Pipe welding fixture
By designing a round pipe welding clamping tool suitable for different pipe diameters, the problem that traditional clamps cannot adapt to different pipe diameters has been solved, and the uniformity of weld formation and construction efficiency have been improved.
Patent Information
- Application Number
- CN202522725842.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-23
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-12-23
AI Technical Summary
Traditional round pipe welding fixtures cannot adapt to different pipe diameters, resulting in uneven weld formation, which affects weld quality and construction efficiency.
A circular pipe welding clamping tool was designed, including a "日"-shaped base and a circular pipe support unit. Combined with a vertical support and a clamping unit, it can reliably clamp and rotate pipes of different diameters. Through the cooperation of support wheels and pressure wheels, the welding torch position is ensured to be stable and frequent movement is avoided.
It achieves stable clamping of round pipes of different diameters, avoids uneven weld formation, improves weld quality and construction efficiency, and reduces the incidence of welding defects.
Smart Images

Figure CN224992702U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of metal processing, and specifically relates to a circular tube welding clamping tool. Background Art
[0002] When performing butt welding of circular tubes, conventional clamps can only adapt to pipe diameter specifications within a single or limited range, cannot be fully universal for clamping circular tubes of different pipe diameters, and often require replacement of clamps, which greatly affects construction efficiency. In addition, conventional clamps can only fix the position of the circular tube and have no rotation function, so that the welding torch has to perform welding around the circumference of the tube. Under the action of gravity, the molten pool metal will produce flow differences due to the relative change of the gravity direction at different welding positions, resulting in obvious inconsistency in the weld formation (such as reinforcement, weld width, and weld penetration) at various parts of the circumference of the circular tube, which ultimately affects the stability of weld quality. Contents of the Utility Model
[0003] The purpose of the utility model is to provide a circular tube welding clamping tool, which is suitable for circular tubes of different pipe diameter specifications, and at the same time solves the problem that the circular tube itself cannot rotate during welding so that the welding torch has to be moved, resulting in uneven weld formation and further affecting the overall performance of the weld.
[0004] According to the technical solution adopted by the utility model, the circular tube welding clamping tool comprises a "day"-shaped base, two opposite side walls of the base are each provided with a first chute, the cross beam at the central axis of the base is provided with two mutually parallel second chutes, two sets of circular tube bracket units are mounted on the base, the two sets of circular tube bracket units are arranged in mirror symmetry on the base with the cross beam as the symmetry axis, and each set of circular tube bracket unit is used in cooperation with the first chute and the second chute; It also comprises two sets of vertical support units mounted on the base, each set of vertical support unit is used in cooperation with one set of circular tube bracket unit, and a set of pressing unit is further mounted on each set of vertical support unit.
[0005] The utility model is further characterized in that: Each set of the circular tube bracket unit comprises two "L"-shaped support beams, a first slider is arranged on the side wall of the end of the short arm of the support beam facing the base, and a second slider is arranged on the side wall of the end of the long arm of the support beam facing the base; the first slider is installed in the first chute, the first slider is used in cooperation with the first chute, the second slider is installed in the second chute, and the second slider is used in cooperation with the second chute; Two support wheel mounting grooves are formed at the edge of the long arm body of the support beam, and one support wheel is arranged in each support wheel mounting groove; the support beam further comprises a support threaded rod, one end of the support threaded rod is inserted into the long arm body of the support beam and sequentially passes through the two support wheels, and the two support wheels are both sleeved on the rod body of the support threaded rod; In each set of the circular tube bracket units, the opening orientation of the two support wheel mounting slots on one support beam is opposite to the opening orientation of the two support wheel mounting slots on the other support beam. A first butterfly-shaped fixing bolt is installed on the short arm of the support beam. The bolt body of the first butterfly-shaped fixing bolt passes through the short arm of the support beam. One end of the first butterfly-shaped fixing bolt faces the side wall of the base, and the other end of the first butterfly-shaped fixing bolt is away from the side wall of the base.
[0006] The cross-sections of the first and second slides are both trapezoidal, as are the cross-sections of the first and second sliders.
[0007] The vertical support unit includes a "T"-shaped cantilever and a column. The column is vertically fixed to the frame of the device base. The "T"-shaped cantilever includes a first connecting rod, which is a hollow tube. A second connecting rod is connected to the tube of the first connecting rod. The first connecting rod is sleeved on the column body. A bolt fastening unit is connected to the rod body of the first connecting rod. A clamping unit is installed on the rod body of the second connecting rod.
[0008] The bolt fastening unit includes a second butterfly fixing bolt and a bolt mounting tube with threads on the inner wall. The bolt mounting tube is installed on the tube body of the first connecting rod and is connected to the tube body of the first connecting rod. The bolt body of the second butterfly fixing bolt passes through the bolt mounting tube and is used in conjunction with the bolt mounting tube.
