the boring machine and affecting the cleaning of the round tube.
[0023] Furthermore, a chip removal mechanism is connected to the side wall of the base, and the chip removal mechanism communicates with the chip removal hole.
[0024] The above solution uses a chip removal mechanism to allow the iron chips generated by the drill bit boring the round tube to fall from the chip removal hole into the chip removal mechanism. The chip removal mechanism is equipped with a rotating scraper and a pump station, which introduces cutting fluid into the chip removal mechanism to accelerate chip removal.
[0025] The above solution has the following advantages: The boring device of the round tube and bushing welding production line of this utility model includes a boring machine and a centering assembly that makes the round tube coaxial with the boring machine. The stop cylinder pushes the baffle to move. The baffle moves to the middle position of the two clamps, and the round tube is transported to the centering assembly through the feeding mechanism by passing through the clamping assembly. The round tube is blocked by the baffle and stops moving. At the same time, the clamping cylinder pushes a slider, which drives the drive rack on it to slide on the clamping gear. The drive rack drives the clamping gear to rotate, which drives the other drive rack, slider and jaws to slide. The two jaws move in opposite directions to clamp the round tube. The baffle retracts, and the feeding cylinder pushes the two jaws and the round tube closer to the boring machine. The feeding cylinder moves to the set value and stops. The two oil cylinders simultaneously push the clamps and the synchronous rack. Moving towards the drill bit, since both synchronous racks mesh with the centering gear and are located on opposite sides of it, their displacements are opposite and identical at all times. This pushes the tube to the center, making it coaxial with the drill bit. The identical displacements of the two jaws ensure the tube's alignment. After alignment, the motor drives the lead screw to rotate, and the slide and boring machine move horizontally along the lead screw, initiating the boring machine's feed. The boring machine performs beveling on the tube, and the chips generated during boring are processed through the chip removal hole into the chip removal mechanism. The alignment component ensures the tube is always in the same position, eliminating the need to repeatedly set the machining path for the boring machine, thus guaranteeing the coaxiality of the tube and bushing and improving their accuracy and efficiency. Attached Figure Description
[0026] To make the content of this utility model easier to understand, the present utility model will be further described in detail below with reference to specific embodiments and accompanying drawings, wherein: Figure 1 This is a schematic diagram of the boring device in a production line for welding round tubes and bushings. Figure 2 This is a structural diagram of the boring machine, slide table, and slide block; Figure 3 This is a schematic diagram of the structure of the centering component; Figure 4 for Figure 3 Internal structure diagram; Figure 5 for Figure 4 Enlarged view of point A; Figure 6 This is a schematic diagram of the clamping assembly.
[0027] Explanation of reference numerals in the attached drawings: 1. Boring machine; 11. Drill bit; 12. Housing; 2. Slide table; 3. Slide base; 31. Motor; 32. Lead screw; 4. Centering assembly; 41. Clamping seat; 42. Hydraulic cylinder; 43. Centering gear; 44. Synchronous rack; 45. Gear cylinder; 46. Baffle; 47. Base frame; 5. Clamping assembly; 51. Gripper; 52. Slider; 53. Clamping gear; 54. Drive rack; 55. Clamping cylinder; 56. Vertical frame; 57. Feeding cylinder; 58. Mounting plate; 6. Base; 61. Chip removal hole; 7. Chip removal mechanism. Detailed Implementation
[0028] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0029] In specific embodiment 1, such as Figures 1-5 As shown, the present invention discloses a boring device for a round tube and bushing welding production line, comprising: a boring machine 1, a centering component 4, a clamping component 5, and a base 6. The boring machine 1, the centering component 4, and the clamping component 5 are all disposed on the base 6, and the clamping component 5, the centering component 4, and the boring machine are arranged sequentially along the length direction of the base 6.