[0009] The clamping unit includes a clamping screw, a rotating handle, and a pressure roller bracket. The clamping screw passes vertically through the body of the second connecting rod and is threadedly connected to the second connecting rod. The rotating handle passes through the first end of the clamping screw, and the pressure roller bracket is threadedly connected to the second end of the clamping screw. The clamping screw fixes the pressure roller bracket through a plug and a clamping nut at the second end. Two sets of pressure roller units are symmetrically installed on the pressure roller bracket. The pressure roller bracket includes a "U"-shaped bracket base, with pressure roller mounting blocks at both ends of the bracket base. The top of the bracket base is threaded to the second end of the clamping screw. The pressure roller unit is mounted on the pressure roller mounting block. The two sets of pressure roller mounting blocks correspond one-to-one with the two sets of pressure roller units.
[0010] The pressure roller unit includes a support screw that passes through the pressure roller mounting block. A pressure roller is provided at both ends of the support screw, and each pressure roller is fixed to the support screw by nuts provided on both sides.
[0011] Both the support roller and the pressure roller are bearings.
[0012] Both the pressure roller and the support roller are covered with rubber sleeves on their outer surfaces.
[0013] The beneficial effects of this utility model are: (1) The device of this utility model optimizes the traditional clamping structure and realizes reliable clamping of round pipes of different diameters. It relies on the cooperation of the round pipe bracket unit and the clamping unit to ensure clamping stability and effectively suppress the radial shaking of the pipe during welding. The welding torch can complete the continuous welding of the circumferential weld by keeping it in the flat welding position, avoiding the fluctuation of welding parameters (such as unstable arc length and welding speed) caused by frequent movement of the welding torch, significantly reducing the occurrence rate of defects such as uneven weld height, incomplete penetration and undercut, and finally achieving the simultaneous improvement of weld formation quality and welding efficiency.
[0014] (2) The device of this utility model has good clamping stability and can rotate the pipe at the same time, avoiding the uneven weld caused by frequent movement of the welding gun, thereby improving the weld quality. Attached Figure Description
[0015] Figure 1 This is a structural schematic diagram of the round tube welding clamping tool of this utility model; Figure 2 yes Figure 1 Schematic diagram of the structure of the medium-circular tube bracket unit; Figure 3 yes Figure 1 Schematic diagram of the intermediate clamping unit; Figure 4 This is a diagram showing the usage status of the round tube welding clamping tool of this utility model.
[0016] In the diagram, 1. base, 2. round tube bracket unit, 3. vertical support unit, 4. clamping unit, 5. welding torch, 6. first pipe to be welded, 7. second pipe to be welded, 8. electric motor; 1-1. First groove; 1-2. Second groove; 2-1. Support beam; 2-2. First slider; 2-3. Second slider; 2-4. Support wheel mounting groove; 2-5. Support wheel; 2-6. Support threaded rod; 2-7. First wing fixing bolt; 3-1. T-shaped cantilever; 3-2. Column; 3-3. Bolt fastening unit; 3-1-1. First connecting rod; 3-1-2. Second connecting rod; 3-3-1. Second butterfly fixing bolt; 3-3-2. Bolt mounting tube; 4-1. Clamping screw; 4-2. Rotating handle; 4-3. Pressure roller bracket; 4-4. Pressure roller unit; 4-5. Clamping nut; 4-6. Washer; 4-3-1. Support base; 4-3-2. Pressure roller mounting block; 4-4-1. Support screw; 4-4-2. Pressure roller; 8-1. Drive wheel. Detailed Implementation
[0017] The present utility model will be described in detail below with reference to the accompanying drawings and specific embodiments.
[0018] The present utility model provides a clamping tool for round pipe welding, as shown in Figure 1-3 the figure, which includes a "日"-shaped base 1. Two opposite side walls of the base 1 are each provided with a first sliding groove 1-1, and the cross beam at the central axis of the base 1 is provided with two mutually parallel second sliding grooves 1-2. Two sets of round pipe bracket units 2 are mounted on the base 1, the two sets of round pipe bracket units 2 are arranged in mirror symmetry on the base 1 with the cross beam as the symmetry axis, and each set of the round pipe bracket units 2 is used in cooperation with the first sliding groove 1-1 and the second sliding groove 1-2; It also includes two sets of vertical support units 3 mounted on the base 1. Each set of the vertical support units 3 is used in cooperation with one set of the round pipe bracket units 2, and a set of pressing units 4 is further mounted on each set of the vertical support units 3.
[0019] Each set of the round pipe bracket units 2 includes two "L"-shaped support beams 2-1. A first slider 2-2 is disposed on the side wall of the short arm end of the support beam 2-1 facing the base 1, and a second slider 2-3 is disposed on the side wall of the long arm end of the support beam 2-1 facing the base 1. The first slider 2-2 is installed in the first sliding groove 1-1, the first slider 2-2 is used in cooperation with the first sliding groove 1-1, the second slider 2-3 is installed in the second sliding groove 1-2, and the second slider 2-3 is used in cooperation with the second sliding groove 1-2; The sliding blocks disposed on the support beams 2-1 are in clearance fit with the grooves formed in the base 1 to realize sliding along the Y axis, so as to adapt to different pipe diameter sizes; Two support wheel mounting grooves 2-4 are formed at the edge of the long arm body of the support beam 2-1, and one support wheel 2-5 is disposed in each support wheel mounting groove 2-4. The clamping tool further includes a support threaded rod 2-6, one end of the support threaded rod 2-6 is inserted into the long arm body of the support beam 2-1 and sequentially passes through the two support wheels 2-5, and both of the two support wheels 2-5 are sleeved on the rod body of the support threaded rod 2-6. The two support wheels 2-5 mounted on each support beam 2-1 are arranged along the axial direction of the pipe to be welded, so that the pipe can rotate around the axial direction on each set of the round pipe bracket units 2.
[0020] In each set of the round pipe bracket units 2, the opening directions of the two support wheel mounting grooves 2-4 on one support beam 2-1 are arranged opposite to the opening directions of the two support wheel mounting grooves 2-4 on the other support beam 2-1; A first butterfly-shaped fixing bolt 2-7 is installed on the short arm of the support beam 2-1. The bolt body of the first butterfly-shaped fixing bolt 2-7 passes through the short arm of the support beam 2-1. One end of the first butterfly-shaped fixing bolt 2-7 faces the side wall of the base 1, and the other end of the first butterfly-shaped fixing bolt 2-7 is away from the side wall of the base 1. The support beam 2-1 can be guided to move along the groove opened in the base 1 and is fixed in position by the first butterfly-shaped fixing bolt 2-7.
[0021] The cross-sections of the first slide 1-1 and the second slide 1-2 are both trapezoidal, and the cross-sections of the first slider 2-2 and the second slider 2-3 are both trapezoidal.
[0022] The vertical support unit 3 includes a "T"-shaped cantilever 3-1 and a column 3-2. The column 3-2 is vertically fixed to the frame of the device base 1. The "T"-shaped cantilever 3-1 includes a first connecting rod 3-1-1, which is a hollow tube. A second connecting rod 3-1-2 is connected to the tube of the first connecting rod 3-1-1. The first connecting rod 3-1-1 is sleeved on the column of the column 3-2. The rod of the first connecting rod 3-1-1 is connected to a bolt fastening unit 3-3. A clamping unit 4 is installed on the rod of the second connecting rod 3-1-2.
[0023] The bolt fastening unit 3-3 includes a second butterfly fixing bolt 3-3-1 and a bolt mounting tube 3-3-2 with threads on its inner wall. The bolt mounting tube 3-3-2 is installed on the tube body of the first connecting rod 3-1-1 and is connected to the tube body of the first connecting rod 3-1-1. The bolt body of the second butterfly fixing bolt 3-3-1 passes through the bolt mounting tube 3-3-2 and is used in conjunction with the bolt mounting tube 3-3-2.
[0024] The “T”-shaped cantilever 3-1 can be moved up and down on the surface of column 3-2 to adjust its height, and its adjusted height position is fixed by bolt fastening unit 3-3; The clamping unit 4 includes a clamping screw 4-1, a rotating handle 4-2, and a pressure roller bracket 4-3. The clamping screw 4-1 passes vertically through the body of the second connecting rod 3-1-2 and is threadedly connected to the second connecting rod 3-1-2. The rotating handle 4-2 passes through the first end of the clamping screw 4-1, and the pressure roller bracket 4-3 is threadedly connected to the second end of the clamping screw 4-1. The clamping screw 4-1 fixes the pressure roller bracket 4-3 through a plug and a clamping nut 4-5 at the second end. Two sets of pressure roller units 4-4 are symmetrically installed on the pressure roller bracket 4-3. Rotating handle 4-2 adjusts the pressure screw 4-1 to move up or down, thereby driving the pressure roller unit 4-4 to move up or down. The pressure roller bracket 4-3 includes a "U"-shaped bracket base 4-3-1, with pressure roller mounting blocks 4-3-2 at both ends of the bracket base 4-3-1. The top of the bracket base 4-3-1 is threadedly connected to the second end of the clamping screw 4-1. The pressure roller unit 4-4 is mounted on the pressure roller mounting block 4-3-2. The two sets of pressure roller mounting blocks 4-3-2 correspond one-to-one with the two sets of pressure roller units 4-4.
[0025] The pressure roller unit 4-4 includes a support screw 4-4-1, which passes through the pressure roller mounting block 4-3-2. A pressure roller 4-4-2 is provided at both ends of the support screw 4-4-1, and each pressure roller 4-4-2 is fixed to the support screw 4-4-1 by nuts provided on both sides.
[0026] Both support roller 2-5 and pressure roller 4-4-2 are bearings.
[0027] The outer surfaces of the pressure roller 4-4-2 and the support roller 2-5 are both covered with rubber sleeves, which can absorb the slight radial sway generated when the pipe rotates.
[0028] When clamping the pipe to be welded, such as Figure 4 As shown, the first step is to align the bevel edges of the two pipes 6 and 7, which have V-shaped bevels, as follows: First, adjust the spacing between the two "L"-shaped support beams 2-1 in one set of round pipe bracket units 2 to ensure that the four support wheels 2-5 can lift the pipe to be welded while the support wheels 2-5 installed on the two "L"-shaped support beams 2-1 do not contact each other. Tighten the first butterfly fixing bolts 2-7 installed on the short arms of the two support beams 2-1 respectively. Fix the support beams 2-1 by contacting the end of the first butterfly fixing bolts 2-7 with the side wall of the base 1. Place the first pipe to be welded 6 on the four support wheels 2-5 of the support beams 2-1 with the adjusted spacing. Adjust the position of the two support beams 2-1 in the other set of round pipe bracket units 2 in the same way, so that the second pipe to be welded 7 can be aligned with the bevel edge of the first pipe to be welded 6 when placed on it.