[0030] Among them, such as Figure 2 As shown, a slide block 3 is provided at the top of the base 6. Inside the slide block 3, a motor 31 and a lead screw 32 are installed along the axial direction of the drill bit 11 of the boring machine 1. The output shaft of the motor 31 is connected to the lead screw 32, and the motor 31 drives the lead screw 32 to rotate. The boring machine 1 is slidably connected to the slide block 3 via a slide table 2. The bottom end of the housing 12 of the boring machine 1 is connected to the top end of the slide table 2. The bottom end of the slide table 2 is sleeved on the lead screw 32. The boring machine 1 and the slide table 2 move along the axial direction of the lead screw 32. The motor 31 drives the lead screw 32 to rotate, and the slide table 2 and the boring machine 1 move horizontally along the lead screw 32. That is, the slide block 3 drives the boring machine 1 to move in the front-back direction, thereby approaching or moving away from the round tube, realizing the beveling of the round tube by the tool advance and retract.
[0031] like Figure 3 As shown, the centering component 4 is located at one end of the boring machine 1 near the drill bit 11. The centering component 4 includes two symmetrically arranged clamps 41. One end of each clamp 41 is connected to a hydraulic cylinder 42. The two hydraulic cylinders 42 simultaneously push the clamps 41 to move in the direction close to the drill bit 11. The hydraulic cylinders 42 drive the clamps 41 to move in the left and right directions. The clamps 41 push the round tube to move towards the center 1. The two clamps 41 match each other to clamp the round tube.
[0032] like Figure 4 and Figure 5 As shown, the other ends of the two clamps 41 are connected to synchronous racks 44, and a rotating centering gear 43 is provided between the two synchronous racks 44. The two synchronous racks 44 mesh with the two sides of the centering gear 43 respectively. The hydraulic cylinder 42 drives the clamps 41 and the synchronous racks 44 to move in the horizontal direction. The two synchronous racks 44 are both horizontally arranged along the axis of the hydraulic cylinder 42, and the ends of the two synchronous racks 44 mesh with the centering gear 43 respectively.
[0033] It should be noted that the two hydraulic cylinders 42 simultaneously push the clamping seat 41 and the synchronous rack 44 to move closer to the drill bit 11. Since both synchronous racks 44 are engaged with the centering gear 43, and the two synchronous racks 44 are respectively on both sides of the centering gear 43, the displacement directions of the two synchronous racks 44 and the two clamping seats 41 are opposite and the displacement amount is the same at all times. This ensures that the two clamping seats 41 push the round tube to the same position, eliminating the need to readjust the processing path of the boring machine 1 and improving the efficiency of beveling.
[0034] In this embodiment, the centering assembly 4 also includes a base frame 47, which is mounted on the base 6. The clamping seat 41 is slidably connected to the base frame 47. The centering gear 43 and the synchronous rack 44 are both located inside the base frame 47. A stop cylinder 45 and a baffle 46 are connected to the side wall of the base frame 47 near the drill bit 11 of the boring machine 1. The output shaft of the stop cylinder 45 is connected to the baffle 46. The stop cylinder 45 drives the baffle 46 to move horizontally on the base frame 47. The height of the baffle 46 is higher than the height of the clamping seat 41. The stop cylinder 45 pushes the baffle 46 to move. The baffle 46 moves to the middle position of the two clamping seats 41 and transports the round tube to the centering assembly 4 through the feeding mechanism. The round tube is blocked by the baffle 46 and stops moving. The clamping assembly 5 clamps and feeds the round tube close to the boring machine.
[0035] like Figure 6 As shown, in specific embodiment 2, based on embodiment 1, the top of the base 6 in this embodiment is also connected to a vertical frame 56 and a feeding cylinder 57 in sequence. The output shaft of the feeding cylinder 57 is connected to a clamping component 5. The feeding cylinder 57 drives the clamping component 5 to move in the direction of approaching or away from the centering component 4. The clamping component 5 is located at the end of the centering component 4 away from the boring machine 1. The clamping component 5 can move in the front-back direction.
[0036] The clamping assembly 5 includes a mounting plate 58 connected to the output shaft of the feeding cylinder 57, two symmetrically arranged grippers 51, and a clamping cylinder 55 mounted on the mounting plate 58. Both grippers 51 are connected to the mounting plate 58 via sliders 52. The output shaft of the clamping cylinder 55 is connected to a slider 52. The round tube is stopped from moving by the baffle 46. The clamping cylinder 55 drives the slider 52 and the grippers 51 to move horizontally on the mounting plate 58. The clamping cylinder 55 pushes the slider 52 and the grippers 51 to move in the left and right directions. The two grippers 51 match and move in opposite directions to clamp the round tube.