[0029] Next, the clamping unit 4 is used to clamp and fix the first pipe 6 and the second pipe 7 to be welded. The specific operation is as follows: move the T-shaped cantilever 3-1 up and down to a suitable height and position so that the upper clamping unit 4 moves to the top of the pipe to be welded under the drive of the T-shaped cantilever 3-1, which will ensure that the two pressure roller mounting blocks 4-3-2 are symmetrically distributed on the top of the pipe to be welded.
[0030] Tighten the second butterfly fixing bolt 3-3-1 to fix it on the column 3-2; turn the rotating handle 11 to lower the pressing wheel bracket 4-3, so that the central axes of all the pressing wheels 4-4-2 are parallel to the axial direction of the pipe to be welded, and all the pressing wheels 4-4-2 are in close contact with the surface of the pipe to be welded; finally, tighten the pressing nut 4-5 sleeved on the pressing screw 4-1 to fix the pressing wheel bracket 4-3, so that relative rotation cannot occur between the pressing screw 4-1 and the fixed pressing wheel bracket 4-3. A gasket 4-6 may be arranged between the pressing nut 4-5 and the pressing wheel bracket 4-3, for dispersing the tightening pressure of the pressing nut 4-5 on the pressing wheel bracket, so as to further fix the pressing wheel bracket 4-3.
[0031] It is worth noting that when the present utility model is in use, the two opposite supporting wheels 2-5 on the two supporting beams 2-1 in the circular pipe bracket unit 2 should be prevented from contacting each other, which would otherwise fail to drive the pipe to rotate. Therefore, during clamping, the pipe to be welded needs to always be tangent to the pressing wheels 4-4-2 and the supporting wheels 2-5, and the two opposite supporting wheels 2-5 located on the two supporting beams 2-1 do not contact each other. At the same time, contact between the outer wall of the pipe and the column 3-2 during clamping should also be avoided, as this is not conducive to rotation.
[0032] During the welding process, the pipe to be welded is jointly clamped by the pressing wheels 4-4-2 in the pressing unit 4 and the supporting wheels 2-5 in the circular pipe bracket unit 2. Two electric motors 8 are additionally arranged on the outer wall of the pipe, and the driving wheels 8-1 of the two electric motors 8 are respectively attached to the outer walls of the two pipes to be welded. Both the supporting wheels 2-5 and the pressing wheels 4-4-2 are bearings, which can ensure that the pipe to be welded can rotate together with the driving wheels 8-1. By adjusting the rotating speed and rotation direction of the electric motors 8, the two pipes to be welded are kept in the same direction and at the same angular velocity, so that stable rotation can be achieved. In this way, only the welding torch 5 needs to be fixed at the butt joint of the V-shaped groove of the pipe, and a uniform and aesthetically pleasing weld can be finally obtained.
[0033] Example 1 The circular pipe welding clamping tool, as shown in Figure 1-3 the figure, includes a "日"-shaped base 1. Two opposite side walls of the base 1 are each provided with a first chute 1-1, and the cross beam at the central axis of the base 1 is provided with two mutually parallel second chutes 1-2. Two sets of circular pipe bracket units 2 are mounted on the base 1, the two sets of circular pipe bracket units 2 are arranged in mirror symmetry on the base 1 with the cross beam as the symmetry axis, and each set of circular pipe bracket units 2 is used in cooperation with the first chute 1-1 and the second chute 1-2; It also includes two sets of vertical support units 3 mounted on the base 1, each set of vertical support units 3 is used in cooperation with one set of circular pipe bracket units 2, and each set of vertical support units 3 is further mounted with one set of pressing unit 4.
[0034] Example 2 The circular pipe welding clamping tool, as shown in Figure 1-3as shown, comprises a "日"-shaped base 1, two opposite side walls of the base 1 are each provided with a first sliding groove 1-1, the cross beam at the central axis of the base 1 is provided with two mutually parallel second sliding grooves 1-2, two sets of circular tube bracket units 2 are mounted on the base 1, the two sets of circular tube bracket units 2 are arranged in mirror symmetry on the base 1 with the cross beam as the axis of symmetry, and each set of the circular tube bracket units 2 is used in cooperation with the first sliding groove 1-1 and the second sliding groove 1-2; It further comprises two sets of vertical support units 3 mounted on the base 1, each set of the vertical support units 3 is used in cooperation with one set of the circular tube bracket unit 2, and a set of pressing units 4 is further mounted on each set of the vertical support units 3.
[0035] Each set of the circular tube bracket units 2 comprises two "L"-shaped support beams 2-1, a side wall of the short arm end of the support beam 2-1 facing the base 1 is provided with a first sliding block 2-2, and a side wall of the long arm end of the support beam 2-1 facing the base 1 is provided with a second sliding block 2-3; the first sliding block 2-2 is mounted in the first sliding groove 1-1, the first sliding block 2-2 is used in cooperation with the first sliding groove 1-1, the second sliding block 2-3 is mounted in the second sliding groove 1-2, and the second sliding block 2-3 is used in cooperation with the second sliding groove 1-2; The sliding block provided on the support beam 2-1 is in clearance fit with the groove formed in the base 1 to realize sliding along the Y axis, so as to adapt to different pipe diameter sizes; Two support wheel mounting grooves 2-4 are formed at the edge of the long arm body of the support beam 2-1, and a support wheel 2-5 is arranged in each support wheel mounting groove 2-4; the support device further comprises a support threaded rod 2-6, one end of the support threaded rod 2-6 is inserted into the long arm body of the support beam 2-1 and sequentially passes through the two support wheels 2-5, and the two support wheels 2-5 are both sleeved on the rod body of the support threaded rod 2-6; the two support wheels 2-5 mounted on each support beam 2-1 are arranged along the axial direction of the pipe to be welded, so that the pipe can rotate around the axial direction on each set of the circular tube bracket units 2.
[0036] Example 3 A circular tube welding clamping tool, as Figure 1-3 shown, comprises a "日"-shaped base 1, two opposite side walls of the base 1 are each provided with a first sliding groove 1-1, the cross beam at the central axis of the base 1 is provided with two mutually parallel second sliding grooves 1-2, two sets of circular tube bracket units 2 are mounted on the base 1, the two sets of circular tube bracket units 2 are arranged in mirror symmetry on the base 1 with the cross beam as the axis of symmetry, and each set of the circular tube bracket units 2 is used in cooperation with the first sliding groove 1-1 and the second sliding groove 1-2; It further comprises two sets of vertical support units 3 mounted on the base 1, each set of the vertical support units 3 is used in cooperation with one set of the circular tube bracket unit 2, and a set of pressing units 4 is further mounted on each set of the vertical support units 3.
[0037] Each set of the circular tube bracket units 2 includes two L-shaped support beams 2-1. A first sliding block 2-2 is disposed on the side wall of the short arm end of the support beam 2-1 facing the base 1, and a second sliding block 2-3 is disposed on the side wall of the long arm end of the support beam 2-1 facing the base 1. The first sliding block 2-2 is installed in the first sliding groove 1-1 and is used in cooperation with the first sliding groove 1-1, and the second sliding block 2-3 is installed in the second sliding groove 1-2 and is used in cooperation with the second sliding groove 1-2; The sliding blocks disposed on the support beams 2-1 are in clearance fit with the grooves formed on the base 1 to realize sliding along the Y-axis, so as to adapt to different pipe diameter sizes; Two support wheel mounting grooves 2-4 are formed at the edge of the long arm body of the support beam 2-1, and one support wheel 2-5 is disposed in each support wheel mounting groove 2-4. The support beam further includes a support threaded rod 2-6, one end of the support threaded rod 2-6 is inserted into the long arm body of the support beam 2-1 and passes through the two support wheels 2-5 in sequence, and both of the two support wheels 2-5 are sleeved on the rod body of the support threaded rod 2-6. The two support wheels 2-5 mounted on each support beam 2-1 are arranged along the axial direction of the pipe to be welded, so that the pipe can rotate around the axial direction on each set of the circular tube bracket units 2.
[0038] In each set of the circular tube bracket units 2, the opening directions of the two support wheel mounting grooves 2-4 on one support beam 2-1 are arranged opposite to the opening directions of the two support wheel mounting grooves 2-4 on the other support beam 2-1; A first wing-shaped fixing bolt 2-7 is mounted on the short arm body of the support beam 2-1. The shank of the first wing-shaped fixing bolt 2-7 passes through the short arm body of the support beam 2-1, one end of the first wing-shaped fixing bolt 2-7 faces the side wall of the base 1, and the other end of the first wing-shaped fixing bolt 2-7 is away from the side wall of the base 1.
[0039] Embodiment 4 The circular tube welding clamping tool, as Figure 1-3 shown, includes a "day"-shaped base 1. Two opposite side walls of the base 1 are each formed with a first sliding groove 1-1, the cross beam at the central axis of the base 1 is formed with two mutually parallel second sliding grooves 1-2, two sets of circular tube bracket units 2 are mounted on the base 1, the two sets of circular tube bracket units 2 are arranged in mirror symmetry on the base 1 with the cross beam as the symmetry axis, and each set of the circular tube bracket units 2 is used in cooperation with the first sliding groove 1-1 and the second sliding groove 1-2; It further includes two sets of vertical support units 3 mounted on the base 1, each set of the vertical support units 3 is used in cooperation with one set of the circular tube bracket units 2, and one set of pressing units 4 is further mounted on each set of the vertical support units 3.
[0040] Each group of the circular tube bracket units 2 includes two L-shaped support beams 2-1. On the side wall of the short arm end of the support beam 2-1 facing the base 1, a first sliding block 2-2 is disposed, and on the side wall of the long arm end of the support beam 2-1 facing the base 1, a second sliding block 2-3 is disposed; the first sliding block 2-2 is installed in the first sliding groove 1-1 and is used in cooperation with the first sliding groove 1-1, and the second sliding block 2-3 is installed in the second sliding groove 1-2 and is used in cooperation with the second sliding groove 1-2; The sliding block disposed on the support beam 2-1 is in clearance fit with the groove formed in the base 1 to realize sliding along the Y axis, so as to adapt to different pipe diameter sizes; At the edge of the long arm body of the support beam 2-1, two support wheel mounting grooves 2-4 are formed, and one support wheel 2-5 is disposed in each support wheel mounting groove 2-4. The circular tube bracket unit further includes a support threaded rod 2-6, one end of the support threaded rod 2-6 is inserted into the long arm body of the support beam 2-1 and sequentially passes through the two support wheels 2-5, and both of the two support wheels 2-5 are sleeved on the rod body of the support threaded rod 2-6. The two support wheels 2-5 installed on each support beam 2-1 are arranged along the axial direction of the pipe to be welded, so that the pipe can rotate around the axial direction on each group of the circular tube bracket units 2.