[0037] In this embodiment, a clamping gear 53 is rotatably mounted on the mounting plate 58, and a drive rack 54 is mounted on each of the two sliders 52. The two drive racks 54 mesh with the two sides of the clamping gear 53 respectively. The clamping cylinder 55 pushes one slider 52, thereby causing the drive rack 54 on it to slide on the clamping gear 53. The drive rack 54 drives the clamping gear 53 to rotate, thereby causing the other drive rack 54, slider 52 and jaw 51 to slide. The two jaws 51 move in opposite directions to clamp the round tube. The baffle 46 retracts, and the feeding cylinder 57 can drive the round tube to approach the boring machine, so that the round tube is in the same position each time, which is convenient for the boring machine 1 to process the bevel, or to be removed from the centering assembly 4 and placed on the feeding assembly to realize the loading and unloading of the round tube. For round tubes of different diameters, it is necessary to change the tool of the boring machine 1 and set the processing path of the tool. This application is used to improve the bevel processing efficiency of round tubes of the same diameter.
[0038] In specific embodiment 3, based on embodiments 1 and 2, the top of the base 6 in this embodiment is provided with a chip removal hole 61, which is located between the boring machine 1 and the centering assembly 4. The side wall of the base 6 is connected to a chip removal mechanism 7, which communicates with the chip removal hole 61. The iron chips generated by the drill bit 11 in the beveling of the round tube fall from the chip removal hole 61 into the chip removal mechanism 7. The chip removal mechanism 7 is provided with a rotating scraper, which rotates to scrape away the waste chips. The chip removal mechanism 7 is also provided with a pump station, which introduces cutting fluid into the chip removal mechanism 7 to accelerate chip removal.
[0039] During operation, the shift cylinder 45 drives the baffle 46 to move to the center of the centering assembly 4. The round tube is fed to the centering assembly 4 via the clamping assembly 5 through the feeding mechanism. The round tube moves to abut against the baffle 46, and the baffle 46 stops the round tube on the clamping seat 41. The clamping cylinder 55 pushes the slider 52 and the jaws 51 closer to the round tube. The drive rack 54 slides on the clamping gear 53, thereby driving the clamping gear 53 to slide. The clamping gear 53 drives another drive rack 54 to move. The two drive racks 54 move in opposite directions, thereby causing the two jaws 51 to come closer to each other and clamp the round tube. The shift cylinder 45 drives the baffle 46 to retract, and the feeding cylinder 57 pushes the mounting plate 58 to move in the direction closer to the boring machine 1, driving the round tube to move to the boring machine 1 and stop.
[0040] Two hydraulic cylinders 42 push the two clamps 41 closer together, and two synchronous racks 44 move synchronously in the same direction as the two clamps 41. Since both synchronous racks 44 are engaged with the centering gear 43 and move in opposite directions, when one clamp 41 comes into contact with the round tube, the moving speed of the clamp 41 and the synchronous rack 44 is less than that of the other clamp 41 due to the obstruction of the round tube. Under the action of the centering gear 43, the movement of the other synchronous rack 44 drives the centering gear 43 to rotate, thereby driving the synchronous rack 44 to move, providing the clamp 41 with the force to push the round tube, so that the displacement of the two clamps 41 is always the same, thus moving the round tube to the same position each time.
[0041] Motor 31 drives lead screw 32 to rotate, thereby slide table 2 drives boring machine 1 to slide on slide block 3 to approach the round tube, realize the advance and retraction of boring machine 1, and start boring machine 1 to perform beveling on round tube. The waste chips generated by beveling enter the chip removal mechanism 7 from chip removal hole 61 for processing.
[0042] In the description of this utility model, it should be understood that the terms "longitudinal," "lateral," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," and "outer," etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the accompanying drawings and are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model. In the description of this utility model, unless otherwise specified and limited, it should be noted that the terms "installation," "connection," and "joining" should be interpreted broadly. For example, they can refer to mechanical or electrical connections, or internal connections between two components, and can be direct connections or indirect connections through an intermediate medium. For those skilled in the art, the specific meaning of the above terms can be understood according to the specific circumstances.