[0041] In each group of the circular tube bracket units 2, the opening directions of the two support wheel mounting grooves 2-4 on one support beam 2-1 are arranged opposite to the opening directions of the two support wheel mounting grooves 2-4 on the other support beam 2-1; A first wing-shaped fixing bolt 2-7 is installed on the short arm body of the support beam 2-1. The shank of the first wing-shaped fixing bolt 2-7 passes through the short arm body of the support beam 2-1, one end of the first wing-shaped fixing bolt 2-7 faces the side wall of the base 1, and the other end of the first wing-shaped fixing bolt 2-7 is away from the side wall of the base 1. The support beam 2-1 can move along the groove body formed in the base 1 for guidance, and its position is fixed by the first wing-shaped fixing bolt 2-7.
[0042] The cross sections of the first sliding groove 1-1 and the second sliding groove 1-2 are both trapezoidal, and the cross sections of the first sliding block 2-2 and the second sliding block 2-3 are both trapezoidal.
[0043] Embodiment 5 The circular tube welding clamping tool, as shown Figure 1-3 in the figure, includes a "日"-shaped base 1. A first sliding groove 1-1 is respectively formed on two opposite side walls of the base 1, two mutually parallel second sliding grooves 1-2 are formed on the cross beam at the central axis of the base 1, two groups of the circular tube bracket units 2 are installed on the base 1, the two groups of the circular tube bracket units 2 are arranged in mirror symmetry on the base 1 with the cross beam as the symmetry axis, and each group of the circular tube bracket units 2 is used in cooperation with the first sliding groove 1-1 and the second sliding groove 1-2; It also includes two sets of vertical support units 3 installed on the base 1. Each set of vertical support units 3 is used in conjunction with a set of round tube bracket units 2. Each set of vertical support units 3 is also equipped with a set of clamping units 4.
[0044] Each set of circular tube bracket units 2 includes two "L"-shaped support beams 2-1. A first slider 2-2 is provided on the side wall of the short arm end of the support beam 2-1 facing the base 1, and a second slider 2-3 is provided on the side wall of the long arm end of the support beam 2-1 facing the base 1. The first slider 2-2 is installed in the first slide groove 1-1 and is used in conjunction with the first slide groove 1-1. The second slider 2-3 is installed in the second slide groove 1-2 and is used in conjunction with the second slide groove 1-2. The slider on the support beam 2-1 is fitted with the groove on the base 1 to slide along the Y-axis, thereby adapting to different pipe diameters; Two support wheel mounting slots 2-4 are opened on the edge of the long arm of the support beam 2-1, and a support wheel 2-5 is installed in each support wheel mounting slot 2-4; it also includes a support threaded rod 2-6, one end of which is inserted into the long arm of the support beam 2-1 and passes through the two support wheels 2-5 in sequence, and both support wheels 2-5 are sleeved on the support threaded rod 2-6; the two support wheels 2-5 installed on each support beam 2-1 are arranged along the axial direction of the pipe to be welded, so that the pipe can rotate around the axial direction on each set of round pipe bracket units 2.
[0045] In each set of circular tube bracket units 2, the opening orientation of the two support wheel mounting grooves 2-4 on one support beam 2-1 is opposite to the opening orientation of the two support wheel mounting grooves 2-4 on the other support beam 2-1; A first butterfly-shaped fixing bolt 2-7 is installed on the short arm of the support beam 2-1. The bolt body of the first butterfly-shaped fixing bolt 2-7 passes through the short arm of the support beam 2-1. One end of the first butterfly-shaped fixing bolt 2-7 faces the side wall of the base 1, and the other end of the first butterfly-shaped fixing bolt 2-7 is away from the side wall of the base 1. The support beam 2-1 can be guided to move along the groove opened in the base 1 and is fixed in position by the first butterfly-shaped fixing bolt 2-7.
[0046] The cross-sections of the first slide 1-1 and the second slide 1-2 are both trapezoidal, and the cross-sections of the first slider 2-2 and the second slider 2-3 are both trapezoidal.
[0047] The vertical support unit 3 includes a T-shaped cantilever 3-1 and a column 3-2. The column 3-2 is vertically fixed at the frame of the device base 1. The T-shaped cantilever 3-1 includes a first link 3-1-1, which is a hollow tube. A second link 3-1-2 is connected to the tube body of the first link 3-1-1; the first link 3-1-1 is sleeved on the column body of the column 3-2; the rod body of the first link 3-1-1 is connected with a bolt fastening unit 3-3; the rod body of the second link 3-1-2 is fitted with a pressing unit 4.
[0048] Embodiment 6 The circular tube welding clamping tool, as shown in Figure 1-3 the figure, includes a "日"-shaped base 1. Two opposite side walls of the base 1 are each provided with a first sliding groove 1-1, the cross beam at the central axis of the base 1 is provided with two mutually parallel second sliding grooves 1-2. Two sets of circular tube bracket units 2 are mounted on the base 1, the two sets of circular tube bracket units 2 are arranged in mirror symmetry on the base 1 with the cross beam as the axis of symmetry, and each set of circular tube bracket units 2 is used in cooperation with the first sliding groove 1-1 and the second sliding groove 1-2; It further includes two sets of vertical support units 3 mounted on the base 1, each set of vertical support units 3 is used in cooperation with one set of circular tube bracket units 2, and each set of vertical support units 3 is further fitted with one set of pressing unit 4.
[0049] Each set of circular tube bracket unit 2 includes two L-shaped support beams 2-1. The end of the short arm of the support beam 2-1 facing one side wall of the base 1 is provided with a first sliding block 2-2, and the end of the long arm of the support beam 2-1 facing one side wall of the base 1 is provided with a second sliding block 2-3; the first sliding block 2-2 is installed in the first sliding groove 1-1, the first sliding block 2-2 is used in cooperation with the first sliding groove 1-1, the second sliding block 2-3 is installed in the second sliding groove 1-2, and the second sliding block 2-3 is used in cooperation with the second sliding groove 1-2; The sliding blocks provided on the support beam 2-1 are in clearance fit with the grooves formed in the base 1 to realize sliding along the Y axis, so as to adapt to different pipe diameter sizes; Two support wheel mounting grooves 2-4 are formed on the edge of the long arm body of the support beam 2-1, and one support wheel 2-5 is arranged in each support wheel mounting groove 2-4; it further includes a support threaded rod 2-6, one end of the support threaded rod 2-6 is inserted into the long arm body of the support beam 2-1 and sequentially passes through the two support wheels 2-5, and both support wheels 2-5 are sleeved on the rod body of the support threaded rod 2-6; the two support wheels 2-5 mounted on each support beam 2-1 are arranged along the axial direction of the pipe to be welded, so that the pipe can rotate around the axial direction on each set of circular tube bracket unit 2.
[0050] In each set of circular tube bracket units 2, the opening orientation of the two support wheel mounting grooves 2-4 on one support beam 2-1 is opposite to the opening orientation of the two support wheel mounting grooves 2-4 on the other support beam 2-1; A first butterfly-shaped fixing bolt 2-7 is installed on the short arm of the support beam 2-1. The bolt body of the first butterfly-shaped fixing bolt 2-7 passes through the short arm of the support beam 2-1. One end of the first butterfly-shaped fixing bolt 2-7 faces the side wall of the base 1, and the other end of the first butterfly-shaped fixing bolt 2-7 is away from the side wall of the base 1. The support beam 2-1 can be guided to move along the groove opened in the base 1 and is fixed in position by the first butterfly-shaped fixing bolt 2-7.
[0051] The cross-sections of the first slide 1-1 and the second slide 1-2 are both trapezoidal, and the cross-sections of the first slider 2-2 and the second slider 2-3 are both trapezoidal.
[0052] The vertical support unit 3 includes a "T"-shaped cantilever 3-1 and a column 3-2. The column 3-2 is vertically fixed to the frame of the device base 1. The "T"-shaped cantilever 3-1 includes a first connecting rod 3-1-1, which is a hollow tube. A second connecting rod 3-1-2 is connected to the tube of the first connecting rod 3-1-1. The first connecting rod 3-1-1 is sleeved on the column of the column 3-2. The rod of the first connecting rod 3-1-1 is connected to a bolt fastening unit 3-3. A clamping unit 4 is installed on the rod of the second connecting rod 3-1-2.
[0053] The bolt fastening unit 3-3 includes a second butterfly fixing bolt 3-3-1 and a bolt mounting tube 3-3-2 with threads on its inner wall. The bolt mounting tube 3-3-2 is installed on the tube body of the first connecting rod 3-1-1 and is connected to the tube body of the first connecting rod 3-1-1. The bolt body of the second butterfly fixing bolt 3-3-1 passes through the bolt mounting tube 3-3-2 and is used in conjunction with the bolt mounting tube 3-3-2.
Claims
1. A round pipe welding clamping tool, characterized in that, comprising a "day"-shaped base (1), two opposite side walls of the base (1) are each provided with a first sliding groove (1-1), the cross beam at the central axis of the base (1) is provided with two mutually parallel second sliding grooves (1-2), two sets of circular tube bracket units (2) are mounted on the base (1), the two sets of circular tube bracket units (2) are arranged in mirror symmetry on the base (1) with the cross beam as the axis of symmetry, and each set of the circular tube bracket units (2) is used in cooperation with the first sliding groove (1-1) and the second sliding groove (1-2); further comprising two sets of vertical support units (3) mounted on the base (1), each set of the vertical support units (3) is used in cooperation with one set of the circular tube bracket units (2), and a set of pressing units (4) is further mounted on each set of the vertical support units (3).