[0043] Obviously, the above embodiments are merely examples for clear illustration and are not intended to limit the implementation. For those skilled in the art, other variations or modifications can be made based on the above description. It is neither necessary nor possible to exhaustively list all implementation methods here, and any obvious variations or modifications derived therefrom are still within the protection scope of this utility model.
Claims
1. A boring device for a round tube and bushing welding production line, characterized in that, include: Boring machine (1); Centering component (4), the centering component (4) is used to clamp the round tube, the centering component (4) is located near the output end of the boring machine (1), the centering component (4) includes two symmetrically arranged clamps (41), one end of the clamps (41) is connected to a hydraulic cylinder (42). The other end of each of the two clamps (41) is connected to a synchronous rack (44), and a rotating centering gear (43) is provided between the two synchronous racks (44). The two synchronous racks (44) mesh with the two sides of the centering gear (43) respectively, and the oil cylinder (42) drives the clamps (41) and the synchronous racks (44) to move in the horizontal direction.
2. The boring device for the round tube and bushing welding production line as described in claim 1, characterized in that, The centering assembly (4) also includes a base frame (47), the clamp (41) is slidably connected to the base frame (47), and the centering gear (43) and the synchronizing rack (44) are both located inside the base frame (47); The base frame (47) is connected to a gear cylinder (45) and a baffle (46) on the side wall of the drill bit (11) of the boring machine (1). The output shaft of the gear cylinder (45) is connected to the baffle (46), and the gear cylinder (45) drives the baffle (46) to move horizontally on the base frame (47).
3. The boring device for the round tube and bushing welding production line as described in claim 2, characterized in that, It also includes a base (6), on which the base frame (47) is mounted; The top of the base (6) is provided with a slide (3), and the slide (3) is provided with a motor (31) and a lead screw (32). The output shaft of the motor (31) is connected to the lead screw (32).
4. The boring device for the round tube and bushing welding production line as described in claim 3, characterized in that, The boring machine (1) is slidably connected to the slide block (3) via the slide table (2). The bottom end of the housing (12) of the boring machine (1) is connected to the top end of the slide table (2). The bottom end of the slide table (2) is sleeved on the lead screw (32). The boring machine (1) moves in a direction close to or away from the centering assembly (4).
5. The boring device for the round tube and bushing welding production line as described in claim 3, characterized in that, The top of the base (6) is also connected in sequence to a vertical frame (56) and a feeding cylinder (57). The output shaft of the feeding cylinder (57) is connected to a clamping assembly (5). The feeding cylinder (57) drives the clamping assembly (5) to move in a direction close to or away from the centering assembly (4). The clamping assembly (5) is located at the end of the centering assembly (4) away from the boring machine (1).
6. The boring device for the round tube and bushing welding production line as described in claim 5, characterized in that, The clamping assembly (5) includes a mounting plate (58) connected to the output shaft of the feeding cylinder (57), two symmetrically arranged grippers (51), and a clamping cylinder (55) disposed on the mounting plate (58).
7. The boring device for the round tube and bushing welding production line as described in claim 6, characterized in that, Both grippers (51) are connected to the mounting plate (58) via sliders (52). The output shaft of the clamping cylinder (55) is connected to one of the sliders (52). The clamping cylinder (55) drives the slider (52) and the grippers (51) to move horizontally on the mounting plate (58).
8. The boring device for the round tube and bushing welding production line as described in claim 7, characterized in that, The mounting plate (58) is also rotatably provided with a clamping gear (53), and each of the two sliders (52) is provided with a drive rack (54), and the two drive racks (54) respectively mesh with the two sides of the clamping gear (53).
9. The boring device for the round tube and bushing welding production line as described in claim 3, characterized in that, The base (6) has a chip removal hole (61) at its top, which is located between the boring machine (1) and the centering assembly (4).
10. The boring device for the round tube and bushing welding production line as described in claim 9, characterized in that, The side wall of the base (6) is connected to a chip removal mechanism (7), which is connected to the chip removal hole (61).