2. The round pipe welding clamping tool according to claim 1, characterized in that, Each set of the circular tube bracket units (2) comprises two "L"-shaped support beams (2-1), a first sliding block (2-2) is arranged on the side wall of the end of the short arm of the support beam (2-1) facing the base (1), and a second sliding block (2-3) is arranged on the side wall of the end of the long arm of the support beam (2-1) facing the base (1); the first sliding block (2-2) is mounted in the first sliding groove (1-1), the first sliding block (2-2) is used in cooperation with the first sliding groove (1-1), the second sliding block (2-3) is mounted in the second sliding groove (1-2), and the second sliding block (2-3) is used in cooperation with the second sliding groove (1-2); Two supporting wheel mounting grooves (2-4) are formed at the edge of the long arm body of the support beam (2-1), and one supporting wheel (2-5) is arranged in each supporting wheel mounting groove (2-4); the circular tube bracket unit further comprises a supporting threaded rod (2-6), one end of the supporting threaded rod (2-6) is inserted into the long arm body of the support beam (2-1) and sequentially passes through the two supporting wheels (2-5), and both of the two supporting wheels (2-5) are sleeved on the rod body of the supporting threaded rod (2-6); In each set of the circular tube bracket units (2), the opening directions of the two supporting wheel mounting grooves (2-4) on one support beam (2-1) are arranged opposite to the opening directions of the two supporting wheel mounting grooves (2-4) on the other support beam (2-1); A first wing-shaped fixing bolt (2-7) is mounted on the short arm body of the support beam (2-1), the shank of the first wing-shaped fixing bolt (2-7) passes through the short arm body of the support beam (2-1), one end of the first wing-shaped fixing bolt (2-7) faces the side wall of the base (1), and the other end of the first wing-shaped fixing bolt (2-7) is away from the side wall of the base (1).
3. The round tube welding clamping tool according to claim 2, characterized in that, The cross sections of the first sliding groove (1-1) and the second sliding groove (1-2) are both trapezoidal, and the cross sections of the first sliding block (2-2) and the second sliding block (2-3) are both trapezoidal.
4. The round pipe welding clamping tool according to claim 2, characterized in that, The vertical support unit (3) includes a "T"-shaped cantilever (3-1) and a column (3-2). The column (3-2) is vertically fixed to the frame of the device base (1). The "T"-shaped cantilever (3-1) includes a first connecting rod (3-1-1). The first connecting rod (3-1-1) is a hollow tube. A second connecting rod (3-1-2) is connected to the tube of the first connecting rod (3-1-1). The first connecting rod (3-1-1) is sleeved on the column of the column (3-2). The rod of the first connecting rod (3-1-1) is connected to a bolt fastening unit (3-3). A clamping unit (4) is installed on the rod of the second connecting rod (3-1-2).
5. The round pipe welding clamping tool according to claim 4, characterized in that, The bolt fastening unit (3-3) includes a second butterfly fixing bolt (3-3-1) and a bolt mounting tube (3-3-2) with threads on its inner wall. The bolt mounting tube (3-3-2) is installed on the tube body of the first connecting rod (3-1-1). The bolt mounting tube (3-3-2) is connected to the tube body of the first connecting rod (3-1-1). The bolt body of the second butterfly fixing bolt (3-3-1) passes through the bolt mounting tube (3-3-2) and is used in conjunction with the bolt mounting tube (3-3-2).
6. The round pipe welding clamping tool according to claim 4, characterized in that, The clamping unit (4) includes a clamping screw (4-1), a rotating handle (4-2), and a pressure roller bracket (4-3). The clamping screw (4-1) passes vertically through the body of the second connecting rod (3-1-2), and the clamping screw (4-1) is threadedly connected to the second connecting rod (3-1-2). The rotating handle (4-2) passes through the first end of the clamping screw (4-1), and the pressure roller bracket (4-3) is threadedly connected to the second end of the clamping screw (4-1). The clamping screw (4-1) fixes the pressure roller bracket (4-3) through a plug and a clamping nut (4-5) provided at the second end. Two sets of pressure roller units (4-4) are symmetrically installed on the pressure roller bracket (4-3).
7. The round pipe welding clamping tool according to claim 6, characterized in that, The pressure roller bracket (4-3) includes a "U"-shaped bracket base (4-3-1), and pressure roller mounting blocks (4-3-2) are provided at both ends of the bracket base (4-3-1). The top of the bracket base (4-3-1) is threadedly connected to the second end of the clamping screw (4-1). The pressure roller unit (4-4) is mounted on the pressure roller mounting block (4-3-2). The two sets of pressure roller mounting blocks (4-3-2) correspond one-to-one with the two sets of pressure roller units (4-4).
8. The round pipe welding clamping tool according to claim 7, characterized in that, The pressure roller unit (4-4) includes a support screw (4-4-1), which passes through the pressure roller mounting block (4-3-2). A pressure roller (4-4-2) is provided at both ends of the support screw (4-4-1), and each pressure roller (4-4-2) is fixed to the support screw (4-4-1) by nuts provided on both sides.
9. The round tube welding clamping tool according to claim 8, characterized in that, Both the support wheel (2-5) and the pressure wheel (4-4-2) are bearings.
10. The round tube welding clamping tool according to claim 9, characterized in that, The outer surfaces of the pressure roller (4-4-2) and the support roller (2-5) are both covered with rubber sleeves.